Block 0301, lot 014
1008 Larkin St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 5
- Units
- 57
- Rooms
- 53 bathrooms
- Building
- 33,875 sq ft
- Lot
- 6,875 sq ft
- Zoning
- POLK
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
70 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | Completed final sign-off May 2026 | 1008 Larkin St | Mrm Ventures Llc. | revision to permit 202512192294 to add "repairs per the facade report per the san francisco facade maintenance program dated 05/14/25"Details
revision to permit 202512192294 to add "repairs per the facade report per the san francisco facade maintenance program dated 05/14/25" | |
| Jan 14, 2026 | Expired or cancelled cancelled Feb 2026 | 1008 Larkin St | Mrm Ventures Llc. | revision to pa 2025-1219-2294: add scope to previous permit - " per building facade inspection maintenance report dated 7/14/24"Details
revision to pa 2025-1219-2294: add scope to previous permit - " per building facade inspection maintenance report dated 7/14/24" | |
| Dec 19, 2025 | Completed final sign-off May 2026 | 1008 Larkin St | Mrm Ventures Llc. | building facade maintenance & repairs to restore the outside of building. "like for like". seal & paint windows & fire escape, like for like street facing,Details
building facade maintenance & repairs to restore the outside of building. "like for like". seal & paint windows & fire escape, like for like street facing, | $185,000 |
| Sep 2, 2025 | Expired or cancelled cancelled Aug 2026 | 1008 Larkin St | Hon's Construction Inc. | remove and replace two street facing windows with new aluminum clad wood window frame. same sides and locations. u-factor 0.29 windows.Details
remove and replace two street facing windows with new aluminum clad wood window frame. same sides and locations. u-factor 0.29 windows. | $1,500 |
| Jul 7, 2025 | Completed final sign-off Aug 2025 | 1008 Larkin St | Redlog Flooring Services Corp | common area work: interior plaster repairs on common area due to water damage. hallway interior work, drywall repairs needed.Details
common area work: interior plaster repairs on common area due to water damage. hallway interior work, drywall repairs needed. | $20,000 |
| Apr 9, 2025 | Completed final sign-off Jun 2025 | 1008 Larkin St | Quintanilla Milian Construction | unit #207 replace kitchen cabinets and counters, full paint, replace baseboards, install new floor replace bathroom tile and vanityDetails
unit #207 replace kitchen cabinets and counters, full paint, replace baseboards, install new floor replace bathroom tile and vanity | $20,000 |
| Mar 31, 2025 | Completed final sign-off Jul 2025 | 1008 Larkin St | G T M Works Llc Dba Greentree Maint | unit #105: in kind kitchen remodel. no walls demo.Details
unit #105: in kind kitchen remodel. no walls demo. | $25,000 |
| Feb 9, 2024 | Expired or cancelled withdrawn Jun 2026 | 1008 Larkin St | International Fire Inc | upgrade existing fire alarm system in non sprinklered building to comply with 2022 cbc/cfc, hfpa 72 and sffc sec 1103.7.6.1 existing facu, smoke detector, pull station and monitor modules to remain. add radio to mnitor system. horn/strobes in common areas and install low frequency sounders insideDetails
upgrade existing fire alarm system in non sprinklered building to comply with 2022 cbc/cfc, hfpa 72 and sffc sec 1103.7.6.1 existing facu, smoke detector, pull station and monitor modules to remain. add radio to mnitor system. horn/strobes in common areas and install low frequency sounders inside | $54,000 |
| Apr 19, 2019 | Completed final sign-off Jun 2019 | 1008 Larkin St | Nomellini Construction * Ask For Id * | unit 303: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit 303: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| Jun 5, 2017 | Never finaled issued Jun 2017, no final | 1008 Larkin St | Nomellini Construction * Ask For Id * | common area bathroom remodels, floor 1-4. (1) tub/shower, sink, toilet per floor. (as like)Details
common area bathroom remodels, floor 1-4. (1) tub/shower, sink, toilet per floor. (as like) | $35,000 |
| Jan 13, 2017 | Expired or cancelled cancelled Jan 2026 | 1008 Larkin St | modify (e) fire escape ladder with new escape ladder av-019 complaintDetails
modify (e) fire escape ladder with new escape ladder av-019 complaint | $10,000 | |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 1000 Larkin St | Terra Nova Industries | revision to 201512285972, lighting reduction throughout.Details
revision to 201512285972, lighting reduction throughout. | |
| Sep 14, 2016 | Completed final sign-off Sep 2016 | 1000 Larkin St | International Fire Equip | install ul300 fire system; ref. 201507080981; maher n/aDetails
install ul300 fire system; ref. 201507080981; maher n/a | $5,000 |
| Aug 15, 2016 | Never finaled issued Aug 2016, no final | 1008 Larkin St | Nomellini Construction * Ask For Id * | apt 401: kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows.Details
apt 401: kitchen & bathroom renovation. replace (e) exh fans, lightings to be remain. no (n) windows. | $20,000 |
| Jun 3, 2016 | Never finaled issued Jun 2016, no final | 982 Post St | Pyro-Comm Systems, Inc. | new fire alarm devices added to t.i. in an existing bldg (part of 1008 larkin where main facu is located). to include: (1) pull station, (4) strobes, (4) horns/strobes. 1/f & basement. t.i. pa#201603293389. n/a ordinance #155-13Details
new fire alarm devices added to t.i. in an existing bldg (part of 1008 larkin where main facu is located). to include: (1) pull station, (4) strobes, (4) horns/strobes. 1/f & basement. t.i. pa#201603293389. n/a ordinance #155-13 | $4,700 |
| Jun 3, 2016 | Completed final sign-off Jun 2016 | 982 Post St | Rcm Fire Protection Inc. | add or relocate sprinkler heads for t.i. 201603293389; maher n/aDetails
add or relocate sprinkler heads for t.i. 201603293389; maher n/a | $5,000 |
| Jun 3, 2016 | Never finaled issued Jun 2016, no final | 1000 Larkin St | Terra Nova Industries | wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13Details
wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13 | $4,000 |
| Jun 1, 2016 | Completed final sign-off Aug 2016 | 1008 Larkin St | Nomellini Construction * Ask For Id * | apt 407: kitchen & bathroom remodel.Details
apt 407: kitchen & bathroom remodel. | $20,000 |
| May 4, 2016 | Expired or cancelled cancelled Jan 2026 | 1008 Larkin St | remodel portion of basement floor. relocate laundry room, create new sparation for e boiler rooms and e elec rm to accomodate for new storage. maher naDetails
remodel portion of basement floor. relocate laundry room, create new sparation for e boiler rooms and e elec rm to accomodate for new storage. maher na | $25,000 | |
| Apr 22, 2016 | Completed final sign-off Jun 2016 | 1014 Larkin St | Pyro-Comm Systems, Inc. | grd fl: new fire alarm devices added to ti in existing building to include : 1 pull station, 1 monitor module, 3 strobes, 2 horn/strobes. maher not req. ref ti 2015-1022-0543.Details
grd fl: new fire alarm devices added to ti in existing building to include : 1 pull station, 1 monitor module, 3 strobes, 2 horn/strobes. maher not req. ref ti 2015-1022-0543. | $4,300 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 1000 Larkin St | Pyro-Comm Systems, Inc. | 1/f restaurant: new fire alarm devices added to ti in an existing building to include: (1) power supply (2) pull stations (1) smoke detector (1) monitor module (3) duct detectors (3) relay modules (6) horn/strobes, (5) strobes. ref pa 2015-0708-0981Details
1/f restaurant: new fire alarm devices added to ti in an existing building to include: (1) power supply (2) pull stations (1) smoke detector (1) monitor module (3) duct detectors (3) relay modules (6) horn/strobes, (5) strobes. ref pa 2015-0708-0981 | $8,743 |
| Apr 7, 2016 | Never finaled issued Apr 2016, no final | 1008 Larkin St | Pyro-Comm Systems, Inc. | voluntary one-for-one fire alarm system replacement in an existing building to include (1) replacement facu,(9)replacement pull stations,(8)replacement bells,(1)new sd,(7)new monitor modules,(3)new dual monitor modules;maher n/aDetails
voluntary one-for-one fire alarm system replacement in an existing building to include (1) replacement facu,(9)replacement pull stations,(8)replacement bells,(1)new sd,(7)new monitor modules,(3)new dual monitor modules;maher n/a | $14,783 |
| Mar 29, 2016 | Completed final sign-off Jul 2016 | 982 Post St | M Douglas Construction Inc. | tenant improvement for retail clothing store. includes new stair, non structural partitons, freestanding millwork, new plumbing, elec, lighting, new mech. fire sprinkler work to be under sep permit. maher not reqDetails
tenant improvement for retail clothing store. includes new stair, non structural partitons, freestanding millwork, new plumbing, elec, lighting, new mech. fire sprinkler work to be under sep permit. maher not req | $100,000 |
| Mar 15, 2016 | Completed final sign-off Sep 2016 | 1000 Larkin St | Incom Mechanical Inc | changing existing uprights to pendants for new rrestaurant. t.i. #201512285972. n/a mahe ordinanceDetails
changing existing uprights to pendants for new rrestaurant. t.i. #201512285972. n/a mahe ordinance | $5,000 |
| Feb 18, 2016 | Completed final sign-off Mar 2016 | 1008 Larkin St | Nomellini Construction * Ask For Id * | apt 409: kitchen remodel.no structural. this is an efficiency unit.Details
apt 409: kitchen remodel.no structural. this is an efficiency unit. | $5,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 1014 Larkin St | M Douglas Construction Inc. | revision to appl #201510220543 with revised lighting plan, lighting fixture schedule, power plan & title 24 calculations. n/a maher ordinanceDetails
revision to appl #201510220543 with revised lighting plan, lighting fixture schedule, power plan & title 24 calculations. n/a maher ordinance | |
| Jan 21, 2016 | Completed final sign-off Feb 2016 | 1014 Larkin St | Rcm Fire Protection Inc. | 1st flor: relocate and add sprinklers as req'd to accomodate proposed ti 2015 1022 0543Details
1st flor: relocate and add sprinklers as req'd to accomodate proposed ti 2015 1022 0543 | $3,000 |
| Dec 28, 2015 | Never finaled issued Jan 2016, no final | 1000 Larkin St | Terra Nova Industries | revision to 201507080981. recuction of lighting, new air intake on larkin street elevation, modified elec and mech loads for revised mech/elec layout due to field conditionsDetails
revision to 201507080981. recuction of lighting, new air intake on larkin street elevation, modified elec and mech loads for revised mech/elec layout due to field conditions | |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 1008 Larkin St | Nomellini Construction * Ask For Id * | unit 307: kitchen & bathroom remodel. no allteration of walls, window and doors.Details
unit 307: kitchen & bathroom remodel. no allteration of walls, window and doors. | $18,000 |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 1000 Larkin St | street space permitDetails
street space permit | ||
| Oct 22, 2015 | Completed final sign-off Jun 2016 | 1014 Larkin St | M Douglas Construction Inc. | t.i. for barber shop: work includes partitions, nw millwork, nw electrical, lighting, & new mech. project will apply for change of use from an "m" occupancy to a "b" occupancy barber shop(personal service). the project is not formula retail. fire sprinkler work to be under seperate permit. n/a maherDetails
t.i. for barber shop: work includes partitions, nw millwork, nw electrical, lighting, & new mech. project will apply for change of use from an "m" occupancy to a "b" occupancy barber shop(personal service). the project is not formula retail. fire sprinkler work to be under seperate permit. n/a maher | $150,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 1000 Larkin St | Alsterlind Construction Inc. | demo only non structural while waiting on ti permit commercial demo only, no residential or exterior scope of work only demolition of non structural elements in prepartation for ti permit issuance ref pa 2015-0708-0981. n/a maher ordinanceDetails
demo only non structural while waiting on ti permit commercial demo only, no residential or exterior scope of work only demolition of non structural elements in prepartation for ti permit issuance ref pa 2015-0708-0981. n/a maher ordinance | $8,700 |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 1008 Larkin St | street spaceDetails
street space | ||
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 1014 Larkin St | work includes demo (e) sheetrock on columns, upgrade to code compliant stairs, new restroom, plumbing & electric ceiling fans. demo per ab-017, accessibility features in future t.i. n/a ordinance #155-13Details
work includes demo (e) sheetrock on columns, upgrade to code compliant stairs, new restroom, plumbing & electric ceiling fans. demo per ab-017, accessibility features in future t.i. n/a ordinance #155-13 | $30,000 | |
| Jul 8, 2015 | Never finaled issued Dec 2015, no final | 1000 Larkin St | Terra Nova Industries | change of use from retail to a new resturant. building of existing shell space into resturant include kitchen, hood, dining rooms, restrooms, lula lift. maher n/a.Details
change of use from retail to a new resturant. building of existing shell space into resturant include kitchen, hood, dining rooms, restrooms, lula lift. maher n/a. | $200,000 |
| Jul 7, 2015 | Never finaled issued Jul 2015, no final | 1008 Larkin St | street spaceDetails
street space | ||
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 1008 Larkin St | streetspaceDetails
streetspace | ||
| May 13, 2015 | Completed final sign-off Jul 2015 | 1008 Larkin St | Nomellini Construction * Ask For Id * | remove kitchen and bath cabinet. install ele & plumb to new remodel. supply fixtures and counters - redo hardwood or supply vinyl flooring. paint apt. no walls to be removed or altered.Details
remove kitchen and bath cabinet. install ele & plumb to new remodel. supply fixtures and counters - redo hardwood or supply vinyl flooring. paint apt. no walls to be removed or altered. | $18,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 1008 Larkin St | Towey Construction Inc. | build retaining wall, dig trench for pge pipes and 2 vaults. fill pits with rock & fill place vaults. pour partial sidewalk and back fill trenches and pour topping slabDetails
build retaining wall, dig trench for pge pipes and 2 vaults. fill pits with rock & fill place vaults. pour partial sidewalk and back fill trenches and pour topping slab | $32,000 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 1000 Larkin St | street spaceDetails
street space | ||
| Dec 12, 2014 | Never finaled issued Jan 2015, no final | 1000 Larkin St | A.S.T.I. Services (Automatic Sprinkler) | install (42) new sprinklers in basement and ground floor only; t.i. #201308094001; maher n/aDetails
install (42) new sprinklers in basement and ground floor only; t.i. #201308094001; maher n/a | $10,000 |
| Aug 12, 2014 | Completed final sign-off Oct 2014 | 1008 Larkin St | Nomellini Construction * Ask For Id * | unit 201 - remove existing bath & kitchen cabinets, relocate plumbing & electrical to new locations. tile kitchen and bath, floors. install laminate or redo hardwod. paint apartmentDetails
unit 201 - remove existing bath & kitchen cabinets, relocate plumbing & electrical to new locations. tile kitchen and bath, floors. install laminate or redo hardwod. paint apartment | $15,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2014 | 1008 Larkin St | Nomellini Construction * Ask For Id * | remove e kitchen and bath cabinets, provide new wlec and plumbing for remodel. refinish existing floors. no walls moved, removed or added. all fixture layout to remain unchanged.Details
remove e kitchen and bath cabinets, provide new wlec and plumbing for remodel. refinish existing floors. no walls moved, removed or added. all fixture layout to remain unchanged. | $30,000 |
| Aug 9, 2013 | Expired or cancelled expired Jun 2016 | 1008 Larkin St | Towey Construction Inc. | renovation of ground level exterior storefronts for all 4 tenant spaces. convert (e) garage to new retail space for 1008 larkin street tenant. t.i. under separate permit.compliance with ord 155-13 not requiredDetails
renovation of ground level exterior storefronts for all 4 tenant spaces. convert (e) garage to new retail space for 1008 larkin street tenant. t.i. under separate permit.compliance with ord 155-13 not required | $60,000 |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 1008 Larkin St | On-Site Maintenance | #202 - replace 42" kitchen cabinet, item # 8 only. complaint #201067472Details
#202 - replace 42" kitchen cabinet, item # 8 only. complaint #201067472 | $850 |
| Apr 17, 2009 | Completed final sign-off May 2009 | 1008 Larkin St | On-Site Maintenance | unit 203: comply with nov 200998522 in 203, repair damaged walls, paint, repair floor covering , patch ceiling in bath, elec outlets, plumbingDetails
unit 203: comply with nov 200998522 in 203, repair damaged walls, paint, repair floor covering , patch ceiling in bath, elec outlets, plumbing | $2,500 |
| Aug 7, 2008 | Expired or cancelled expired May 2011 | 1008 Larkin St | F B E And Sons General Const | apt 301 - kitchen and bathroom remodel. no structural work, no lighting work. remove and replace cabinet, counter, floor & wall tiles. nov 200787593-his & 200863594-his.Details
apt 301 - kitchen and bathroom remodel. no structural work, no lighting work. remove and replace cabinet, counter, floor & wall tiles. nov 200787593-his & 200863594-his. | $15,000 |
| Feb 22, 2008 | Completed final sign-off Jun 2008 | 1008 Larkin St | F B E And Sons General Const | apt 111 and 312: replace vanity sink in each unit. repair walls to move electrical conduit and water copper pipe into walls. no structural or lighting.Details
apt 111 and 312: replace vanity sink in each unit. repair walls to move electrical conduit and water copper pipe into walls. no structural or lighting. | $15,000 |
| Feb 5, 2008 | Never finaled issued Feb 2008, no final | 1008 Larkin St | street spaceDetails
street space | ||
| Dec 3, 2007 | Never finaled issued Dec 2007, no final | 1008 Larkin St | street space onlyDetails
street space only | ||
| Nov 2, 2007 | Expired or cancelled expired Jan 2011 | 1008 Larkin St | F B E And Sons General Const | apt# 205 a & b: kitchen & bathroom remodel. apt# 305b: bathroom remodel & kitchen. apt# 204: kitchen & bathroom remodel. apt# 304 & # 310: repair wall after plumbing & electrical work. apt# 406: bathroom remodel. no structural work on all units.Details
apt# 205 a & b: kitchen & bathroom remodel. apt# 305b: bathroom remodel & kitchen. apt# 204: kitchen & bathroom remodel. apt# 304 & # 310: repair wall after plumbing & electrical work. apt# 406: bathroom remodel. no structural work on all units. | $60,000 |
| Oct 25, 2007 | Never finaled issued Oct 2007, no final | 1008 Larkin St | street space permitDetails
street space permit | ||
| Oct 11, 2007 | Never finaled issued Oct 2007, no final | 1008 Larkin St | F B E And Sons General Const | apt.#110,308- minor repair on bathroom after electrical & plumbing. repair sheetrock all opening 5/8 1 hr. no structural work. no lighting work.Details
apt.#110,308- minor repair on bathroom after electrical & plumbing. repair sheetrock all opening 5/8 1 hr. no structural work. no lighting work. | $10,000 |
| Sep 26, 2007 | Never finaled issued Sep 2007, no final | 1008 Larkin St | street space permitDetails
street space permit | ||
| Aug 9, 2007 | Never finaled issued Aug 2007, no final | 1008 Larkin St | F B E And Sons General Const | work @ apt# 212 & apt# 309 only. apt# 212: replace wall after electrical work & remove all exposed pipe or conduit. apt# 309: remodel bathroom. no structural work. no lighting work. replace bathroom window glass.Details
work @ apt# 212 & apt# 309 only. apt# 212: replace wall after electrical work & remove all exposed pipe or conduit. apt# 309: remodel bathroom. no structural work. no lighting work. replace bathroom window glass. | $15,000 |
| Jul 19, 2007 | Completed final sign-off Oct 2008 | 1008 Larkin St | Frankie English Dba Doe Mabuhay Builders | apt#410. repair walls and ceiling after electrical and plumbing was done. replace vanity sink & faucet. no structural work-no lighting, no window.Details
apt#410. repair walls and ceiling after electrical and plumbing was done. replace vanity sink & faucet. no structural work-no lighting, no window. | $10,000 |
| Jul 17, 2007 | Never finaled issued Jul 2007, no final | 1008 Larkin St | street space permit only.Details
street space permit only. | ||
| Jul 9, 2007 | Never finaled issued Jul 2007, no final | 1008 Larkin St | F B E And Sons General Const | apt. 101 ktichen and bathroom remodel, apt. 102: kitchen and bathroom remodel, apt. 307: bathroom remodel reapir wall after electrical work was done (to comply with nov 3200787593) no structural, no lighting work, no window.Details
apt. 101 ktichen and bathroom remodel, apt. 102: kitchen and bathroom remodel, apt. 307: bathroom remodel reapir wall after electrical work was done (to comply with nov 3200787593) no structural, no lighting work, no window. | $40,000 |
| Apr 19, 2007 | Never finaled issued Apr 2007, no final | 1008 Larkin St | F B E And Sons General Const | comply with nov# 200707593. no structural work. no lighting work. unit# 103, 104, 107, 303. kitchen & bathroom remodel. unit# 405b, #406a kitchen remodel. studio. total 6 kitchen @ unit# 103, 104, 107, 303, 405b & 406a. total 4 bathrooms @ unit# 103, 104, 107 & 303.Details
comply with nov# 200707593. no structural work. no lighting work. unit# 103, 104, 107, 303. kitchen & bathroom remodel. unit# 405b, #406a kitchen remodel. studio. total 6 kitchen @ unit# 103, 104, 107, 303, 405b & 406a. total 4 bathrooms @ unit# 103, 104, 107 & 303. | $70,000 |
| Apr 19, 2007 | Completed final sign-off Oct 2008 | 1008 Larkin St | F B E And Sons General Const | comply with nov# 200707593. no structural work. no lighting work. apt# 108, 112, 208, 307, 403, 411. repair & patch wall after electrical & plumbing work. new water line & replace sink. less than 20% total walls of the units.Details
comply with nov# 200707593. no structural work. no lighting work. apt# 108, 112, 208, 307, 403, 411. repair & patch wall after electrical & plumbing work. new water line & replace sink. less than 20% total walls of the units. | $30,000 |
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 1008 Larkin St | F B E And Sons General Const | comply with nov#200787593. kitchen and bathroom remodel apt#206a & b, apt#306a & b. replace walls-repalce vanity sink apt#209 Ò. no lighting work no structural work.Details
comply with nov#200787593. kitchen and bathroom remodel apt#206a & b, apt#306a & b. replace walls-repalce vanity sink apt#209 Ò. no lighting work no structural work. | $40,000 |
| Feb 27, 2007 | Completed final sign-off Oct 2008 | 1008 Larkin St | F B E And Sons General Const | work @ apt# 106 only. kitchen & bathroom remodel. existing kitchen (no change to partitions or windows) no structural work. no lighting work.Details
work @ apt# 106 only. kitchen & bathroom remodel. existing kitchen (no change to partitions or windows) no structural work. no lighting work. | $15,000 |
| Feb 23, 2007 | Never finaled issued Feb 2007, no final | 1008 Larkin St | California Constrution Co | reroofing.Details
reroofing. | $51,000 |
| Feb 20, 2007 | Completed final sign-off Oct 2008 | 1008 Larkin St | F B E And Sons General Const | kitchen & bathroom remodel apt# 407 & #206. repair walls after electrical & plumbing was done. apt #211, # 311, # 412. no structural & no lighting work.Details
kitchen & bathroom remodel apt# 407 & #206. repair walls after electrical & plumbing was done. apt #211, # 311, # 412. no structural & no lighting work. | $40,000 |
| Feb 6, 2007 | Never finaled issued Feb 2007, no final | 1008 Larkin St | F B E And Sons General Const | remodel 8 bathroom, 2 on each floor. (community bathroom) no structural work. no lighting work. provide fluorescent lights or occupancy sensors.Details
remodel 8 bathroom, 2 on each floor. (community bathroom) no structural work. no lighting work. provide fluorescent lights or occupancy sensors. | $50,400 |
| Nov 3, 2005 | Never finaled issued Nov 2005, no final | 982 Post St | streetspace and sidewalkDetails
streetspace and sidewalk | ||
| May 31, 2005 | Expired or cancelled expired Mar 2006 | 1000 Larkin St | change use from drug/candy store to grocery install 3 compartment sink, change doors at display refrDetails
change use from drug/candy store to grocery install 3 compartment sink, change doors at display refr | $1,500 | |
| Feb 9, 2005 | Completed final sign-off Mar 2005 | 1008 Larkin St | Fire Protection Retrofit Specialist | renewal 200304253128 for final.Details
renewal 200304253128 for final. | |
| Oct 22, 2004 | Never finaled issued Oct 2004, no final | 1008 Larkin St | Bay Alarm Company | install 1 duct to monitor 1 existing facu.Details
install 1 duct to monitor 1 existing facu. | $798 |
| Apr 25, 2003 | Never finaled issued Jul 2003, no final | 1008 Larkin St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply w/ ordinance #172-02Details
to install fire sprinkler system to comply w/ ordinance #172-02 | $39,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- F B E And Sons General Const (12), Nomellini Construction * Ask For Id * (9), Pyro-Comm Systems, Inc. (4), Terra Nova Industries (4), M Douglas Construction Inc. (3), Mrm Ventures Llc. (3), Fire Protection Retrofit Specialist (2), On-Site Maintenance (2), Rcm Fire Protection Inc. (2), Towey Construction Inc. (2), A.S.T.I. Services (Automatic Sprinkler), Alsterlind Construction Inc., Bay Alarm Company, California Constrution Co, Frankie English Dba Doe Mabuhay Builders, G T M Works Llc Dba Greentree Maint, Hon's Construction Inc., Incom Mechanical Inc, International Fire Equip, International Fire Inc, Quintanilla Milian Construction, Redlog Flooring Services Corp
- Architects
- Steven Hall (3), Jerome Douglas Tobias (2), Marc Dimalanta (2)
- Engineers
- Gerald Neuffer, Kyle Thomas Moyer