Block 0235, lot 022

50 California St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 1, 2026In progress50 California St27/fl- new exhaust fan vav's air and water balancing, insulation of ductwork. ref 202608196842$15,000
Sep 17, 2026In progress50 California StRichlen Constructionexisting interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.$3,942,870
Aug 20, 2026In progress50 California StRichlen Constructionsuit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.$859,574
Aug 19, 2026In progress50 California StPrincipal Builders Inc.level 27; alterations to conference rooms, storage area and employee break room. mep deferred.$2,862,400
Aug 10, 2026In progress50 California StBcci Construction Companyinterior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permit$75,000
Jul 8, 2026In progress50 California StPrincipal Builders Inc.l27: suite 2750 non-structural demo per ab-017$25,000
Jul 6, 2026In progress50 California StSwinerton Builders16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building.$2,234,736
May 28, 2026In progress50 California StSc Builders, Incunit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.$1,308,872
Apr 29, 2026In progress50 California Stconstruction of new roof terrace over (e) roof above 2/f.$1,000,000
Apr 29, 2026In progress50 California StSkyline Construction2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge.$3,790,509
Apr 27, 2026In progress50 California StCraddaar Corp Dba Solano Signschanel letter sign, ext 001, electric, single faced, 2" thickness. "bank of america"$1,300
Apr 27, 2026In progress50 California StCraddaar Corp Dba Solano Signs2) aluminum plate letters, ext 002 & 003, non-electric, single faced sign, 3/16" thickness. "bank of america"$2,200
Mar 26, 2026Completed50 California StCorporate Sign Systemsinstall 3 evacuation maps on 28th floor.$1,065
Mar 24, 2026Completed50 California StHoneywell International, Incas-built ti: add (6) smoke detectors and (4) duct detectors. arch ref# 202510036672$1,000
Feb 5, 2026Completed50 California StHoneywell International, Inc28th fl ref pa #2025-1003-6672: fire alarm ti. demo 1 relay mod 7 duct detectors 6 smoke detectors 8 ceiling speaker strobes. add 29 ceiling speakers 8 smoke detectors 8 duct detectors 11 relay mods 11 dual motor mods 15 rib relays 22 auxiliary relays pam 1 emergency door release.$15,000
Dec 16, 2025Completed50 California StAnderson, Rowe & Buckley, Inc.28th floor: modify sprinkler location. plugged 7, relocate upright 3, relocate pendent 154$30,000
Nov 4, 2025Completed50 California StRichlen Construction35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete.
Oct 3, 2025Completed50 California StSc Builders, Inc28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.$4,135,200
Sep 2, 2025Completed50 California StHoneywell International, Inc26/f suite 2670: fire alarm tenant improvement. demo (1) ceiling speaker, (6) ceiling speaker strobes, (1) smoke detector, (4) duct detectors, (4) relay module. install (6) ceiling speaker/strobes, (1) smoke detector. ref ti permit 202506279667$5,500
Aug 19, 2025Completed50 California StAnderson, Rowe & Buckley, Inc.26th fl, ste 2670 fire sprinkler ti ref 202506279667 relocate 5 add 2 total 7$3,602
Jun 27, 2025In progress50 California StR.M.R. Construction Company26/f tenant improvment of existing suite 2670 including demo of non structural partitions, new non-structural partitions, door, ceilings, millwork, finishes, and light fixtures$432,708
May 28, 2025Completed50 California StHoneywell International, Inc26/f: fire alarms to add 4 speaker/strobe and 1 smoke detector, relocate 1 speaker/strobe. ref pa# 202503071783.$2,500
May 16, 2025In progress50 California Stste #3150 31st/f: t.i. demo of non structural partitions, new non structural paritions, doors, ceilings, millwork, finishes, hvav, plumbing fixtures, electrical outlets, finishes, & light fixtures. no change in use or occupancy & no change in fl area. no structural work$1,120,520
May 15, 2025In progress50 California StHoneywell International, Inc16th, 26 & 38th fl ref pa 202309287611: total 9 relays added. 3 relays on each fl. sequence, relocation matrix, smoke control- all updated as per latest 50 california jobs under seperate permits. these are recently updated as per fire review$113,134
Apr 14, 2025Completed50 California StAnderson, Rowe & Buckley, Inc.26th fl ref pa # 2025-0307-1783 existing fire sprinkler system- tenant improvements relocate 4 sprinklers$2,400
Mar 31, 2025Completed50 California StGolden Gate Fire Protection Incfire sprinkler t.i add 2 concelaed pendent in phone booths on the 25/f$500
Mar 7, 2025In progress50 California StR.M.R. Construction Company26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.$440,198
Feb 21, 2025Completed50 California StHoneywell International, Inc35th fl - fire alarm ti. demo (3) speaker/strobes, (22) speakers, (22) strobes, (6) smokes, (6) ducts install 33 speaker/strobes, 3 strobes, 6 duct detectors, 2 dual input modules, 1 power supply, 1 door release arch ref 202406265293$12,500
Feb 7, 2025In progress50 California StRichlen Construction2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.$14,000
Jan 22, 2025Completed50 California StSkyline Construction35th floor: arch revision to pa # 202406265293: change to door hardware at elevator lobby doors. adding mag locks.$4,000
Jan 8, 2025Completed50 California StHoneywell International, Inc35th/f as built to fire alarm pa 202411205415: change camdela to 30 cd per fire inspector
Dec 18, 2024In progress50 California StBcci Construction Company24th fl- ref pa # 2024-0904-9993 structural for movable partitions
Dec 12, 2024In progress50 California StHoneywell International, Inc24th/f ref to t.i. 202409049993: demo 3 speakers & 5 strobes, relocate 2 speakers, install 1 speaker strobe, 1 wall strobe, 1 ceiling strobe ref 202409049393$3,500
Dec 9, 2024Completed50 California StAyoob & Peery Plumbing Co Inc24th/f: record as built for 202410283852 update drawing for adjusted piping plan & final sprinkler job 24-673. ref to 202409049993
Nov 20, 2024Completed50 California StHoneywell International, Inc35/f: fire alarm modification. ref pa 202406245061. demo 22 speakers, 20 strobes, 3 smoke detectors and 12 duct detectors. install 6 duct detectors, 10 rib relays, 10 dual monitor module.$26,585
Nov 19, 2024Completed50 California StHoneywell International, Inc35th floor: fire alarm t.i.: demo 3 speaker strobes, 22 strobes, 22 speakers, 6 smokes, 6 duct detectors, 4 door holders. install 33 speaker speaker/strobes, 3 strobes, 1 duct detectors, 2 dual input modules, 1 power supply, 1 door release. ref #202405222693/mech #202407257297$22,000
Nov 15, 2024In progress50 California StHoneywell International, Inc36/fl- ti 202405222693 and 202407257297- fire alarm ti demo (6) speaker/strobes. remove and replace w/ (n) 5 speaker/strobe, 2 smoke detectors, duct detector, and emergency door release. relocate speaker/strobe install 34 (n) speaker/strobe, 5 smokes, 6 (n) strobes$12,500
Oct 28, 2024Completed50 California StAyoob & Peery Plumbing Co Inc24th floor: add 16 relocate 15 fire sprinkler per t.i. job # 24-673. ref pa #202409049993$19,254
Oct 17, 2024Completed50 California StCapitol Electric Const24th fl - provide new lights and associated circuiting/controls for restrooms. ref pa 202408078122$8,530
Oct 17, 2024Completed50 California StGolden Gate Fire Protection Inc35/f: relocate (125) pendent sprinklers and relocate (45) uprights on the 35th floor. ti ref# 202406265293$42,500
Oct 15, 2024In progress50 California StBcci Construction Company24/f: mechanical and electrical work to support approved arch # 202409049993. office ti.$75,000
Oct 10, 2024In progress50 California StSkyline Constructionrevision to previously approved architectural permit# 202406265293: (35th floor) clarification of partition detail d5 and e5 as non fire rated.
Oct 3, 2024Completed50 California StGolden Gate Fire Protection Increlocate 147 pendant sprinklers and relocate 25 uprights on the 36th flr. t.i #202212138199 & 202308234993$43,000
Sep 25, 2024Completed50 California StSkyline Construction35/fl-ref 202406265293 - office ti for finishes, walls, and floors to include mep work includes ductwork, lighting, power receptacles. mep deferred submitial$1,000,000
Sep 17, 2024In progress50 California StHoneywell International, Inc36th floor: fire alarm t.i. demo 6 speaker/strobes. replace 5 speaker/strobes, 2 smoke detectors, 1 duct detector. relocate and replace 1 speaker/strobe. install 34 speaker/strobes, 6 strobes, 5 smokes. ref pa 202405222693$12,500
Sep 4, 2024In progress50 California StBcci Construction Company24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or area$1,721,466
Aug 26, 2024In progress50 California StGolden Gate Fire Protection Inc35 and 36/flr- ref 202212138199 and 202308234993 office ti to relocate 125 pendent sprinklers and relocate 45 uprights on the 35th floor and relocate 147 pendents sprinklers and 25 uprights on the 36th floor.$85,500
Aug 7, 2024Completed50 California StRichlen Construction24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred$195,721
Jul 25, 2024Completed50 California StSkyline Construction36th/flr -ref ti 202405222693- mep work for office ti$1,000,000
Jul 12, 2024Completed50 California StHoneywell International, Inc31st fl fire t.i. - demo 10 speaker/strobes, 2 speakers, 1 smokes, 2 ducts, 2 relays, 2 emergency door release relocate/replace with new 17 speaker/strobes, 5 smokes. install new 5 speaker/strobes, 2 duct detectors, 1 smoke, 3 relays. arch ref pa# 202403157924$22,000
Jul 3, 2024Completed50 California StHoneywell International, Inc36/f: fire alarm tenant as builts. ref pa# 202311020022$13,500
Jul 2, 2024In progress50 California StGolden Gate Fire Protection Incadd 129 upright sprinklers with new system on the 35th floor. aydraulic calculations included. ref pa#202306150127$38,700
Jun 26, 2024Completed50 California StSkyline Construction35th fl. office t.i. includes installation of new finishes, floors, walls mep deffered on spearate application$5,000,000
Jun 24, 2024In progress50 California StRichlen Construction35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.$192,560
Jun 21, 2024Completed50 California StHoneywell International, Inc28th fl: fire alarm tenant improvement as builts$12,000
May 22, 2024Completed50 California StSkyline Construction36th fl: office ti installation of new finishes, floors & walls. mep deffered on separate application$5,000,000
May 2, 2024Completed50 California StIngram Fire Protection Incfire sprinkler ti , relocate 64 heads, add 5 heads, tied to building 202403157924$18,745
Apr 2, 2024In progress50 California St30th floor- office ti to include soft demo to remove and replace partitions, ceiling tile replace in kind, fixtures and finishes. upgrade restrooms to ada requirements.$272,650
Mar 15, 2024Completed50 California StDpr Construction A31/f: demolition of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, light, new demising partitions and non-rated common corridor. no change in occupancy, use or area.$2,551,472
Feb 27, 2024In progress50 California StHoneywell International, Incfire alarm add 3 monitor modules for new sprinkler equipment ref pa 2023-1101-9957$5,000
Feb 15, 2024In progress50 California StHoneywell International, Inc34th & 35th floors: t.i. 35th floor demo 12 ceilig spreaker strobes, 4 ceiling spreakers, 1 ceiling storbes, 2 smokes, 1 duct detectors, 1 heat detector, 2 relays. 34th floor:demo 3 ceiling speaker/strobes. demo permit pa# 20230615127.$5,000
Jan 16, 2024Completed50 California StAyoob & Peery Plumbing Co Incbasement as-builts to pa# 202311019957, add 23 pendent fire sprinklers per ti job# 23-672.$14,285
Dec 22, 2023In progress50 California StAyoob & Peery Plumbing Co Inc21st floor: record as built for pa#202309116331. capture final locations of added and relocated sprinkler head per field inspector. job #23-654. ref #202304055082$4,348
Dec 20, 2023In progress50 California StHoneywell International, Incfire alarm tenant improvement suite 2150 21st fl. demo 2 ceiling speaker strobbes, add 13 celing spkr strobes and 1 smoke detector$15,000
Nov 2, 2023In progress50 California StHoneywell International, Inc36th fl: fire alarm tenant improvement. ref 202212138199.$22,000
Nov 1, 2023Completed50 California StAyoob & Peery Plumbing Co Incbasement: add 52 fire sprinklers per t.i.. install new control valve, main & branch lines for upgraded ev car charge areas, hagers, and seismic bracing for new sprinkler pipe.$34,949
Oct 11, 2023Completed50 California StHoneywell International, Inc13/f suite 1350: f/a t.i. demo (18) ceiling speaker/strobes, (1) ceiling speaker, (4) smoke detectors. add (1) smoke detector, (12) ceiling speaker/strobes, (7) ceiling strobes. ref permit 202303304700$6,500
Oct 11, 2023Completed50 California StHoneywell International, Inc28/f: f/a t.i. demo (35) ceiling speaker, (31) wall strobes, (31) smoke detectors, (3) ducts. relocate (7) smoke detectors, (1) pull station. add (10) ceiling speaker/strobes. ref permit 202306260808$5,500
Sep 28, 2023In progress50 California StHoneywell International, Incfire alarm modification on 16th, 26th and 38th fl. maintained existing fire alarm 500$113,134
Sep 19, 2023In progress50 California StHoneywell International, Incvoluntary fire alarm domo 34th /35 fl. relocate 3 ceiling speakers/strobes (35th fl) & 1 wm speaker/strobe (34th). demo 35th (12) speakers/strobes, 4 speakers, 1 strobe, 2 smoke detectors, 1 duct and 1 heat.$2,000
Sep 11, 2023Completed50 California StAyoob & Peery Plumbing Co Inc21/f: add 7 relocate 49 fire sprinkler per t.i. job# 23-654. ref t.i. 202304055082$34,782
Sep 7, 2023Completed50 California StR L H Fire Protection Incvoluntary elevator modernizatyion per sffd letter. remove 23 existing fire sprinklers in elevator pits only. no other work to system.$5,000
Aug 24, 2023Never finaled50 California StSotello Graphic Associates21/f: make new drawing, manufacture and install 4 evacuation maps$2,938
Aug 23, 2023Completed50 California StGolden Gate Fire Protection Increplace e fire sprinkler s ystem. add 1 38 upright sprinklers to replace existing sprinlker system. hydraulic calculations included$75,900
Jun 27, 2023Completed50 California StAyoob & Peery Plumbing Co Inc28th fl - sprinkler modifications ref pa 2023-0626-0808. 3 relocates and 134 changeouts in-kind.$85,090
Jun 26, 2023Completed50 California StRichlen Construction28th fl - demo of partitions, ceilings, finishes and millwork; remodel of (e) restrooms and elevator lobby. the space will remain unoccupied after this project. any future ti's will be under separate permit. no new plumbing fixtures$469,000
Jun 15, 2023Completed50 California StRichlen Construction35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel$289,880
Jun 13, 2023Completed50 California StHoneywell International, Inc10/f: adding (3) speaker strobes, (2) strobes, (2) speakers$6,800
Jun 8, 2023Completed50 California StHoneywell International, Inc21st floor remodel - devices added, 2 input modules$6,800
Jun 8, 2023Completed50 California StHoneywell International, Incdemising wall removal devices impacted 21st floor$5,000
May 31, 2023Completed50 California StAyoob & Peery Plumbing Co Inc13/f: add (33), relocate (51) fire sprinklers per ti. ref permit 202303304700$52,172
Apr 18, 2023Completed50 California StRichlen Construction10th fl: interior alterations. demo, ceiling grid, mill work, electrical and mechanical$400,000
Apr 5, 2023Completed50 California StRichlen Construction21/f ste# 2150 spec suite: tenant improvement, new non-structural paritions, doors, ceilings, millwork,hvac, plumbing, electrical, finishes and light fixtures.$1,309,680
Apr 4, 2023Never finaled50 California StGolden Gate Fire Protection Incfire sprinkler: relocate 17 pendents, 1 upright and 3 concealed pendents ref t.i. #2023-0113-0143$13,020
Mar 30, 2023Completed50 California StRichlen Construction13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvac$1,938,674
Mar 29, 2023Completed50 California StAnderson, Rowe & Buckley, Inc.21st fl: relocate 37 pendent, add 18 upright, add 9 pendents, add 1 upright sprinkler. ref to 2023 0130 1025$39,000
Mar 21, 2023Never finaled50 California StHoneywell International, Inc21/f: fa modification: add 24 sprinklers/strobs, 1 strobe, 1 dual sync module, 1 smoke dtc, 2 duct dtc, 3 rib relays, 4 control relay, 2 mushroom push buttom door release, relocate 2 sprinkler/strobes$28,000
Mar 3, 2023Expired or cancelled50 California Stdemo of non structural partitoins, doors, millwork, finishes, electrical. new non structural partitoins, doors, glazing, finishes, electrical. mep deferred$131,400
Jan 30, 2023Completed50 California StPrincipal Builders Inc.21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work.$2,839,105
Jan 13, 2023Expired or cancelled50 California Stpartial floor interior tenant office improvement to suite 2750 on 27th fl. scope of work includes slective demo, new partitions, doors, ceilings. mech, elec, plumbing design build under deferred or sep permit. no change of use$250,000
Jan 13, 2023Completed50 California StRichlen Construction21st fl - construction of (n) common corridor, elevator lobby and demising walls. scope includes (n) non-structural walls, electrical outlets, (n) floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shell$180,000
Dec 13, 2022Completed50 California StRichlen Constructionnon structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred.$16,000
Dec 2, 2022Never finaled50 California StHoneywell International, Inc6th fl - f/s modification; add 11 speaker/strobes; 4 smoke detectors; 4 door holders; (2) rib relays; 2 control relays; relocate 1 smoke detectors$14,000
Nov 16, 2022Never finaled50 California StHoneywell International, Incref pa# 202209065431. fls modification on 6/f: install (26) sprinklers; (3) strobes; (1) smoke detector; (2) duct detectors; (4) rib relays; (3) control relays; (1) dual synch modules. relocate (2) spkr/strobes.$25,000
Nov 2, 2022Never finaled50 California StGolden Gate Fire Protection Incfire sprinkers - add 105 pendent sprinklers and relocate 3 uprights on the 6/f. ti. ref #202209061885 & 202210174484. ste 600$56,700
Nov 2, 2022Completed50 California StGolden Gate Fire Protection Incfire sprinkers - add 57 pendent sprinklers and relocate 6 uprights on the 6/f. ti. ref #202209273178 & 202210174484$33,075
Oct 28, 2022Completed50 California StHoneywell International, Incthis is an asbuilt permit for approved fls pa# 202207128236 & 20220953491. the changes are: (1) update location of red phone (work by oters), (2) update address of (1) duct detector & (1) smoke detector; (3) update strobe power supply as "existing", (4) update voice messaging/announcement ...$1,000
Oct 17, 2022Completed50 California StGolden Gate Fire Protection Inc6th fl - fire sprinklers add 135 uprights for a new system$69,850
Oct 17, 2022Completed50 California StGolden Gate Fire Protection Inc21st fl - fire sprinklers add 127 uprights for a new system. hydraulic calculation included$69,850
Sep 30, 2022Completed50 California StHoneywell International, Incref pa# 2022-0712-8236: this is an as-built permit for pa# 2022-0712-8136, the only changes under this permit is to add 2 strobes synch module and to update the sprinkler/strobe, brand due to this change, the strobe voltage drop and battery calculations has been updated$840
Sep 27, 2022Completed50 California StRichlen Construction6/f ti consisting of (n) non structural partitions, doors, ceiling, lights, millwork, finishes and mep.$786,168
Sep 15, 2022Never finaled50 California StSotello Graphic Associates23rd/f: install evacuation map$3,100
Sep 6, 2022Completed50 California StRichlen Constructiont.i. non structural partitions, doors, ceiling, lights, millwork, and finishes.$1,440,000
Aug 25, 2022Never finaled50 California StPrincipal Builders Inc.23/f revision to pa 202207269318 and 202204252951 update occupant load for conf rm 102
Aug 23, 2022Completed50 California StPrincipal Builders Inc.23/f: rev to pa202207269318 & 202206287275: provide anchorage detail of high density shelving unit.
Aug 23, 2022Completed50 California StHoneywell International, Incref pa# 202204262977. 6/f fls modification: install 8 spk/strobes, 7 s/d, 7 d/d, 22 pam -1, 11 rib relays, 11 dual monitor modules, 3 ctrl relays, 1 power supply, 1 nac mod, replace 2 duct det and 2 pull station with new.$35,000
Aug 23, 2022Completed50 California StHoneywell International, Incref pa# 202204262977. 6/f fls modification: install 8 spkn/strobes, 7 s/d, 7 d/d, 22 pam -1; 11 rib relays, 11 dual monitor modules, 3 replace 2 duct det and 2 pull station and 5 smoke detector with new.$35,000
Jul 26, 2022Completed50 California StPrincipal Builders Inc.23rd/f: revision 202204252951. minor partition, door, and finishes changes
Jul 14, 2022Completed50 California StPribuss Engineering Incfire sprinkler ti for office space ref gc permit 202204252951 total 162 heads$83,268
Jul 12, 2022Completed50 California StHoneywell International, Inc29/f: fa addition: demo (2) speaker/strobes, add (6) speaker/strobes, replace (1) strobe power supply with new. ref pa 202204051586.$4,000
Jul 12, 2022Completed50 California StHoneywell International, Inc23/f: fa addition: fa modification - add (35) spkr/strbs, (2) strbs, (4) spkn det, (3) duct det, (6) rib relays, (4) pam-1, (2) monitor mods, (5) control relays, (2) emergency door rlease, replace (1) rps, relocate (5) spkr/strbs, (1) smoke det, (1) duct detector$38,000
Jun 30, 2022Never finaled50 California StGolden Gate Fire Protection Incfire sprinklers, relocate 4 pendents. ref to t.i. 2022 0405 1586.$2,100
Jun 28, 2022Completed50 California StPrincipal Builders Inc.23/f-24/f: strengthening of existing steel framing for installation of a new high density shelving unit.$25,000
Jun 2, 2022Completed50 California StRichlen Constructiondemo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.$160,000
May 26, 2022Completed50 California StPrincipal Builders Inc.23/f deferred mep associated with pa 202204252951$800,000
May 12, 2022Completed50 California StR L H Fire Protection Inc23rd fl: fire sprinkler permit install a new shell system on the 23rd floor 140 new sprinkler heads. 202204252951$50,000
Apr 26, 2022Completed50 California StRichlen Construction6/f: demo of (e) non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/a.$160,000
Apr 25, 2022Completed50 California StPrincipal Builders Inc.23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred.$1,600,000
Apr 5, 2022Completed50 California StRichlen Construction29/f t.i. ste #2900: new non structural partitions, finishes, millwork, & mep.$650,000
Mar 28, 2022Never finaled50 California St# 1902a & 1902b: per sffd inspector, occupancy load signs will be added to 1902a & 1902b.
Feb 25, 2022Completed50 California StHoneywell International, Inc23rd fl: fire alarm modification. demo devices in tenant space. install 8 speaker/strobes, 6 smoke detectors, 6 duct detectors, 10 rib relays, 10 pam-1 relays, 10 dual monitor modules, 2 cntr relays. replace 2 duct detectors & 2 pull stations. ref pa# 202110080093$28,000
Jan 6, 2022Never finaled50 California Stresubmittal of previously approved and completed pa# 201412184046 for purpose of confirming occupant load at break area #2635 in order to submit a permit to operate as required by sffd inspector michelle li, ref nov# 21120001
Nov 4, 2021Completed50 California StCapitol Electric Constprovide power and lighting for restrooms and vistibule area on 11th and 12th fl 202012161094$8,530
Oct 8, 2021Completed50 California StRichlen Construction23rd floor:revision to bpa#202107214842. new restroom, const of non struct walls, plumb, fixtures & restroom accessories & elec outlets as well as new floor & walls finishes & light fixtures on unocupied floor. add of mep systems to warm shell condition.$60,000
Jul 21, 2021Completed50 California StRichlen Constructiondemo of (e) non-structural partitions, power/data, millwork, plumbing & ceilling systems including removal of hazardous materials on an unoccupied fl. space will remain unoccupied, any future bulid outs will be under a sep permit at which time accessibilit documentaion will be provided$100,000
May 11, 2021Completed50 California StHoneywell International, Incref pa 2020-1217-1240 (stairs); 2020-1217-1216 (12/f); 2020-1217-1247 (11/f); f/a addition on 11/f & 12/f; add (75) spkrs/strbs; (15) strobes; (20) smk detectors; (2) door holders; (4) emergency door release; (19) cntrl rlys; (4) monitor modules; (9) duct detectors; (2) strobe power supply; (2) cn..$80,630
Apr 27, 2021Never finaled50 California StG Swanson Constr. Inc.1st fl: installation of a new wellness room. to comply with california state labor code chapter 3.8, lactation accomodation sections 1030-1034.$5,500
Mar 11, 2021Completed50 California StGolden Gate Fire Protection Incfire sprinklers; relocate 88 pendents, 39 uprights and 18 concealed pendents on the 11th foor. relocate 99 pendents, 34 uprights and 34 concealed pendents on the 12th floor. upgrade end of line bracing and eaerthquake bracing. t.i. ref# 2020-10-19-6863 11th floor 2020-12-17-1246 12th$149,000
Jan 29, 2021Completed50 California StRichlen Constructionselective demolition of an exterior trellis and planter. no change in occupancy, use, or area.$8,865
Dec 17, 2020Completed50 California StHathaway Dinwiddie Co.existing office tenant improvements for 11th fl. interior demo under pa# 202010196863.$1,092,700
Dec 17, 2020Completed50 California StHathaway Dinwiddie Co.existing office tenant improvement to 12th floor. interior demo under pa# 202010196863.$1,092,700
Dec 17, 2020Completed50 California StHathaway Dinwiddie Construct Coa new communication stair and portal between 11th & 12th fl.$700,000
Dec 16, 2020Completed50 California StRichlen Construction11th and 12th floor restroom upgrade: selective demolition of finishes, restroom plumbing fixtures & accessories & lighting. construction of non-structural partitions, plumbing & electrical fixtures & all finishes. no change in occupancy, use, or area.$352,776
Dec 9, 2020Completed50 California StHoneywell International, Incref. p/a 2020-0926-5160. 2nd floor f/a modification: demo (2) emergency door releases & (2) spkr/strobes; add (1) control relay; (2) smoke detectors; (2) rib relay; (1) emergency door release; (4) spkr/strobes; (1) strobe; (1) spkr.$6,240
Dec 8, 2020Completed50 California StR L H Fire Protection Incfire sprinkler permit. relocate 11 and add 5 pendent sprinklers on the 2nd floor. t.i. # 2020-0926-5160$5,000
Dec 3, 2020Never finaled50 California StHoneywell International, Incref p/a 2020-1002-5766. 4th & 5th addition: demo (12) spkrs/strbs and (1) smoke detector and (13) spkrs/strobes & (4) control relay$9,740
Dec 2, 2020Never finaled50 California StM C S Construction Servicessuite #200: deferred mechanical & electrical. upgrades to electrical and mechanical systems. added power requirements. ti reference pa #2020-0926-5160.$120,000
Nov 12, 2020Never finaled50 California St4/f: deferred mechanical & electrical work for t.i. ref pa 202010025766 maher n/a.$120,000
Oct 29, 2020Never finaled50 California StAyoob & Peery Plumbing Co Incref demo permit 2020-1019-6863. 11th floor: change out one hundred and thirty nine (139) sprinklers 12th floor: change out one hundred and thirty nine (139) sprinklers$62,550
Oct 19, 2020Never finaled50 California St11/f & 12/f: selectrive demo of non-load bearing partitions, celings, light fixtures, millwork, finishes, electrical and plumbing. abatement of haz mat as indicated. maher n/a. (sprinkler ti for this project submitted under 2020-1029-$247,512
Oct 2, 2020Never finaled50 California StSkyline Construction4/f: demo of non-structural interior paretiions doors, finishes, celings. new partiitions, doors, finishes, lighting. mep under sep permits. maher n/a.$1,301,429
Sep 26, 2020Never finaled50 California StM C S Construction Servicessuite 200: demo of non-structural partitions, doors, millwork, finishes, electrical and plumbing. new non-strutural partitions, doors, glazing, electrical & finishes. no change in occupany or use. no floor area increases. maher n/a.$127,022
Sep 2, 2020Completed50 California StAnderson, Rowe & Buckley, Inc.4th fl: added 1 sprinkler head relocate 31 sprinkler heads$16,000
Sep 1, 2020Completed50 California StHoneywell International, Incref# 202007099908; f/a mod on 33rd fl: remove devices in sheet f8.1. replace 2 pull stations, 2 duct detectors; add 45 spkr/strbs; 1 spkr; 16 smk det; 6 control relays; 1 strobe power supply; 1 control module; 5 door holders; 3 emergency door release; 6 duct detectors; 23 rib; 11 monitor module.$57,260
Aug 21, 2020Never finaled50 California StGolden Gate Fire Protection Inc33rd floor: fire sprinkler only. relocate 196 pendent sprinklers and 3 uprights.t.i. ref app#202007099908$100,940
Aug 5, 2020Completed50 California StM C S Construction Services#2525: deferred mep submittal. ref app#202003056276. provide power for t.i.
Jul 23, 2020Expired or cancelled50 California St25th fl - to document accessible toilet in women's restroom to remain in existing location. all other conditions will be code compliant. addition of 25th fl technical infeasibility request (sheet 25rr-2) 25rr-1;modified demo and construction sheet notes, modified accessory & toilet locations,$32,365
Jul 16, 2020Never finaled50 California StGolden Gate Fire Protection Incadd new sprinker system on the 33/f. add 128 upright sprinklers. add new end of line bracing and earthquake bracing. hydraulic calculations included. t.i ref pa#201912200152$67,200
Jul 9, 2020Completed50 California StPrincipal Builders Inc.33rd floor only. construction includes new partitions, finishes, lighting, and equipment.$2,000,000
Jul 7, 2020Completed50 California StAnderson, Rowe & Buckley, Inc.plug 6 sprinklers, relocate 6, add 1 ref 201912099043$3,500
Jun 3, 2020Completed50 California StHoneywell International, Incsuite 2525: add (3) speaker/strobes and (2) speakers to fire alarm$7,630
May 21, 2020Completed50 California StR L H Fire Protection Inc25/f: fire sprinkler t.i., (8) relocated fire sprinklers. ref bpa#202003056276$3,136
Mar 5, 2020Completed50 California StM C S Construction Servicessuite 2525: modification of existing ti to include construction of non-load bearing partitions, modification to existing ceiling grid & tile, new light, fixtures including reswitching, new office finishes, millwork & sink. maher na$200,000
Feb 27, 2020Completed50 California StRichlen Construction25th floor: upgrade toilet room for accessibility. barrier removal only. no change in occupancy, use or area.$32,365
Dec 20, 2019Completed50 California StGolden Gate Fire Protection Inc33rd flr. fire sprinkler only - demo - relocate 112 uprights for 33rd fl.$56,000
Dec 17, 2019Completed50 California StRichlen Construction33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher na$114,120
Dec 9, 2019Completed50 California StDpr Construction31st floor: selective demolition of non-structural partitions, doors/glazing, ceiling, lights & finishes. construction of new partitions. doors/glazing, ceiling, lights & patching of finishes. no changes in use or area.$176,657
Oct 11, 2019Completed50 California StHoneywell International, Incref pa 201907035113; 25th fl. ste 2500 f.a. modification : install 10 (n) speaker/strobe, 3 rib relays & 3 control relays, replace 1 strobe power supply, remove 8 speaker/strobes.$4,020
Oct 8, 2019Completed50 California StHoneywell International, Incbsement f.a modification; add 2 smoke detectors; 2 heat detectors; 4 control relays; 1 montor module; 2 aux relay;$4,620
Oct 4, 2019Completed50 California StAcco Engineered Systems Inc. Dba Acco En34th fl - remove & replace 1 water source heat pump with like for like unit. reconnect to existing power, condenser water supply and return and condensate connections$8,700
Oct 4, 2019Completed50 California StSwinerton Buildersrevision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425.
Sep 26, 2019Never finaled50 California StWestates Mechanical Corporation Incsuite 2500: modify fire sprinklers as tenant improvement in the area of work, all (e) branchliner and main piping beyond the areas of work are to remain, relocate (7) pendent fire sprinklers. ref t.i. pa201907035113. maher n/a.$6,000
Aug 8, 2019Expired or cancelled52 California Stprovide and install new nitrogen infused coffee dispenser.//the total amount of nitrogen is 18lbs, there are 6 kegs of 3 lbs each... this does not require an operational permit according to cfc 105.6.11$8,500
Jul 3, 2019Completed50 California StSwinerton Builderssuite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.$500,000
Jun 3, 2019Completed50 California StGci, Inc13th fl - ti of (e) office - replace all interior finishes & furniture, ceiling & tiles, electrical$267,000
Feb 7, 2019Completed50 California StHoneywell International, Incas built for approved f/a permit #201811145804. add scope: software changes to program 3rd fl as a separate fire alarm zone from 2nd fl, due tothe removal of interconnected stairs.
Jan 18, 2019Completed50 California StGolden Gate Fire Protection Incfire sprinkler only- relocate 1 head; add 4 pendents for turner & towsend on the 18th fl.$2,500
Jan 16, 2019Never finaled50 California StPeacock Constructiont-24 - mechanical & electrical for work under pa #201812117945. 27th fl. maher na$3,000
Dec 11, 2018Completed50 California StPeacock Constructionselective demo and construction of non-structural partitions, doors and frames, modify (e) grid and tile, relocate light fixtures add new$15,000
Nov 14, 2018Completed50 California StBcci Construction Companyref pa# 201810102728; drawings to suppoprt previously approved architechual set. includes the installation of duct work and equipment$45,000
Nov 14, 2018Completed50 California StHoneywell International, Incf/a modifications on 3rd fl: install 12 speaker/strobesl 1 speaker, 1 control relay, 1 smoke detector, relocate 4 speaker/strobes. ref pa #201810102728.$8,900
Nov 1, 2018Completed50 California StAnderson, Rowe & Buckley, Inc.sprinklers 3rd floor-ref pa# 201809251352; (e) fire sprinklers system - t.i. (4) added sprinklers, (15) relocated sprinklers$9,500
Oct 10, 2018Completed50 California StBcci Construction Company3rd flr. new parititions, doors, ceilings, light fixtures and finishes. no change of use. maher n/a$1,000,000
Oct 2, 2018Expired or cancelled50 California St4/f: rev to pa201711174223: new technical infeasibility request for previously permited work for water closet location in mens restroom ada stall. maher n/a.
Sep 25, 2018Completed50 California StBcci Construction Companyremove extg interior stairs between 2nd and 3rd floor. infill stair opening at 3rd floor. infill interior stair opening at 3rd floor.$50,000
Aug 28, 2018Completed50 California StHoneywell International, Inc18th fl f/a modification - replace 1 strobe power supply; relocate 4 speakers/strobes; add 30 speaker/strobes; 11 strobes; 4 smoke detecros; 3 control relays; 1 dual monitor module; 10 rib relays; 3 emergency door release; 2 door holders; 4 duct detectors$37,810
Aug 23, 2018Completed50 California StHoneywell International, Inc18th fl l- replace 6 speaker strobes; 5 smoke detectors 1 nac module. install 11 dual monitor modules; 11 rib relays; 2 smoke detectors; 7 duct detectors; 1 speaker/strobes; 2 control relays; 2 pull stations. ref pa 2018-0208-0808$24,070
Aug 22, 2018Completed50 California StGolden Gate Fire Protection Inc18/f: fire sprinkler only revised fire sprinkler plan requested by inspector in field 2 pendent in space now. ref #201807184814
Jul 18, 2018Never finaled50 California StGolden Gate Fire Protection Inc18/f: fire sprinkler only. relocate 75 pendents & 112 uprights for 18th fl spec suite. plug off 11 pendents. ref #201805108789.$46,750
May 21, 2018Never finaled50 California StAnderson, Rowe & Buckley, Inc.31st floor: extg fire sprinkler system t.i 3 relocated sprinklers and 2 added sprinklers. n/a for maher$1,600
May 17, 2018Completed50 California StHoneywell International, Incfire alarm modification on 31st fl add 1 speaker strobe, demo 1 speaker$616
May 10, 2018Completed50 California StSkyline Constructioninterior tenant renovation of 18th fl. lobby, open office and comf. rms. including new partitions, finishes & lighting, mech, elec, plumbing and fire protection$2,500,000
May 8, 2018Never finaled50 California StHoneywell International, Inc4th flr - as built fa ref 201802090903; n/a maher
Apr 13, 2018Completed50 California StDpr Construction(n) non-structural partitions & doors, lighting & ceiling, finishes. no change in occupancy, use, or area$176,000
Mar 29, 2018Completed50 California StHoneywell International, Incf/a modification on the 15th & 16th fl: 15- install (7) spreakers; (8) strobes; (2) dor rel; (1) control relay, replace (4) smoke detectors with new; relocate (3) speakers; demo (6) strobe, (5) speakers. 16- install (4) speakers; (3) strobes; (3) strobe replaces with new; demo (6) smoke detectors.$17,668
Mar 22, 2018Never finaled50 California StPribuss Engineering Incsuites 1500 & 1600: fire sprinkler ti (ref app# 201801047832) relocated sprinklers = 21 heads, added sprinkler = 4 heads, total = 25 heads; maher ord 155-3 na$12,850
Mar 16, 2018Completed50 California StHoneywell International, Incf.a. modification on 31st floor, install (2) duct detectors for the heat pump, (2) rib relays (1) control relay; (1) control relay, (1) aadc1 analog loop cond$5,192
Mar 14, 2018Completed50 California StField Construction Inc.electrical lighting plans (20th floor) and title 24 certificates of compliance only; reference p.a. #201803143593; change rcp to accurately rflect exsting condidions (revision to pa 2018-0131-0046)$50,000
Mar 7, 2018Completed50 California StAyoob & Peery Plumbing Co Inc20th flr ti: add 3 and relocate 4 sprinkler to conform with the new wall/ceiling layout of the ti ref 201801310046 maher na$2,475
Feb 9, 2018Completed50 California StHoneywell International, Incref pa 2017-1117-4223 f/a modification on 4th floor; install (8) speaker/strobes; (1) smoke detectors; 1 rib relay; 1 magnetic door holder. remove 4 ceiling speaker/strobes and 1 smoke detector$6,464
Feb 8, 2018Completed50 California StSkyline Constructiondemo of non structural partitions and ceiling of 18th fl warm shell condition and 18th fl restroom. barrier and finishes upgrades. suite to remain unoccupied unit a tenant improvement is filed per ab 017. not ti under separate permit maher not req...sprinklers separte demo permit$550,000
Feb 1, 2018Completed50 California StDpr Construction31 st flr - installation of 2 new heat pumps, minor ceiling removal/reinstallation, control commissioning maher na ref pa 201411050746$203,000
Jan 31, 2018Completed50 California StField Construction Inc.20th floor:minor demo, new partitions, minor ceiling work and finish refresh. meps on seperate permit.nn/a for maher$175,000
Jan 30, 2018Never finaled50 California StSkyline Constructionmechanical and electrical work for ti 1 (n) vav box relocate supply grilles. new lighting and electrical. ref pa 2017-1117-4223$60,000
Jan 19, 2018Never finaled50 California StGolden Gate Fire Protection Inc18th - fire sprinkler only. demo plan remove all pendents and return to uprights at the outlets. maher na$28,000
Jan 16, 2018Completed50 California StHoneywell International, Inc8th floor: f/a modification, add (3) sprinklers and (1) 1 sprinkler/strobe, ref. pa#201712055567$2,464
Jan 10, 2018Completed50 California StAnderson, Rowe & Buckley, Inc.4th flr (e) fire sprinkler system ti 16 relocated sprinklers, 1 added sprinkler. maher na$25,000
Jan 4, 2018Completed50 California StRichlen Construction15th and 16th floors: partial renovation of extg office suites. total 1482 sq. feet: breakroom, hallway, reception area. n/a for maher$439,000
Dec 12, 2017Completed50 California StAnderson, Rowe & Buckley, Inc.8th floor: suite 850 fire sprinkler t.i. relocate 1 head and add 1 head. ref app#201712055567. n/a for maher$800
Dec 5, 2017Completed50 California StDpr Construction8th flr, suite 850: addition of 3 new phone rooms constructed from demountable partitions from furniture vendor maher na$20,000