Meng Hsiu Chen
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Mhc Engineers
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Sep 2026
514 permits since 2000 (engineer on 496 permits, architect on 11 permits, designer on 3 permits, attorney on 2 permits, authorized agent-others on 2 permits): 324 completed, 53 in progress, 104 never finaled, 33 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 514.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 461 Pacific Av | Two Bricks Design Build | revision to mep pa# 202605151362 & arch pa# 202407186789.Details
revision to mep pa# 202605151362 & arch pa# 202407186789. | |
| Jul 22, 2026 | In progress issued Sep 2026 | 2222 Fillmore St | Sweitzer Inc. | defferred mechanical, electrical, plumbing and food service. ref 202603268336Details
defferred mechanical, electrical, plumbing and food service. ref 202603268336 | $130,000 |
| May 15, 2026 | In progress issued May 2026 | 461 Pacific Av | Two Bricks Design Build | mep. permit for pa# 202605040620. (ref permit 202511149590)Details
mep. permit for pa# 202605040620. (ref permit 202511149590) | |
| May 7, 2026 | In progress issued May 2026 | 2180 Folsom St | State Sheet Metal Works Inc., Schmitt Heating Co Inc | to comply with nov 202315320 to include mechanical equipment replacement due to fire damageDetails
to comply with nov 202315320 to include mechanical equipment replacement due to fire damage | $40,000 |
| May 4, 2026 | In progress issued Jul 2026 | 88 Spear St | Gci, Inc | 1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qworkDetails
1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qwork | $2,797,784 |
| Apr 22, 2026 | In progress issued Jun 2026 | 560 Battery St | Metcon Ti, Inc | combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet...Details
combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet... | $639,000 |
| Apr 16, 2026 | In progress issued Jun 2026 | 88 Howard St | Saarman Construction,Ltd. | mechanical and electrical system for lobby renovation under 202604018666Details
mechanical and electrical system for lobby renovation under 202604018666 | |
| Apr 6, 2026 | In progress issued Sep 2026 | 1007 Market St | install new limited-use/limited access "passenger" - type elevator serving floors 1,2,3. install new vertical platform lift serving basement and floor 1. building modifications as needed to structure and to (e) mech, elec, and plumbing systems. "barrier removal" project.Details
install new limited-use/limited access "passenger" - type elevator serving floors 1,2,3. install new vertical platform lift serving basement and floor 1. building modifications as needed to structure and to (e) mech, elec, and plumbing systems. "barrier removal" project. | $650,000 | |
| Apr 1, 2026 | In progress filed Apr 2026, not yet issued | 1723 Wallace Av | to erect 2 stories, no basement, type iii-b, light industrial. (building over 2 lots)Details
to erect 2 stories, no basement, type iii-b, light industrial. (building over 2 lots) | $280,000 | |
| Mar 23, 2026 | In progress issued Jun 2026 | 350 Bay St | Ting's Construction | revision to pa# 202602135940 reduced from 4 commercial unit to 3; change of plumbing location; mep plans in reference to permit # 202602135940 mep plans orginally deffered. (not associated with food or food court & market).Details
revision to pa# 202602135940 reduced from 4 commercial unit to 3; change of plumbing location; mep plans in reference to permit # 202602135940 mep plans orginally deffered. (not associated with food or food court & market). | $65,224 |
| Mar 18, 2026 | In progress issued Mar 2026 | 2565 03rd St | Dajani Construction | unit #309 & 310: expansion of commercial kitchen facility including: cookline w/ hood, plumbing, finishes.Details
unit #309 & 310: expansion of commercial kitchen facility including: cookline w/ hood, plumbing, finishes. | $150,000 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1601 Webster St | Nibbi Bros Assoc Inc. | ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1820 Post St | Nibbi Bros Assoc Inc. | ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 9, 2026 | In progress issued Apr 2026 | 3150 Geary Bl | Melo Willard Tabudlo Dba Dreamt Design | hvac, plumbing, electrical and title 24 related work.Details
hvac, plumbing, electrical and title 24 related work. | $75,000 |
| Feb 11, 2026 | In progress issued Mar 2026 | 502 Jefferson St | Rossi Builders Inc. | deferred mechanical, electrical and plumbing for pa #2022-1011-4038Details
deferred mechanical, electrical and plumbing for pa #2022-1011-4038 | $300,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 470 Bay Shore Bl | tenant space #1: new hvac for office spaces. ref pa #2026-0109-3567Details
tenant space #1: new hvac for office spaces. ref pa #2026-0109-3567 | $50,000 | |
| Jan 23, 2026 | In progress issued Feb 2026 | 461 Pacific Av | Two Bricks Design Build | mep permit for t.i. 202407186789 & 202511149590Details
mep permit for t.i. 202407186789 & 202511149590 | $48,500 |
| Jan 21, 2026 | In progress issued Apr 2026 | 448 Brannan St | R 3 Builders Inc. | tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations.Details
tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations. | $600,000 |
| Jan 15, 2026 | In progress issued Jul 2026 | 460 Bush St | North Bay Construction | revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system.Details
revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system. | $8,000 |
| Dec 31, 2025 | Completed final sign-off Mar 2026 | 1839 Divisadero St | Schmitt Heating Co Inc | install 1 new filtered fresh air-makeup air fan & ducting to main retail spaceDetails
install 1 new filtered fresh air-makeup air fan & ducting to main retail space | $3,480 |
| Dec 30, 2025 | In progress issued Apr 2026 | 988 Market St | 9/f: provide new ceilings and new lighting. no change in occupancy/use. no additional plumbing fixtures required.Details
9/f: provide new ceilings and new lighting. no change in occupancy/use. no additional plumbing fixtures required. | $100,000 | |
| Dec 18, 2025 | In progress issued Apr 2026 | 988 Market St | revision to pa #2025-0327-3203: remove act ceilings, (n) air handler unit and add mep drawings.Details
revision to pa #2025-0327-3203: remove act ceilings, (n) air handler unit and add mep drawings. | ||
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1581 Webster St | interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modificationsDetails
interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modifications | $350,000 | |
| Dec 17, 2025 | In progress issued Sep 2026 | 2900 Scott St | Andrew Vanni Builders Inc | convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical.Details
convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical. | $1,800,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 205 Oak St | Sweitzer Inc. | 2 hoods, 1 normal, 1 solid fuel. grease duct, heat pump. deferred from pa#202503041510Details
2 hoods, 1 normal, 1 solid fuel. grease duct, heat pump. deferred from pa#202503041510 | |
| Nov 25, 2025 | In progress issued Dec 2025 | 1170 Harrison St | Achill Beg Construction Inc | rev to pa# 2025-0910-5001: to remove 2 conf room from scope.Details
rev to pa# 2025-0910-5001: to remove 2 conf room from scope. | |
| Nov 24, 2025 | In progress issued Aug 2026 | 299 West Portal Av | Singular Builders, Heneghan Developers Llc | change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc.Details
change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc. | $1,108,500 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 2105 Fillmore St | M1 Mechanical Corp | provide and install new heat pump and fan coil. includes ventallation air.Details
provide and install new heat pump and fan coil. includes ventallation air. | $32,500 |
| Oct 20, 2025 | In progress issued May 2026 | 830 Cortland Av | Strong Builders Construction Inc. | ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout.Details
ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout. | $180,000 |
| Oct 3, 2025 | In progress filed Oct 2025, not yet issued | 1 Dr Carlton B Goodlett Pl | prop h:tenant improvement of(e)childcare area within city hall @ ground flDetails
prop h:tenant improvement of(e)childcare area within city hall @ ground fl | $1,100,000 | |
| Sep 23, 2025 | Completed final sign-off Aug 2026 | 1075 California St | Build Singular Joint Venture | deferred submittal for pa #202502120165 for food service review. new equipment and finish work for lobby bar back of house and lobby bar; repair or replacement of existing finishes and fixtures in existing restaurant bar, kitchen and room service area.Details
deferred submittal for pa #202502120165 for food service review. new equipment and finish work for lobby bar back of house and lobby bar; repair or replacement of existing finishes and fixtures in existing restaurant bar, kitchen and room service area. | $44,175 |
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 550 07th St | Centric Construction Inc | 2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street.Details
2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street. | $1,744,000 |
| Sep 10, 2025 | In progress issued Oct 2025 | 1170 Harrison St | Achill Beg Construction Inc | interior only ti to (e) office space on all floorsDetails
interior only ti to (e) office space on all floors | $1,000,000 |
| Aug 27, 2025 | Completed final sign-off Nov 2025 | 550 07th St | Centric Construction Inc | tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed.Details
tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed. | $325,000 |
| Aug 19, 2025 | In progress issued Apr 2026 | 88 Spear St | Gci, Inc | construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layoutDetails
construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layout | $637,000 |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 875 Howard St | installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuitingDetails
installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuiting | $143,621 | |
| Aug 13, 2025 | In progress issued Nov 2025 | 1 Clement St | Sweitzer Inc. | interior tenant improvement of existing restaurant space in a former restaurant use. new kitchen interior, service bar, and dining counter millwork. interior partitions, interior dining area and kitchen finishes; fixures and equipment. m.e.p. modifications. no work to (e)shored bldg hallway andDetails
interior tenant improvement of existing restaurant space in a former restaurant use. new kitchen interior, service bar, and dining counter millwork. interior partitions, interior dining area and kitchen finishes; fixures and equipment. m.e.p. modifications. no work to (e)shored bldg hallway and | $422,586 |
| Aug 5, 2025 | Completed final sign-off Mar 2026 | 1825 Post St | Innovative Mechanical Inc | replace: 6 rooftop air handling units, 6 condensing units, 1 boiler and 4 exhaust fans.Details
replace: 6 rooftop air handling units, 6 condensing units, 1 boiler and 4 exhaust fans. | $700,000 |
| Jul 30, 2025 | In progress issued Dec 2025 | 4100 03rd St | Achill Beg Construction Inc | this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2.Details
this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2. | $848,905 |
| Jul 28, 2025 | In progress filed Jul 2025, not yet issued | 2830 Sloat Bl | increase area of retail unit# 1(cafe) from 1029 sf to 1294 sf. install exterior louver at curtain wall for air intake. provide rough mech, elect and plumbing for future cafe tenant (retail# 4) and future restaurant tenant(retail# 1); both spaces remain vacantDetails
increase area of retail unit# 1(cafe) from 1029 sf to 1294 sf. install exterior louver at curtain wall for air intake. provide rough mech, elect and plumbing for future cafe tenant (retail# 4) and future restaurant tenant(retail# 1); both spaces remain vacant | $80,000 | |
| Jul 23, 2025 | Completed final sign-off Apr 2026 | 351 Turk St | B B J Electric, Inc | replace existing generator with uninterupted power system (ups). install ups in basement electrical room. run feeder to existing emergency panel at top of stairwell on roof level. disconnect existing generator and automatic transfer switch (ats).Details
replace existing generator with uninterupted power system (ups). install ups in basement electrical room. run feeder to existing emergency panel at top of stairwell on roof level. disconnect existing generator and automatic transfer switch (ats). | $120,000 |
| Jul 22, 2025 | In progress issued Feb 2026 | 1101 Masonic Av | Guild Construction Inc | minor interior remodel of childcare center at 1101 masonic. the building is childcare since 1985 0-5years only.add childrens restrooms within classrooms and in place of e childrens restrooms, new ada adult restrooms will be added. minor refresh of finishes and lights in other areas. no exteriorDetails
minor interior remodel of childcare center at 1101 masonic. the building is childcare since 1985 0-5years only.add childrens restrooms within classrooms and in place of e childrens restrooms, new ada adult restrooms will be added. minor refresh of finishes and lights in other areas. no exterior | $490,000 |
| Jul 16, 2025 | Completed final sign-off Jun 2026 | 2498 Folsom St | Dore Const. Of Calif. Inc. | minor interior remodel of (e) preschool. no change to occupancy. replacement of old heat pump with new unit, replacement of old flourescent light fixtures w/ new led fixtures, remove (e) plumbing fixtures & replace w/ child size fixtures and adding cabinetry and storage for teachers.Details
minor interior remodel of (e) preschool. no change to occupancy. replacement of old heat pump with new unit, replacement of old flourescent light fixtures w/ new led fixtures, remove (e) plumbing fixtures & replace w/ child size fixtures and adding cabinetry and storage for teachers. | $193,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2026 | 235 02nd St | Premier Structures Inc | defer mech. & elec. drwngs - 202504255292. changes to exist. vav terminal units and rtus for 6th fl rms. power for workstations, breakroom, and pantry. new & updated lighting in select areas. revise scope to include new elevator lobby doors and card/emergency release devices and changes to rcp.Details
defer mech. & elec. drwngs - 202504255292. changes to exist. vav terminal units and rtus for 6th fl rms. power for workstations, breakroom, and pantry. new & updated lighting in select areas. revise scope to include new elevator lobby doors and card/emergency release devices and changes to rcp. | |
| Jun 16, 2025 | Completed final sign-off Aug 2026 | 2359 Chestnut St | Terra Nova Industries | change of occupancy from b restaurant/r-3 to a-2 restaurant/r-3. interior restaurant remodel. 2 exit provided, new live fire unit.Details
change of occupancy from b restaurant/r-3 to a-2 restaurant/r-3. interior restaurant remodel. 2 exit provided, new live fire unit. | $210,000 |
| May 5, 2025 | Completed final sign-off May 2025 | 2263 Chestnut St | De Brus Construction Inc | reference ti permit 202407297443 to include install mechanical type 1 hood for the rear kitchen building.Details
reference ti permit 202407297443 to include install mechanical type 1 hood for the rear kitchen building. | |
| Apr 22, 2025 | Completed final sign-off Oct 2025 | 235 02nd St | Premier Structures Inc | 5th/f: deferred mep & electrical for t.i. 202412237311Details
5th/f: deferred mep & electrical for t.i. 202412237311 | |
| Apr 22, 2025 | In progress issued Apr 2025 | 235 02nd St | Premier Structures Inc | ground floor-ti 202410314101 and 202502261170- deferred mechanical and electrical. ref ti 202410314101Details
ground floor-ti 202410314101 and 202502261170- deferred mechanical and electrical. ref ti 202410314101 | |
| Mar 24, 2025 | In progress issued Dec 2025 | 1303 Larkin St | D & H Construction | mayoral ed13-01: add 5 units in (e) common spaces. reconfigure (e) units to provide 25% mobility units. provide casework, finishes, & fixtures as shown .provide windows in (e) opening and door hardware throughout. provide usps and accessible compliant mailboxes.Details
mayoral ed13-01: add 5 units in (e) common spaces. reconfigure (e) units to provide 25% mobility units. provide casework, finishes, & fixtures as shown .provide windows in (e) opening and door hardware throughout. provide usps and accessible compliant mailboxes. | $9,640,711 |
| Mar 4, 2025 | Completed final sign-off Apr 2025 | 50 Quint St | Schmitt Heating Co Inc | base building improvements to (e) warehouse. provide new split system heat pump for heating and cooling serving offices and restroom spaces only. provide new restroom exhaust.Details
base building improvements to (e) warehouse. provide new split system heat pump for heating and cooling serving offices and restroom spaces only. provide new restroom exhaust. | |
| Feb 28, 2025 | Completed final sign-off Jun 2025 | 42 Waller St | Silicon Valley General Builder Contracto | convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38.Details
convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38. | $50,000 |
| Feb 27, 2025 | In progress issued May 2025 | 2100 Webster St | Derry Casey Builders Inc | 3/fl-suite 331-332- ti for medical offices to include non structrual partitions, finishes, fixtures, equipment and mepDetails
3/fl-suite 331-332- ti for medical offices to include non structrual partitions, finishes, fixtures, equipment and mep | $250,000 |
| Feb 26, 2025 | In progress issued Nov 2025 | 2675 Geary Bl | Sevan Multi-Site Solutions Inc | 3/f: interior-only soft demo, non-structural. ab-017.Details
3/f: interior-only soft demo, non-structural. ab-017. | $250,000 |
| Feb 25, 2025 | Completed final sign-off Aug 2026 | 1075 California St | Build Singular Joint Venture | renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes...Details
renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes... | $15,000,000 |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 11 Innes Ct | Nibbi Bros Assoc Inc. | final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364Details
final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364 | $40,000 |
| Feb 13, 2025 | Completed final sign-off Nov 2025 | 1001 Polk St | rev to permit #2022-1019-4651: new fire dampers added at new duct routeDetails
rev to permit #2022-1019-4651: new fire dampers added at new duct route | $70,000 | |
| Jan 10, 2025 | Completed final sign-off Feb 2025 | 550 03rd St | Walls Construction And Contracting Inc | interior work offices 1st and 2nd floor. mechanical and electrical. mep deferred portion for ref app # 202412136809.Details
interior work offices 1st and 2nd floor. mechanical and electrical. mep deferred portion for ref app # 202412136809. | $10,000 |
| Jan 8, 2025 | Completed final sign-off Aug 2025 | 25 Kearny St | Yum's Mechanical Co Inc | 4th, 5th, and 6th floor; furnish and install 6 heatpumps and 4 coils with associated ductwork and refrigerant line sets.Details
4th, 5th, and 6th floor; furnish and install 6 heatpumps and 4 coils with associated ductwork and refrigerant line sets. | $222,800 |
| Dec 24, 2024 | Completed final sign-off Jan 2025 | 750 44th Av | revision to pa 201805038088-s. reduction in scope- no 274 sqft rear yard addition or 111 sq ft deck. remaining plan: a) legalize, renovate and expand (e) lower lvl dwelling unit as follows: 436 sq ft renovation of (e) lower lvl dwelling area, 93 sq ft conversion of (e) garage to dwelling area.Details
revision to pa 201805038088-s. reduction in scope- no 274 sqft rear yard addition or 111 sq ft deck. remaining plan: a) legalize, renovate and expand (e) lower lvl dwelling unit as follows: 436 sq ft renovation of (e) lower lvl dwelling area, 93 sq ft conversion of (e) garage to dwelling area. | ||
| Nov 15, 2024 | Completed final sign-off Mar 2026 | 65 Division St | Black Creek Builders | remodel (e) outdoor restaurant patio to include (n) partially covered outdoor bar & upgraded exterior canopy structure. remodel interior of (e) restaurant with (n) kitchen equipment & lightingDetails
remodel (e) outdoor restaurant patio to include (n) partially covered outdoor bar & upgraded exterior canopy structure. remodel interior of (e) restaurant with (n) kitchen equipment & lighting | $580,000 |
| Nov 15, 2024 | Completed final sign-off Apr 2026 | 8 Buchanan St | Saarman Construction,Ltd. | to provide new indoor highwall mount units in residential units. to provide new outdoor vrf heat pump system on roof. to provide new refrigerant piping distribution.Details
to provide new indoor highwall mount units in residential units. to provide new outdoor vrf heat pump system on roof. to provide new refrigerant piping distribution. | $1,380,000 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1088 Sansome St | Brennan Strong Hold Construction Inc | mep for pa 202408078163 move (e) fan coil to enclosed room; install 2x new in wall fan in same roomDetails
mep for pa 202408078163 move (e) fan coil to enclosed room; install 2x new in wall fan in same room | $3,000 |
| Sep 27, 2024 | Completed final sign-off Dec 2024 | 2130 Oakdale Av | installation of co2 tanks and fill boxes. separate permit (refer to permit#: 202305047126)Details
installation of co2 tanks and fill boxes. separate permit (refer to permit#: 202305047126) | $1,500 | |
| Sep 25, 2024 | Completed final sign-off Jun 2025 | 100 Pine St | Hathaway Dinwiddie Co. | 30/f: interior tenant improvement.Details
30/f: interior tenant improvement. | $1,600,000 |
| Jul 31, 2024 | In progress issued Aug 2024 | 125 06th St | Freestone Reconstruction Inc | create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls.Details
create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls. | $950,000 |
| Jul 19, 2024 | In progress issued Apr 2025 | 478 27th Av | revision to pa# 202211227070, plumbing/swc system revisions in meeting with pid. ref# 201912099022Details
revision to pa# 202211227070, plumbing/swc system revisions in meeting with pid. ref# 201912099022 | ||
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 1950 Jackson St | revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures.Details
revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures. | $10,000 | |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 1960 Jackson St | revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures.Details
revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures. | $20,000 | |
| Jul 11, 2024 | In progress issued Sep 2024 | 1950 Jackson St | Skanska Usa Building Inc | all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot water return piping water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098990.Details
all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot water return piping water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098990. | $15,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 6210 Geary Bl | revision to pa# 202211096151. pid permit for review of storm water management plan by pid only for new building under ref pa# 201912099041.Details
revision to pa# 202211096151. pid permit for review of storm water management plan by pid only for new building under ref pa# 201912099041. | ||
| Jun 25, 2024 | In progress filed Jun 2024, not yet issued | 235 Cortland Av | ref pa #2019-1218-9836 & 2023-0914-6638 ti for ground fl retail for existing market. new commercial kitchen, revise fixture location & remodel finishes. no change to exterior or change in use.Details
ref pa #2019-1218-9836 & 2023-0914-6638 ti for ground fl retail for existing market. new commercial kitchen, revise fixture location & remodel finishes. no change to exterior or change in use. | $80,000 | |
| Jun 11, 2024 | Completed final sign-off Nov 2025 | 434 Shotwell St | Roman Hunt | rev 202206307486-change of location of production equipment and associated utilities and ducting. change layout of cafe equipment. work includes mech and plumbing work. no change to use or occupancy or egress.Details
rev 202206307486-change of location of production equipment and associated utilities and ducting. change layout of cafe equipment. work includes mech and plumbing work. no change to use or occupancy or egress. | $120,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 1 Warriors Wy | Skyline Construction | tenant improvements for retail space (restaurant) at suite 4Details
tenant improvements for retail space (restaurant) at suite 4 | $911,460 |
| May 21, 2024 | In progress filed May 2024, not yet issued | 3208 Scott St | Terra Nova Industries | renovation: ground floor: of an (e) retail space. work to include demo of (e) non-bearing parition and constuction of new parition. electrical work is accommodate new point of sale station (pos) and refrigerated retail cases.Details
renovation: ground floor: of an (e) retail space. work to include demo of (e) non-bearing parition and constuction of new parition. electrical work is accommodate new point of sale station (pos) and refrigerated retail cases. | $30,000 |
| May 20, 2024 | Completed final sign-off Aug 2026 | 1075 California St | Build Singular Joint Venture | renovate (1) guestroom suite and section of adjoining corridor in the (e) hotel to test new operational standards of hotel. renovations include demo of (e) interior partitons, fixtures and finishes, construct new partitions, plumbing, electrical fixtures, floor, wall, and ceiling finishes.Details
renovate (1) guestroom suite and section of adjoining corridor in the (e) hotel to test new operational standards of hotel. renovations include demo of (e) interior partitons, fixtures and finishes, construct new partitions, plumbing, electrical fixtures, floor, wall, and ceiling finishes. | $125,000 |
| Apr 25, 2024 | Completed final sign-off Dec 2024 | 535 Mission St | City Mechanical Inc | revision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24.Details
revision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24. | |
| Apr 4, 2024 | Completed final sign-off May 2025 | 2006 Washington St | Nob Hill Construction | interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room.Details
interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room. | $450,000 |
| Mar 27, 2024 | In progress issued Aug 2024 | 2111 Franklin St | unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area.Details
unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area. | $50,000 | |
| Mar 20, 2024 | Expired or cancelled cancelled Aug 2026 | 1590 Pacific Av | Doherty Restoration, Inc. | re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area.Details
re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area. | $240,000 |
| Mar 18, 2024 | Completed final sign-off Jun 2024 | 1278 Minnesota St | Schmitt Heating Co Inc | replace existing heating sytem with new gas forced furnace and new ductwork, flue and combustion air. condensate and power by plumber and electrician. ref ti permit 202309297767Details
replace existing heating sytem with new gas forced furnace and new ductwork, flue and combustion air. condensate and power by plumber and electrician. ref ti permit 202309297767 | $44,000 |
| Feb 21, 2024 | Completed final sign-off Feb 2025 | 3252 19th St | ref pa 201808167612 deferred type 1 hood and duct submittalDetails
ref pa 201808167612 deferred type 1 hood and duct submittal | ||
| Feb 21, 2024 | In progress filed Feb 2024, not yet issued | 690 Mission St | installation of 2 new typ 2 kitchen exhaust hoods in an existing cafe spaceDetails
installation of 2 new typ 2 kitchen exhaust hoods in an existing cafe space | $30,000 | |
| Feb 14, 2024 | Completed final sign-off Mar 2025 | 2134 Polk St | C & C General Engineering Inc. | mep deferred submittal under original permit # 202212309589.Details
mep deferred submittal under original permit # 202212309589. | |
| Feb 1, 2024 | Completed final sign-off Mar 2024 | 169 Steuart St | Charles Pankow Builders Ltd | revision to pa# 202109017557, mechanical title 24.Details
revision to pa# 202109017557, mechanical title 24. | |
| Jan 26, 2024 | In progress issued Jan 2024 | 101 Spear St | City Mechanical Inc | installation of water source heat pumps, ductwork and diffusers in the atriumDetails
installation of water source heat pumps, ductwork and diffusers in the atrium | $40,000 |
| Jan 23, 2024 | Completed final sign-off Mar 2026 | 1140 Folsom St | C T W Mechanical | new interior buildout of an a occupancy restaurant. no exterior changes. leveling floor to be provided due to sloping (e) conditions. new hood & conditioning systems, new electrical distributions system, new plumbing systems.Details
new interior buildout of an a occupancy restaurant. no exterior changes. leveling floor to be provided due to sloping (e) conditions. new hood & conditioning systems, new electrical distributions system, new plumbing systems. | $450,000 |
| Jan 12, 2024 | Completed final sign-off Feb 2025 | 3252 19th St | Velox Construction Inc/Velox Des & Const | revision to approved permit# 201808167612: including the lighting plan, kitchen and bar equipment layout, relocate water heater, add funnel drain at backbar and updated mechanical plans, remove electrical water heater.Details
revision to approved permit# 201808167612: including the lighting plan, kitchen and bar equipment layout, relocate water heater, add funnel drain at backbar and updated mechanical plans, remove electrical water heater. | |
| Dec 29, 2023 | Completed final sign-off Apr 2024 | 1663 Mission St | Modern Construction Inc | 7th fl, ste 700 - add mechanical & electrical title 24 to pa 202311140802Details
7th fl, ste 700 - add mechanical & electrical title 24 to pa 202311140802 | |
| Dec 1, 2023 | Completed final sign-off Apr 2024 | 455 Franklin St | City Mechanical Inc | mcquay chiller replacement.Details
mcquay chiller replacement. | $287,000 |
| Nov 7, 2023 | In progress issued Dec 2023 | 662 Clay St | Northern Sun Associates | deferred new mechanical for a t.i. of an (e) vacant tenant space. ref pa# 2023-0616-0316.Details
deferred new mechanical for a t.i. of an (e) vacant tenant space. ref pa# 2023-0616-0316. | $10,000 |
| Nov 3, 2023 | Completed final sign-off Jan 2025 | 982 Mission St | The Whiting-Turner Contracting Company | remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn.Details
remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn. | $1,792,526 |
| Oct 31, 2023 | Completed final sign-off Sep 2024 | 429 Gough St | Schrobsdorff Construction | install mechanical ventilation for cannibis consumption room. deferred submittal for ti pa 2023-0922-7184Details
install mechanical ventilation for cannibis consumption room. deferred submittal for ti pa 2023-0922-7184 | $10,000 |
| Oct 27, 2023 | Completed final sign-off Oct 2024 | 1928 Fillmore St | Alsterlind Construction Inc. | interior tenant improvement, new raised floor, new partitions, finishes, fixtures, ada ramps, new lighting, relocated furnace, new ducts, restroom alteration for ada compliance. storefront work under separate permit.Details
interior tenant improvement, new raised floor, new partitions, finishes, fixtures, ada ramps, new lighting, relocated furnace, new ducts, restroom alteration for ada compliance. storefront work under separate permit. | $435,115 |
| Oct 10, 2023 | Expired or cancelled expired Jun 2026 | 3548 Pierce St | install new hydronic heating in all units.Details
install new hydronic heating in all units. | $30,000 | |
| Oct 10, 2023 | Expired or cancelled expired Jun 2026 | 1580 Beach St | install new hydronic heating in all units. install bath fans in all units.Details
install new hydronic heating in all units. install bath fans in all units. | $50,000 | |
| Aug 23, 2023 | Completed final sign-off Mar 2024 | 685 Beach St | Empire Pavers Corp | t.i. for self serve restaurant w/ (n) type-i hood, food service eq. and finishes, hc resroom to remain, signaure under sep permitDetails
t.i. for self serve restaurant w/ (n) type-i hood, food service eq. and finishes, hc resroom to remain, signaure under sep permit | $425,000 |
| Aug 10, 2023 | Never finaled filed Aug 2023, never issued | 2115 Fillmore St | t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposedDetails
t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposed | $194,899 | |
| Jul 6, 2023 | Completed final sign-off Feb 2025 | 4135 California St | Seamus Collins Construction, Inc. | ref pa# 201612275923s2. stormwater control plan to be reviewed by dbi plumbing inspection division per sfpuc request. per pid-insp steve panelli, submit drawing to pid-insp for revise cost and approval.Details
ref pa# 201612275923s2. stormwater control plan to be reviewed by dbi plumbing inspection division per sfpuc request. per pid-insp steve panelli, submit drawing to pid-insp for revise cost and approval. | |
| Jun 23, 2023 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.Details
storefront removal & install new storefront @ 2nd level. restripe parking & light replacement. | $360,000 |
| May 24, 2023 | In progress issued May 2025 | 3065 23rd St | preserve front facade of two existing multi-family/commercial bldgs. demo less 50% of the three fls & walls behind facade. merge two lots. create additional floor area to build a 9-unit multi-family bldg over residential & pdr space. horizontal & vertical additionDetails
preserve front facade of two existing multi-family/commercial bldgs. demo less 50% of the three fls & walls behind facade. merge two lots. create additional floor area to build a 9-unit multi-family bldg over residential & pdr space. horizontal & vertical addition | $800,000 |