Back to kitchen remodel contractors
Dpr Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Jul 2022
- Last 24 months
- 0 permits filed
428 permits since 2000: 323 completed, 89 never finaled, 16 expired or cancelled.
Of the 89 never-finaled permits, 1 is 3 to 5 years old, 41 are 5 to 10 years old, 47 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 16 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 22 04th St | 11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230Details
11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230 | $30,000 |
| Jan 16, 2019 | Completed final sign-off Jul 2020 | 300 16th St | installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a**Details
installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a** | $50,000 |
| Sep 22, 2016 | Completed final sign-off May 2017 | 135 Townsend St | 1st floor: interior t.i. include all hands assembly, servey, test kitchen mechanical and electrical. n/a for maher.Details
1st floor: interior t.i. include all hands assembly, servey, test kitchen mechanical and electrical. n/a for maher. | $540,000 |
| May 29, 2015 | Completed final sign-off Jun 2016 | 1 Market St | new structural support for heavy kitchen equipement, reinforcement for large penetrations, supports for partial height walls, added shaft platforms for mech equip ref 201503231539 maher not req. hood/duct under seperate permit.Details
new structural support for heavy kitchen equipement, reinforcement for large penetrations, supports for partial height walls, added shaft platforms for mech equip ref 201503231539 maher not req. hood/duct under seperate permit. | $50,000 |
| Jun 27, 2014 | Never finaled issued Jan 2015, no final | 1275 Market St | level 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storageDetails
level 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storage | $7,020,000 |
| May 14, 2014 | Completed final sign-off Jun 2014 | 300 Clay St | remove ceiling height wall, new wall, extend the kitchen area. new cabninetry, add new sink and plumbing, relocate lights, new outlets, new flooring. maher n/a.Details
remove ceiling height wall, new wall, extend the kitchen area. new cabninetry, add new sink and plumbing, relocate lights, new outlets, new flooring. maher n/a. | $80,000 |
| Dec 16, 2013 | Completed final sign-off Aug 2014 | 945 Front St | 1 & 2/f - commercial ti: demo relocate stair case; separate permits for structural works; building confernece rooms, upgrade bathrooms, relocate kitchen, elec, plumbing, hvacDetails
1 & 2/f - commercial ti: demo relocate stair case; separate permits for structural works; building confernece rooms, upgrade bathrooms, relocate kitchen, elec, plumbing, hvac | $280,000 |