Permit GraphShortlistSan Francisco building permits since 2000

Block 3738, lot 011

301 Howard St

City’s use
Commercial Office
Built
1987
Stories
22
Building
328,501 sq ft
Lot
18,092 sq ft
Zoning
C3OSD
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 22, 2026In progress
issued Sep 2026
301 Howard St22nd and 23rd floor - deferred mep permit application #: 202608066150
Details
Permit
202609228457
Permit issued
Sep 25, 2026

22nd and 23rd floor - deferred mep permit application #: 202608066150

Open the permit page

$299,415
Sep 18, 2026In progress
issued Sep 2026
301 Howard StHathaway Dinwiddie Co.rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout.
Details
Permit
202609188312
Permit issued
Sep 29, 2026

rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout.

Open the permit page

$1,500
Aug 6, 2026In progress
issued Aug 2026
301 Howard StHathaway Dinwiddie Co.suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred.
Details
Permit
202608066150
Permit issued
Aug 12, 2026

suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred.

Open the permit page

$256,025
Jun 11, 2026Completed
final sign-off Jul 2026
301 Howard StKr Johnston Construction Incsuite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done.
Details
Permit
202606113000
Permit issued
Jun 18, 2026
Final sign-off
Jul 30, 2026

suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done.

Open the permit page

$5,000
Apr 30, 2026In progress
issued Jul 2026
301 Howard StSkyline Construction3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater.
Details
Permit
202604300400
Permit issued
Jul 2, 2026

3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater.

Open the permit page

$1,200,000
Apr 29, 2026In progress
issued Jul 2026
301 Howard StSkyline Construction4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permit
Details
Permit
202604290300
Permit issued
Jul 2, 2026

4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permit

Open the permit page

$1,200,000
Mar 27, 2026In progress
issued Mar 2026
301 Howard StBcci Construction Companyto obtain final inspection for work approved under pa# 202501148268. all work is complete.
Details
Permit
202603278482
Permit issued
Mar 27, 2026

to obtain final inspection for work approved under pa# 202501148268. all work is complete.

Open the permit page

Mar 10, 2026In progress
issued May 2026
301 Howard StSkyline Constructioninterior demo only permit for level 3 and 4. tenant improvement seperate permit.
Details
Permit
202603107294
Permit issued
May 8, 2026

interior demo only permit for level 3 and 4. tenant improvement seperate permit.

Open the permit page

$100,000
Nov 18, 2025In progress
issued Nov 2025
301 Howard StGolden Gate Fire Protection Incfire sprinkler t. i.; add 1 concealed pendent to phone booth in suite #830. ref t.i permit 202509105029
Details
Permit
202511189820
Permit issued
Nov 18, 2025

fire sprinkler t. i.; add 1 concealed pendent to phone booth in suite #830. ref t.i permit 202509105029

Open the permit page

$250
Nov 12, 2025Completed
final sign-off Dec 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa8/f suite 830: fire alarm t.i. adding (3) speaker-strobes and relocating (1) strobe on existing notifier nfs2-3030 fire alarm system. ref permit 202509105029
Details
Permit
202511129436
Permit issued
Nov 13, 2025
Final sign-off
Dec 4, 2025

8/f suite 830: fire alarm t.i. adding (3) speaker-strobes and relocating (1) strobe on existing notifier nfs2-3030 fire alarm system. ref permit 202509105029

Open the permit page

$6,885
Oct 31, 2025Completed
final sign-off Jul 2026
301 Howard StKr Johnston Construction Inc, Harvey Usa Llcsuite 120 1st fl: tenant improvement of empty shell for new low impact fitness studio including 2 new restrooms. change of use from office to fitness.
Details
Permit
202510318649
Permit issued
Dec 9, 2025
Final sign-off
Jul 21, 2026

suite 120 1st fl: tenant improvement of empty shell for new low impact fitness studio including 2 new restrooms. change of use from office to fitness.

Open the permit page

$565,000
Oct 20, 2025Completed
final sign-off Jan 2026
301 Howard StSky Rider Equip Co Increvision to 2023-0817-4636 (ref. 2025-1010-7234). number of davits reduced from 12 to 10. number of sockets reduced from 10 to 8. use existing pedestals. change in height of removed pedestals.
Details
Permit
202510207672
Permit issued
Oct 20, 2025
Final sign-off
Jan 13, 2026

revision to 2023-0817-4636 (ref. 2025-1010-7234). number of davits reduced from 12 to 10. number of sockets reduced from 10 to 8. use existing pedestals. change in height of removed pedestals.

Open the permit page

Oct 15, 2025Completed
final sign-off Dec 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa17th & 18th floors - ref pa 202508062394 between 17th & 18th floors is being added. new devices added to existing notifier nfs2-3030 - 1 ceiling speaker strobe and 1 smoke detector
Details
Permit
202510026609
Permit issued
Nov 5, 2025
Final sign-off
Dec 3, 2025

17th & 18th floors - ref pa 202508062394 between 17th & 18th floors is being added. new devices added to existing notifier nfs2-3030 - 1 ceiling speaker strobe and 1 smoke detector

Open the permit page

$15,000
Oct 14, 2025Completed
final sign-off Oct 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa11th floor. fire alarm t.i. adding 1 amplifier, 2 relay moduels, 1 smoke detector, 8 speaker -strobes and 1 speaker to existing notifier nfs2-3030 fire alarm system, ref#: 202507019862.
Details
Permit
202510147257
Permit issued
Oct 14, 2025
Final sign-off
Oct 21, 2025

11th floor. fire alarm t.i. adding 1 amplifier, 2 relay moduels, 1 smoke detector, 8 speaker -strobes and 1 speaker to existing notifier nfs2-3030 fire alarm system, ref#: 202507019862.

Open the permit page

$15,895
Oct 10, 2025Completed
final sign-off Jan 2026
301 Howard StSky Rider Equip Co Incto obtain final inspection for work approved under pa# 202308174636. all work is complete.
Details
Permit
202510107234
Permit issued
Oct 10, 2025
Final sign-off
Jan 13, 2026

to obtain final inspection for work approved under pa# 202308174636. all work is complete.

Open the permit page

Oct 8, 2025Completed
final sign-off Oct 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafafire alarm ti. adding 1 s/d, 2 relay modules and 11 speaker-strobe to existing notifier, nfs2-3030 fire alarm system. ref pa# 202507030103. 5/f
Details
Permit
202510086976
Permit issued
Oct 9, 2025
Final sign-off
Oct 21, 2025

fire alarm ti. adding 1 s/d, 2 relay modules and 11 speaker-strobe to existing notifier, nfs2-3030 fire alarm system. ref pa# 202507030103. 5/f

Open the permit page

$13,776
Oct 7, 2025Completed
final sign-off Jan 2026
301 Howard StHathaway Dinwiddie Co.17th & 18th fl: deferred mep for pa # 202508062394
Details
Permit
202510076847
Permit issued
Oct 20, 2025
Final sign-off
Jan 15, 2026

17th & 18th fl: deferred mep for pa # 202508062394

Open the permit page

$101,415
Oct 6, 2025Completed
final sign-off Apr 2026
301 Howard StBcci Construction Company11th fl: scope of wk: new ducts for heating/air, lighting, power and plumbing. reference pa#2025-0114-8262, 2025-0701-9862, 2024-0919-1121. new mechanical scope.
Details
Permit
202510066780
Permit issued
Oct 14, 2025
Final sign-off
Apr 20, 2026

11th fl: scope of wk: new ducts for heating/air, lighting, power and plumbing. reference pa#2025-0114-8262, 2025-0701-9862, 2024-0919-1121. new mechanical scope.

Open the permit page

$120,000
Sep 29, 2025Completed
final sign-off Nov 2025
301 Howard Stfire sprinkler permit- add 3 and delete one upright sprinkler for new stair between floors 17 and 18. + 1 head on 17th ref pa #202508062394
Details
Permit
202509296290
Permit issued
Oct 20, 2025
Final sign-off
Nov 21, 2025

fire sprinkler permit- add 3 and delete one upright sprinkler for new stair between floors 17 and 18. + 1 head on 17th ref pa #202508062394

Open the permit page

$2,500
Sep 19, 2025Completed
final sign-off Dec 2025
301 Howard StHathaway Dinwiddie Co.deferred mep for building permit 202507030103
Details
Permit
202509195677
Permit issued
Sep 30, 2025
Final sign-off
Dec 29, 2025

deferred mep for building permit 202507030103

Open the permit page

Sep 15, 2025Expired or cancelled
withdrawn Feb 2026
301 Howard St1st floor: interior t.i. to ground floor tenant lounge, building lobby, and restrooms, scope includes: demo and construction of selective finishes, ceilings, walls, doors, and light fixtures.
Details
Permit
202509155260

1st floor: interior t.i. to ground floor tenant lounge, building lobby, and restrooms, scope includes: demo and construction of selective finishes, ceilings, walls, doors, and light fixtures.

Open the permit page

$185,200
Sep 10, 2025Completed
final sign-off Mar 2026
301 Howard StSkyline Construction8/f suite 830: install (3) new freestanding phone booths.
Details
Permit
202509105029
Permit issued
Nov 13, 2025
Final sign-off
Mar 10, 2026

8/f suite 830: install (3) new freestanding phone booths.

Open the permit page

$18,000
Aug 22, 2025Completed
final sign-off Jan 2026
301 Howard St5/fl- fire sprinkler permit relocate 9 add 2 and delete 2 sprinklers. ref ti 202507030103
Details
Permit
202508223697
Permit issued
Aug 22, 2025
Final sign-off
Jan 20, 2026

5/fl- fire sprinkler permit relocate 9 add 2 and delete 2 sprinklers. ref ti 202507030103

Open the permit page

$7,000
Aug 6, 2025Completed
final sign-off Jan 2026
301 Howard StHathaway Dinwiddie Co.17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred.
Details
Permit
202508062394
Permit issued
Aug 22, 2025
Final sign-off
Jan 15, 2026

17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred.

Open the permit page

$378,295
Aug 6, 2025Completed
final sign-off Sep 2025
301 Howard StAnderson, Rowe & Buckley, Inc.llth floor, suite 1100. fire protection t.i. total relocater 6, total apps 5, total heads 11;
Details
Permit
202508062409
Permit issued
Aug 6, 2025
Final sign-off
Sep 22, 2025

llth floor, suite 1100. fire protection t.i. total relocater 6, total apps 5, total heads 11;

Open the permit page

$5,654
Jul 3, 2025Completed
final sign-off Dec 2025
301 Howard StHathaway Dinwiddie Co.5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred
Details
Permit
202507030103
Permit issued
Jul 25, 2025
Final sign-off
Dec 29, 2025

5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred

Open the permit page

$887,826
Jul 2, 2025Completed
final sign-off Mar 2026
301 Howard StBcci Construction Companyrevision to 20024-1203-5984 to document balcony railings will not be refurbished as previously shown but will be replaced fully in a similar manner.
Details
Permit
202507020006
Permit issued
Jul 16, 2025
Final sign-off
Mar 9, 2026

revision to 20024-1203-5984 to document balcony railings will not be refurbished as previously shown but will be replaced fully in a similar manner.

Open the permit page

$11,000
Jul 1, 2025Completed
final sign-off Apr 2026
301 Howard StBcci Construction Companysuite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.
Details
Permit
202507019862
Permit issued
Jul 16, 2025
Final sign-off
Apr 20, 2026

suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.

Open the permit page

$65,000
Jun 23, 2025Completed
final sign-off Aug 2025
301 Howard StBcci Construction Companymechanical: modification including new vav heat pump. new supply/return registers. ref 202503242903
Details
Permit
202506239233
Permit issued
Jun 23, 2025
Final sign-off
Aug 5, 2025

mechanical: modification including new vav heat pump. new supply/return registers. ref 202503242903

Open the permit page

$20,000
Jun 11, 2025In progress
issued Jun 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafafire alarm ti: add speaker strobe, 1 relay module, and 2 two way communication call station to e) notifier nfs2-3030 fire alarm system & e) control 2 way communication sysyem. reference permit #2025-0324-2903
Details
Permit
202506118465
Permit issued
Jun 11, 2025

fire alarm ti: add speaker strobe, 1 relay module, and 2 two way communication call station to e) notifier nfs2-3030 fire alarm system & e) control 2 way communication sysyem. reference permit #2025-0324-2903

Open the permit page

$10,835
Apr 22, 2025Completed
final sign-off Aug 2025
301 Howard StBcci Construction Company14th fl, ste 1440 2 new free standing phone booths in tenant suite 1440. all other elements are existing to remain with no proposed changes
Details
Permit
202504224909
Permit issued
Apr 30, 2025
Final sign-off
Aug 5, 2025

14th fl, ste 1440 2 new free standing phone booths in tenant suite 1440. all other elements are existing to remain with no proposed changes

Open the permit page

$16,000
Mar 24, 2025Completed
final sign-off Aug 2025
301 Howard StBcci Construction Company2nd fl- architectural office ti. new partitions & millwork. mep deferred
Details
Permit
202503242903
Permit issued
Mar 26, 2025
Final sign-off
Aug 5, 2025

2nd fl- architectural office ti. new partitions & millwork. mep deferred

Open the permit page

$79,520
Mar 17, 2025Completed
final sign-off Jun 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafafire alarm ti: adding (1) speaker-strobe and (1) speakders to existing notifier nfs2-3030 fire alarm system. relocate (2) existing speaker strobe. delete one existing speaker strobe. ref pa# 202412035984
Details
Permit
202503172365
Permit issued
Mar 17, 2025
Final sign-off
Jun 18, 2025

fire alarm ti: adding (1) speaker-strobe and (1) speakders to existing notifier nfs2-3030 fire alarm system. relocate (2) existing speaker strobe. delete one existing speaker strobe. ref pa# 202412035984

Open the permit page

$4,275
Mar 17, 2025Completed
final sign-off Mar 2026
301 Howard StBcci Construction Companysuite 1800: mechanical and electrical to support approved arch for office ti. ref 202412035984
Details
Permit
202503172390
Permit issued
Mar 24, 2025
Final sign-off
Mar 9, 2026

suite 1800: mechanical and electrical to support approved arch for office ti. ref 202412035984

Open the permit page

$65,000
Mar 17, 2025Completed
final sign-off Mar 2025
301 Howard StAyoob & Peery Plumbing Co Inc18/fl: add (1) re-locate (10) fire sprinkler per t.i job#25-610 ref#2024-1203-5984
Details
Permit
202503172338
Permit issued
Mar 17, 2025
Final sign-off
Mar 21, 2025

18/fl: add (1) re-locate (10) fire sprinkler per t.i job#25-610 ref#2024-1203-5984

Open the permit page

$6,832
Feb 20, 2025Completed
final sign-off Mar 2025
301 Howard StAyoob & Peery Plumbing Co Inc10/f: record as-built for bpa# 202501168442: adjust uprights to pendents in corridor 1014 and 1012. add (1) pendent for elevator lobby and add (2) pendents in corridor doorways. job # 24-722. ref# 202409181011.
Details
Permit
202502200742
Permit issued
Feb 21, 2025
Final sign-off
Mar 4, 2025

10/f: record as-built for bpa# 202501168442: adjust uprights to pendents in corridor 1014 and 1012. add (1) pendent for elevator lobby and add (2) pendents in corridor doorways. job # 24-722. ref# 202409181011.

Open the permit page

Feb 10, 2025Completed
final sign-off Feb 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa14/f - fire alarm t.i.: adding 1 speaker-strobes, 1 smoke dtectors, to previoulsy permitted original scope on (e) notifier nfs2-3030 alarm system. t.i: 202409251546, f/a 2024-1113-4920.
Details
Permit
202502100047
Permit issued
Feb 10, 2025
Final sign-off
Feb 28, 2025

14/f - fire alarm t.i.: adding 1 speaker-strobes, 1 smoke dtectors, to previoulsy permitted original scope on (e) notifier nfs2-3030 alarm system. t.i: 202409251546, f/a 2024-1113-4920.

Open the permit page

$1,090
Jan 17, 2025Completed
final sign-off May 2025
301 Howard StBcci Construction Companysuite#1050: minor duct modifications to mech system. new lightening and power ref#202409181011
Details
Permit
202501178569
Permit issued
Jan 24, 2025
Final sign-off
May 19, 2025

suite#1050: minor duct modifications to mech system. new lightening and power ref#202409181011

Open the permit page

$75,000
Jan 16, 2025Completed
final sign-off Feb 2025
301 Howard StAyoob & Peery Plumbing Co Inc14th fl, #1440 - add 2 relocate, 8 fire sprinkler ti ref pa 202409251546
Details
Permit
202501168441
Permit issued
Jan 16, 2025
Final sign-off
Feb 11, 2025

14th fl, #1440 - add 2 relocate, 8 fire sprinkler ti ref pa 202409251546

Open the permit page

$6,211
Jan 16, 2025Completed
final sign-off Mar 2025
301 Howard StAyoob & Peery Plumbing Co Inc10th fl, #1050 add 2 relocate 14 fire sprinkler per ti 202409181011
Details
Permit
202501168442
Permit issued
Jan 16, 2025
Final sign-off
Mar 4, 2025

10th fl, #1050 add 2 relocate 14 fire sprinkler per ti 202409181011

Open the permit page

$9,938
Jan 15, 2025Completed
final sign-off Mar 2025
301 Howard StBcci Construction Company14/fl: minor duct modifications to mech systems new lighting and power reference pa#202409251546
Details
Permit
202501158361
Permit issued
Jan 22, 2025
Final sign-off
Mar 28, 2025

14/fl: minor duct modifications to mech systems new lighting and power reference pa#202409251546

Open the permit page

$55,000
Jan 14, 2025Completed
final sign-off Apr 2026
301 Howard StBcci Construction Company11th fl: deferred electrical lighting & power for t.i. 202409191121 break area, wellness & reception
Details
Permit
202501148268
Permit issued
Jan 15, 2025
Final sign-off
Apr 20, 2026

11th fl: deferred electrical lighting & power for t.i. 202409191121 break area, wellness & reception

Open the permit page

$65,000
Jan 14, 2025Completed
final sign-off Mar 2025
301 Howard StBcci Construction Company17/f suite 1700: minor duct modifications to existing ductwork. new lighting and power. ref permit 202409271773.
Details
Permit
202501148311
Permit issued
Jan 24, 2025
Final sign-off
Mar 31, 2025

17/f suite 1700: minor duct modifications to existing ductwork. new lighting and power. ref permit 202409271773.

Open the permit page

$65,000
Jan 13, 2025Completed
final sign-off May 2025
301 Howard StBcci Construction Companynew lighting and power in break areas. no m or p ref 202409170900
Details
Permit
202501138218
Permit issued
Jan 17, 2025
Final sign-off
May 19, 2025

new lighting and power in break areas. no m or p ref 202409170900

Open the permit page

$75,000
Dec 3, 2024Completed
final sign-off Mar 2026
301 Howard StBcci Construction Company18th fl - ti including demo and construction of selective partitions, cabinets, plumbing fixtures, ceilings and light ixtures, restroom accessibility upgrades. refurbish and modify (e) balcony railings, new floor finishes throughout suite. mep deferred. work not visible from street.
Details
Permit
202412035984
Permit issued
Jan 13, 2025
Final sign-off
Mar 9, 2026

18th fl - ti including demo and construction of selective partitions, cabinets, plumbing fixtures, ceilings and light ixtures, restroom accessibility upgrades. refurbish and modify (e) balcony railings, new floor finishes throughout suite. mep deferred. work not visible from street.

Open the permit page

$225,200
Nov 13, 2024Completed
final sign-off Jun 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafafloor 10, 14, 18. fire alarm ti: adding 3 new amplier cabinets to existing notifier nfs2-3030 fire alarm system on floors 10, 14, 18.
Details
Permit
202411134893
Permit issued
Nov 14, 2024
Final sign-off
Jun 17, 2025

floor 10, 14, 18. fire alarm ti: adding 3 new amplier cabinets to existing notifier nfs2-3030 fire alarm system on floors 10, 14, 18.

Open the permit page

$23,880
Nov 13, 2024Completed
final sign-off Jun 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa10th fl- ref pa #2024-0918-1011 fire alarm ti: adding 1 ceiling mounted speaker strobe to replace (e) wall mounted speaker strobe on (e) notifier nfs2-3030 fire alarm system
Details
Permit
202411134917
Permit issued
Nov 14, 2024
Final sign-off
Jun 17, 2025

10th fl- ref pa #2024-0918-1011 fire alarm ti: adding 1 ceiling mounted speaker strobe to replace (e) wall mounted speaker strobe on (e) notifier nfs2-3030 fire alarm system

Open the permit page

$3,880
Nov 13, 2024Completed
final sign-off Feb 2025
301 Howard StRapid Fire Safety&Security Llc Dba Pafa14th fl- ref pa #2024-0925-1546 fire alarm ti: adding 5 speaker strobes to (e) notifier nfs2-3030 fire alarm system
Details
Permit
202411134920
Permit issued
Nov 14, 2024
Final sign-off
Feb 28, 2025

14th fl- ref pa #2024-0925-1546 fire alarm ti: adding 5 speaker strobes to (e) notifier nfs2-3030 fire alarm system

Open the permit page

$6,280
Nov 5, 2024In progress
filed Nov 2024, not yet issued
301 Howard StBcci Construction Company9th floor - furniture permit for 5 new floor monuments w/ furniture whips. ref permit # 202408299692.
Details
Permit
202411054444

9th floor - furniture permit for 5 new floor monuments w/ furniture whips. ref permit # 202408299692.

Open the permit page

Oct 17, 2024Completed
final sign-off Oct 2024
301 Howard Stfire sprinkler: relocate 3 pendent sprinklers on the 9th fl. ti# 202408299692
Details
Permit
202410173120
Permit issued
Oct 17, 2024
Final sign-off
Oct 31, 2024

fire sprinkler: relocate 3 pendent sprinklers on the 9th fl. ti# 202408299692

Open the permit page

$2,000
Oct 3, 2024Completed
final sign-off Dec 2024
301 Howard StBcci Construction Company9th flr. - mep submittal to support approved architectural permit. (1) new vav terminal unit and micellaneous ductwork. ref#: 202408299692
Details
Permit
202410032279
Permit issued
Oct 4, 2024
Final sign-off
Dec 4, 2024

9th flr. - mep submittal to support approved architectural permit. (1) new vav terminal unit and micellaneous ductwork. ref#: 202408299692

Open the permit page

$20,000
Sep 27, 2024Completed
final sign-off Mar 2025
301 Howard StBcci Construction Company17th flr suite 1700: interior tenant improvement to include: removal of selective finishes. light fixturs and 1 partition. installation of new finishes, millwork, light fixtures, and equipment. new drinking fountain, relocation of restroom accessories and faucet.
Details
Permit
202409271773
Permit issued
Nov 1, 2024
Final sign-off
Mar 31, 2025

17th flr suite 1700: interior tenant improvement to include: removal of selective finishes. light fixturs and 1 partition. installation of new finishes, millwork, light fixtures, and equipment. new drinking fountain, relocation of restroom accessories and faucet.

Open the permit page

$278,295
Sep 26, 2024Completed
final sign-off Oct 2024
301 Howard StCapitol Electric Const14th/f electrical work for t.i. 202408158729: additional power & tele-data
Details
Permit
202409261724
Permit issued
Sep 26, 2024
Final sign-off
Oct 18, 2024

14th/f electrical work for t.i. 202408158729: additional power & tele-data

Open the permit page

$10,523
Sep 25, 2024Completed
final sign-off Mar 2025
301 Howard StBcci Construction Company14th fl, ste 1440 - interior ti including new millwork and plumbing fixtures to replace existing in break area; new flushometers in restrooms, new finishes throughout suite
Details
Permit
202409251546
Permit issued
Oct 30, 2024
Final sign-off
Mar 28, 2025

14th fl, ste 1440 - interior ti including new millwork and plumbing fixtures to replace existing in break area; new flushometers in restrooms, new finishes throughout suite

Open the permit page

$158,000
Sep 19, 2024Completed
final sign-off Apr 2026
301 Howard StBcci Construction Company11th floor: interior tenant improvement, scope of work includes: (n) millwork, fixtures, and lighting to replace (e) in break area, (n) bike rack, (n) flushometers in restrooms and relcoation of select fixtures, (n) floor finishes throughout suite.
Details
Permit
202409191121
Permit issued
Oct 30, 2024
Final sign-off
Apr 20, 2026

11th floor: interior tenant improvement, scope of work includes: (n) millwork, fixtures, and lighting to replace (e) in break area, (n) bike rack, (n) flushometers in restrooms and relcoation of select fixtures, (n) floor finishes throughout suite.

Open the permit page

$185,800
Sep 18, 2024Completed
final sign-off May 2025
301 Howard StBcci Construction Company10/f ste 1050: interior ti - scope includes: selective millwork, electrical, and plumbing remodel at break area. finishes and lighting upgrades at ste 1050, common corridor and elevator lobby. restrooms upgrade.
Details
Permit
202409181011
Permit issued
Oct 30, 2024
Final sign-off
May 19, 2025

10/f ste 1050: interior ti - scope includes: selective millwork, electrical, and plumbing remodel at break area. finishes and lighting upgrades at ste 1050, common corridor and elevator lobby. restrooms upgrade.

Open the permit page

$103,200
Sep 17, 2024Completed
final sign-off May 2025
301 Howard StBcci Construction Companyinterior improvement, scope of work includes millwork, lighting, and finishes remodel of breakrooms 803 and 815. replace shushometers in restrooms, finish upgrades throughout suite
Details
Permit
202409170900
Permit issued
Oct 30, 2024
Final sign-off
May 19, 2025

interior improvement, scope of work includes millwork, lighting, and finishes remodel of breakrooms 803 and 815. replace shushometers in restrooms, finish upgrades throughout suite

Open the permit page

$69,790
Sep 17, 2024Completed
final sign-off Nov 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafafire alarm ti adding 3 spaker strobes and 1 strobe to existing notifier nfs2-3030 fire alarm system. ref pa 202408299692
Details
Permit
202409170949
Permit issued
Sep 17, 2024
Final sign-off
Nov 21, 2024

fire alarm ti adding 3 spaker strobes and 1 strobe to existing notifier nfs2-3030 fire alarm system. ref pa 202408299692

Open the permit page

$6,650
Aug 29, 2024Completed
final sign-off Dec 2024
301 Howard StBcci Construction Companyinterior t.i. includes 2 additonal meeting rooms, and 1 new wellness room, new non-structural partitions, doors, frames and hardware, new finishes mep deferred
Details
Permit
202408299692
Permit issued
Sep 5, 2024
Final sign-off
Dec 4, 2024

interior t.i. includes 2 additonal meeting rooms, and 1 new wellness room, new non-structural partitions, doors, frames and hardware, new finishes mep deferred

Open the permit page

$45,440
Aug 23, 2024Completed
final sign-off Oct 2024
301 Howard StMatrix Hg Inc14/f suite 1400: hvac modification to support interior tenant improvements no new fsd's ref pa# 2024-0530-3259
Details
Permit
202408239326
Permit issued
Aug 23, 2024
Final sign-off
Oct 18, 2024

14/f suite 1400: hvac modification to support interior tenant improvements no new fsd's ref pa# 2024-0530-3259

Open the permit page

$17,500
Aug 16, 2024Completed
final sign-off Oct 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafa14/fl-ref 202405303259- fire alarm ti adding (1) relay module, 3 speaker strobes and 1 strobe to (e) notifier nfs2-3030 fire alarm system
Details
Permit
202408168879
Permit issued
Aug 16, 2024
Final sign-off
Oct 3, 2024

14/fl-ref 202405303259- fire alarm ti adding (1) relay module, 3 speaker strobes and 1 strobe to (e) notifier nfs2-3030 fire alarm system

Open the permit page

$12,562
Aug 15, 2024Completed
final sign-off Oct 2024
301 Howard StCapitol Electric Const14th fl ref pa # 2024-0530-3259 provide lighting & power for ti
Details
Permit
202408158729
Permit issued
Aug 15, 2024
Final sign-off
Oct 18, 2024

14th fl ref pa # 2024-0530-3259 provide lighting & power for ti

Open the permit page

$21,533
Aug 13, 2024Completed
final sign-off Sep 2024
301 Howard StAyoob & Peery Plumbing Co Inc14th fl ref pa# 2024-0530-3259 add (1) relocate (4) changeout (1) fire sprinkler per ti sub# 24-652
Details
Permit
202408138506
Permit issued
Aug 13, 2024
Final sign-off
Sep 19, 2024

14th fl ref pa# 2024-0530-3259 add (1) relocate (4) changeout (1) fire sprinkler per ti sub# 24-652

Open the permit page

$3,346
May 30, 2024Completed
final sign-off Oct 2024
301 Howard StTruebeck Construction14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling.
Details
Permit
202405303259
Permit issued
Aug 12, 2024
Final sign-off
Oct 18, 2024

14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling.

Open the permit page

$177,500
Nov 30, 2023Completed
final sign-off Apr 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafa9/f: fire alarm t.i.: adding 9 speaker strobes and 4 smoke detectors to (e) notififer nfs2-3030 fire alarm system. ref 202309196902
Details
Permit
202311301667
Permit issued
Nov 30, 2023
Final sign-off
Apr 10, 2024

9/f: fire alarm t.i.: adding 9 speaker strobes and 4 smoke detectors to (e) notififer nfs2-3030 fire alarm system. ref 202309196902

Open the permit page

$9,412
Nov 30, 2023Completed
final sign-off Apr 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafa14/f: fire alarm t.i.: adding 8 speaker strobes, 3 speakers and 4 smoke detectors to (e) notififer nfs2-3030 fire alarm system. ref 202309196897
Details
Permit
202311301668
Permit issued
Nov 30, 2023
Final sign-off
Apr 25, 2024

14/f: fire alarm t.i.: adding 8 speaker strobes, 3 speakers and 4 smoke detectors to (e) notififer nfs2-3030 fire alarm system. ref 202309196897

Open the permit page

$9,412
Nov 29, 2023Completed
final sign-off Apr 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafafire alarm ti adding 8 speaker strobes to e notifier nfs2-3030 fire alarm system. ref to 202309186768
Details
Permit
202311291603
Permit issued
Nov 30, 2023
Final sign-off
Apr 10, 2024

fire alarm ti adding 8 speaker strobes to e notifier nfs2-3030 fire alarm system. ref to 202309186768

Open the permit page

$9,298
Nov 29, 2023Completed
final sign-off Apr 2024
301 Howard StRapid Fire Safety&Security Llc Dba Pafafirre alarm ti adding 2 speaker strobes and 3 smoke detectors to e notifier nfs2-3030 fie alarm systems. ref to 202309186767
Details
Permit
202311291600
Permit issued
Nov 30, 2023
Final sign-off
Apr 10, 2024

firre alarm ti adding 2 speaker strobes and 3 smoke detectors to e notifier nfs2-3030 fie alarm systems. ref to 202309186767

Open the permit page

$11,678
Nov 7, 2023Completed
final sign-off Dec 2023
301 Howard StAyoob & Peery Plumbing Co Inc9th fl - relocate 17 sprinkler per ti ref pa 2023-0919-6902
Details
Permit
202311070310
Permit issued
Nov 7, 2023
Final sign-off
Dec 11, 2023

9th fl - relocate 17 sprinkler per ti ref pa 2023-0919-6902

Open the permit page

$10,559
Nov 7, 2023Completed
final sign-off Dec 2023
301 Howard StAyoob & Peery Plumbing Co Inc8/f: relocate (14) fire sprinklers per ti sob # 679. ref# 202309186767
Details
Permit
202311070305
Permit issued
Nov 7, 2023
Final sign-off
Dec 11, 2023

8/f: relocate (14) fire sprinklers per ti sob # 679. ref# 202309186767

Open the permit page

$8,695
Nov 7, 2023Completed
final sign-off Dec 2023
301 Howard StAyoob & Peery Plumbing Co Inc5th fl - relocate 14 sprinklers per ti ref pa 2023-0918-6868
Details
Permit
202311070309
Permit issued
Nov 7, 2023
Final sign-off
Dec 11, 2023

5th fl - relocate 14 sprinklers per ti ref pa 2023-0918-6868

Open the permit page

$8,695
Nov 7, 2023Completed
final sign-off Dec 2023
301 Howard StAyoob & Peery Plumbing Co Inc14/f: add (2) relocate (18) fire sprinkler per ti job# 23-669. ref# 202309196897
Details
Permit
202311070307
Permit issued
Nov 7, 2023
Final sign-off
Dec 11, 2023

14/f: add (2) relocate (18) fire sprinkler per ti job# 23-669. ref# 202309196897

Open the permit page

$12,422
Oct 12, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company14th fl hvac modification to support approved arch drawings. ref 202309196897
Details
Permit
202310128564
Permit issued
Nov 3, 2023
Final sign-off
Apr 26, 2024

14th fl hvac modification to support approved arch drawings. ref 202309196897

Open the permit page

$100,000
Sep 19, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company14/f. demo and build back of non structural partitions, doors, ceilings, lighting and millwork at ste 1410. minor accessiblity upgrades at restrooms. mep deferred. fire alarm and sprinkler on separate permit.
Details
Permit
202309196897
Permit issued
Sep 21, 2023
Final sign-off
Apr 26, 2024

14/f. demo and build back of non structural partitions, doors, ceilings, lighting and millwork at ste 1410. minor accessiblity upgrades at restrooms. mep deferred. fire alarm and sprinkler on separate permit.

Open the permit page

$699,918
Sep 19, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company9/f. demo and build back of flooring, ceilings, lighting and finishes. minor accessibility upgrades to restrooms.
Details
Permit
202309196902
Permit issued
Oct 2, 2023
Final sign-off
Apr 26, 2024

9/f. demo and build back of flooring, ceilings, lighting and finishes. minor accessibility upgrades to restrooms.

Open the permit page

$213,994
Sep 18, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company8th fl: upgrades to (e) common area and elevator lobby. demo and construction of flooring, ceilings, lighting and finishes. minor accessibility upgrades at men's restroom.
Details
Permit
202309186767
Permit issued
Sep 21, 2023
Final sign-off
Apr 26, 2024

8th fl: upgrades to (e) common area and elevator lobby. demo and construction of flooring, ceilings, lighting and finishes. minor accessibility upgrades at men's restroom.

Open the permit page

$140,154
Sep 18, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company5th fl: common area upgrades. demo and construction of flooring, ceilings, lighting and finishes. minor accessibility upgrades at restroom.
Details
Permit
202309186768
Permit issued
Sep 21, 2023
Final sign-off
Apr 26, 2024

5th fl: common area upgrades. demo and construction of flooring, ceilings, lighting and finishes. minor accessibility upgrades at restroom.

Open the permit page

$206,468
Aug 17, 2023Expired or cancelled
expired Jan 2026
301 Howard StSky Rider Equip Co Incinstall pedestals with portable davits on building roof and balconies. only exterior work.
Details
Permit
202308174636
Permit issued
Dec 13, 2023

install pedestals with portable davits on building roof and balconies. only exterior work.

Open the permit page

$25,000
Jun 29, 2023Completed
final sign-off Jul 2023
301 Howard StProgress Glass Co Inc6th floor: to comply with notive of violation #202309968. to address window replacement - visible from street. max u-factor 0.58
Details
Permit
202306291228
Permit issued
Jul 10, 2023
Final sign-off
Jul 17, 2023

6th floor: to comply with notive of violation #202309968. to address window replacement - visible from street. max u-factor 0.58

Open the permit page

$7,000
Jun 12, 2023Completed
final sign-off Aug 2023
301 Howard StPacific Auxiliary Fire Alarmsuite 1030: fire alarm t.i.: demolition of (e) and relocate of (e) notification devices, per plan.
Details
Permit
202306129838
Permit issued
Jun 12, 2023
Final sign-off
Aug 14, 2023

suite 1030: fire alarm t.i.: demolition of (e) and relocate of (e) notification devices, per plan.

Open the permit page

$4,568
May 8, 2023Completed
final sign-off Jun 2023
301 Howard StGolden Gate Fire Protection Inc10/f suite 1030: fire sprinklers. relocate 41 upright sprinklers for demo permit per nfpa 13.
Details
Permit
202305087271
Permit issued
May 8, 2023
Final sign-off
Jun 26, 2023

10/f suite 1030: fire sprinklers. relocate 41 upright sprinklers for demo permit per nfpa 13.

Open the permit page

$22,550
Apr 12, 2023Completed
final sign-off Aug 2023
301 Howard StSkyline Constructioninterior demo of e unoccupied suite. includes non structural partitoins, doors, frames, flooring, ceilings, lighting, finishes, millwork. mep deferred
Details
Permit
202304125543
Permit issued
May 22, 2023
Final sign-off
Aug 11, 2023

interior demo of e unoccupied suite. includes non structural partitoins, doors, frames, flooring, ceilings, lighting, finishes, millwork. mep deferred

Open the permit page

$53,613
Dec 8, 2022Never finaled
issued Dec 2022, no final
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti: as built/record drawing submittal per sffd inspector. ref-202210194633
Details
Permit
202212087908
Permit issued
Dec 8, 2022

fire alarm ti: as built/record drawing submittal per sffd inspector. ref-202210194633

Open the permit page

Oct 19, 2022Completed
final sign-off Apr 2023
301 Howard StPacific Auxiliary Fire Alarm9th fl - fire alarm ti adding 7 speaker-strobes, 8 speakers, 1 relay module, 1 smoke detector and 1 power supply to existing notifier nfs2-3030 fire alarm system. ref pa 2022-0825-1297
Details
Permit
202210194633
Permit issued
Oct 19, 2022
Final sign-off
Apr 10, 2023

9th fl - fire alarm ti adding 7 speaker-strobes, 8 speakers, 1 relay module, 1 smoke detector and 1 power supply to existing notifier nfs2-3030 fire alarm system. ref pa 2022-0825-1297

Open the permit page

$18,170
Oct 13, 2022Completed
final sign-off Apr 2023
301 Howard StBcci Construction Company9th floor: mechanical only permit to support approved t.i. ref pa#202208251297
Details
Permit
202210134275
Permit issued
Oct 18, 2022
Final sign-off
Apr 10, 2023

9th floor: mechanical only permit to support approved t.i. ref pa#202208251297

Open the permit page

$50,000
Aug 29, 2022Completed
final sign-off Dec 2022
301 Howard StAyoob & Peery Plumbing Co Inc9th floor: add 7, relocate 28 fire sprinklers per t.i
Details
Permit
202208291519
Permit issued
Aug 30, 2022
Final sign-off
Dec 2, 2022

9th floor: add 7, relocate 28 fire sprinklers per t.i

Open the permit page

$9,080
Aug 25, 2022Completed
final sign-off Apr 2023
301 Howard StBcci Construction Company9/f: t.i. for space suite. dmeo, new partitions & finishes. mep def.
Details
Permit
202208251297
Permit issued
Sep 1, 2022
Final sign-off
Apr 10, 2023

9/f: t.i. for space suite. dmeo, new partitions & finishes. mep def.

Open the permit page

$310,247
Jul 20, 2022Completed
final sign-off Aug 2022
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i: adding 8 speaker-strobes, 3 speakers and 6 strobes to existing notifier nfs-3030 fire alarm system. t.i ref pa# 202108055858
Details
Permit
202207208910
Permit issued
Jul 20, 2022
Final sign-off
Aug 10, 2022

fire alarm t.i: adding 8 speaker-strobes, 3 speakers and 6 strobes to existing notifier nfs-3030 fire alarm system. t.i ref pa# 202108055858

Open the permit page

$13,580
Jul 11, 2022Completed
final sign-off Aug 2022
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i adding 29 speaker strobe, 5 speakers, 3 storbe and 6 smoke detectors to existing notifier. nfs2-3030 fire alarm system.
Details
Permit
202207118158
Permit issued
Jul 11, 2022
Final sign-off
Aug 10, 2022

fire alarm t.i adding 29 speaker strobe, 5 speakers, 3 storbe and 6 smoke detectors to existing notifier. nfs2-3030 fire alarm system.

Open the permit page

$20,468
Jul 6, 2022Completed
final sign-off Mar 2023
301 Howard StBcci Construction Company2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies
Details
Permit
202207067837
Permit issued
Jul 6, 2022
Final sign-off
Mar 1, 2023

2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies

Open the permit page

$11,500
May 25, 2022Completed
final sign-off Jul 2022
301 Howard StAyoob & Peery Plumbing Co Inc2nd fl: add 7, relocate 36 sprinkler heads per ti. ref pa# 202106031596.
Details
Permit
202205255006
Permit issued
May 25, 2022
Final sign-off
Jul 29, 2022

2nd fl: add 7, relocate 36 sprinkler heads per ti. ref pa# 202106031596.

Open the permit page

$11,775
May 11, 2022Completed
final sign-off Aug 2022
301 Howard StAyoob & Peery Plumbing Co Inc8/f: relocating 9 sprinkler headds per t.i.202108055858.
Details
Permit
202205113994
Permit issued
May 12, 2022
Final sign-off
Aug 8, 2022

8/f: relocating 9 sprinkler headds per t.i.202108055858.

Open the permit page

$2,025
May 6, 2022Completed
final sign-off Mar 2023
301 Howard StBcci Construction Company2/f-suite 200: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202106031596. in cludes architectural revisions - enlarge confrence & meeting rooms, remove break room walls & island.
Details
Permit
202205063752
Permit issued
May 23, 2022
Final sign-off
Mar 1, 2023

2/f-suite 200: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202106031596. in cludes architectural revisions - enlarge confrence & meeting rooms, remove break room walls & island.

Open the permit page

$150,000
May 6, 2022Completed
final sign-off Mar 2023
301 Howard StBcci Construction Company8/f-suite 800: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202108055858
Details
Permit
202205063755
Permit issued
May 11, 2022
Final sign-off
Mar 1, 2023

8/f-suite 800: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202108055858

Open the permit page

$150,000
Apr 25, 2022Completed
final sign-off Jun 2022
301 Howard StPacific Auxiliary Fire Alarm22/f: fire alarm t.i. : adding 1 dual point mointor module to (e) notifier nfs2-3030 fire alarm system. ref t.i. pa202204122043
Details
Permit
202204252922
Permit issued
Apr 25, 2022
Final sign-off
Jun 9, 2022

22/f: fire alarm t.i. : adding 1 dual point mointor module to (e) notifier nfs2-3030 fire alarm system. ref t.i. pa202204122043

Open the permit page

$9,290
Apr 12, 2022Completed
final sign-off Jun 2022
301 Howard StMatrix Hg Incadded controls for (e) exhaust fan for fire department override.
Details
Permit
202204122043
Permit issued
Apr 14, 2022
Final sign-off
Jun 9, 2022

added controls for (e) exhaust fan for fire department override.

Open the permit page

$5,000
Feb 23, 2022Completed
final sign-off Apr 2022
301 Howard StPacific Auxiliary Fire Alarmrevisio to 202105180521: change sd not from new to existing. delete 5 smoke detectors and associated fsds shown as existing. notifieer nfs2-3030 fa system.
Details
Permit
202202238496
Permit issued
Feb 23, 2022
Final sign-off
Apr 18, 2022

revisio to 202105180521: change sd not from new to existing. delete 5 smoke detectors and associated fsds shown as existing. notifieer nfs2-3030 fa system.

Open the permit page

Nov 9, 2021Never finaled
issued Nov 2021, no final
301 Howard StPeacock Construction16/f: restrooms - new lgihting & electrical controls for title 24 compliance. ref pa201910316064 t.i. maher n/a
Details
Permit
202111092065
Permit issued
Nov 9, 2021

16/f: restrooms - new lgihting & electrical controls for title 24 compliance. ref pa201910316064 t.i. maher n/a

Open the permit page

Nov 4, 2021Never finaled
issued Nov 2021, no final
301 Howard StPeacock Construction16/f: title 24 compliance. electrical plans for pa201910316068.
Details
Permit
202111041825
Permit issued
Nov 9, 2021

16/f: title 24 compliance. electrical plans for pa201910316068.

Open the permit page

Nov 4, 2021Never finaled
issued Nov 2021, no final
301 Howard StPeacock Construction5/f suite 575: electrical. new power and data for training room. new lighting and controls. ref. pa 201910316068.
Details
Permit
202111041790
Permit issued
Nov 8, 2021

5/f suite 575: electrical. new power and data for training room. new lighting and controls. ref. pa 201910316068.

Open the permit page

Sep 14, 2021Never finaled
issued Sep 2021, no final
301 Howard Stroof level: evac sign submittal per request of fire nov 2108-0103.
Details
Permit
202109148346
Permit issued
Sep 30, 2021

roof level: evac sign submittal per request of fire nov 2108-0103.

Open the permit page

Aug 5, 2021Completed
final sign-off Mar 2023
301 Howard StBcci Construction Companysuite 800: t.i of an (e) unoccupied suite and interior remodel of an (e) 1 hr rated elevator lobby and corridor on 8/f, includes interior selective non structural demolition. no change in use or occupancy.
Details
Permit
202108055858
Permit issued
Mar 16, 2022
Final sign-off
Mar 1, 2023

suite 800: t.i of an (e) unoccupied suite and interior remodel of an (e) 1 hr rated elevator lobby and corridor on 8/f, includes interior selective non structural demolition. no change in use or occupancy.

Open the permit page

$562,653
Jun 3, 2021Completed
final sign-off Mar 2023
301 Howard StBcci Construction Company2nd fl suite 200: ti of an existing full-floor unoccipied speculative suite. scope of work to include non-structural demo, (n) non-structural partitions, lighting, millwork & finishes. toilet room upgrade. no change in occupancy, use, or area.
Details
Permit
202106031596
Permit issued
Mar 16, 2022
Final sign-off
Mar 1, 2023

2nd fl suite 200: ti of an existing full-floor unoccipied speculative suite. scope of work to include non-structural demo, (n) non-structural partitions, lighting, millwork & finishes. toilet room upgrade. no change in occupancy, use, or area.

Open the permit page

$994,665
Jun 1, 2021Completed
final sign-off Sep 2022
301 Howard StPeacock Construction16th fl: mechanical- demo of vav's. contrusction of new vav's. ref pa #202010066016
Details
Permit
202106011378
Permit issued
Jul 8, 2021
Final sign-off
Sep 23, 2022

16th fl: mechanical- demo of vav's. contrusction of new vav's. ref pa #202010066016

Open the permit page

$50,000
May 18, 2021Completed
final sign-off Apr 2022
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i.: adding (34) speaker-strobes, (24) speakers, (1) strobe and (1) smoke detector to existing notifier nfs2-3030 fire alarm system. ref 202010066019
Details
Permit
202105180521
Permit issued
May 20, 2021
Final sign-off
Apr 18, 2022

fire alarm t.i.: adding (34) speaker-strobes, (24) speakers, (1) strobe and (1) smoke detector to existing notifier nfs2-3030 fire alarm system. ref 202010066019

Open the permit page

$16,080
Mar 23, 2021Completed
final sign-off Apr 2021
301 Howard StPacific Auxiliary Fire Alarmone new strobe power supply, twenty-two new speaker/strobes, two new speakers and one transponder module are being added for tenant improvement on the 10th floor.
Details
Permit
202103237096
Permit issued
Apr 14, 2021
Final sign-off
Apr 28, 2021

one new strobe power supply, twenty-two new speaker/strobes, two new speakers and one transponder module are being added for tenant improvement on the 10th floor.

Open the permit page

$75,000
Mar 11, 2021Completed
final sign-off Jun 2021
301 Howard StSkyline Construction10th fl / ste 1050: mechanical & electrical work for tenant improvement. ref arch pa# 202011249562.
Details
Permit
202103116421
Permit issued
May 17, 2021
Final sign-off
Jun 15, 2021

10th fl / ste 1050: mechanical & electrical work for tenant improvement. ref arch pa# 202011249562.

Open the permit page

$125,000
Mar 11, 2021Completed
final sign-off Apr 2021
301 Howard StGolden Gate Fire Protection Incfire sprinklers; relocate 29 sprinklers and relocate 38 uprights on the 10th floor suite 1050
Details
Permit
202103116416
Permit issued
Apr 1, 2021
Final sign-off
Apr 8, 2021

fire sprinklers; relocate 29 sprinklers and relocate 38 uprights on the 10th floor suite 1050

Open the permit page

$33,500
Feb 9, 2021Completed
final sign-off Feb 2022
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti: adding (2) speaker-strobes and (3) speakers to existing notifier nfs-3030 firealarm system.
Details
Permit
202102094329
Permit issued
Mar 9, 2021
Final sign-off
Feb 17, 2022

fire alarm ti: adding (2) speaker-strobes and (3) speakers to existing notifier nfs-3030 firealarm system.

Open the permit page

$6,176
Feb 1, 2021Never finaled
issued Feb 2021, no final
301 Howard StSkyline Constructionnew lighting and controls for exterior balcony on the 18/f. ref pa# 202009124053
Details
Permit
202102013748
Permit issued
Feb 9, 2021

new lighting and controls for exterior balcony on the 18/f. ref pa# 202009124053

Open the permit page

$12,000
Jan 21, 2021Completed
final sign-off Feb 2022
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti: replacing (2) strobes (existing) and (2) speakers (existing) with new devices (as part of restroom upgrad) on existing notifier nfs2-3030 fire alarm system. ref 2019.1031.6064
Details
Permit
202101213075
Permit issued
Feb 23, 2021
Final sign-off
Feb 17, 2022

fire alarm ti: replacing (2) strobes (existing) and (2) speakers (existing) with new devices (as part of restroom upgrad) on existing notifier nfs2-3030 fire alarm system. ref 2019.1031.6064

Open the permit page

$4,626
Dec 28, 2020Completed
final sign-off Sep 2021
301 Howard StGolden Gate Fire Protection Incfire sprinklers; relocate 88 pendent sprinklers on the 16th floor
Details
Permit
202012281786
Permit issued
Feb 10, 2021
Final sign-off
Sep 1, 2021

fire sprinklers; relocate 88 pendent sprinklers on the 16th floor

Open the permit page

$44,000
Dec 24, 2020Completed
final sign-off Feb 2021
301 Howard StGolden Gate Fire Protection Incfire sprinklers: relocate 9 pendent sprinklers on the 5th floor suite 575.
Details
Permit
202012241704
Permit issued
Feb 5, 2021
Final sign-off
Feb 17, 2021

fire sprinklers: relocate 9 pendent sprinklers on the 5th floor suite 575.

Open the permit page

$4,500
Dec 23, 2020Completed
final sign-off Apr 2021
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti: adding (1) power supply, (4) smoke detectors, (40) speaker-strobes, (10) speakers, (1) duct detector & (1) relay module to existing nfs-3030d fire alarm.
Details
Permit
202012231615
Permit issued
Mar 23, 2021
Final sign-off
Apr 28, 2021

fire alarm ti: adding (1) power supply, (4) smoke detectors, (40) speaker-strobes, (10) speakers, (1) duct detector & (1) relay module to existing nfs-3030d fire alarm.

Open the permit page

$16,000
Dec 23, 2020Completed
final sign-off Apr 2021
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti: adding (1) call station to existing cornell 2-way communication system.
Details
Permit
202012231627
Permit issued
Feb 8, 2021
Final sign-off
Apr 28, 2021

fire alarm ti: adding (1) call station to existing cornell 2-way communication system.

Open the permit page

$6,000
Dec 15, 2020Never finaled
issued Mar 2021, no final
301 Howard StGolden Gate Fire Protection Incfire sprinkler only- #2020-1026-7431. relocate 45 pendents & 80 uprights for quotient on the 13th floor
Details
Permit
202012151079
Permit issued
Mar 23, 2021

fire sprinkler only- #2020-1026-7431. relocate 45 pendents & 80 uprights for quotient on the 13th floor

Open the permit page

$62,500
Dec 11, 2020Completed
final sign-off Mar 2021
301 Howard StPacific Auxiliary Fire Alarm20th & 21st floors: two remote power supplies, seventy-three speaker strobes, one smoke detector and one addressable relay module are being added to an existing fire alarm system.
Details
Permit
202012110893
Permit issued
Feb 25, 2021
Final sign-off
Mar 19, 2021

20th & 21st floors: two remote power supplies, seventy-three speaker strobes, one smoke detector and one addressable relay module are being added to an existing fire alarm system.

Open the permit page

Dec 1, 2020Completed
final sign-off Aug 2021
301 Howard StNovo Construction Inc13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341.
Details
Permit
202012019968
Permit issued
Feb 9, 2021
Final sign-off
Aug 5, 2021

13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341.

Open the permit page

Nov 24, 2020Completed
final sign-off Jul 2021
301 Howard StSkyline Constructionsuite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area.
Details
Permit
202011249562
Permit issued
Feb 22, 2021
Final sign-off
Jul 22, 2021

suite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area.

Open the permit page

$562,653
Nov 19, 2020Completed
final sign-off Feb 2021
301 Howard StGolden Gate Fire Protection Incfire sprinkler only. ref # 2020-1026-7431. relocate 45 pendents & relocate 3 & add 6 upright for quotient, 13th floor
Details
Permit
202011199329
Permit issued
Dec 28, 2020
Final sign-off
Feb 5, 2021

fire sprinkler only. ref # 2020-1026-7431. relocate 45 pendents & relocate 3 & add 6 upright for quotient, 13th floor

Open the permit page

$27,000
Nov 6, 2020Never finaled
issued Mar 2021, no final
301 Howard StSkyline Constructionmech, electrical, and plumbing for tenant improvement on the 20th & 21st floor. ref arch pa#202009023295
Details
Permit
202011068447
Permit issued
Mar 30, 2021

mech, electrical, and plumbing for tenant improvement on the 20th & 21st floor. ref arch pa#202009023295

Open the permit page

Nov 5, 2020Completed
final sign-off Dec 2020
301 Howard Stfire sprinkler permit. relocate 88, add 26 and and delete 11 sprinklers on the 20th and 21st floors. t.i. # 2020-0902-3295
Details
Permit
202011058334
Permit issued
Dec 8, 2020
Final sign-off
Dec 31, 2020

fire sprinkler permit. relocate 88, add 26 and and delete 11 sprinklers on the 20th and 21st floors. t.i. # 2020-0902-3295

Open the permit page

$31,000
Oct 26, 2020Completed
final sign-off Aug 2021
301 Howard StNovo Construction Inc13/f: mechanical & electrical work for t.i. ref pa202009144100. maher n/a
Details
Permit
202010267431
Permit issued
Dec 1, 2020
Final sign-off
Aug 5, 2021

13/f: mechanical & electrical work for t.i. ref pa202009144100. maher n/a

Open the permit page

$95,000
Oct 15, 2020Completed
final sign-off Dec 2020
301 Howard StPacific Auxiliary Fire Alarmfire alarm only - tenant improvement to existing notifier nfs2-3030. adding 1 speaker strobe. building permit 2020-0706-9647.
Details
Permit
202010156608
Permit issued
Oct 29, 2020
Final sign-off
Dec 21, 2020

fire alarm only - tenant improvement to existing notifier nfs2-3030. adding 1 speaker strobe. building permit 2020-0706-9647.

Open the permit page

$5,100
Oct 6, 2020Completed
final sign-off Sep 2022
301 Howard StPeacock Construction16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.
Details
Permit
202010066019
Permit issued
Mar 15, 2021
Final sign-off
Sep 23, 2022

16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.

Open the permit page

$1,082,125
Sep 28, 2020Completed
final sign-off Dec 2020
301 Howard StPacific Auxiliary Fire Alarm18/f: addding 1 remote power supply and 9 speaker-strobes to (e) notifier nfs2-3030 fire alarm system. ref ti pa 202007069647. maher n/a
Details
Permit
202009285331
Permit issued
Oct 21, 2020
Final sign-off
Dec 14, 2020

18/f: addding 1 remote power supply and 9 speaker-strobes to (e) notifier nfs2-3030 fire alarm system. ref ti pa 202007069647. maher n/a

Open the permit page

$8,886
Sep 28, 2020Completed
final sign-off Dec 2020
301 Howard StPacific Auxiliary Fire Alarm18/f: adding 2 call stations to (e) cornell 2-way communication system. ref ti pa 202007069647. maher n/a
Details
Permit
202009285327
Permit issued
Nov 3, 2020
Final sign-off
Dec 14, 2020

18/f: adding 2 call stations to (e) cornell 2-way communication system. ref ti pa 202007069647. maher n/a

Open the permit page

$5,782
Sep 26, 2020Completed
final sign-off Mar 2021
301 Howard StSkyline Construction18/f: mechanical & electrical work for t.. on the 18/f. ref ti pa 202007069647. maher n/a
Details
Permit
202009265032
Permit issued
Oct 15, 2020
Final sign-off
Mar 25, 2021

18/f: mechanical & electrical work for t.. on the 18/f. ref ti pa 202007069647. maher n/a

Open the permit page

$125,000
Sep 14, 2020Completed
final sign-off Sep 2021
301 Howard StNovo Construction Inc13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.
Details
Permit
202009144100
Permit issued
Oct 20, 2020
Final sign-off
Sep 24, 2021

13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.

Open the permit page

$1,061,958
Sep 12, 2020Never finaled
issued Jan 2021, no final
301 Howard StSkyline Construction18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.
Details
Permit
202009124053
Permit issued
Jan 4, 2021

18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.

Open the permit page

$82,505
Sep 2, 2020Completed
final sign-off Apr 2022
301 Howard StSkyline Constructiontenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening.
Details
Permit
202009023295
Permit issued
Nov 2, 2020
Final sign-off
Apr 12, 2022

tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening.

Open the permit page

$5,524,278
Jul 16, 2020Completed
final sign-off Aug 2020
301 Howard Stfire sprinklers ti 30 relocated pendent, 8 added pendent, and 2 relocated upright - 40 total. ref pa 20207-0706-9647
Details
Permit
202007160314
Permit issued
Jul 21, 2020
Final sign-off
Aug 17, 2020

fire sprinklers ti 30 relocated pendent, 8 added pendent, and 2 relocated upright - 40 total. ref pa 20207-0706-9647

Open the permit page

$13,858
Jul 6, 2020Completed
final sign-off Mar 2021
301 Howard StSkyline Construction18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.
Details
Permit
202007069647
Permit issued
Jul 9, 2020
Final sign-off
Mar 25, 2021

18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.

Open the permit page

$964,862
May 13, 2020Completed
final sign-off Jun 2022
301 Howard StMatrix Hg Increplace existing chillers and chilled water pumping system. provide new energy management system and intergrate into existing system
Details
Permit
202005137518
Permit issued
Aug 21, 2020
Final sign-off
Jun 9, 2022

replace existing chillers and chilled water pumping system. provide new energy management system and intergrate into existing system

Open the permit page

$1,100,000
Feb 24, 2020Expired or cancelled
cancelled Jan 2026
301 Howard StBaba Builders Coground fl, ste 120 - commercial ti. new work includes partitions, plulmbing, electrical & mechanical scope. new use is wine shop. no change to facade, no structural work. retail only maher not req
Details
Permit
202002245193

ground fl, ste 120 - commercial ti. new work includes partitions, plulmbing, electrical & mechanical scope. new use is wine shop. no change to facade, no structural work. retail only maher not req

Open the permit page

$160,000
Feb 12, 2020Completed
final sign-off Aug 2020
301 Howard StPacific Auxiliary Fire Alarmfire alarm permit #2018-0102-7671. as built fire alarm drawing for smoke management panel upgrades.
Details
Permit
202002124291
Permit issued
Feb 21, 2020
Final sign-off
Aug 10, 2020

fire alarm permit #2018-0102-7671. as built fire alarm drawing for smoke management panel upgrades.

Open the permit page

Dec 19, 2019Never finaled
issued Dec 2019, no final
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i.; adding 2 emergency phnes & relay module to (e) 2-way communication & nfs2-3030 notifier fire alarm system n/a maher
Details
Permit
201912190061
Permit issued
Dec 19, 2019

fire alarm t.i.; adding 2 emergency phnes & relay module to (e) 2-way communication & nfs2-3030 notifier fire alarm system n/a maher

Open the permit page

$5,448
Oct 31, 2019Completed
final sign-off Jul 2022
301 Howard StPeacock Construction5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes.
Details
Permit
201910316068
Permit issued
Dec 11, 2020
Final sign-off
Jul 20, 2022

5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes.

Open the permit page

$94,494
Oct 31, 2019Completed
final sign-off Jul 2022
301 Howard StPeacock Construction16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a.
Details
Permit
201910316064
Permit issued
Dec 11, 2020
Final sign-off
Jul 20, 2022

16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a.

Open the permit page

$47,166
Sep 18, 2019Completed
final sign-off Nov 2019
301 Howard StPacific Auxiliary Fire Alarm14th flr - restroom - fa ti - adding 2 speaker strobes to (e) notofier nfs2-3030 fa system, ref 201902273882
Details
Permit
201909182004
Permit issued
Sep 18, 2019
Final sign-off
Nov 25, 2019

14th flr - restroom - fa ti - adding 2 speaker strobes to (e) notofier nfs2-3030 fa system, ref 201902273882

Open the permit page

$3,622
Sep 18, 2019Completed
final sign-off Nov 2019
301 Howard StPacific Auxiliary Fire Alarm14th flr - suite 1400 - fa ti - adding 10 speaker strobes and 2 speakers to (e) notofier nfs2-3030 fa syste, ref 201908158893 201905221346
Details
Permit
201909182003
Permit issued
Sep 18, 2019
Final sign-off
Nov 7, 2019

14th flr - suite 1400 - fa ti - adding 10 speaker strobes and 2 speakers to (e) notofier nfs2-3030 fa syste, ref 201908158893 201905221346

Open the permit page

$6,954
Aug 15, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Constructionref pa# 201905221346 ; mechanical and electrical work for t.i. on the 14th fl.
Details
Permit
201908158893
Permit issued
Aug 19, 2019
Final sign-off
Feb 20, 2020

ref pa# 201905221346 ; mechanical and electrical work for t.i. on the 14th fl.

Open the permit page

$9,000
Aug 15, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Constructionref pa# 201902273882; elec work for the 14th fl. restrooms
Details
Permit
201908158890
Permit issued
Aug 19, 2019
Final sign-off
Feb 11, 2020

ref pa# 201902273882; elec work for the 14th fl. restrooms

Open the permit page

$3,000
Aug 8, 2019Completed
final sign-off Sep 2019
301 Howard StGolden Gate Fire Protection Incfire sprinklers. relocate 22 sprinkler uprights and 13 sprinkler pendents in suite 1400 apex 14th fl ref 201905221346
Details
Permit
201908088246
Permit issued
Aug 8, 2019
Final sign-off
Sep 20, 2019

fire sprinklers. relocate 22 sprinkler uprights and 13 sprinkler pendents in suite 1400 apex 14th fl ref 201905221346

Open the permit page

$17,500
Aug 8, 2019Completed
final sign-off Sep 2019
301 Howard StGolden Gate Fire Protection Incfire sprinker relocate 4 sprinkler pendents, 2 concealed pendents in divco restrooms on 14th fl. ref pa 2019-0227-3882
Details
Permit
201908088247
Permit issued
Aug 8, 2019
Final sign-off
Sep 20, 2019

fire sprinker relocate 4 sprinkler pendents, 2 concealed pendents in divco restrooms on 14th fl. ref pa 2019-0227-3882

Open the permit page

$3,000
Jul 18, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Construction14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif compliance
Details
Permit
201907186266
Permit issued
Jul 29, 2019
Final sign-off
Feb 11, 2020

14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif compliance

Open the permit page

Jun 19, 2019Completed
final sign-off Jul 2019
301 Howard StGolden Gate Fire Protection Inc19th fl - relocate 3 upright; add 2 uprights; relocate 20 pendents; add 4 pendents, ref pa 2019-0419-8436
Details
Permit
201906193844
Permit issued
Jun 19, 2019
Final sign-off
Jul 8, 2019

19th fl - relocate 3 upright; add 2 uprights; relocate 20 pendents; add 4 pendents, ref pa 2019-0419-8436

Open the permit page

$14,500
May 24, 2019Completed
final sign-off Aug 2019
301 Howard StPacific Auxiliary Fire Alarm19th floor: fire alarm t.i. to extg notifier nfs-3030 for adding 5 speakers and 13 speaker-strobes. ref app#201904198436. n/a for maher
Details
Permit
201905241711
Permit issued
May 24, 2019
Final sign-off
Aug 1, 2019

19th floor: fire alarm t.i. to extg notifier nfs-3030 for adding 5 speakers and 13 speaker-strobes. ref app#201904198436. n/a for maher

Open the permit page

$12,348
May 22, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Construction14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882.
Details
Permit
201905221346
Permit issued
May 28, 2019
Final sign-off
Feb 26, 2020

14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882.

Open the permit page

$295,354
Apr 19, 2019Completed
final sign-off Oct 2019
301 Howard StPeacock Construction19/f: demo and construction of non structural partitions, ceilings, doors, frames, hardward, and relocation of existing light fixtures, new millwork, finishes includes mech and elec. sprinkler/life-safety under seperate permit.
Details
Permit
201904198436
Permit issued
Apr 22, 2019
Final sign-off
Oct 17, 2019

19/f: demo and construction of non structural partitions, ceilings, doors, frames, hardward, and relocation of existing light fixtures, new millwork, finishes includes mech and elec. sprinkler/life-safety under seperate permit.

Open the permit page

$488,816
Mar 27, 2019Never finaled
issued Apr 2019, no final
301 Howard StNovo Construction Incste 400 - revision to pa 2018-1219-8700 4a-5.1 for revised ceiling and lighting
Details
Permit
201903276334
Permit issued
Apr 8, 2019

ste 400 - revision to pa 2018-1219-8700 4a-5.1 for revised ceiling and lighting

Open the permit page

Mar 15, 2019Completed
final sign-off Aug 2019
301 Howard StPacific Auxiliary Fire Alarm4/f: add 2 emergency lobby phones to existing 2 way communication system maher not req.
Details
Permit
201903155411
Permit issued
Mar 18, 2019
Final sign-off
Aug 16, 2019

4/f: add 2 emergency lobby phones to existing 2 way communication system maher not req.

Open the permit page

$4,400
Mar 1, 2019Completed
final sign-off Aug 2019
301 Howard StGolden Gate Fire Protection Inc4th flr fire sprinklers only relocate 39 pendents, 16 uprights add 4 uprights for chegg for suite 400 on the 4th flr
Details
Permit
201903014162
Permit issued
Mar 1, 2019
Final sign-off
Aug 16, 2019

4th flr fire sprinklers only relocate 39 pendents, 16 uprights add 4 uprights for chegg for suite 400 on the 4th flr

Open the permit page

$29,500
Feb 28, 2019Completed
final sign-off Apr 2019
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i. improvement; add to (e) notifier nfs3030-(1) strobe panel supply, (4) speakers, (3) strobes, (37) speaker strobes n/a maher
Details
Permit
201902284075
Permit issued
Feb 28, 2019
Final sign-off
Apr 2, 2019

fire alarm t.i. improvement; add to (e) notifier nfs3030-(1) strobe panel supply, (4) speakers, (3) strobes, (37) speaker strobes n/a maher

Open the permit page

$16,200
Feb 27, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Constructionbarrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle filler
Details
Permit
201902273882
Permit issued
May 14, 2019
Final sign-off
Feb 11, 2020

barrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle filler

Open the permit page

$47,165
Feb 13, 2019Never finaled
issued Feb 2019, no final
301 Howard StNovo Construction Incall work on the 4th floor: mechanical and electrical work per plans.
Details
Permit
201902132803
Permit issued
Feb 13, 2019

all work on the 4th floor: mechanical and electrical work per plans.

Open the permit page

$250,000
Dec 19, 2018Never finaled
issued Jan 2019, no final
301 Howard StNovo Construction Inct.i. of (e) full floor tenant suite. scope of work to include non-structural demo, (n) (non)- structural partitions, lighting, millwork & finishes, toilet room upgrade, no change in occupancy, use, or area
Details
Permit
201812198700
Permit issued
Jan 18, 2019

t.i. of (e) full floor tenant suite. scope of work to include non-structural demo, (n) (non)- structural partitions, lighting, millwork & finishes, toilet room upgrade, no change in occupancy, use, or area

Open the permit page

$981,207
Dec 14, 2018Never finaled
issued Dec 2018, no final
301 Howard StPacific Auxiliary Fire Alarm15th fl - ref pa 2018-0628-3226, original fire alarm permit 2018-0822-7979 revision & as built drawing; change quantities for smoke detector from 4 to 3; duct detector from 4 to 3; relay modules from 1 to 3
Details
Permit
201812148425
Permit issued
Dec 14, 2018

15th fl - ref pa 2018-0628-3226, original fire alarm permit 2018-0822-7979 revision & as built drawing; change quantities for smoke detector from 4 to 3; duct detector from 4 to 3; relay modules from 1 to 3

Open the permit page

$5,300
Nov 30, 2018Never finaled
issued Dec 2018, no final
301 Howard StGci, Inc15th fl - mechanical new fsd below the ceiling ref pa 2018-0628-3226
Details
Permit
201811307094
Permit issued
Dec 5, 2018

15th fl - mechanical new fsd below the ceiling ref pa 2018-0628-3226

Open the permit page

Nov 20, 2018Completed
final sign-off Jan 2019
301 Howard StPacific Auxiliary Fire Alarmref pa #'s 201808076715 & 201809211099; as built (record set) drawings's for t.i. on (e) notifier nb2-3030, added 1 smoke detector at elevator lobby door (suite side) per elec inspector commets
Details
Permit
201811206364
Permit issued
Nov 21, 2018
Final sign-off
Jan 4, 2019

ref pa #'s 201808076715 & 201809211099; as built (record set) drawings's for t.i. on (e) notifier nb2-3030, added 1 smoke detector at elevator lobby door (suite side) per elec inspector commets

Open the permit page

Nov 9, 2018Never finaled
issued Nov 2018, no final
301 Howard Stevac maps on 15th floor: for weight watchers. maher n/a.
Details
Permit
201811095523
Permit issued
Nov 30, 2018

evac maps on 15th floor: for weight watchers. maher n/a.

Open the permit page

$2,000
Sep 24, 2018Never finaled
issued Sep 2018, no final
301 Howard StAnderson, Rowe & Buckley, Inc.15th fl - fire sprinkler ti relocated heads 71, added 13 heads, plugged 15 heads. maher n/a.
Details
Permit
201809241118
Permit issued
Sep 24, 2018

15th fl - fire sprinkler ti relocated heads 71, added 13 heads, plugged 15 heads. maher n/a.

Open the permit page

$16,200
Sep 21, 2018Completed
final sign-off Jan 2019
301 Howard StPacific Auxiliary Fire Alarmfire alarm t.i. on extg notifier nfs2-330. adding 14 speaker strobes. ref app#201808076715
Details
Permit
201809211099
Permit issued
Sep 21, 2018
Final sign-off
Jan 4, 2019

fire alarm t.i. on extg notifier nfs2-330. adding 14 speaker strobes. ref app#201808076715

Open the permit page

$3,764
Sep 11, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructiont-24 electrical for work under pa# 201802161502
Details
Permit
201809119665
Permit issued
Sep 11, 2018
Final sign-off
Jan 30, 2019

t-24 electrical for work under pa# 201802161502

Open the permit page

$6,000
Aug 28, 2018Expired or cancelled
cancelled Jan 2026
301 Howard St17th flr - mechanical for 201805250156
Details
Permit
201808288491

17th flr - mechanical for 201805250156

Open the permit page

$2,500
Aug 23, 2018Completed
final sign-off Mar 2019
301 Howard StPeacock Constructiont-24 mechanical and electrical for work under pa#2018-05-07-8327. maher n/a
Details
Permit
201808238170
Permit issued
Aug 24, 2018
Final sign-off
Mar 5, 2019

t-24 mechanical and electrical for work under pa#2018-05-07-8327. maher n/a

Open the permit page

$78,000
Aug 22, 2018Completed
final sign-off Oct 2018
301 Howard StPacific Auxiliary Fire Alarm15/f:fire alarm ti on e nfs2-3030 adding 1 strobe power supply, 3r speaker strobes, 1 strobe, 7 speakers, 4 smoke detectors, 4 duct smoke detectors, 1 relay modules, 1 monitor module
Details
Permit
201808227979
Permit issued
Aug 22, 2018
Final sign-off
Oct 31, 2018

15/f:fire alarm ti on e nfs2-3030 adding 1 strobe power supply, 3r speaker strobes, 1 strobe, 7 speakers, 4 smoke detectors, 4 duct smoke detectors, 1 relay modules, 1 monitor module

Open the permit page

$16,200
Aug 22, 2018Completed
final sign-off Jun 2020
301 Howard StPacific Auxiliary Fire Alarm2 way emergency communication ti to e cornell system. add 2 ndw pull stations
Details
Permit
201808227978
Permit issued
Aug 22, 2018
Final sign-off
Jun 22, 2020

2 way emergency communication ti to e cornell system. add 2 ndw pull stations

Open the permit page

$4,400
Aug 9, 2018Completed
final sign-off Aug 2018
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti to e nfs2-3030 adding 2 speaker strobe to the 11th fl
Details
Permit
201808096885
Permit issued
Aug 9, 2018
Final sign-off
Aug 31, 2018

fire alarm ti to e nfs2-3030 adding 2 speaker strobe to the 11th fl

Open the permit page

$3,622
Aug 9, 2018Never finaled
issued Aug 2018, no final
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti to e notifieer nfs2-3030 add 1 strobe power supply, 32 speakr strobes, 1 strobe, 1 speaker, 2 smoke detectors, 1 addressable control relay for door unlocking to the 11th fl. head end and 2 way emergency communication riser installed on #201801027671.
Details
Permit
201808096886
Permit issued
Aug 9, 2018

fire alarm ti to e notifieer nfs2-3030 add 1 strobe power supply, 32 speakr strobes, 1 strobe, 1 speaker, 2 smoke detectors, 1 addressable control relay for door unlocking to the 11th fl. head end and 2 way emergency communication riser installed on #201801027671.

Open the permit page

$5,600
Aug 9, 2018Completed
final sign-off Aug 2018
301 Howard StPacific Auxiliary Fire Alarmfire alarm ti to e notifier nfs2=3030 adding 1 strobe power supply, 32 speaker strobe, 1 speaker, 2 smoke detector, 1 addressable control relay for door unlocking 11th fl
Details
Permit
201808096887
Permit issued
Aug 9, 2018
Final sign-off
Aug 31, 2018

fire alarm ti to e notifier nfs2=3030 adding 1 strobe power supply, 32 speaker strobe, 1 speaker, 2 smoke detector, 1 addressable control relay for door unlocking 11th fl

Open the permit page

$12,944
Aug 7, 2018Completed
final sign-off Nov 2018
301 Howard StPeacock Construction3rd floor: t-24 electrical for work under app#201805219627. n/a for maher
Details
Permit
201808076713
Permit issued
Aug 8, 2018
Final sign-off
Nov 15, 2018

3rd floor: t-24 electrical for work under app#201805219627. n/a for maher

Open the permit page

$73,000
Aug 7, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Construction9th floor: t-24 mechanical and electrical for work under app#201806202362. n/a for maher
Details
Permit
201808076715
Permit issued
Aug 8, 2018
Final sign-off
Jan 11, 2019

9th floor: t-24 mechanical and electrical for work under app#201806202362. n/a for maher

Open the permit page

$118,000
Aug 3, 2018Never finaled
issued Aug 2018, no final
301 Howard StPacific Auxiliary Fire Alarmas built per inspector comment added smoke detector to tenant side of elevator lobby by door. added interface relay for security system. increased candela rate on break area strobe. fire alarm permit #201807053757
Details
Permit
201808036339
Permit issued
Aug 3, 2018

as built per inspector comment added smoke detector to tenant side of elevator lobby by door. added interface relay for security system. increased candela rate on break area strobe. fire alarm permit #201807053757

Open the permit page

Aug 2, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Construction15th fl - title 24 electrial for work under pa 2018-0216-1499
Details
Permit
201808026280
Permit issued
Aug 8, 2018
Final sign-off
Jan 30, 2019

15th fl - title 24 electrial for work under pa 2018-0216-1499

Open the permit page

$8,000
Jul 25, 2018Completed
final sign-off Mar 2019
301 Howard StPacific Auxiliary Fire Alarm15th fl: ti to existing notifier nfs2-3030. adding 2 speaker strobes. ref #201802161499.
Details
Permit
201807255531
Permit issued
Jul 26, 2018
Final sign-off
Mar 11, 2019

15th fl: ti to existing notifier nfs2-3030. adding 2 speaker strobes. ref #201802161499.

Open the permit page

$3,600
Jul 24, 2018Expired or cancelled
cancelled Jan 2026
301 Howard StPacific Auxiliary Fire Alarm2 way emergency comm system master and riser, installation of 1 call station in passenger elevator lobby due to door locks
Details
Permit
201807245410

2 way emergency comm system master and riser, installation of 1 call station in passenger elevator lobby due to door locks

Open the permit page

$1,500
Jul 24, 2018Completed
final sign-off Jul 2018
301 Howard StPacific Auxiliary Fire Alarm7th floor: tenant improvement to existing notifier nfs2-3030. adding 1 smoke detector, 1 control relay
Details
Permit
201807245408
Permit issued
Jul 26, 2018
Final sign-off
Jul 31, 2018

7th floor: tenant improvement to existing notifier nfs2-3030. adding 1 smoke detector, 1 control relay

Open the permit page

$6,400
Jul 18, 2018Never finaled
issued Jul 2018, no final
301 Howard StPacific Auxiliary Fire Alarm17/f: addition of 2 call statoin to locked eleator lobby. the 2-way comm system was install under pa201801027671. ref bp201805250156.this permit is only for 15/f call staton and cable to expansion switch. maher n/a.
Details
Permit
201807184808
Permit issued
Jul 18, 2018

17/f: addition of 2 call statoin to locked eleator lobby. the 2-way comm system was install under pa201801027671. ref bp201805250156.this permit is only for 15/f call staton and cable to expansion switch. maher n/a.

Open the permit page

$4,800
Jul 18, 2018Completed
final sign-off Aug 2018
301 Howard StPacific Auxiliary Fire Alarm17/f: t.i.: add 1 strobe power supply, 47 speaker strobes and 1 smoke detectors to (e) notifier nfs2-3030. ref pa#2018-0525-0156. maher n/a.
Details
Permit
201807184807
Permit issued
Jul 18, 2018
Final sign-off
Aug 27, 2018

17/f: t.i.: add 1 strobe power supply, 47 speaker strobes and 1 smoke detectors to (e) notifier nfs2-3030. ref pa#2018-0525-0156. maher n/a.

Open the permit page

$13,800
Jul 11, 2018Completed
final sign-off Sep 2018
301 Howard StGolden Gate Fire Protection Incfire sprinkler only ref pa 2018-0216-1502 relocate 6 sprinkler pendents for the 11th fl.
Details
Permit
201807114221
Permit issued
Jul 11, 2018
Final sign-off
Sep 18, 2018

fire sprinkler only ref pa 2018-0216-1502 relocate 6 sprinkler pendents for the 11th fl.

Open the permit page

$1,500
Jul 11, 2018Completed
final sign-off Sep 2018
301 Howard StGolden Gate Fire Protection Incfire sprinkler ref pa 2018-0216-1499 relocate 6 sprinkler pendents for the 15th fl restroom
Details
Permit
201807114217
Permit issued
Jul 11, 2018
Final sign-off
Sep 18, 2018

fire sprinkler ref pa 2018-0216-1499 relocate 6 sprinkler pendents for the 15th fl restroom

Open the permit page

$1,500
Jul 6, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Construction7th flr - t-24 for work under 201804307711 maher na
Details
Permit
201807063877
Permit issued
Jul 23, 2018
Final sign-off
Jan 11, 2019

7th flr - t-24 for work under 201804307711 maher na

Open the permit page

$102,000
Jul 5, 2018Never finaled
issued Jul 2018, no final
301 Howard StPacific Auxiliary Fire Alarmrefpa# 201805219627; ti for 3rd fl. (3) new speaker strobes are being added
Details
Permit
201807053757
Permit issued
Jul 5, 2018

refpa# 201805219627; ti for 3rd fl. (3) new speaker strobes are being added

Open the permit page

$5,800
Jul 5, 2018Completed
final sign-off May 2021
301 Howard StPacific Auxiliary Fire Alarmrefpa# 201805219627; exisitng builing wide 2way communication system backbone installed under 201801027671, adding 2 wall call station for 3rd fl. elevator lobby doors. elevator lobby doors are locked
Details
Permit
201807053756
Permit issued
Jul 5, 2018
Final sign-off
May 24, 2021

refpa# 201805219627; exisitng builing wide 2way communication system backbone installed under 201801027671, adding 2 wall call station for 3rd fl. elevator lobby doors. elevator lobby doors are locked

Open the permit page

$4,452
Jun 28, 2018Completed
final sign-off Jul 2020
301 Howard StGci, Inc15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes
Details
Permit
201806283226
Permit issued
Jul 11, 2018
Final sign-off
Jul 29, 2020

15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes

Open the permit page

$1,645,719
Jun 27, 2018Completed
final sign-off Jul 2018
301 Howard StGolden Gate Fire Protection Inc3rd flr - fire sprinkler only. relocate 3 pendents for algolia
Details
Permit
201806273075
Permit issued
Jul 6, 2018
Final sign-off
Jul 18, 2018

3rd flr - fire sprinkler only. relocate 3 pendents for algolia

Open the permit page

$750
Jun 27, 2018Never finaled
issued Jul 2018, no final
301 Howard StGolden Gate Fire Protection Inc11th flr - fire sprinkler only. relocate 74 uprights, 25 pendents for 3q digital. ref#201806273077. n/a for maher.
Details
Permit
201806273077
Permit issued
Jul 2, 2018

11th flr - fire sprinkler only. relocate 74 uprights, 25 pendents for 3q digital. ref#201806273077. n/a for maher.

Open the permit page

$24,750
Jun 20, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, new
Details
Permit
201806202362
Permit issued
Jul 11, 2018
Final sign-off
Jan 11, 2019

ti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, new

Open the permit page

$374,253
Jun 8, 2018Expired or cancelled
cancelled Aug 2023
301 Howard Stb, 13/f, 23/f & ph: fire sprinklers - removed 11 sidwalls fire sprinkler heads from (e) elevator shafts.
Details
Permit
201806081356

b, 13/f, 23/f & ph: fire sprinklers - removed 11 sidwalls fire sprinkler heads from (e) elevator shafts.

Open the permit page

$6,050
Jun 8, 2018Completed
final sign-off Aug 2018
301 Howard StAnderson, Rowe & Buckley, Inc.existing fire sprinklers t.i. added heads (10), relocated heads (45), total heads (55)
Details
Permit
201806081351
Permit issued
Jun 8, 2018
Final sign-off
Aug 22, 2018

existing fire sprinklers t.i. added heads (10), relocated heads (45), total heads (55)

Open the permit page

$28,000
May 25, 2018Never finaled
issued May 2018, no final
301 Howard StDpr Constructionthis is a 12,305sqft interior improvement on 17th fl of existing 23 story building. the work includes new partitions, doors, ceilings, plumbing fixtures in break room area and modify existing ducts. maher na
Details
Permit
201805250156
Permit issued
May 29, 2018

this is a 12,305sqft interior improvement on 17th fl of existing 23 story building. the work includes new partitions, doors, ceilings, plumbing fixtures in break room area and modify existing ducts. maher na

Open the permit page

$1,500,000
May 21, 2018Completed
final sign-off Nov 2018
301 Howard StPeacock Constructionti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher na
Details
Permit
201805219627
Permit issued
May 24, 2018
Final sign-off
Nov 15, 2018

ti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher na

Open the permit page

$300,000
May 14, 2018Completed
final sign-off Aug 2018
301 Howard StDpr Construction17th flr - soft demo no demo of eleveator on stair wells., sprinkler permit 201805108828 elevator lobby doors will not be removed maher na
Details
Permit
201805149039
Permit issued
May 14, 2018
Final sign-off
Aug 31, 2018

17th flr - soft demo no demo of eleveator on stair wells., sprinkler permit 201805108828 elevator lobby doors will not be removed maher na

Open the permit page

$20,000
May 10, 2018Completed
final sign-off May 2018
301 Howard StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system demo of pendents. 53 changed out sprinklers
Details
Permit
201805108828
Permit issued
May 11, 2018
Final sign-off
May 24, 2018

existing fire sprinkler system demo of pendents. 53 changed out sprinklers

Open the permit page

$11,000
May 7, 2018Completed
final sign-off Mar 2019
301 Howard StPeacock Construction11th fl: t.i. to include demo of e non-strctrl interior partitons, doors, sidelights, ceiling & finishes. nw non-strctrl partitionsdoors/frame/hardware. nw ceiling, lighting, elect, plmg, mech, & lifesafty to tie into extg bldg utility.nw finshes, millwork. no change in occupancy use or area.
Details
Permit
201805078327
Permit issued
May 30, 2018
Final sign-off
Mar 5, 2019

11th fl: t.i. to include demo of e non-strctrl interior partitons, doors, sidelights, ceiling & finishes. nw non-strctrl partitionsdoors/frame/hardware. nw ceiling, lighting, elect, plmg, mech, & lifesafty to tie into extg bldg utility.nw finshes, millwork. no change in occupancy use or area.

Open the permit page

$1,041,384
Apr 30, 2018Never finaled
issued Apr 2018, no final
301 Howard StPeacock Construction20th & 21st fl - t-24 electrical for work under pa 2017-1204-5370 and pa 2017-1204-5372
Details
Permit
201804307718
Permit issued
Apr 30, 2018

20th & 21st fl - t-24 electrical for work under pa 2017-1204-5370 and pa 2017-1204-5372

Open the permit page

$198,000
Apr 30, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under
Details
Permit
201804307711
Permit issued
May 30, 2018
Final sign-off
Jan 11, 2019

ste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under

Open the permit page

$1,023,331
Apr 24, 2018Completed
final sign-off Nov 2021
301 Howard StPacific Auxiliary Fire Alarm20th & 21st flr. elevator lobby door on passenger and service elevators are being locked. comply w/ cbc 2016 1010.1.9.12, a 2-way emergency communication system call station is being installed to existing system which was installed under permit 201801027671.
Details
Permit
201804247148
Permit issued
Apr 24, 2018
Final sign-off
Nov 1, 2021

20th & 21st flr. elevator lobby door on passenger and service elevators are being locked. comply w/ cbc 2016 1010.1.9.12, a 2-way emergency communication system call station is being installed to existing system which was installed under permit 201801027671.

Open the permit page

$6,400
Apr 24, 2018Completed
final sign-off Jun 2018
301 Howard StPacific Auxiliary Fire Alarm20th & 21st flrs. tenant improvement to existing am2020 panel. adding 45 new spaeker strobes, 14 speakers and 1 smoke detector. ref ba# 201712045372 and 201812045370; n/a maher
Details
Permit
201804247152
Permit issued
Apr 24, 2018
Final sign-off
Jun 4, 2018

20th & 21st flrs. tenant improvement to existing am2020 panel. adding 45 new spaeker strobes, 14 speakers and 1 smoke detector. ref ba# 201712045372 and 201812045370; n/a maher

Open the permit page

$28,400

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Pacific Auxiliary Fire Alarm (42), Bcci Construction Company (34), Peacock Construction (19), Skyline Construction (18), Rapid Fire Safety&Security Llc Dba Pafa (16), Golden Gate Fire Protection Inc (15), Ayoob & Peery Plumbing Co Inc (12), Hathaway Dinwiddie Co. (6), Novo Construction Inc (6), Anderson, Rowe & Buckley, Inc. (4), Matrix Hg Inc (3), Sky Rider Equip Co Inc (3), Capitol Electric Const (2), Dpr Construction (2), Gci, Inc (2), Kr Johnston Construction Inc (2), Baba Builders Co, Harvey Usa Llc, Progress Glass Co Inc, Truebeck Construction
Architects
Lawrence Smith (20), Pamela Robinson (9), Rene Calara (5), George Soskin (4), Craig Rice (3), Adam Murphy (2), Daniel Kirby, Julian White, Kaylee Kaufman, Kotas/Pantaleoni, Randolph Howder, Rebecca Friedberg, Rene Calara, Rodolfo P. Bustos Iii, Rodolpho Bustos
Engineers
Julian White (10), Alexander Joseph Pacheco (8), Mozart Faizi (6), Shane Litzenberger (5), Pablo Orozco (3), Edward Rivera (2), Jesus B Cabellon Jr (2), Keith Miller (2), Larry J Smith (2), Lloyd Mariner (2), Rudolfo P Bustos Iii (2), Stephen Shaffer (2), Xuong Quach (2), Zhen Chao Xiong (2), Alexander Pacheco, C.K. Allen Jr, Cyrus Kendall Allen, Daniel Conrad, Donald Dammen, Edward Rivera, Jon Alan Inman, Matthew Case, Nicholas Chiarito, Shane Litzenberger, William Hadinger
Authorized agents
John Toby, Lawrence Smith
Designers
Ayoob & Peery Plumbing (3), Golden Gate Fire Protection (2), David Fraser, Lawrence Smith, Pafa, Robert Buckley, Terrence Olson
Pmt consultant/expediters
Donald Dammen

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.