Hathaway Dinwiddie Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 111 permits filed
2,989 permits since 2000: 2,253 completed, 59 in progress, 297 never finaled, 380 expired or cancelled.
Of the 297 never-finaled permits, 13 are 3 to 5 years old, 73 are 5 to 10 years old, 211 are over 10 years old. 19 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 2,989.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 301 Howard St | rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout.Details
rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout. | $1,500 |
| Sep 18, 2026 | In progress issued Sep 2026 | 185 Berry St | revision to open permit#202602125816, design changes, revised evcs stall location.Details
revision to open permit#202602125816, design changes, revised evcs stall location. | |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 2801 Geary Bl | construct ext wall at kitchen storage room property line. upgrade accessible restroom demo rear deck stair.Details
construct ext wall at kitchen storage room property line. upgrade accessible restroom demo rear deck stair. | $15,000 |
| Sep 2, 2026 | In progress issued Sep 2026 | 1800 Owens St | roof-revision 202406255203 to mount roof top equipmentDetails
roof-revision 202406255203 to mount roof top equipment | |
| Aug 10, 2026 | In progress issued Aug 2026 | 505 Howard St | deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411pDetails
deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411p | |
| Aug 6, 2026 | In progress issued Aug 2026 | 301 Howard St | suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred.Details
suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred. | $256,025 |
| Aug 4, 2026 | In progress issued Aug 2026 | 101 California St | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only).Details
revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only). | $3,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 505 Howard St | install evacuation maps. (level 6,7, & 8)Details
install evacuation maps. (level 6,7, & 8) | $2,000 |
| Jul 22, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition.Details
revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition. | |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | revision phone booths under 202505287420 floors 16. area of work fl 16, add focus podsDetails
revision phone booths under 202505287420 floors 16. area of work fl 16, add focus pods | |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | 8th floor: phone booth revision per pa #202509125222.Details
8th floor: phone booth revision per pa #202509125222. | |
| Jul 10, 2026 | In progress issued Jul 2026 | 101 California St | 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope.Details
12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. | $5,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 1 California St | 22/fl- ref 202604229900- mep workDetails
22/fl- ref 202604229900- mep work | $750,000 |
| Jun 22, 2026 | In progress issued Jul 2026 | 185 Berry St | revisions from 202602266569 - permit set are clouded, tagged and include updates to restroom scope updates per architectural ceiling and wall changes, constructibility coordination.Details
revisions from 202602266569 - permit set are clouded, tagged and include updates to restroom scope updates per architectural ceiling and wall changes, constructibility coordination. | |
| Jun 9, 2026 | In progress issued Jun 2026 | 185 Berry St | provide mechanincal and electrical for pa#2025-1208-1164Details
provide mechanincal and electrical for pa#2025-1208-1164 | $90,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 505 Howard St | mech revisions for 8th floor ti permit # 202510207678.Details
mech revisions for 8th floor ti permit # 202510207678. | |
| Jun 3, 2026 | Completed final sign-off Oct 2026 | 491 Post St | to obtain final inspection for work approved under pa# 201205049824. all work is complete.Details
to obtain final inspection for work approved under pa# 201205049824. all work is complete. | |
| May 22, 2026 | In progress issued Jun 2026 | 101 California St | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1Details
12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 | $15,000 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishesDetails
13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke controlDetails
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| Apr 23, 2026 | In progress issued May 2026 | 185 Berry St | ste 2400 deferred submittal for mep ref pa 202602135952Details
ste 2400 deferred submittal for mep ref pa 202602135952 | $25,000 |
| Apr 23, 2026 | In progress issued May 2026 | 505 Howard St | def. health dept submittal for bpa: 202510207678 - l8 catering pantry.Details
def. health dept submittal for bpa: 202510207678 - l8 catering pantry. | |
| Apr 23, 2026 | In progress issued May 2026 | 185 Berry St | suite 1200: deffered m.e.p for pa #202602125816Details
suite 1200: deffered m.e.p for pa #202602125816 | $25,000 |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | 13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strappingDetails
13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping | $20,000 |
| Apr 22, 2026 | In progress issued May 2026 | 1 California St | 22/fl-ref 202603318610- ti to (e) office space including non structual demo. (n) interior partitions, ceilings, doors, finishes, millwork, lighting, power/data, adn associated mep modifications for office renovation. no change to occupancy or use or egress. deferrerd mepDetails
22/fl-ref 202603318610- ti to (e) office space including non structual demo. (n) interior partitions, ceilings, doors, finishes, millwork, lighting, power/data, adn associated mep modifications for office renovation. no change to occupancy or use or egress. deferrerd mep | $1,500,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 1800 Owens St | revision to pa# 202406255203 + 202602276646 to remove shaft bottom @ fsdDetails
revision to pa# 202406255203 + 202602276646 to remove shaft bottom @ fsd | |
| Apr 7, 2026 | In progress issued Apr 2026 | 101 California St | revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps.Details
revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps. | $68,000 |
| Apr 7, 2026 | In progress issued May 2026 | 101 California St | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14thDetails
13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| Mar 31, 2026 | In progress issued Mar 2026 | 1 California St | 22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and light fixtures only. ti will be on separate permitDetails
22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and light fixtures only. ti will be on separate permit | $40,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 185 Berry St | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public rowDetails
exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public row | $125,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | deferred mep for office ti permit 202603036821. spec suites 250 and 270.Details
deferred mep for office ti permit 202603036821. spec suites 250 and 270. | $200,000 |
| Mar 11, 2026 | In progress issued Jun 2026 | 185 Berry St | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicatiDetails
ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati | $2,350,400 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.Details
spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope. | $750,000 |
| Feb 27, 2026 | In progress issued Apr 2026 | 185 Berry St | interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.Details
interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf. | $8,000,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 1800 Owens St | revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scopeDetails
revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope | |
| Feb 26, 2026 | In progress issued Apr 2026 | 185 Berry St | 6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqftDetails
6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft | $15,855,932 |
| Feb 13, 2026 | In progress issued Feb 2026 | 185 Berry St | 2/f suite 2400: tenant improvement. interior construction of non structural elements including but not necessary limited interior partitions, doors, finishes, ceiling and lighting. relocation of restroom. mep deferred.Details
2/f suite 2400: tenant improvement. interior construction of non structural elements including but not necessary limited interior partitions, doors, finishes, ceiling and lighting. relocation of restroom. mep deferred. | $1,400,000 |
| Feb 13, 2026 | In progress issued Mar 2026 | 535 Washington St | revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park.Details
revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park. | |
| Feb 12, 2026 | In progress issued Feb 2026 | 185 Berry St | 1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceiling and lighting. mep deferred. non structural.Details
1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceiling and lighting. mep deferred. non structural. | $1,100,000 |
| Feb 9, 2026 | In progress issued Mar 2026 | 185 Berry St | interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.Details
interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans. | $13,383,368 |
| Jan 20, 2026 | In progress issued Jan 2026 | 185 Berry St | non structural demo on floors 1,4,5, & 6Details
non structural demo on floors 1,4,5, & 6 | $830,000 |
| Jan 14, 2026 | Completed final sign-off Jun 2026 | 1140 07th St | to obtain final inspection for work approved under 202010315479 and 202002144560Details
to obtain final inspection for work approved under 202010315479 and 202002144560 | |
| Dec 8, 2025 | In progress issued Mar 2026 | 101 California St | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations.Details
new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| Dec 8, 2025 | In progress issued Mar 2026 | 185 Berry St | provide new exit passageway at ground floorDetails
provide new exit passageway at ground floor | $250,000 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior workDetails
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work | $9,700,000 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,500,000 |
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 350 Mission St | revision to bpa: 202506309783 - scope includes partial removal of approved light fixtures that will impact electrical and energy sheets.Details
revision to bpa: 202506309783 - scope includes partial removal of approved light fixtures that will impact electrical and energy sheets. | |
| Dec 1, 2025 | In progress issued Mar 2026 | 101 California St | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,600,000 |
| Nov 26, 2025 | In progress issued Mar 2026 | 101 California St | 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep.Details
13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep. | $8,800,000 |
| Nov 21, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642Details
17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642 | |
| Nov 17, 2025 | In progress issued Mar 2026 | 505 Howard St | 8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry.Details
8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry. | $3,083,100 |
| Nov 17, 2025 | In progress issued Mar 2026 | 505 Howard St | 7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.Details
7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,123,250 |
| Nov 13, 2025 | Completed final sign-off Jun 2026 | 185 Berry St | 1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150.Details
1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150. | $15,000 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 505 Howard St | selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678Details
selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678 | $275,000 |
| Nov 6, 2025 | In progress issued Mar 2026 | 185 Berry St | revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way.Details
revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way. | $250,000 |
| Oct 28, 2025 | In progress issued Mar 2026 | 505 Howard St | 6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.Details
6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,163,600 |
| Oct 7, 2025 | Completed final sign-off Jan 2026 | 301 Howard St | 17th & 18th fl: deferred mep for pa # 202508062394Details
17th & 18th fl: deferred mep for pa # 202508062394 | $101,415 |
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 600 Montgomery St | 20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage.Details
20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage. | $25,000 |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 301 Howard St | deferred mep for building permit 202507030103Details
deferred mep for building permit 202507030103 | |
| Sep 16, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | revision to pa# 202502261091: removing the work on the east entrance from the scope of work.Details
revision to pa# 202502261091: removing the work on the east entrance from the scope of work. | |
| Sep 12, 2025 | In progress issued Jan 2026 | 1800 Owens St | deferred submittal to pa# 202406255203 for frp structural only.Details
deferred submittal to pa# 202406255203 for frp structural only. | |
| Sep 12, 2025 | Completed final sign-off Feb 2026 | 600 Montgomery St | 22nd fl - revision to pa202504114245 for relocation of fire smoke dampersDetails
22nd fl - revision to pa202504114245 for relocation of fire smoke dampers | |
| Sep 12, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | revision to 202506096173. remove 1 focus pod on floor 8,9,10, and 11.Details
revision to 202506096173. remove 1 focus pod on floor 8,9,10, and 11. | |
| Sep 10, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | #4000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507221346Details
#4000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507221346 | $15,000 |
| Sep 10, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | #3000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507231432, new lighting in open office 108 and 111 only.Details
#3000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507231432, new lighting in open office 108 and 111 only. | $15,000 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.Details
17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit. | $800,000 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms.Details
ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms. | |
| Aug 20, 2025 | Completed final sign-off Aug 2026 | 600 Montgomery St | 21st fl- interior demolition subject to and interior tenant fit out of office space including non-structural partitions, ceilings, finishes and millwork.Details
21st fl- interior demolition subject to and interior tenant fit out of office space including non-structural partitions, ceilings, finishes and millwork. | $2,190,000 |
| Aug 20, 2025 | Completed final sign-off Aug 2026 | 600 Montgomery St | interior tenant fitout of office space on l20 of a 50 story building. non structural partitions and ceilings, finishes and millwork.Details
interior tenant fitout of office space on l20 of a 50 story building. non structural partitions and ceilings, finishes and millwork. | $2,520,000 |
| Aug 13, 2025 | Completed final sign-off Sep 2025 | 425 Market St | 2nd fl ref pa # 2024-1021-3389. evacuation signageDetails
2nd fl ref pa # 2024-1021-3389. evacuation signage | $5,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 301 Howard St | 17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred.Details
17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred. | $378,295 |
| Jul 23, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | #3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel.Details
#3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel. | $131,148 |
| Jul 22, 2025 | Completed final sign-off Nov 2025 | 185 Berry St | suite 1600 - ref ti 202506279624- mech demo revise (e) ductwork and diffusers furnish and install new duct, rebalance (e) terminal. electrical track lighting fixtures, and circuiting controlsDetails
suite 1600 - ref ti 202506279624- mech demo revise (e) ductwork and diffusers furnish and install new duct, rebalance (e) terminal. electrical track lighting fixtures, and circuiting controls | $25,000 |
| Jul 22, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | #4000 -patch and repair finishes impacted by interior demo and adddition of new lighting.Details
#4000 -patch and repair finishes impacted by interior demo and adddition of new lighting. | $90,000 |
| Jul 8, 2025 | In progress issued Aug 2025 | 535 Washington St | revision to pa #202204111970 to document approved occupant load for a-2 space; change exit gates to swing in the direction of egress; location of fire extinguishers and exit signs.Details
revision to pa #202204111970 to document approved occupant load for a-2 space; change exit gates to swing in the direction of egress; location of fire extinguishers and exit signs. | |
| Jul 3, 2025 | Completed final sign-off Dec 2025 | 301 Howard St | 5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferredDetails
5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred | $887,826 |
| Jun 30, 2025 | Completed final sign-off Dec 2025 | 350 Mission St | 2/f - ti (e)restaurant & bar located. add accessory use for 2(n) golf simulators with metal trellis; modification & removal of (e) wood trellis; existing building is fully sprinkler. fire sprinklers for (n) golf simulators under separate application. no change of existing mechanicalDetails
2/f - ti (e)restaurant & bar located. add accessory use for 2(n) golf simulators with metal trellis; modification & removal of (e) wood trellis; existing building is fully sprinkler. fire sprinklers for (n) golf simulators under separate application. no change of existing mechanical | $297,800 |
| Jun 27, 2025 | Completed final sign-off Nov 2025 | 185 Berry St | 1/f suite 1600 interior demolition of non structural elements including but not limited to partition, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches w/patch repair to match exisiting ref pa# 2019-0614-3465 & ref pa# 2025-0604-7929Details
1/f suite 1600 interior demolition of non structural elements including but not limited to partition, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches w/patch repair to match exisiting ref pa# 2019-0614-3465 & ref pa# 2025-0604-7929 | $92,432 |
| Jun 25, 2025 | Completed final sign-off Aug 2025 | 185 Berry St | ste 4807: l4-furnish & install new duct and diffuser to accomodate new floor plan. demo & revise existing ductwork. office tenant retrofit: lighting fixtures and associated circuting/control, power and signal devices and assoicated wiring. mep permit in ref to #202506047929Details
ste 4807: l4-furnish & install new duct and diffuser to accomodate new floor plan. demo & revise existing ductwork. office tenant retrofit: lighting fixtures and associated circuting/control, power and signal devices and assoicated wiring. mep permit in ref to #202506047929 | $17,532 |
| Jun 17, 2025 | Completed final sign-off Aug 2026 | 600 Montgomery St | interior demolition of levels 20 and 21. demolition subject to ab-017Details
interior demolition of levels 20 and 21. demolition subject to ab-017 | $250,000 |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 185 Berry St | tenant improvement: partial demo at e wall, add door, add new wall, relocate e lighting and elecDetails
tenant improvement: partial demo at e wall, add door, add new wall, relocate e lighting and elec | $36,750 |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | floors 12-19: install focus pods.Details
floors 12-19: install focus pods. | $25,000 |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | floors 21-25, 27-30: install focus pods.Details
floors 21-25, 27-30: install focus pods. | $25,000 |
| May 9, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | install focus pods on floors 8,9.10, & 11Details
install focus pods on floors 8,9.10, & 11 | $60,000 |
| May 5, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | 6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing.Details
6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing. | $384,260 |
| May 2, 2025 | Completed final sign-off Oct 2025 | 415 Mission St | 11/f: ref 202504174648: structure - new elevated concrete slab.Details
11/f: ref 202504174648: structure - new elevated concrete slab. | $20,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | revision to pa 202503212723 change to restroom layout no fixture changesDetails
revision to pa 202503212723 change to restroom layout no fixture changes | |
| Apr 24, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | 37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open officeDetails
37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open office | |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 415 Mission St | 11th fl: new multi-faith room. new finishes, mechanical & electricalDetails
11th fl: new multi-faith room. new finishes, mechanical & electrical | $243,000 |
| Apr 15, 2025 | In progress issued Aug 2025 | 185 Berry St | converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.Details
converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades. | $15,000,000 |
| Apr 11, 2025 | Completed final sign-off Feb 2026 | 600 Montgomery St | 22nd floor: interior tenant fit out of office space.Details
22nd floor: interior tenant fit out of office space. | $2,350,000 |
| Apr 2, 2025 | Completed final sign-off Nov 2025 | 600 Montgomery St | 35/f: electrical work for pa #202502120191Details
35/f: electrical work for pa #202502120191 | |
| Mar 26, 2025 | Completed final sign-off Aug 2025 | 2 Embarcadero Center | 19/flr- demo of non load bearing partitions, finishes, ceilings construction of (n) full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribution and finishes.Details
19/flr- demo of non load bearing partitions, finishes, ceilings construction of (n) full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribution and finishes. | $400,000 |
| Mar 21, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | 6th fl: interior alteration of (e) office suite. new non structural partitions, millwork, ceilings, finishes. remodel of (e) restrooms, (n) accessible platform lift & alterations to portions of the 5th & 6th fl stairwell.Details
6th fl: interior alteration of (e) office suite. new non structural partitions, millwork, ceilings, finishes. remodel of (e) restrooms, (n) accessible platform lift & alterations to portions of the 5th & 6th fl stairwell. | $484,753 |
| Mar 3, 2025 | In progress issued Mar 2025 | 415 Mission St | 44 and 45/fl-revision to 202306129861 to revise smoke control of operationsDetails
44 and 45/fl-revision to 202306129861 to revise smoke control of operations | |
| Feb 26, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.Details
remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. | $492,824 |
| Feb 25, 2025 | In progress issued Aug 2025 | 1800 Owens St | revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3.Details
revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3. | |
| Feb 12, 2025 | Completed final sign-off Nov 2025 | 600 Montgomery St | 35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures.Details
35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures. | $906,459 |
| Jan 2, 2025 | Completed final sign-off Jan 2025 | 575 Harrison St | to comply with nov 202432169. replace garage door damaged by an accident /tenant ran into it.Details
to comply with nov 202432169. replace garage door damaged by an accident /tenant ran into it. | $7,000 |
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 633 Battery St | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861Details
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861 |