- 0 permits filed
428 permits since 2000: 323 completed, 89 never finaled, 16 expired or cancelled.
Of the 89 never-finaled permits, 1 is 3 to 5 years old, 41 are 5 to 10 years old, 47 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 428.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | 10/f: interior t.i. - new partitions, doors, finishes and lighting.Details
10/f: interior t.i. - new partitions, doors, finishes and lighting. | $120,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | 8/f: interior t.i. - new partitions, doors, finishes and lighting.Details
8/f: interior t.i. - new partitions, doors, finishes and lighting. | $375,000 |
| Jun 15, 2022 | Completed final sign-off May 2024 | 400 Howard St | 7th/f interior t.i. - new partitions, doors, finishes & lighting & breakroom.Details
7th/f interior t.i. - new partitions, doors, finishes & lighting & breakroom. | $650,000 |
| May 4, 2022 | Completed final sign-off Oct 2022 | 22 04th St | 11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work.Details
11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work. | $80,000 |
| Dec 20, 2021 | Completed final sign-off Jan 2022 | 1 Market St | 2/f: t.i.: mens shower compartment door and locker area changing bench. all new or revised mep, lieft safety and sprinklers will design build and sumbmitted for permit separtely if needed.Details
2/f: t.i.: mens shower compartment door and locker area changing bench. all new or revised mep, lieft safety and sprinklers will design build and sumbmitted for permit separtely if needed. | $1,200 |
| Dec 16, 2021 | Completed final sign-off May 2023 | 1 Sansome St | 41st fl - ti includes demo of non-structural partitions and building (n) non-structural partitions; all new or revised meps, life safety and sprinklers will be design build & submitted separately (bldg is fully sprinklered)Details
41st fl - ti includes demo of non-structural partitions and building (n) non-structural partitions; all new or revised meps, life safety and sprinklers will be design build & submitted separately (bldg is fully sprinklered) | $875,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 1 Sansome St | 40/f: t.i. demo non str parts and building new. all new revised mpes, life safety and spirnlers. will be design build submitted for permit sep.Details
40/f: t.i. demo non str parts and building new. all new revised mpes, life safety and spirnlers. will be design build submitted for permit sep. | $456,000 |
| Oct 6, 2021 | Never finaled issued Oct 2021, no final | 1 Market St | revision to pa 2020-0926-5068 admin permit to include sffd stamps for event & exhibit spacesDetails
revision to pa 2020-0926-5068 admin permit to include sffd stamps for event & exhibit spaces | |
| Aug 24, 2021 | Never finaled issued Sep 2021, no final | 22 04th St | 11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler.Details
11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler. | $160,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2022 | 1 Market St | t.i. on 2nd floor of spear-steuart tower to include demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and under a separate permit. fully sprinklered.Details
t.i. on 2nd floor of spear-steuart tower to include demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and under a separate permit. fully sprinklered. | $599,100 |
| Jul 27, 2021 | Completed final sign-off Dec 2021 | 1 Market St | deferred mep to approved & rev to pa# 2021-0226-5469 & 2021-0226-5479 l34- new duct, uvav equipment & ligting l33-new lightingDetails
deferred mep to approved & rev to pa# 2021-0226-5469 & 2021-0226-5479 l34- new duct, uvav equipment & ligting l33-new lighting | |
| May 25, 2021 | Completed final sign-off Mar 2022 | 1 Market St | 4/f interior ti includes demo and new non structural partitions.Details
4/f interior ti includes demo and new non structural partitions. | $126,000 |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | 34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $180,000 |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | 33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $195,000 |
| Jan 21, 2021 | Never finaled issued Apr 2021, no final | 1 Market St | 2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes.Details
2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes. | $200,000 |
| Dec 17, 2020 | Completed final sign-off Sep 2022 | 1 Warriors Wy | ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200Details
ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200 | $320,000 |
| Dec 10, 2020 | Never finaled issued Mar 2021, no final | 22 04th St | overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905Details
overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905 | |
| Oct 26, 2020 | Never finaled issued Oct 2020, no final | 1250 Tennessee St | administration permit to clarify and correct scope of pa 2019 1212 9446 to indicate change of use from pdr/storage to lab of 3940 sf. the project will retain 37249 sf of storage/warehouse which include 35797 sf of storage and 1451 sf of access office.Details
administration permit to clarify and correct scope of pa 2019 1212 9446 to indicate change of use from pdr/storage to lab of 3940 sf. the project will retain 37249 sf of storage/warehouse which include 35797 sf of storage and 1451 sf of access office. | |
| Oct 14, 2020 | Never finaled issued Apr 2021, no final | 1 Market St | ste 200, 2/f: structural modifications for t.i under pa # 202009265068. scope includes structural support for moveable partition in main event space. support for roll down fire door.Details
ste 200, 2/f: structural modifications for t.i under pa # 202009265068. scope includes structural support for moveable partition in main event space. support for roll down fire door. | $10,000 |
| Sep 26, 2020 | Completed final sign-off Sep 2021 | 1 Market St | #200: interior non-structural demo. work includes non-structural partitions, finishes, electrical, plumbing, & mechanical equipment.Details
#200: interior non-structural demo. work includes non-structural partitions, finishes, electrical, plumbing, & mechanical equipment. | $10,000 |
| Sep 26, 2020 | Completed final sign-off Sep 2021 | 1 Market St | ste 200: interior tenant improvement includeds remodel of elevator lobby,reception area, gallery, meeting rooms & catering staging pantry.Details
ste 200: interior tenant improvement includeds remodel of elevator lobby,reception area, gallery, meeting rooms & catering staging pantry. | $2,557,000 |
| Sep 25, 2020 | Expired or cancelled withdrawn Oct 2020 | 1 Market St | suite 200. tenant improvement of an existing type a3 occupancy. includes remodel of existing elevator lobby, reception area, gallery, meeting rooms, and catering staging pantry. a new event space is being added. fire sprinkler to be submitted under separate permit.Details
suite 200. tenant improvement of an existing type a3 occupancy. includes remodel of existing elevator lobby, reception area, gallery, meeting rooms, and catering staging pantry. a new event space is being added. fire sprinkler to be submitted under separate permit. | $2,557,000 |
| Sep 4, 2020 | Completed final sign-off Oct 2020 | 1655 03rd St | fire only revision to bpa# 201811276767 in response to sffd inspection requirement to show fuel oil piping as builts and solenoid location.Details
fire only revision to bpa# 201811276767 in response to sffd inspection requirement to show fuel oil piping as builts and solenoid location. | |
| Aug 27, 2020 | Completed final sign-off Oct 2020 | 455 Market St | revision to pa#2019-1217-9718. new floor sink penetrations through the 23rd floor.Details
revision to pa#2019-1217-9718. new floor sink penetrations through the 23rd floor. | $3,500 |
| Aug 19, 2020 | Never finaled issued Aug 2020, no final | 1655 03rd St | determine occupant load for assembly permit.Details
determine occupant load for assembly permit. | |
| Aug 19, 2020 | Never finaled issued Aug 2020, no final | 1725 03rd St | fire only administrative permit to provide information required by sffd inspector, memorialize assembly space ol 504 @ terrace, provide travel distances + furniture plan. no new work or loading. ref pa# 201810011925Details
fire only administrative permit to provide information required by sffd inspector, memorialize assembly space ol 504 @ terrace, provide travel distances + furniture plan. no new work or loading. ref pa# 201810011925 | |
| Aug 13, 2020 | Completed final sign-off May 2022 | 1655 03rd St | mb3 - provide evacuation plans for level 1 to level 11Details
mb3 - provide evacuation plans for level 1 to level 11 | $1,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2021 | 1655 03rd St | mb3-t.i within unoccupied maintenance office. incl non-struct partitions, doors, frames, millwork, finishes, lt fixtures, mep work. core restrm & accessibility under pa 201606149952. no change in floor area.Details
mb3-t.i within unoccupied maintenance office. incl non-struct partitions, doors, frames, millwork, finishes, lt fixtures, mep work. core restrm & accessibility under pa 201606149952. no change in floor area. | $113,766 |
| Jul 15, 2020 | Completed final sign-off Jan 2021 | 200 Paul Av | suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated.Details
suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated. | |
| Jul 14, 2020 | Never finaled issued Aug 2020, no final | 1655 03rd St | rev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements.Details
rev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements. | |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 1725 03rd St | 12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping.Details
12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping. | |
| Jun 12, 2020 | Never finaled issued Jul 2020, no final | 1725 03rd St | rev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a.Details
rev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a. | |
| Mar 10, 2020 | Completed final sign-off Feb 2022 | 1655 03rd St | 3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.Details
3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope. | $1,475,000 |
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 22 04th St | 11th floor: new electrical. ref app#202002124230Details
11th floor: new electrical. ref app#202002124230 | $100,000 |
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 22 04th St | 11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230Details
11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230 | $30,000 |
| Mar 2, 2020 | Never finaled issued Oct 2020, no final | 22 04th St | 11th floor: new mechanical throughout t.i. ref #202002124230Details
11th floor: new mechanical throughout t.i. ref #202002124230 | $100,000 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 22 04th St | 11/f ti to upgrade office space, work to incl refurbursement of open office space, conference rooms, pantry, and renovation of existing restrooms, new restroom, no work to existing stairs, elev lobby rated wall repl by glass with deluge sprinklers on both sides, no structural work, no exterior work.Details
11/f ti to upgrade office space, work to incl refurbursement of open office space, conference rooms, pantry, and renovation of existing restrooms, new restroom, no work to existing stairs, elev lobby rated wall repl by glass with deluge sprinklers on both sides, no structural work, no exterior work. | $2,128,000 |
| Jan 27, 2020 | Never finaled issued Oct 2020, no final | 300 16th St | mb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408Details
mb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408 | |
| Jan 27, 2020 | Never finaled issued Oct 2020, no final | 300 16th St | mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386Details
mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386 | |
| Jan 21, 2020 | Never finaled issued Feb 2020, no final | 22 04th St | demo of non structural walls and mech, elec & plumbing systems, interior partitions, finishes, core elements including shafts, risers, stairs and elev to remainDetails
demo of non structural walls and mech, elec & plumbing systems, interior partitions, finishes, core elements including shafts, risers, stairs and elev to remain | $145,000 |
| Dec 23, 2019 | Never finaled issued Feb 2020, no final | 139 Townsend St | suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maherDetails
suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maher | $428,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 350 California St | 21/f: demo of (e) ductwork per 21m2.0. install (n) vav boxes, fan coil, exhaust fans, ductwork 7 piping for vavs/fan coil. test & balance. ref pa201904178249. maher n/a.Details
21/f: demo of (e) ductwork per 21m2.0. install (n) vav boxes, fan coil, exhaust fans, ductwork 7 piping for vavs/fan coil. test & balance. ref pa201904178249. maher n/a. | $389,319 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 350 California St | 21/f: partial t.i. of office lighting: retrofit lighting, power and signal, wiring and lighting controls. ref t.i. pa201904178249. maher n/a.Details
21/f: partial t.i. of office lighting: retrofit lighting, power and signal, wiring and lighting controls. ref t.i. pa201904178249. maher n/a. | $208,549 |
| Dec 12, 2019 | Never finaled issued Oct 2020, no final | 1250 Tennessee St | t.i. to a part of the ground floor of a multi-tenant bldg. improvements include (n) partitions, ceilings, lighting and finishes. no change of use.Details
t.i. to a part of the ground floor of a multi-tenant bldg. improvements include (n) partitions, ceilings, lighting and finishes. no change of use. | $2,100,000 |
| Dec 9, 2019 | Completed final sign-off Jul 2020 | 50 California St | 31st floor: selective demolition of non-structural partitions, doors/glazing, ceiling, lights & finishes. construction of new partitions. doors/glazing, ceiling, lights & patching of finishes. no changes in use or area.Details
31st floor: selective demolition of non-structural partitions, doors/glazing, ceiling, lights & finishes. construction of new partitions. doors/glazing, ceiling, lights & patching of finishes. no changes in use or area. | $176,657 |
| Nov 14, 2019 | Completed final sign-off Jun 2020 | 345 California St | 15th and 20th floor: electrical av upgrades to 7 locations. paint and carpet upgrades in noted locations. restrooms to have ada partition upgrades. ada stall on 2oth floor. to recieve upgraded toilet.Details
15th and 20th floor: electrical av upgrades to 7 locations. paint and carpet upgrades in noted locations. restrooms to have ada partition upgrades. ada stall on 2oth floor. to recieve upgraded toilet. | $280,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2020 | 135 Townsend St | ref #201909171806: new lighting for 4th floor shower room, pantry, fitness room. reconfigure receptacles in new pantry and shower rooms. n/a for maherDetails
ref #201909171806: new lighting for 4th floor shower room, pantry, fitness room. reconfigure receptacles in new pantry and shower rooms. n/a for maher | $39,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a**Details
supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a** | $2,000,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | new generators on pads 13, 14, and 30 serving suite f200 **maher n/a**Details
new generators on pads 13, 14, and 30 serving suite f200 **maher n/a** | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Aug 2020 | 345 California St | interior connecton stairwell between 14th & 15th fl. to partition off non exit stairm no change to (e) or occupancyDetails
interior connecton stairwell between 14th & 15th fl. to partition off non exit stairm no change to (e) or occupancy | $45,000 |
| Oct 2, 2019 | Completed final sign-off Jan 2021 | 200 Paul Av | new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permitDetails
new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permit | $750,000 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.Details
mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. | $2,116,305 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,250,015 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maherDetails
mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher | $2,145,835 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,133,034 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,235,187 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,236,961 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,235,187 |
| Sep 17, 2019 | Completed final sign-off Jun 2020 | 135 Townsend St | reno of 620 sf level 4 convert 2 conference rooms to fitness, add a single shower room and 100 sf of an l5 to add a single shower roomDetails
reno of 620 sf level 4 convert 2 conference rooms to fitness, add a single shower room and 100 sf of an l5 to add a single shower room | $72,000 |
| Sep 10, 2019 | Completed final sign-off Jun 2020 | 135 Townsend St | renovation of 200 sq ft lvel 4, removing a lounge area and convert to employee break/pantryDetails
renovation of 200 sq ft lvel 4, removing a lounge area and convert to employee break/pantry | $91,440 |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | rev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control systemDetails
rev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control system | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | mb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system.Details
mb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system. | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | rev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative updateDetails
rev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative update | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | mb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system.Details
mb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system. | |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | (4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a**Details
(4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a** | $2,500,000 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not reqDetails
mb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not req | $1,407,574 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not reqDetails
mb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not req | $959,168 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not reqDetails
mbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not req | $2,000,971 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 north, 1st time ti level 3, work includes new partitons, finishes, mepDetails
mb3 north, 1st time ti level 3, work includes new partitons, finishes, mep | $3,178,766 |
| May 31, 2019 | Completed final sign-off Feb 2020 | 1 Post St | structural permit for work on the 11th, 12th, 13th floors only. no changes to other floors in bulding or (e) egress path to street. maher n/a.Details
structural permit for work on the 11th, 12th, 13th floors only. no changes to other floors in bulding or (e) egress path to street. maher n/a. | $33,655 |
| May 22, 2019 | Completed final sign-off Nov 2020 | 300 16th St | mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.Details
mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. | $4,868,336 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.Details
installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch. | $16,000 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $3,979,382 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,807,428 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,055,807 |
| May 13, 2019 | Never finaled issued May 2019, no final | 139 Townsend St | suite 150. interior improvements of (e) office space incl non-structural partitions, finishes, lighting and equipment. defferred submittals for fire sprinkler, smoke detection and fire alarm system. n/a for maherDetails
suite 150. interior improvements of (e) office space incl non-structural partitions, finishes, lighting and equipment. defferred submittals for fire sprinkler, smoke detection and fire alarm system. n/a for maher | $426,100 |
| Apr 17, 2019 | Completed final sign-off Mar 2020 | 350 California St | scope of work ti 21st fl approx 13,166 sq ft tenant improvement includes construction of open office, conference, restroom, breakroom, and typical office support spacesDetails
scope of work ti 21st fl approx 13,166 sq ft tenant improvement includes construction of open office, conference, restroom, breakroom, and typical office support spaces | $1,070,790 |
| Apr 8, 2019 | Expired or cancelled cancelled Jan 2026 | 1 Market St | security update to reception lobby, includes new flass wall, doors, reception desk modificationDetails
security update to reception lobby, includes new flass wall, doors, reception desk modification | $50,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 350 California St | 21st floor: interior demolition for approx. 13,000 sq ft in prep for t.i. (under seperate permit). demolition includes partitions, ceilings, doors, and finishes. typical in an office environment. n/a for maherDetails
21st floor: interior demolition for approx. 13,000 sq ft in prep for t.i. (under seperate permit). demolition includes partitions, ceilings, doors, and finishes. typical in an office environment. n/a for maher | $150,000 |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 300 16th St | revision to 201810011925 work includes revisions to partitions, layout and finishes mb4 southDetails
revision to 201810011925 work includes revisions to partitions, layout and finishes mb4 south | |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishesDetails
mb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishes | $5,727,579 |
| Mar 25, 2019 | Completed final sign-off Feb 2020 | 1 Post St | non-structural ti on 11th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade.Details
non-structural ti on 11th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade. | $1,500,000 |
| Mar 25, 2019 | Completed final sign-off Feb 2020 | 1 Post St | non-structural ti on 12th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade.Details
non-structural ti on 12th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade. | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | 18th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facadeDetails
18th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | 14th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changesDetails
14th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changes | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | 16th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinklers and structural work shall be under separate permit. no changes to ext facadeDetails
16th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinklers and structural work shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | 17th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facadeDetails
17th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | 15th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changesDetails
15th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changes | $1,500,000 |
| Feb 28, 2019 | Completed final sign-off May 2019 | 1 Market St | 7/f: meps: install new supply air duct per sheet m2.1, install new exhaust duct per sheet m2.1, balnce griles prer sheet m2.1Details
7/f: meps: install new supply air duct per sheet m2.1, install new exhaust duct per sheet m2.1, balnce griles prer sheet m2.1 | |
| Feb 20, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | ref pa# 201901251225; revised sheets 12a-1.0,4.15,5.1,6.19.0 per removal of (cn) doors and partitionsDetails
ref pa# 201901251225; revised sheets 12a-1.0,4.15,5.1,6.19.0 per removal of (cn) doors and partitions | |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 71 Stevenson St | 12th fl - outlets, circuiting, 1 light fixture. ref pa 2019-0125-1225Details
12th fl - outlets, circuiting, 1 light fixture. ref pa 2019-0125-1225 | |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 71 Stevenson St | 13th fl - outlets, circuiting, 1 panel 125a w/60 a main breaker. ref pa 2019-0125-1227Details
13th fl - outlets, circuiting, 1 panel 125a w/60 a main breaker. ref pa 2019-0125-1227 | |
| Jan 25, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | 13th flr. select removal of (e) flooring and base. new power / data, electrical, finishes, mop sink and wall hung sink. no change in occupance or use. no floor area increaseDetails
13th flr. select removal of (e) flooring and base. new power / data, electrical, finishes, mop sink and wall hung sink. no change in occupance or use. no floor area increase | $195,537 |
| Jan 25, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | 12th flr. select demo of non-structural partitions, store front system, doors, finishes and millwork. new non-structural partitions, door, power / data, electrical and finishes. no change in occupancy or use. no floor area increaseDetails
12th flr. select demo of non-structural partitions, store front system, doors, finishes and millwork. new non-structural partitions, door, power / data, electrical and finishes. no change in occupancy or use. no floor area increase | $354,375 |
| Jan 16, 2019 | Completed final sign-off Jul 2020 | 300 16th St | installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a**Details
installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a** | $50,000 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 555 Market St | 7th flr. mechanical sheets for selective demo of non-structural partitions, doors & electrical, outlets, lighting and construction of 3 new offices, add new non-structural parition, doors & lights, no change in area & occupancy. install mechanical ductwork and equipment. ref pa 201811155929Details
7th flr. mechanical sheets for selective demo of non-structural partitions, doors & electrical, outlets, lighting and construction of 3 new offices, add new non-structural parition, doors & lights, no change in area & occupancy. install mechanical ductwork and equipment. ref pa 201811155929 | $10,000 |
| Nov 27, 2018 | Never finaled issued Aug 2019, no final | 300 16th St | south tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **Details
south tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a ** | $125,000 |
| Nov 27, 2018 | Never finaled issued Aug 2019, no final | 300 16th St | north tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **Details
north tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a ** | $125,000 |
| Nov 27, 2018 | Completed final sign-off Jul 2020 | 300 16th St | south tower-mb4. provide new grease separator.** maher: n/a **Details
south tower-mb4. provide new grease separator.** maher: n/a ** | $75,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 555 Market St | 7th fl: selective demo of non structural partitions, doors, and electrical outlets, lighting construction of new non structural partitions, doors & lights, new electric data finishes, no change on are or occupancyDetails
7th fl: selective demo of non structural partitions, doors, and electrical outlets, lighting construction of new non structural partitions, doors & lights, new electric data finishes, no change on are or occupancy | $152,556 |