Terra Nova Industries
- Based in
- Walnut Creek
- On San Francisco permits
- Feb 2000 to Apr 2026
- Last 24 months
- 11 permits filed
340 permits since 2000: 231 completed, 8 in progress, 78 never finaled, 23 expired or cancelled.
Of the 78 never-finaled permits, 4 are 3 to 5 years old, 21 are 5 to 10 years old, 53 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 340.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress issued May 2026 | 2234 Market St | prop h:revision to pa# 202512081211. tenant fit out of an existing business space. new interior partitions, finishes and fixtures. new electrical, lighting mechanical systems and controls. new plumbing andDetails
prop h:revision to pa# 202512081211. tenant fit out of an existing business space. new interior partitions, finishes and fixtures. new electrical, lighting mechanical systems and controls. new plumbing and | |
| Feb 20, 2026 | Completed final sign-off Aug 2026 | 2359 Chestnut St | remove wood framed residential stairs in the passageway & new support for lower e) landing (exterior work only)Details
remove wood framed residential stairs in the passageway & new support for lower e) landing (exterior work only) | $10,000 |
| Dec 18, 2025 | In progress issued Mar 2026 | 2765 Hyde St | revision to pa# 202009305584, relocation of switchgear.Details
revision to pa# 202009305584, relocation of switchgear. | |
| Dec 8, 2025 | In progress issued Mar 2026 | 2234 Market St | prop h:tenat improvement on existing business space.new interior parttions,finishes & fixtures.new electrical,lighting mechanical systems & controls.new plumbing & fixtures.Details
prop h:tenat improvement on existing business space.new interior parttions,finishes & fixtures.new electrical,lighting mechanical systems & controls.new plumbing & fixtures. | $1,100,000 |
| Oct 21, 2025 | In progress filed Oct 2025, not yet issued | 2301 Chestnut St | expansion of trash enclosure to serve existing restaurant.Details
expansion of trash enclosure to serve existing restaurant. | $15,000 |
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 550 Montgomery St | to obtain fina inspection for work approved under pa# 202402206119. all work is complete.Details
to obtain fina inspection for work approved under pa# 202402206119. all work is complete. | |
| Sep 8, 2025 | Completed final sign-off Aug 2026 | 2359 Chestnut St | demo work. remove tiles, countertop & drywall. ab017. space currently vacantDetails
demo work. remove tiles, countertop & drywall. ab017. space currently vacant | $5,000 |
| Aug 14, 2025 | Completed final sign-off Sep 2025 | 2301 Chestnut St | as-built drawings for permit 202503212725. exterior electric heaters. see electrical permit ew202507288323.Details
as-built drawings for permit 202503212725. exterior electric heaters. see electrical permit ew202507288323. | |
| Jun 16, 2025 | Completed final sign-off Aug 2026 | 2359 Chestnut St | change of occupancy from b restaurant/r-3 to a-2 restaurant/r-3. interior restaurant remodel. 2 exit provided, new live fire unit.Details
change of occupancy from b restaurant/r-3 to a-2 restaurant/r-3. interior restaurant remodel. 2 exit provided, new live fire unit. | $210,000 |
| Mar 21, 2025 | Completed final sign-off Sep 2025 | 2301 Chestnut St | install (n) exterior electrica heaters at sidewalk dining areaDetails
install (n) exterior electrica heaters at sidewalk dining area | $25,000 |
| Mar 11, 2025 | Completed final sign-off Aug 2025 | 717 Battery St | remodel (e) dining room bar at the ground floor. no mechanical/hvac workDetails
remodel (e) dining room bar at the ground floor. no mechanical/hvac work | $200,000 |
| Sep 27, 2024 | Completed final sign-off Oct 2025 | 2623 Ocean Av | rev to pa# 202403057124- to comply with nov 202425361- removal of all interior drywall, plaster and all related water damaged areas (plaster, drywall, rotted framing mold, crown and chandeliers.Details
rev to pa# 202403057124- to comply with nov 202425361- removal of all interior drywall, plaster and all related water damaged areas (plaster, drywall, rotted framing mold, crown and chandeliers. | |
| Sep 27, 2024 | Completed final sign-off Sep 2025 | 2623 Ocean Av | improvements to the exterior envelope. patch and repair of e roofing and exterior stucco finish as requiredDetails
improvements to the exterior envelope. patch and repair of e roofing and exterior stucco finish as required | $70,000 |
| Jun 25, 2024 | In progress issued Jun 2024 | 1501 Folsom St | selective demo prior to remodel of existing nightclub and restaurant.Details
selective demo prior to remodel of existing nightclub and restaurant. | $89,000 |
| May 21, 2024 | In progress filed May 2024, not yet issued | 3208 Scott St | renovation: ground floor: of an (e) retail space. work to include demo of (e) non-bearing parition and constuction of new parition. electrical work is accommodate new point of sale station (pos) and refrigerated retail cases.Details
renovation: ground floor: of an (e) retail space. work to include demo of (e) non-bearing parition and constuction of new parition. electrical work is accommodate new point of sale station (pos) and refrigerated retail cases. | $30,000 |
| Mar 5, 2024 | Completed final sign-off Oct 2025 | 2623 Ocean Av | selective interior demo in advance of future tenant on ground fl.remove doors flooring lighting ducting diffussers and associated mep no work at basement or bulding exterior interior renovation under seperate permit.tenant space is currenly vacant and remain so until futureti with accessibility ab17Details
selective interior demo in advance of future tenant on ground fl.remove doors flooring lighting ducting diffussers and associated mep no work at basement or bulding exterior interior renovation under seperate permit.tenant space is currenly vacant and remain so until futureti with accessibility ab17 | $27,850 |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 599 Skyline Bl | landscaping plans only. no other work but to place new landscaping near the restaurant. pa ref 2022-0307-9322Details
landscaping plans only. no other work but to place new landscaping near the restaurant. pa ref 2022-0307-9322 | $25,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 1 Mission St | revision to pa#202201206308. remove from proposed scope (1) hand sink.Details
revision to pa#202201206308. remove from proposed scope (1) hand sink. | |
| Jun 8, 2023 | Completed final sign-off Apr 2024 | 2301 Chestnut St | revision to 202206216759 to accommodate pg&e upgrade to building. new electrical closet at exterior of ground fl & new electrical vault in sidewalk.Details
revision to 202206216759 to accommodate pg&e upgrade to building. new electrical closet at exterior of ground fl & new electrical vault in sidewalk. | $75,000 |
| Mar 21, 2023 | Completed final sign-off Oct 2023 | 599 Skyline Bl | structural rfi responses from inspector. ref demo permits: 202203079322, 202206075752, 202302212278Details
structural rfi responses from inspector. ref demo permits: 202203079322, 202206075752, 202302212278 | $90,000 |
| Feb 21, 2023 | Completed final sign-off Oct 2023 | 599 Skyline Bl | new walk-in cooler w/in loading areaDetails
new walk-in cooler w/in loading area | $40,000 |
| Feb 21, 2023 | Completed final sign-off Oct 2023 | 599 Skyline Bl | revision to bpa#202206075752, new outdoor dining pergola near front of patio, relocating columnsDetails
revision to bpa#202206075752, new outdoor dining pergola near front of patio, relocating columns | $10,000 |
| Dec 6, 2022 | Never finaled issued Dec 2022, no final | 950 Market St | add cocktail station @ 1st fl bar area consisting of 1 ice bin, dump sink, all with indiirect waste to existing floor sinkDetails
add cocktail station @ 1st fl bar area consisting of 1 ice bin, dump sink, all with indiirect waste to existing floor sink | $3,000 |
| Oct 26, 2022 | In progress issued May 2026 | 1501 Folsom St | remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural.Details
remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural. | $975,000 |
| Sep 21, 2022 | Never finaled issued Sep 2022, no final | 1 Mission St | revision to pa 2022-0120-6308 keep (e) basement vanities in restrooms; add signage to direct patrons to ada accessible entrance; add sets of power door openers t0 (e) ada accessible entranceDetails
revision to pa 2022-0120-6308 keep (e) basement vanities in restrooms; add signage to direct patrons to ada accessible entrance; add sets of power door openers t0 (e) ada accessible entrance | |
| Aug 31, 2022 | Completed final sign-off Mar 2023 | 243 West Portal Av | demolition of extg ground floor and extg 2nd floor interiors to support future t.i. project. t. i. under seperate permit. approved per ab-017-soft demo only. no structural work, t.i. under separate permit.Details
demolition of extg ground floor and extg 2nd floor interiors to support future t.i. project. t. i. under seperate permit. approved per ab-017-soft demo only. no structural work, t.i. under separate permit. | $40,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2022 | 2301 Chestnut St | demolition of (e) ground floor interiors to support future tenant improvement project. ti under separate permit 202206216759.Details
demolition of (e) ground floor interiors to support future tenant improvement project. ti under separate permit 202206216759. | $7,500 |
| Jun 21, 2022 | Completed final sign-off Jul 2024 | 2301 Chestnut St | tenant improvement of an (e) vacant space to support a (n) restaurant. scope to include mechanical, electrical, plumbing, and minor structural to support rooftop mechanical equipment and construction of stall storage mezzanine.Details
tenant improvement of an (e) vacant space to support a (n) restaurant. scope to include mechanical, electrical, plumbing, and minor structural to support rooftop mechanical equipment and construction of stall storage mezzanine. | $850,000 |
| Jun 7, 2022 | Completed final sign-off Oct 2023 | 599 Skyline Bl | rev to pa202203079322: updated structural sheets as per original bldg comments: new patio, outdoor dining bar (golfers). all work not visible to adjacent properties. no interior under this permitDetails
rev to pa202203079322: updated structural sheets as per original bldg comments: new patio, outdoor dining bar (golfers). all work not visible to adjacent properties. no interior under this permit | |
| Mar 7, 2022 | Completed final sign-off Oct 2023 | 599 Skyline Bl | interior work for demo. (n) golfers bar & (e) dining area. (n) enclosed patio dining area to (e) exterior patio. (n) egress stairs, (n)mens/womens toilet rooms. interior finishes & paint. ref demo 202201035256.Details
interior work for demo. (n) golfers bar & (e) dining area. (n) enclosed patio dining area to (e) exterior patio. (n) egress stairs, (n)mens/womens toilet rooms. interior finishes & paint. ref demo 202201035256. | $250,000 |
| Mar 3, 2022 | Never finaled issued Mar 2022, no final | 950 Market St | to complete work under addenda s-11. new permit for 950 market hotel phase 2. kitchen food services equipment. permit 2016-0208-9004-s11 will be performed and completed under p.a. 202203039143 (this permit) plans and scope did not change, plan set for referance only to original permit. 2016020890.Details
to complete work under addenda s-11. new permit for 950 market hotel phase 2. kitchen food services equipment. permit 2016-0208-9004-s11 will be performed and completed under p.a. 202203039143 (this permit) plans and scope did not change, plan set for referance only to original permit. 2016020890. | |
| Jan 20, 2022 | Completed final sign-off Jul 2023 | 1 Mission St | basement level: banquet room: install (2) new folding partitions, new interior door, new back bar appliances, replace (e) lighting, renovate (e) finishes on floors/wall/ceilingDetails
basement level: banquet room: install (2) new folding partitions, new interior door, new back bar appliances, replace (e) lighting, renovate (e) finishes on floors/wall/ceiling | $40,000 |
| Jan 3, 2022 | Completed final sign-off Jun 2022 | 599 Skyline Bl | interior only demo permit. no structural work.Details
interior only demo permit. no structural work. | $35,000 |
| Dec 8, 2021 | Completed final sign-off May 2023 | 88 Sutter St | 1/f: revision to pa# 2021-0112-2520. interior work only. changes to floor plan layouts,mechanical, plumbing & electrical work, fixtures. removal of demo scope within the (e) space.Details
1/f: revision to pa# 2021-0112-2520. interior work only. changes to floor plan layouts,mechanical, plumbing & electrical work, fixtures. removal of demo scope within the (e) space. | $100,000 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 49 Stevenson St | basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permitsDetails
basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permits | |
| May 24, 2021 | Completed final sign-off Oct 2021 | 717 Battery St | ti: this project consist of a newbar within the existing event/banquet room on the 2nd fl, near the se corner of the building. includes new finishes, appliances, plumbing and lighting associated with the area of the new bar. no change to structure, floor levels, occupancies, occupied load exitDetails
ti: this project consist of a newbar within the existing event/banquet room on the 2nd fl, near the se corner of the building. includes new finishes, appliances, plumbing and lighting associated with the area of the new bar. no change to structure, floor levels, occupancies, occupied load exit | $150,000 |
| Apr 21, 2021 | Never finaled issued May 2021, no final | 717 Battery St | 1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths.Details
1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths. | $120,000 |
| Mar 4, 2021 | Never finaled issued May 2021, no final | 140 Ellis St | revision to pa# 201901079715 replace (e) 6004 section in electrical rm. 127 with (n) 1000a section (prev. locted in mech room 124, per approved pa #201911086806) n/a maherDetails
revision to pa# 201901079715 replace (e) 6004 section in electrical rm. 127 with (n) 1000a section (prev. locted in mech room 124, per approved pa #201911086806) n/a maher | |
| Feb 8, 2021 | Never finaled issued Sep 2021, no final | 200 Van Ness Av | g/f -interior renovation of 1,850 sq/ft restaurant space on g/f of new sf conservatory of music bowes hall ((ref. pa# 2017-05-05-5847). interior improvement includes new wall, floor & ceiling finishes, new commercial kitchen, new bar & lighting throughout. fire sprinkler defer submittal.Details
g/f -interior renovation of 1,850 sq/ft restaurant space on g/f of new sf conservatory of music bowes hall ((ref. pa# 2017-05-05-5847). interior improvement includes new wall, floor & ceiling finishes, new commercial kitchen, new bar & lighting throughout. fire sprinkler defer submittal. | $283,900 |
| Jan 12, 2021 | Never finaled issued Sep 2021, no final | 88 Sutter St | tenant improvement: a 650 sf addition to an (e) tenant space on the ground levelat 88 sutter street. work includes light gauge framing, new interior hvac ductwork and exhaust systems, interior electrical systems, interior finishes and interior furnishings. interior work only.Details
tenant improvement: a 650 sf addition to an (e) tenant space on the ground levelat 88 sutter street. work includes light gauge framing, new interior hvac ductwork and exhaust systems, interior electrical systems, interior finishes and interior furnishings. interior work only. | $250,000 |
| Sep 30, 2020 | In progress issued Aug 2025 | 2765 Hyde St | repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails.Details
repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails. | $825,000 |
| Sep 24, 2020 | Completed final sign-off Oct 2021 | 1019 Market St | sign, "chai bar", single-faced, wall-mounted, door window, 360 sq ft, non-electric. to comply w/ planning enforcement # 2019-021982enf.Details
sign, "chai bar", single-faced, wall-mounted, door window, 360 sq ft, non-electric. to comply w/ planning enforcement # 2019-021982enf. | $3,000 |
| Sep 12, 2020 | Never finaled issued Nov 2020, no final | 140 Ellis St | revision to pa 201911086806. installation of a ( n ) 3'-0" x 7'0" door in corridor 120.Details
revision to pa 201911086806. installation of a ( n ) 3'-0" x 7'0" door in corridor 120. | |
| Aug 20, 2020 | Never finaled filed Aug 2020, never issued | 599 Skyline Bl | new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical.Details
new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical. | $100,000 |
| Aug 6, 2020 | Expired or cancelled withdrawn May 2023 | 599 Skyline Bl | interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces.Details
interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces. | $4,500,000 |
| Jun 30, 2020 | Expired or cancelled cancelled May 2023 | 599 Skyline Bl | per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments.Details
per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments. | $20,000 |
| Dec 26, 2019 | Never finaled issued Aug 2020, no final | 599 Skyline Bl | basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door;Details
basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door; | $50,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 140 Ellis St | revision to pa#2019-0107-97154: relocate all proposed new mech equipment to high roof. no work at low roof. (n) 2-hour rated shaft from basement kitchen to 2nd flr lightwell. (n) structural framing at ground floor, mezzanine, 2nd flr, and roof. electrical revisions. (e) storefront entrance to remainDetails
revision to pa#2019-0107-97154: relocate all proposed new mech equipment to high roof. no work at low roof. (n) 2-hour rated shaft from basement kitchen to 2nd flr lightwell. (n) structural framing at ground floor, mezzanine, 2nd flr, and roof. electrical revisions. (e) storefront entrance to remain | |
| Oct 7, 2019 | Completed final sign-off Dec 2021 | 49 Stevenson St | tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.Details
tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom. | $230,000 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 916 Kearny St | investigate expired permit to final (fire) building permit. 201810264208Details
investigate expired permit to final (fire) building permit. 201810264208 | |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 140 Ellis St | revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mahDetails
revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mah | |
| Jul 17, 2019 | Completed final sign-off Aug 2019 | 2765 Hyde St | temporary shoring in basement to support a partially damaged ground floor structureDetails
temporary shoring in basement to support a partially damaged ground floor structure | $8,033 |
| Jun 12, 2019 | Completed final sign-off Aug 2020 | 717 Battery St | t.i. new bar service and built in booth at extg library room. n/a for maherDetails
t.i. new bar service and built in booth at extg library room. n/a for maher | $150,000 |
| May 3, 2019 | Completed final sign-off Jan 2021 | 1000 03rd St | deffered equip anchorage for ti restaurant/brewery ref 201903014210 maher naDetails
deffered equip anchorage for ti restaurant/brewery ref 201903014210 maher na | |
| Apr 11, 2019 | Completed final sign-off Aug 2019 | 1737 Post St | unit# 350: minor t.i in (e) benihan resturant, remove part of sushi bar to create small cooking are with hood & equipment, all else including lighting to remain the sameDetails
unit# 350: minor t.i in (e) benihan resturant, remove part of sushi bar to create small cooking are with hood & equipment, all else including lighting to remain the same | $100,000 |
| Mar 29, 2019 | Completed final sign-off Apr 2022 | 1000 03rd St | exterior storefront work including metal canopies awnings & new window. signage under seperate permits.Details
exterior storefront work including metal canopies awnings & new window. signage under seperate permits. | $8,000 |
| Mar 27, 2019 | Completed final sign-off Apr 2022 | 1000 03rd St | ref pa# 201812219049: revision to equipment platforms from cfmf joist to concrete slab on metal deck & other minor design details per planDetails
ref pa# 201812219049: revision to equipment platforms from cfmf joist to concrete slab on metal deck & other minor design details per plan | |
| Mar 8, 2019 | Never finaled issued Apr 2022, no final | 140 Ellis St | sign, "ab steak", electric, wall-mounted, indirect illumination. puncture into mortar joints only. 2'8'' x 4'0''Details
sign, "ab steak", electric, wall-mounted, indirect illumination. puncture into mortar joints only. 2'8'' x 4'0'' | $2,000 |
| Mar 1, 2019 | Completed final sign-off Jan 2021 | 1000 03rd St | t.i. for (n) restaurant brewery on ground fl. of (e) residential tower, scope inclues interior partitions, interior dining room finishes (n) lighting, kitchen & brewery equipmentDetails
t.i. for (n) restaurant brewery on ground fl. of (e) residential tower, scope inclues interior partitions, interior dining room finishes (n) lighting, kitchen & brewery equipment | $950,000 |
| Jan 24, 2019 | Never finaled issued Jul 2019, no final | 140 Ellis St | (n) mechanical equipment at basement and ground floor onlyDetails
(n) mechanical equipment at basement and ground floor only | $200,000 |
| Jan 7, 2019 | Never finaled issued May 2019, no final | 140 Ellis St | renovation of basement restaurant. work includes n int partitions and finishes. new strucural openings in e roof and structural walls and new plumbing and elec, mech sep permit. determine occupant load for new assembly space. mechanical only under seperate permitDetails
renovation of basement restaurant. work includes n int partitions and finishes. new strucural openings in e roof and structural walls and new plumbing and elec, mech sep permit. determine occupant load for new assembly space. mechanical only under seperate permit | $1,251,000 |
| Dec 21, 2018 | Completed final sign-off Apr 2022 | 1000 03rd St | revision to 201811014769 add a cout out of slab for future sump pit maher not reqDetails
revision to 201811014769 add a cout out of slab for future sump pit maher not req | |
| Dec 21, 2018 | Completed final sign-off Apr 2022 | 1000 03rd St | equipment for future retail restaurant tenant on gr flDetails
equipment for future retail restaurant tenant on gr fl | $45,000 |
| Nov 7, 2018 | Completed final sign-off Nov 2020 | 298 Alabama St | remove panic hardware from main entry door as occupant load servce does not exceed 49 occupants (ref sheet tn-ask-36r3) ref pa 201809130095 maher naDetails
remove panic hardware from main entry door as occupant load servce does not exceed 49 occupants (ref sheet tn-ask-36r3) ref pa 201809130095 maher na | |
| Nov 1, 2018 | Completed final sign-off Apr 2022 | 990 03rd St | only floor slab for future retail restaurant tenant and restrooms on ground floorDetails
only floor slab for future retail restaurant tenant and restrooms on ground floor | $250,000 |
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 916 Kearny St | to obtain final inspection for work approved under pa#9818231. all work is complete.Details
to obtain final inspection for work approved under pa#9818231. all work is complete. | |
| Oct 3, 2018 | Expired or cancelled cancelled Jan 2026 | 781 Mission St | replace existing metal panel wall w/stud wall and durock. replace existing pavers w/new pavers. replace existing transition plate w/new plate. maher naDetails
replace existing metal panel wall w/stud wall and durock. replace existing pavers w/new pavers. replace existing transition plate w/new plate. maher na | $17,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 298 Alabama St | permit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing.Details
permit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing. | |
| Aug 14, 2018 | Expired or cancelled withdrawn Nov 2018 | 110 Channel | change of permited plans (201707131746). change in routing of hvac duct. air exhaust and fresh air.Details
change of permited plans (201707131746). change in routing of hvac duct. air exhaust and fresh air. | |
| Apr 26, 2018 | Completed final sign-off May 2020 | 1200 07th St | improvements to accessible parking and path of travel. existing ramp and stirs repair/replace to be updated ada compliant. minor interior work - new door parts area, partition at existing restroom area, replace existing sales desks with new. maher na. elec under separate permitDetails
improvements to accessible parking and path of travel. existing ramp and stirs repair/replace to be updated ada compliant. minor interior work - new door parts area, partition at existing restroom area, replace existing sales desks with new. maher na. elec under separate permit | $11,000 |
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 586 Hayes St | install projecting double faced "salt & straw" signDetails
install projecting double faced "salt & straw" sign | $2,000 |
| Feb 2, 2018 | Never finaled issued May 2018, no final | 298 Alabama St | revision to 201611233501, add cafe and retail use. modification to fire alarm scope. refrigeraton system removed and replaced with vrf system, revised ductwork, lighting, plumbing fixtures and calcs. n/a for maher.Details
revision to 201611233501, add cafe and retail use. modification to fire alarm scope. refrigeraton system removed and replaced with vrf system, revised ductwork, lighting, plumbing fixtures and calcs. n/a for maher. | |
| Dec 21, 2017 | Never finaled issued Mar 2018, no final | 131 Steuart St | interior t.i of restaurant. finishes and minor reconfiguration to include updated mep & kitchen. n/a for maher.Details
interior t.i of restaurant. finishes and minor reconfiguration to include updated mep & kitchen. n/a for maher. | $400,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 111 Mason St | rev to pa#201605318709: revision to t-24 lighting documentation oly. no other work performed.Details
rev to pa#201605318709: revision to t-24 lighting documentation oly. no other work performed. | |
| Aug 18, 2017 | Completed final sign-off Jan 2018 | 111 Mason St | revision to pa201704073477. route to dph plan review only. no work under this permit.Details
revision to pa201704073477. route to dph plan review only. no work under this permit. | |
| Aug 18, 2017 | Completed final sign-off Jan 2018 | 111 Mason St | revision to pa201605318709. route to dph plan review. revisions includes t24 lighitng calcs and fixture locations.Details
revision to pa201605318709. route to dph plan review. revisions includes t24 lighitng calcs and fixture locations. | |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 644 Broadway | assembly permit.Details
assembly permit. | |
| Jul 13, 2017 | Never finaled issued Jan 2018, no final | 110 Channel | tenant improvement for fitness training studio. new bldg pa#201408133766 sprinkler and fire alarm separte permit.Details
tenant improvement for fitness training studio. new bldg pa#201408133766 sprinkler and fire alarm separte permit. | $300,000 |
| Jun 16, 2017 | Completed final sign-off Jun 2018 | 586 Hayes St | revision to pa#201612074351. change address from 580 hayes street to 586 hayes streetDetails
revision to pa#201612074351. change address from 580 hayes street to 586 hayes street | |
| Jun 15, 2017 | Completed final sign-off Jul 2017 | 16 West Portal Av | adding a grease trapDetails
adding a grease trap | |
| Jun 5, 2017 | Never finaled issued Jun 2017, no final | 920 North Point St | phase 2: waxman's restaurant interior t.i.- to renovate existing bar space with new bar and equip, add new booth and banquet seating areas. phase 1 demising j.bird is under sep. permit. waxman's and j.bird are owned by same entity and will utilize (e) kitchen, (e) ada/unisex restroom to remain.Details
phase 2: waxman's restaurant interior t.i.- to renovate existing bar space with new bar and equip, add new booth and banquet seating areas. phase 1 demising j.bird is under sep. permit. waxman's and j.bird are owned by same entity and will utilize (e) kitchen, (e) ada/unisex restroom to remain. | $125,382 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 920 North Point St | phase 1: j.bird/event room - interior t.i. demise front of space by installing walls/doors in the (e) waxman's restaurant to create dining event room and take-out space for new co-brand j.bird restaurant on east side of space. waxman's & j.bird are owned by the same entity & will utilize existingDetails
phase 1: j.bird/event room - interior t.i. demise front of space by installing walls/doors in the (e) waxman's restaurant to create dining event room and take-out space for new co-brand j.bird restaurant on east side of space. waxman's & j.bird are owned by the same entity & will utilize existing | $139,349 |
| Apr 7, 2017 | Completed final sign-off Jan 2018 | 111 Mason St | revision to pa #201603222772: add employee shower & toilet room to basement. no work at ext. no change in occupancy.Details
revision to pa #201603222772: add employee shower & toilet room to basement. no work at ext. no change in occupancy. | $41,000 |
| Mar 23, 2017 | Completed final sign-off Apr 2018 | 644 Broadway | tenant improvement of a banquet room & kitchen with associated lobby on the 3rd floor of an (e) building no structural work will be done.Details
tenant improvement of a banquet room & kitchen with associated lobby on the 3rd floor of an (e) building no structural work will be done. | $500,000 |
| Jan 6, 2017 | Completed final sign-off Apr 2018 | 644 Broadway | revision to 2016-1021-0869: (n) concrete stem wall to support (e) vestibule store frontDetails
revision to 2016-1021-0869: (n) concrete stem wall to support (e) vestibule store front | |
| Jan 6, 2017 | Completed final sign-off Apr 2018 | 660 Broadway | revision to pa 2016-0926-8773; remove (e) storefront & doors, remove floor, ceiling & wall finishes for new. new storefront, (n) wall & ceiling finishes, (n) flooring with waterproofing in a (n) alcove. mep under pa#201503100377Details
revision to pa 2016-0926-8773; remove (e) storefront & doors, remove floor, ceiling & wall finishes for new. new storefront, (n) wall & ceiling finishes, (n) flooring with waterproofing in a (n) alcove. mep under pa#201503100377 | |
| Dec 7, 2016 | Completed final sign-off Jun 2018 | 580 Hayes St | #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning.Details
#2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning. | $250,000 |
| Nov 29, 2016 | Completed final sign-off Aug 2017 | 644 Broadway | construct platform at roof level to support mech equipment serving floors 1 & 2Details
construct platform at roof level to support mech equipment serving floors 1 & 2 | $40,000 |
| Nov 8, 2016 | Completed final sign-off Jun 2017 | 1266 09th Av | interior renovation t.i. for cafe. new partitions, ceilings, lighting, kitchen equip & food service line, finishes. reuse (e) mechanical system. (non structural) fire supression, fire alarm & signage under separate permits.Details
interior renovation t.i. for cafe. new partitions, ceilings, lighting, kitchen equip & food service line, finishes. reuse (e) mechanical system. (non structural) fire supression, fire alarm & signage under separate permits. | $227,000 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 1000 Larkin St | revision to 201512285972, lighting reduction throughout.Details
revision to 201512285972, lighting reduction throughout. | |
| Oct 21, 2016 | Completed final sign-off Apr 2018 | 644 Broadway | for a-2 portion of occupancy. remove (e) storefront vestibule & door. new storefront in a vestibuleDetails
for a-2 portion of occupancy. remove (e) storefront vestibule & door. new storefront in a vestibule | $35,000 |
| Oct 14, 2016 | Completed final sign-off Apr 2018 | 16 West Portal Av | minor interior revisions to approved permit #201606099531. revisions to food service line and related electrical/lighting. no change to accessible features.Details
minor interior revisions to approved permit #201606099531. revisions to food service line and related electrical/lighting. no change to accessible features. | $18,000 |
| Sep 26, 2016 | Completed final sign-off Apr 2018 | 660 Broadway | remove storefront & doors, remove floor, ceiling and wall finishes for new storefront. new wall and ceiling finishes, new flooring, new 4" curb, add waterproofing in a new alcoveDetails
remove storefront & doors, remove floor, ceiling and wall finishes for new storefront. new wall and ceiling finishes, new flooring, new 4" curb, add waterproofing in a new alcove | $10,000 |
| Jun 9, 2016 | Completed final sign-off Apr 2018 | 16 West Portal Av | interior remodel of new restaurant, remodeuing dining rm, service line & back of house, existing restrms to remain, exterior work consists of new finishes, railing, planters, new storefront cladding signature & sprinklers under sep. permit. formula restaurant approved under 2015-06137cuaDetails
interior remodel of new restaurant, remodeuing dining rm, service line & back of house, existing restrms to remain, exterior work consists of new finishes, railing, planters, new storefront cladding signature & sprinklers under sep. permit. formula restaurant approved under 2015-06137cua | $171,270 |
| Jun 8, 2016 | Completed final sign-off Apr 2018 | 16 West Portal Av | non structural interior demolition of fixtures, finishes, light fixtures, kitchen equipment. accessibility features will be provided in subsequent building permit per sfbc ab-017.Details
non structural interior demolition of fixtures, finishes, light fixtures, kitchen equipment. accessibility features will be provided in subsequent building permit per sfbc ab-017. | $8,000 |
| Jun 3, 2016 | Never finaled issued Jun 2016, no final | 1000 Larkin St | wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13Details
wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13 | $4,000 |
| May 31, 2016 | Completed final sign-off Jan 2018 | 111 Mason St | 1st flr: mep only ref. pa#201603222772.Details
1st flr: mep only ref. pa#201603222772. | $5,000 |
| Apr 12, 2016 | Completed final sign-off Apr 2016 | 920 North Point St | revision to ref pa 2015 0519 6645 & 2015 1002 8713 to correct occupant load per district inspectore requestDetails
revision to ref pa 2015 0519 6645 & 2015 1002 8713 to correct occupant load per district inspectore request | |
| Mar 22, 2016 | Completed final sign-off Jan 2018 | 111 Mason St | interior renovations of tourist hotel at ground fl and basement. add new bar, dining room, upgrade kitchen, new limited access elevator from ground floor to basementDetails
interior renovations of tourist hotel at ground fl and basement. add new bar, dining room, upgrade kitchen, new limited access elevator from ground floor to basement | $550,000 |
| Mar 16, 2016 | Completed final sign-off Dec 2017 | 111 Mason St | revision to 201601217562. demo to ground floor restrooms and (e) mezzanine and use of 6th fl restrooms for temporary use. no work on other floors. t.i. separate permit.Details
revision to 201601217562. demo to ground floor restrooms and (e) mezzanine and use of 6th fl restrooms for temporary use. no work on other floors. t.i. separate permit. | $4,000 |