Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 65 Liberty St | unit 406: demolish 4ftx1ft area of sheetrock in the hallway, with electrical work. after electrical work is complete, patch and paint in kind.Details
unit 406: demolish 4ftx1ft area of sheetrock in the hallway, with electrical work. after electrical work is complete, patch and paint in kind. | $3,000 |
| Oct 1, 2026 | In progress issued Oct 2026 | 65 Liberty St | unit 307: demolish 4ftx1ft area of sheetrock in the hallway, with electrical work. after electrical work is complete, patch and paint in kind.Details
unit 307: demolish 4ftx1ft area of sheetrock in the hallway, with electrical work. after electrical work is complete, patch and paint in kind. | $3,000 |
| Oct 1, 2026 | In progress issued Oct 2026 | 65 Liberty St | unit# 205: demolish 4ftx1ft area of sheetrock in the hallway. electrical work to be preformed under electrical permit no. elec-26-579. after electrical work is complete, patch and paint in kind.Details
unit# 205: demolish 4ftx1ft area of sheetrock in the hallway. electrical work to be preformed under electrical permit no. elec-26-579. after electrical work is complete, patch and paint in kind. | $3,000 |
| Sep 28, 2026 | In progress issued Sep 2026 | 1599 Green St | unit 101, sheetrock demolition, 5' x 1'. electrical work to be done. electrical permit is elec-26-225. work is in the hallway. re-cover with 5/8" type xDetails
unit 101, sheetrock demolition, 5' x 1'. electrical work to be done. electrical permit is elec-26-225. work is in the hallway. re-cover with 5/8" type x | $3,000 |
| Aug 28, 2026 | Completed final sign-off Sep 2026 | 2023 Folsom St | paint and scrape stair case, 1-3 floors. exterior only to abate nov 202656196. located in the lightwell of the buildingDetails
paint and scrape stair case, 1-3 floors. exterior only to abate nov 202656196. located in the lightwell of the building | $10,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2200 Leavenworth St | repairs for sf facade maintenece ordinance: scrape loose paint off windows, fire escape ladders. remove and patch walls with concrete, prime and paint, street facing. entire bldg.Details
repairs for sf facade maintenece ordinance: scrape loose paint off windows, fire escape ladders. remove and patch walls with concrete, prime and paint, street facing. entire bldg. | $100,000 |
| May 27, 2026 | Completed final sign-off Jul 2026 | 72 Gough St | units 2 and unit 9: & common area: demo, plaster and replace walls in-kind to match (e) kind. interior only ~ 480 sq ft.Details
units 2 and unit 9: & common area: demo, plaster and replace walls in-kind to match (e) kind. interior only ~ 480 sq ft. | $15,000 |
| May 27, 2026 | Completed final sign-off Jul 2026 | 3150 Franklin St | unit 7: replace ceiling of living room, in-kind. all work interior.Details
unit 7: replace ceiling of living room, in-kind. all work interior. | $10,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 105 Lakeview Av | to obtain final inspection for work approved under pa# 202311301725. all work is complete.Details
to obtain final inspection for work approved under pa# 202311301725. all work is complete. | |
| Apr 17, 2026 | Completed final sign-off Apr 2026 | 175 21st Av | to obtain final inspection for work approved under pa#202411014255. all work is complete.Details
to obtain final inspection for work approved under pa#202411014255. all work is complete. | |
| Jan 30, 2026 | Completed final sign-off Apr 2026 | 1675 Clay St | revision to pa #202511189862: new structural reinforcement and foundation work to address existing work.Details
revision to pa #202511189862: new structural reinforcement and foundation work to address existing work. | $40,000 |
| Jan 15, 2026 | Completed final sign-off Mar 2026 | 415 Buchanan St | scraping and painting emergency fire escape. no structural alteration.Details
scraping and painting emergency fire escape. no structural alteration. | $15,000 |
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 835 Pine St | unit #8: plaster repairs in living room wall in-kind, not to exceed 200 sq ft.Details
unit #8: plaster repairs in living room wall in-kind, not to exceed 200 sq ft. | $4,000 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 4714 Balboa St | sow-replacement in kind 2/6 joist, measurement for balcony is 2'x6, wood handrail replacement for juliet balcony and stucco repairs and painting. replacement of 2 retrofit vinyl windows (1 in kitchen and 1 in bedroom) this work will be in compliance w/ nov# 20254409, item 7. visible from street.Details
sow-replacement in kind 2/6 joist, measurement for balcony is 2'x6, wood handrail replacement for juliet balcony and stucco repairs and painting. replacement of 2 retrofit vinyl windows (1 in kitchen and 1 in bedroom) this work will be in compliance w/ nov# 20254409, item 7. visible from street. | $10,500 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 175 21st Av | revision to pa# 202508153185 & 202502240980. replace rotted wall studs and posts per plan.Details
revision to pa# 202508153185 & 202502240980. replace rotted wall studs and posts per plan. | $30,000 |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 3744 16th St | replace 4 x 10 garage door header, 1 joist and blocking replacement in kind at garage roof, fascia 1 x 12' replacement in kind at garage gutter. re-cover the soffit(cantilever) with t-11 114 inches length by 30 inches in kind. outside of garage entrance is street facing.Details
replace 4 x 10 garage door header, 1 joist and blocking replacement in kind at garage roof, fascia 1 x 12' replacement in kind at garage gutter. re-cover the soffit(cantilever) with t-11 114 inches length by 30 inches in kind. outside of garage entrance is street facing. | $5,000 |
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 825 Post St | whole bldg: face maintenence, repair in kind, touch up damaged windows, paint and primer, ext work. all work is exterior. a3 new window max factor.Details
whole bldg: face maintenence, repair in kind, touch up damaged windows, paint and primer, ext work. all work is exterior. a3 new window max factor. | $90,000 |
| Nov 24, 2025 | Completed final sign-off Dec 2025 | 345 Fulton St | unit 50: plaster repairs on ceiling of living room.Details
unit 50: plaster repairs on ceiling of living room. | $5,000 |
| Nov 18, 2025 | Completed final sign-off Apr 2026 | 1675 Clay St | provide new foundation below (e) timber columns and wood framed walls as shown on as 100. remove and replace indicated timber post in kind. provide new post base connections cast into new column footings. remove and replace damaged region of (e) mudsillDetails
provide new foundation below (e) timber columns and wood framed walls as shown on as 100. remove and replace indicated timber post in kind. provide new post base connections cast into new column footings. remove and replace damaged region of (e) mudsill | $60,000 |
| Oct 15, 2025 | Completed final sign-off Oct 2025 | 1950 Franklin St | apt 6 interior: plaster replace/repair on (2) cracked closets. all work in-kind.Details
apt 6 interior: plaster replace/repair on (2) cracked closets. all work in-kind. | $6,000 |
| Oct 9, 2025 | Completed final sign-off Nov 2025 | 25 Capra Wy | unit #105 plaster repairs in living room, 2 bedrooms and partial repairs in kitchen. interior.Details
unit #105 plaster repairs in living room, 2 bedrooms and partial repairs in kitchen. interior. | $15,000 |
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 655 Powell St | make repairs, facade maintenance, remove, prep, and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces. touch ups on windows for any loose paint coats. exterior. repair is in kind.Details
make repairs, facade maintenance, remove, prep, and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces. touch ups on windows for any loose paint coats. exterior. repair is in kind. | $80,000 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 324 Larkin St | apt 4: sheetrock repairs in bathroom. all work interior.Details
apt 4: sheetrock repairs in bathroom. all work interior. | $7,000 |
| Sep 9, 2025 | Completed final sign-off Nov 2025 | 835 Pine St | replace siding 20' x 60' in kind. back of home, like for like materials.Details
replace siding 20' x 60' in kind. back of home, like for like materials. | $45,000 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 1950 Franklin St | plaster repairs in kind, ceilings on bedrooms, hallway and kitchen, one wall in kitchen.Details
plaster repairs in kind, ceilings on bedrooms, hallway and kitchen, one wall in kitchen. | $20,000 |
| Aug 15, 2025 | Completed final sign-off Mar 2026 | 175 21st Av | revision to pa #202502240980 units #204,205,203,201,303,305: remove concrete topping and add alx west coaton balconies. both sides of walls replace two 2x4 studs. comply item #2 on nov #202430828. replace deteriorated plywood sheathing 5'-4"Details
revision to pa #202502240980 units #204,205,203,201,303,305: remove concrete topping and add alx west coaton balconies. both sides of walls replace two 2x4 studs. comply item #2 on nov #202430828. replace deteriorated plywood sheathing 5'-4" | $50,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 3440 20th St | unit 311 and 314 balcony repairs - sister severely deteriorated framing. repair minor deterioration with woodepox or approved equivalent. replace full stucco soffit vents.Details
unit 311 and 314 balcony repairs - sister severely deteriorated framing. repair minor deterioration with woodepox or approved equivalent. replace full stucco soffit vents. | $25,000 |
| Aug 1, 2025 | Completed final sign-off Dec 2025 | 320 Turk St | make repairs, facade maintenence, remove, prep and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces.Details
make repairs, facade maintenence, remove, prep and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces. | $200,000 |
| Aug 1, 2025 | Completed final sign-off Aug 2025 | 337 10th Av | 2 4x4 post replacement in kind, hardware installation on joists at rear deck.Details
2 4x4 post replacement in kind, hardware installation on joists at rear deck. | $8,000 |
| Jul 17, 2025 | Completed final sign-off Sep 2025 | 1920 Pacific Av | units 10 & 12: balcony repairs on joists, macoat application. repair cracker and loose stucco. replace deteriorated guard post at unit 10. replace deteriorated plywood decking and concrete toppings.Details
units 10 & 12: balcony repairs on joists, macoat application. repair cracker and loose stucco. replace deteriorated guard post at unit 10. replace deteriorated plywood decking and concrete toppings. | $40,000 |
| Jul 7, 2025 | Completed final sign-off Aug 2025 | 1008 Larkin St | common area work: interior plaster repairs on common area due to water damage. hallway interior work, drywall repairs needed.Details
common area work: interior plaster repairs on common area due to water damage. hallway interior work, drywall repairs needed. | $20,000 |
| Apr 30, 2025 | Completed final sign-off Jun 2025 | 10 Glendale St | unit #101: water proofing using alx stucco repairs and inkind ventilation.Details
unit #101: water proofing using alx stucco repairs and inkind ventilation. | $40,000 |
| Mar 12, 2025 | Completed final sign-off Apr 2025 | 240 St Josephs Av | approx. 15 sq ft of in kind stucco repairs (street visible), and replace fire rated ventilation on unit #114 (replacement in kind).Details
approx. 15 sq ft of in kind stucco repairs (street visible), and replace fire rated ventilation on unit #114 (replacement in kind). | $14,000 |
| Feb 24, 2025 | Completed final sign-off Apr 2026 | 175 21st Av | sb721 structural repairs, water proofing structural repairs, stucco replacement. to comply with nov #202430828 #2. repair decks unit 301,101,103,104,105,201Details
sb721 structural repairs, water proofing structural repairs, stucco replacement. to comply with nov #202430828 #2. repair decks unit 301,101,103,104,105,201 | $120,000 |
| Feb 21, 2025 | Expired or cancelled cancelled Jul 2025 | 990 Fulton St | 1st to 5th floors.- replacement of plaster in kind, hallway will have new plaster. 25 sqft wide typical on each floor. replace plaster in kind.Details
1st to 5th floors.- replacement of plaster in kind, hallway will have new plaster. 25 sqft wide typical on each floor. replace plaster in kind. | $20,000 |
| Feb 12, 2025 | Completed final sign-off Jun 2025 | 10 Glendale St | fascial and water proofing, units 307 and 308 visible from streetDetails
fascial and water proofing, units 307 and 308 visible from street | $30,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 375 24th Av | remove and replace about 50 lineal feet of wood fascia adjacent to a 2nd story walkway.Details
remove and replace about 50 lineal feet of wood fascia adjacent to a 2nd story walkway. | $30,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 365 24th Av | remove and replace about 5o lineal feet of wood fascia adjacent to a 2nd story walkway.Details
remove and replace about 5o lineal feet of wood fascia adjacent to a 2nd story walkway. | $30,000 |
| Jan 10, 2025 | Completed final sign-off Mar 2025 | 57 Taylor St | unit 106: sheetrock repairs, cabinet repair, bathroom and kitchen carpet removal and installation of new wood floor. the work is to address nov: 2024-30858.Details
unit 106: sheetrock repairs, cabinet repair, bathroom and kitchen carpet removal and installation of new wood floor. the work is to address nov: 2024-30858. | $19,000 |
| Nov 15, 2024 | Completed final sign-off Dec 2024 | 1509 Haight St | painting flake removal. painting of stairwelll of emergency fire landing.Details
painting flake removal. painting of stairwelll of emergency fire landing. | $9,500 |
| Nov 1, 2024 | Completed final sign-off Oct 2025 | 630 Alvarado St | units 102,103,104,202,204 will be exploratory demolition on under side of balcony. units 103 203 303 will be shoring to support compromised balconiesDetails
units 102,103,104,202,204 will be exploratory demolition on under side of balcony. units 103 203 303 will be shoring to support compromised balconies | $8,600 |
| Nov 1, 2024 | Expired or cancelled expired Apr 2026 | 175 21st Av | units 101,202,203 tempo shoring to support compromised balconies units 101, 103,104,105,203,204 will be exploratory demo on under side of balconiesDetails
units 101,202,203 tempo shoring to support compromised balconies units 101, 103,104,105,203,204 will be exploratory demo on under side of balconies | $8,600 |
| Oct 18, 2024 | Completed final sign-off Aug 2025 | 324 Larkin St | make repairs per facade inspection report per sf facade maintenance ordinance program (sffmp) remove, prep and recoat lose and failing coating through exterior facade. repair instances of spalling concrete. seal open pentrations. secure unsecured pipes and wiring, replace cracked bricks includingDetails
make repairs per facade inspection report per sf facade maintenance ordinance program (sffmp) remove, prep and recoat lose and failing coating through exterior facade. repair instances of spalling concrete. seal open pentrations. secure unsecured pipes and wiring, replace cracked bricks including | $120,000 |
| Oct 8, 2024 | Completed final sign-off Oct 2024 | 100 Lake St | wood siding repairs on 2 small walls by the tradesman's alley. primer and exterior painting lke for like. not visible from street. repair in kind.Details
wood siding repairs on 2 small walls by the tradesman's alley. primer and exterior painting lke for like. not visible from street. repair in kind. | $9,500 |
| Jun 28, 2018 | Completed final sign-off Jul 2018 | 1175 Pierce St | 1175 pierce street: repair of sheetrock wall between living room and kitchen wall, approx 96sf. repair of 4 walls cabinets, work to be preformed in unit, not in common area. to comply with nov2018700061.Details
1175 pierce street: repair of sheetrock wall between living room and kitchen wall, approx 96sf. repair of 4 walls cabinets, work to be preformed in unit, not in common area. to comply with nov2018700061. | $2,500 |