Farshad Khodayari
- Listed as
- engineer
- Firm
- Soha Engineers
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Aug 2023
19 permits since 2000 (engineer on 19 permits): 11 completed, 2 in progress, 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 30, 2023 | In progress issued Oct 2023 | 201 Eddy St | Esquivel Grading & Paving, Inc. | sidewalk replacement and waterproofing over sub-sidewalk basement roof slab. pole support for new street light and traffic signal.Details
sidewalk replacement and waterproofing over sub-sidewalk basement roof slab. pole support for new street light and traffic signal. | $120,407 |
| Aug 22, 2023 | In progress issued Oct 2023 | 216 Eddy St | Esquivel Grading & Paving, Inc. | sidewalk replacement and waterproofing over sub-sidewalk basement roof slab.Details
sidewalk replacement and waterproofing over sub-sidewalk basement roof slab. | $105,164 |
| Jun 26, 2023 | Never finaled issued Aug 2023, no final | 302 Ellis St | Esquivel Grading & Paving, Inc. | sidewalk replacement and waterproofing over sub-sidewalk basement adjustment of elevator frame to new sidewalk upgradeDetails
sidewalk replacement and waterproofing over sub-sidewalk basement adjustment of elevator frame to new sidewalk upgrade | $57,427 |
| Jun 6, 2023 | Never finaled issued Aug 2023, no final | 225 Taylor St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new sidewalkDetails
alteration of subsidewalk basement roof slab to install new sidewalk | $252,598 |
| Apr 18, 2023 | Never finaled issued Aug 2023, no final | 55 Taylor St | Esquivel Grading & Paving, Inc. | alteration of sub-sidewalk basement roof slab to install new sidewalk.Details
alteration of sub-sidewalk basement roof slab to install new sidewalk. | $252,599 |
| Mar 13, 2023 | Never finaled issued Aug 2023, no final | 162 Taylor St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new sidewalkDetails
alteration of subsidewalk basement roof slab to install new sidewalk | $80,903 |
| May 18, 2022 | Never finaled issued Apr 2023, no final | 108 Taylor St | Esquivel Grading & Paving, Inc. | modify portion of sub sidewalk basement over sidewalk to accomodate public works improvement projectDetails
modify portion of sub sidewalk basement over sidewalk to accomodate public works improvement project | $150,000 |
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Sep 30, 2020 | Completed final sign-off Sep 2023 | 945 Green St | Burke Construction, Danziger Builders | unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room.Details
unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room. | $194,589 |
| Nov 15, 2019 | Completed final sign-off Feb 2022 | 825 Kearny St | Cahill Contractors Llc. | repair of existing deteriorated steel beam in basement of existing buildingDetails
repair of existing deteriorated steel beam in basement of existing building | $3,000 |
| May 15, 2019 | Completed final sign-off May 2021 | 825 Kearny St | Granite Excavation & Demolition Inc | portions of should piles between 827 kearney and 825 kearney hand dug concrete underpinning piers & temp. concrete foundation & pipe shores for (e) super structure & exterior stair.Details
portions of should piles between 827 kearney and 825 kearney hand dug concrete underpinning piers & temp. concrete foundation & pipe shores for (e) super structure & exterior stair. | $70,000 |
| May 15, 2019 | Completed final sign-off May 2021 | 728 Washington St | Granite Excavation & Demolition Inc | temporary tiebacksDetails
temporary tiebacks | $20,000 |
| May 15, 2019 | Completed final sign-off May 2021 | 827 Kearny St | Granite Excavation & Demolition Inc | sequential excavation & replacement of soil with lean concrete at 827 kearny, soldier piles & wood lagging at kearny st & within the project site. portions of wood lagging & soldier piles between 827 kearny & 825 kearny & stabilization of brick wall.Details
sequential excavation & replacement of soil with lean concrete at 827 kearny, soldier piles & wood lagging at kearny st & within the project site. portions of wood lagging & soldier piles between 827 kearny & 825 kearny & stabilization of brick wall. | $200,000 |
| Mar 23, 2015 | Completed final sign-off Jan 2016 | 747 Howard St | Webcor Construction Lp | moscone expansion project: (phase-1a) installation of tieback system along the western side of 3rd street between folsom and howard streets. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
moscone expansion project: (phase-1a) installation of tieback system along the western side of 3rd street between folsom and howard streets. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $454,599 |
| Jul 5, 2012 | Completed final sign-off Oct 2015 | 1301 03rd St | Charles Pankow Builders Ltd | rehabilitation and renovation of an existing (vacated) fire station to become a community room and office for sffd. part of the public safety building project ref. bpa #201110066246. spinklers, spinkler monitoring and fire alarm are under separate permit.Details
rehabilitation and renovation of an existing (vacated) fire station to become a community room and office for sffd. part of the public safety building project ref. bpa #201110066246. spinklers, spinkler monitoring and fire alarm are under separate permit. | $3,700,000 |
| Jun 7, 2012 | Completed final sign-off Aug 2012 | 50 California St | Arb Inc | revision to appl #2012.03.07.5525 (37th floor): extended plate at unit mounting rail.Details
revision to appl #2012.03.07.5525 (37th floor): extended plate at unit mounting rail. | |
| Mar 7, 2012 | Completed final sign-off Aug 2012 | 50 California St | Arb Inc | 37th floor - replace 3 transformers in pg&e vault with 3 dry transformers of roughly equal weight, provide seismic anchorage. space full sprinklers protected, to remain.Details
37th floor - replace 3 transformers in pg&e vault with 3 dry transformers of roughly equal weight, provide seismic anchorage. space full sprinklers protected, to remain. | $100,000 |
| May 11, 2011 | Completed final sign-off Nov 2011 | 450 Sansome St | Bcci Construction Company | revision to pa# 2007-1003-4450-structural changes to details on sheet s-2.0Details
revision to pa# 2007-1003-4450-structural changes to details on sheet s-2.0 | $500 |
| Nov 16, 2010 | Completed final sign-off Oct 2012 | 17 Stockton St | provide sub-sidewalk closure wall, inside the property, for sfmta central subway projectDetails
provide sub-sidewalk closure wall, inside the property, for sfmta central subway project | $30,000 |