Block 0343, lot 001
57 Taylor St
100 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2025 | Completed | 57 Taylor St | Redlog Flooring Services Corp | unit 106: sheetrock repairs, cabinet repair, bathroom and kitchen carpet removal and installation of new wood floor. the work is to address nov: 2024-30858. | $19,000 |
| Aug 8, 2024 | In progress | 39 Taylor St | install (n) projecting 3ftx3ft round double side illuminated box sign facing street for "yemeni kabab and mediterrian" | $3,000 | |
| Jul 25, 2024 | Completed | 39 Taylor St | R.L.Jones Construction | existing restaurant tenant move in. install new cooking equipment in (e) kitchen. | $2,000 |
| May 29, 2024 | Completed | 39 Taylor St | Bay Star Fire Protection, Inc | existing automatic fire extinguishing system. (hood and duct suppression system) | $4,500 |
| Jun 21, 2023 | Completed | 57 Taylor St | B-Side Inc. | unit# 120: remodeling (e) one kitchen. remodeling (e) one bathroom. no moving walls. no exterior work. | $15,000 |
| Apr 18, 2023 | Never finaled | 55 Taylor St | Esquivel Grading & Paving, Inc. | alteration of sub-sidewalk basement roof slab to install new sidewalk. | $252,599 |
| Jan 23, 2023 | Completed | 57 Taylor St | Bay Area Activo Inc. | repair parapet wall at roof level, not visible from street | $20,000 |
| Dec 19, 2022 | Completed | 57 Taylor St | B-Side Inc. | unit 200: remodeling existing: (1) kitchen in kind, (1) bathroom in kind. no moving walls no exterior work | $15,000 |
| Dec 6, 2022 | Never finaled | 57 Taylor St | B-Side Inc. | unit# 138: remodeling (e) kitchen and bathroom. no removing walls. no exterior work. | $15,000 |
| Nov 15, 2022 | Never finaled | 57 Taylor St | B-Side Inc. | apt #156- kitchen and bathroom remodel, no wall removal. no exterior work. | $15,000 |
| Nov 3, 2022 | In progress | 105 Turk St | demolish an existing 1-story, type 5b, commercial building at 105 turk st address, as wll as surface parking in order to build a residential building on the property. (e) 5-story residential bldg on the same lot to remain. | $300,000 | |
| Nov 3, 2022 | In progress | 105 Turk St | erect a 18-story over one basement level, type i, mixed use building with 116 residential units and assembly. | $30,000,000 | |
| Jun 7, 2022 | Never finaled | 57 Taylor St | Quintanilla Builders Inc | unit #154: bathroom rehab. kitchen cabinets replacement. | $25,000 |
| Jun 7, 2022 | Completed | 57 Taylor St | Quintanilla Builders Inc | unit #426: bathroom rehab. kitchen cabinets replacement. | $25,000 |
| Mar 18, 2022 | Completed | 57 Taylor St | Quintanilla Builders Inc | unit 354: replace kitchen cabinets, replace all flooring, replace bathroom tile vanity and toilet. | $20,000 |
| Mar 15, 2022 | Completed | 65 Taylor St | Ps2 Inc | demo of (e) restroom and building (n) single occupancy restroom on ground floor of (e) vacant commercial space. | $20,000 |
| Feb 9, 2022 | Completed | 57 Taylor St | Quintanilla Builders Inc | unit 142: replace kitchen cabinets, full paint. replace bathroom tile and vanity. | $15,000 |
| Nov 29, 2021 | Completed | 57 Taylor St | Axel8 Construction | #334. convert (e) kitchen to bedroom. relocate kitchen, rehab (e) bathroom, install washer and dryer. | $60,000 |
| Sep 20, 2021 | Completed | 57 Taylor St | Axel8 Construction | unit #424: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. 4)no removal of stuctural walls. | $30,000 |
| Jul 20, 2021 | Completed | 57 Taylor St | Axel8 Construction | unit 122: install one new clothes washer and dryer. no wall demo. add new closet. | $5,000 |
| Jun 4, 2021 | Never finaled | 57 Taylor St | Axel8 Construction | rehabilitate kitchen & bathroom. | $35,000 |
| Jan 29, 2021 | Completed | 57 Taylor St | Axel8 Construction | unit 456: rehabilitate existing kitcen, rehabilitate existing bathroom. install washer & dryer in existing closet. no framing work, no structural work. | $35,000 |
| Oct 19, 2020 | Completed | 57 Taylor St | Axel8 Construction | unit 422: rehabilitate (e) kitchen, (e) bathroom. install washer & dryer in (e) closet. no removal of any walls. | $28,000 |
| Aug 31, 2020 | Completed | 57 Taylor St | Aguilera Construction Company | unit 434 - remove and replace bathroom fixtures - same location; remove and replace kitchen fixtures - same location; kitchen & bathroom remodel in kind approx 500 sf | $30,000 |
| Aug 10, 2020 | Never finaled | 57 Taylor St | Axel8 Construction | revision to pa# 202007270820. change project location to unit# 220, was prevfiously submitted for wrong unit. | |
| Jul 27, 2020 | Completed | 57 Taylor St | apartment #44: rehabilitate existing kitchen and bath, install washer/dryer in existing closet. no removal of walls | $30,000 | |
| Feb 10, 2020 | Expired or cancelled | 57 Taylor St | unit #434; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $40,000 | |
| Jan 17, 2020 | Expired or cancelled | 65 Taylor St | repair e cracked brick wall at gr fl level | $2,000 | |
| Jan 8, 2020 | Completed | 57 Taylor St | Aguilera Construction Company | unit # 148: remodel kitchen and bathroom in kind. no structural work. approx 150 sq ft. | $25,000 |
| Nov 13, 2019 | Completed | 57 Taylor St | Axel8 Construction | unit 302: rehab kitchen 64 sqft (e). rehab bathroom 44 sq ft (e) install washer and dryer. | $22,000 |
| Oct 4, 2019 | Never finaled | 57 Taylor St | Axel8 Construction | street space | |
| Sep 11, 2019 | Expired or cancelled | 65 Taylor St | t.i. on ground & b/ fl. new foot/facial massage, coffee bar, yoga studio, accessiible restrooms, platform lift, staff rooms, new partitions, lighting, mechanical, electrical & plumbing, no exterior changes | $250,000 | |
| Aug 30, 2019 | Never finaled | 57 Taylor St | Axel8 Construction | unit 222: rehab existing kitchen and bathroom. kitchen 8'x9' and bathroom 7'x7'. no change to floor layout. | $18,000 |
| Aug 30, 2019 | Never finaled | 57 Taylor St | Axel8 Construction | unit # 114: rehab existing kitchen and bathroom. 7'x8'kitchen and 6'x6' bathroom. no change of existing floor plans. | $18,000 |
| Aug 30, 2019 | Never finaled | 57 Taylor St | Axel8 Construction | $18,000 | |
| Aug 27, 2019 | Expired or cancelled | 67 Taylor St | existing fire sprinkler system ti 101 sprinklers | $51,000 | |
| Aug 20, 2019 | Completed | 57 Taylor St | Hue & Cry Security System | volutary upgrade of fire alarm with like for like panel and addition of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1 n/a for maher | $181,000 |
| Jul 15, 2019 | Never finaled | 39 Taylor St | street space | ||
| May 29, 2019 | Never finaled | 57 Taylor St | Rosendin Electric, Inc. | street space | |
| Feb 19, 2019 | Never finaled | 39 Taylor St | Flow Masters Plumbing Inc | reconfigure (e) fire sprinkler system t.i. relocate (e 4" main: relocate 5 sprinkler heads to area behind new pg&e vault, relocate 2 sprinkler heads to north of vault, relocate 4 sprinkler heads and add 1 within foot print of vault | $20,000 |
| Feb 7, 2019 | Completed | 39 Taylor St | Canning Electric Inc | 2 new pg and e vaults to be installed in basement below sidewalk, new retaining walls for vaults | $20,000 |
| Nov 13, 2018 | Completed | 57 Taylor St | Axel8 Construction | unit 322: rehabilitate bathroom and kitchen | |
| Nov 13, 2018 | Expired or cancelled | 57 Taylor St | Axel8 Construction | unit 336: rehabilitate existing kitchen in-kind. rehabilitate existing bathroom in-kind. no structural work. | $20,000 |
| Nov 13, 2018 | Completed | 57 Taylor St | Axel8 Construction | rehabilitate existing bathroom and kitchen in kind. no structural work. | $20,000 |
| Nov 13, 2018 | Completed | 57 Taylor St | Axel8 Construction | rehabilitate e kitchen in kind, existing bath in kind. no structural unit 232 | $20,000 |
| Nov 13, 2018 | Completed | 57 Taylor St | Axel8 Construction | unit 330: rehabilitate existing kitchen in-kind. rehabilitate existing bathroom in-kind. no structural work. | $20,000 |
| Nov 13, 2018 | Completed | 57 Taylor St | Axel8 Construction | unit # 132. rehabilitate e kitchen in kind, existing bath in kind. no structural | $20,000 |
| Nov 13, 2018 | Expired or cancelled | 57 Taylor St | Axel8 Construction | rehabilitate e kitchen in kind, existing bath in kind. no structural | $20,000 |
| Nov 13, 2018 | Expired or cancelled | 57 Taylor St | Axel8 Construction | rehab (e) bathroom in-kind, rehab (e) kitchen in-kind | $20,000 |
| Oct 18, 2018 | Completed | 57 Taylor St | Erc Renovation Inc | unit # 114 -revision to pa# 201809119683, to correct nov# 20187811 should not be 20185641 | |
| Sep 11, 2018 | Completed | 57 Taylor St | Erc Renovation Inc | replace kitchen cabinets like for like per nov 201885641 & 20185641. all work in unit number 6 | $2,000 |
| Oct 18, 2017 | Expired or cancelled | 57 Taylor St | United California Glass And Door | unit #110: in-kind bathroom window replacement. not visible from the street. maher na | $6,500 |
| Apr 7, 2016 | Expired or cancelled | 57 Taylor St | structural repair of damaged granite caps on (2) column in the basement. | $3,000 | |
| Mar 22, 2016 | Completed | 39 Taylor St | Joe Leo Loeser | grd fl: relocate and lower counters. new half/"pony" wall in sink area to cover plumbing. add handrail and fill in non-closing windows. change from empty pizzaria to cake and chocolate shop. sprinklers deferred, if required. | $5,850 |
| Dec 23, 2015 | Expired or cancelled | 57 Taylor St | remove (e) stair & replace w/new code compliant stairs. n/a maher ordinance | $2,000 | |
| Dec 8, 2015 | Expired or cancelled | 57 Taylor St | Nomellini Construction * Ask For Id * | unit 112: kitchen & bathroom remodel. | $18,000 |
| Nov 4, 2015 | Expired or cancelled | 67 Taylor St | commercial ti, scope of work involves new interior walls, floor and ceiling finishes, kitchen equipment, restrooms and light fixtures. the new restaurant will have an updated mechanical, electrical and plumbing system. maher na. no exterior changes under this permit application. maher not req. | $380,000 | |
| Jul 7, 2015 | Completed | 57 Taylor St | Nomellini Construction * Ask For Id * | unit 228: one kitchen & one bath remodel. | $18,000 |
| Jun 23, 2015 | Completed | 57 Taylor St | Nomellini Construction * Ask For Id * | unit #300 kitchen & bathroom. paint apartment. n/a for maher | $33,000 |
| Jun 2, 2015 | Completed | 57 Taylor St | Nomellini Construction * Ask For Id * | unit #136: repair & replace kitchen & bath cabinets, supply plumbing & elec to new areas of remodel,install tile, counter tops fixtures, redo hardwood or supply vinyl flooring,paint apartment,no structural work or wall work. | $18,000 |
| Apr 28, 2015 | Never finaled | 57 Taylor St | street space | ||
| Apr 8, 2015 | Never finaled | 65 Taylor St | Towey Construction Inc. | addition of new exit stair between basement & first flr. maher - not req'd | $3,000 |
| Dec 31, 2014 | Expired or cancelled | 57 Taylor St | Towey Construction Inc. | add revision to permit 201411050745; add footings at 6x6 tube steel bases under sidewalk | $13,000 |
| Dec 3, 2014 | Completed | 57 Taylor St | Jim Parr Dba Plumbing | relocate 12 (e) spinklers and add 2 new sprinklers on ground fl lobby area; plug 2 sprinklers; relocate fdc. ref ti 2014-0409-2804. n/a for maher. | $3,000 |
| Nov 18, 2014 | Completed | 57 Taylor St | Pyro-Comm Systems, Inc. | 1/f & lobby: fire alarm ti associated with permit #2014-0409-2804 | $3,000 |
| Nov 5, 2014 | Expired or cancelled | 57 Taylor St | Towey Construction Inc. | repair of vaulted sidewalk. ref.2014.0409.2804. maher n/a. | $50,000 |
| Oct 14, 2014 | Expired or cancelled | 57 Taylor St | Towey Construction Inc. | remove steel beams and add new 10x10 dug fir posts, revision for permit 201409166496; maher n/a | $3,200 |
| Sep 16, 2014 | Expired or cancelled | 57 Taylor St | Towey Construction Inc. | remove 2 x 14 beams + replace with psi, install i beams on 1st floor & double up an existing floor joist & install tap flange hangers & plywood floor. n/a maher ordinance | $120,000 |
| Aug 12, 2014 | Expired or cancelled | 57 Taylor St | Nomellini Construction * Ask For Id * | units 116, 146, 306, 312 remove existing kitchen & bath cabinets. relocate plumbing and electrical to new locations. tile kitchen & bath floors. install laminate flooring or redo hardwood. paint apartment. no removal of walls. compliance with ord 155-13 n/a | $72,000 |
| Jul 21, 2014 | Completed | 57 Taylor St | Nomellini Construction * Ask For Id * | to comply with nov 201456991, item #2. replace broken windowin unit 400. compliance with ord 155-13 not required | $300 |
| Jun 17, 2014 | Never finaled | 57 Taylor St | street space | ||
| Jun 4, 2014 | Expired or cancelled | 57 Taylor St | Nomellini Construction * Ask For Id * | remove existing cabinets, supply electrical & plumbing to new kitchen and bath remodel for units 108, 154, 206, 212, 242, 350. provide laminate flooring or refinish hardwood. paint apartment. compliance with ord 155-13 not required | $90,000 |
| May 13, 2014 | Expired or cancelled | 57 Taylor St | Nomellini Construction * Ask For Id * | remove existing kitchen and bath cabinets, provide electrical and plumbing to existing locations, paint and refinish existing hardwood or provide laminate flooring. no changes in layout, no walls moved, removed or added (unit 326 & 406). compliance with ord 155-13 not required | $30,000 |
| Apr 23, 2014 | Never finaled | 57 Taylor St | street space permit | ||
| Apr 17, 2014 | In progress | 55 Taylor St | street space w/mta | ||
| Apr 17, 2014 | In progress | 105 Turk St | street space w/mta | ||
| Apr 16, 2014 | Completed | 57 Taylor St | Nomellini Construction * Ask For Id * | unit 428: remove/replace (e) kitchen & bath cabinetes, provide electrical & plumbing to (e) locations, paint, refinish (e) hardwood. | $12,000 |
| Apr 9, 2014 | Expired or cancelled | 39 Taylor St | Towey Construction Inc. | renovate existing ground floor exterior storefronts, remodel of existing residential lobby and existing manager's unit. n/a ordinance #155-13. | $70,000 |
| Feb 26, 2014 | Expired or cancelled | 57 Taylor St | Nomellini Construction * Ask For Id * | units #118, 140, 144, 150, 248, 302, 314, 340. remove (e) kitchen cabinets, provide elect. & plumb. to all units. new kitchen & bath remodel for all units. install granite floors, paint & refinish flooring or provide laminate flooring. | $144,000 |
| Sep 30, 2013 | Never finaled | 55 Taylor St | Jupiter Enterprises Inc | t.i. work - drop 2 fire sprinkler heads due to add ceiling to existing fire sprinkler systems. orig pa #2013.06.04.8610 | $200 |
| Sep 11, 2013 | Never finaled | 105 Turk St | street space permit | ||
| Aug 29, 2013 | Completed | 55 Taylor St | San Francisco Fire Protection | fire alarm 1 existing horn strobe will be relocated to new location and new horn/strobe added in kitchen area. new device tied into existing circuit and existing power supply. ti permit 201306048610 | $1,000 |
| Jun 4, 2013 | Completed | 55 Taylor St | Presidio Builders | space #55-renovate (e) vacant art gallery space into an art/music gallery. (e) a-3 occup & (e) gallery use & musical performances will added to space. tenant improvement include new walls, new theatrical trusses, new doors & renovation of elecl & mech systems. new occ load verification req. | $60,000 |
| Jun 3, 2013 | Never finaled | 55 Taylor St | to obtain final inspection for work approved under pa 200812229060; all work is complete | ||
| Oct 1, 2012 | Expired or cancelled | 57 Taylor St | New High Protection Roofing | reroofing | $44,000 |
| Feb 10, 2012 | Completed | 57 Taylor St | San Francisco Fire Protection | emergency panel replacement-repl (e) spectronics fire panel w/new silent knight 5820xl hybrid fire control panel to connect to (e) 7 system sensor 4-wire smoke detectors, 16 notifier pull stations, 21 fire bells, added 1 heat detector. added 1 silent knight power supply for smoke detectors, as built | $1,500 |
| Jun 9, 2011 | Completed | 57 Taylor St | Kerley Construction Inc | replace extg aluminum door with new aluminum door same size. | $9,500 |
| Dec 6, 2010 | Completed | 57 Taylor St | San Francisco Fire Protection | add 6 smoke detectors for elevator recall | $2,000 |
| Aug 26, 2010 | Expired or cancelled | 67 Taylor St | exterior demolition & storefront remove glass & brick-replace with new glass & aluminum systems; structure to remain | $50,000 | |
| Aug 24, 2010 | Never finaled | 67 Taylor St | street space & meter | ||
| Aug 12, 2010 | Completed | 57 Taylor St | Ebding Construction | fire sheetrock elevator door way. | $10,000 |
| May 15, 2009 | Never finaled | 55 Taylor St | Carter Brothers Fire & Life Safety | add new fire alarm devices to new ti space. all devices are added to existing fa system. 8 horn strobes, 1 strobe, 2 pull stations, 1 smoke det, 1 booster panel. t.i. appl#200812229060. | $5,600 |
| Apr 16, 2009 | Never finaled | 55 Taylor St | Rcm Fire Protection Inc. | extend existing fire sprinkler system from basement to street level for a new gallery. this is an addition of new 46 upright heads. | $15,000 |
| Dec 22, 2008 | Expired or cancelled | 55 Taylor St | Teamwrkx Construction | space #55 taylor. tenant improvement. studios & gallery. gray area gallery. mep under seperate permit | $350,000 |
| Sep 9, 2008 | Expired or cancelled | 39 Taylor St | erect an electric, illuminated, double faced projecting sign. | $700 | |
| Nov 10, 2003 | Completed | 67 Taylor St | remodel storage, mezzanineto correct nov # | $2,000 | |
| Jan 29, 2003 | Expired or cancelled | 105 Turk St | add electric opener - rev. to pa#2002/03/26/2338 - umb | $5,000 | |
| Mar 26, 2002 | Completed | 101 Turk St | revision to permit 200111163363 add security gate | $1,000 | |
| Nov 16, 2001 | Completed | 57 Taylor St | Great Wall, Inc. | provide handicap entramce to bath | $5,000 |
| May 26, 2000 | Expired or cancelled | 101 Turk St | revision: # 9705840 handicapped entrance |