Kitchen remodel contractors in San Francisco
8,275 contractors have filed kitchen remodel permits in San Francisco since 2000. By permit record, the leaders are: Camp Roofing Ltd Dba Camp Construction (365 of 436 completed), Valex Construction (50 of 51 completed) and Sean M O'reilly (47 of 47 completed).
Ranked across every kitchen remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the kitchen remodel contractors, the 400 that lead on this sort were read; the rest are not in this list. Showing contractors with a kitchen remodel permit in the last 5 years. Include inactive contractors
- 1Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 436 permits: 365 completed, 64 in progress, 5 never finaled, 2 expired or cancelled. Last filed Nov 2026. Typically 70 days from permit to final inspection. Never finaled: 5 are 3 to 5 years old.
- 2Valex ConstructionLicense 809059 51 permits: 50 completed, 1 in progress. Last filed Jul 2026. Typically 128 days from permit to final inspection.
- 3Sean M O'reillyLicense 812877 47 permits: 47 completed. Last filed May 2026. Typically 77 days from permit to final inspection.
- 4Brady ConstructionLicense 539362 94 permits: 92 completed, 1 never finaled, 1 expired or cancelled. Last filed May 2026. Typically 83 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 5He & Kuang IncLicense 892144 43 permits: 40 completed, 3 in progress. Last filed Jul 2026. Typically 236 days from permit to final inspection.
- 6Yiu's Construction CoLicense 802681 127 permits: 123 completed, 4 never finaled. Last filed Jul 2026. Typically 83 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old, 1 is over 10 years old.
- 7Sure, Inc.License 561658 727 permits: 681 completed, 5 in progress, 23 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 16 are 5 to 10 years old, 6 are over 10 years old.
- 8B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Jan 2024. Typically 86 days from permit to final inspection.
- 9North Bay ConstructionLicense 896978 55 permits: 51 completed, 3 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 209 days from permit to final inspection.
- 10Caruso Construction Inc.License 710510 53 permits: 51 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 255 days from permit to final inspection.
- 11Jason Liu Construction CompanyLicense 662067 30 permits: 30 completed. Last filed Sep 2022. Typically 246 days from permit to final inspection.
- 12Darc Ventures Inc Dba Spl Construction SLicense 938513 70 permits: 67 completed, 1 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 179 days from permit to final inspection.
- 13Urban Builder General Contracting IncLicense 869710 51 permits: 49 completed, 1 in progress, 1 never finaled. Last filed Jul 2025. Typically 206 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 14Custom Construction EnterprisesLicense 830244 30 permits: 29 completed, 1 in progress. Last filed Dec 2025. Typically 240 days from permit to final inspection.
- 15Kells Construction Inc.License 746714 30 permits: 28 completed, 2 in progress. Last filed Sep 2026. Typically 90 days from permit to final inspection.
- 16Reliable Construction IncLicense 983658 108 permits: 94 completed, 10 in progress, 3 never finaled, 1 expired or cancelled. Last filed Oct 2026. Typically 188 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old.
- 17J. Ho Construction IncLicense 680425 169 permits: 158 completed, 2 in progress, 7 never finaled, 2 expired or cancelled. Last filed Apr 2026. Typically 84 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 5 are over 10 years old.
- 18Nelson T Lewis Const Co Inc.License 195866 81 permits: 76 completed, 2 in progress, 3 expired or cancelled. Last filed Sep 2026. Typically 86 days from permit to final inspection.
- 19Saturn Construction CoLicense 861233 66 permits: 61 completed, 3 in progress, 2 never finaled. Last filed Jun 2026. Typically 232 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 1 is over 10 years old.
- 20Toni's Construction IncLicense 551504 45 permits: 44 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 135 days from permit to final inspection.
- 21We Do Construction Inc.License 1096552 37 permits: 26 completed, 11 in progress. Last filed Oct 2026. Typically 201 days from permit to final inspection.
- 22Winder Construction Inc.License 1033654 30 permits: 26 completed, 4 in progress. Last filed Aug 2026. Typically 289 days from permit to final inspection.
- 23Jin Qing Construction Corp.License 1030182 27 permits: 25 completed, 2 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 24C J Reed Construction CoLicense 712090 43 permits: 42 completed, 1 never finaled. Last filed Dec 2025. Typically 66 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 25D N ConstructionLicense 945873 25 permits: 24 completed, 1 in progress. Last filed Jan 2026. Typically 119 days from permit to final inspection.
- 26MrccLicense 821253 25 permits: 24 completed, 1 in progress. Last filed May 2026. Typically 170 days from permit to final inspection.
- 27Great Ocean Construction Inc.License 1103304 25 permits: 23 completed, 2 in progress. Last filed Jul 2026. Typically 171 days from permit to final inspection.
- 28Katz GroupLicense 1074133 24 permits: 23 completed, 1 in progress. Last filed Aug 2026. Typically 113 days from permit to final inspection.
- 29Hubert PennyLicense 809333 94 permits: 87 completed, 2 in progress, 3 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 92 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
- 30John Woo ConstructionllcLicense 765131 23 permits: 22 completed, 1 in progress. Last filed Aug 2026. Typically 185 days from permit to final inspection.
- 31Paul K VouLicense 415124 22 permits: 22 completed. Last filed Dec 2024. Typically 169 days from permit to final inspection.
- 32The Sustainable Cbo Inc Dba Oliver MackiLicense 988725 22 permits: 22 completed. Last filed Apr 2025. Typically 152 days from permit to final inspection.
- 33Robison Nieri White ConstructionLicense 796298 78 permits: 74 completed, 2 never finaled, 2 expired or cancelled. Last filed Sep 2024. Typically 217 days from permit to final inspection. Never finaled: 2 are over 10 years old.
- 34Hang C Construction IncLicense 760153 39 permits: 37 completed, 1 in progress, 1 expired or cancelled. Last filed Oct 2025. Typically 178 days from permit to final inspection.
- 35E B W Builders IncLicense 794942 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 142 days from permit to final inspection.
- 36Benjamin ShawLicense 646136 21 permits: 21 completed. Last filed May 2022. Typically 141 days from permit to final inspection.
- 37Freemodel Inc.License 1066986 21 permits: 21 completed. Last filed Sep 2026. Typically 127 days from permit to final inspection.
- 38Macrobuild CorporationLicense 1024387 21 permits: 21 completed. Last filed May 2022. Typically 288 days from permit to final inspection.
- 39Patrick Coakley ConstructionLicense 819320 21 permits: 21 completed. Last filed Nov 2022. Typically 141 days from permit to final inspection.
- 40Peninsula Custom Construction IncLicense 880303 54 permits: 48 completed, 4 in progress, 2 never finaled. Last filed Oct 2026. Typically 104 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old.
How long kitchen remodel permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent kitchen remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 1400 Geary Bl | unit 4f interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry (no exterior work). there is no cook top in kitchenetteDetails
unit 4f interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry (no exterior work). there is no cook top in kitchenette | $94,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 1423 Quesada Av | kitchen remodel, new powder room and fire place demo. | $80,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 3974 22nd St | Valley Boutique Builders Inc | kitchen & bathrooms remodel. remodel bedroom #1 in main level, remodel bedroom #3 in main level. new laundry in main level. remodel in 2nd level, remodel kitchen in 2nd level. replace windows in 2nd level(like for like) new sidings in frontDetails
kitchen & bathrooms remodel. remodel bedroom #1 in main level, remodel bedroom #3 in main level. new laundry in main level. remodel in 2nd level, remodel kitchen in 2nd level. replace windows in 2nd level(like for like) new sidings in front | $150,000 |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 2581 30th Av | convert existing laundry space to kitchenett at 1st floor per plan.Details
convert existing laundry space to kitchenett at 1st floor per plan. | $19,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 487 15th Av | revision to pa# 202606163277: replace 1 rear window in kind. adjustment to kitchenette layout. new footing. selective framing work.Details
revision to pa# 202606163277: replace 1 rear window in kind. adjustment to kitchenette layout. new footing. selective framing work. | $5,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 3219 Harrison St | remodel of (e) single dwelling w/addition @ rear. addition of 296.5 sq ft @ 2nd fl to accommodate (n) master bedroom. new windows; addition of 70 sq ft @ 1st floor kitchen; remodel kitchen; (n) master bathroom & (n) bathroom @ 2nd fl; remodel (e) laundry & bath on 1st fl; replace (e) rear yard deckDetails
remodel of (e) single dwelling w/addition @ rear. addition of 296.5 sq ft @ 2nd fl to accommodate (n) master bedroom. new windows; addition of 70 sq ft @ 1st floor kitchen; remodel kitchen; (n) master bathroom & (n) bathroom @ 2nd fl; remodel (e) laundry & bath on 1st fl; replace (e) rear yard deck | $600,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 351 Guerrero St | interior improvement to bathroom kitchen on 2nd fl and bath room @ 3rd floor. no changes to building envelope, square footage or occupancy load. improvements limited to kitchen and bathroom remodels on both 2nd & 3rd floorsDetails
interior improvement to bathroom kitchen on 2nd fl and bath room @ 3rd floor. no changes to building envelope, square footage or occupancy load. improvements limited to kitchen and bathroom remodels on both 2nd & 3rd floors | $100,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 631 Haight St | W C S S Dba Solid Build Construction | professional sound insulation, electrical upgrade of panel and interior facilities, plumbing to support limited restaurant of kitchen in the space, upgrade of lighting, added security cameras, replacement of front accordion gate, bathroom renovation.Details
professional sound insulation, electrical upgrade of panel and interior facilities, plumbing to support limited restaurant of kitchen in the space, upgrade of lighting, added security cameras, replacement of front accordion gate, bathroom renovation. | $100,000 |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 1400 Geary Bl | unit 4n interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry (no exterior work). there is no cook top in kitchenetteDetails
unit 4n interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry (no exterior work). there is no cook top in kitchenette | $98,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 739 34th Av | interior remodel of (e) sfh. 2/f - kitchen remodel, new opening between kitchen/dining, 1/2 bath remodel. 3/f - add master bathroom. replace front window in kind.Details
interior remodel of (e) sfh. 2/f - kitchen remodel, new opening between kitchen/dining, 1/2 bath remodel. 3/f - add master bathroom. replace front window in kind. | $150,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 1635 26th Av | 1/f: 2 new bathroom. 1 bedroom, wetbar, relocate laundry. 2/f: remodel kitchen and 2 new bathrooms and one half-bathroom.Details
1/f: 2 new bathroom. 1 bedroom, wetbar, relocate laundry. 2/f: remodel kitchen and 2 new bathrooms and one half-bathroom. | $180,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 876 46th Av | 1/f: infill sunroom, new media room, bedroom, bathrooms, laundry wetbar. 2/f: infill lightwell, rmeodel kitchen, dining room, living room. new 2.5 bathrooms.Details
1/f: infill sunroom, new media room, bedroom, bathrooms, laundry wetbar. 2/f: infill lightwell, rmeodel kitchen, dining room, living room. new 2.5 bathrooms. | $190,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 2111 Hyde St | unit #605: renovation of kitchen, 2 bathrooms, and new powder room. removal of some non-loading walls.Details
unit #605: renovation of kitchen, 2 bathrooms, and new powder room. removal of some non-loading walls. | $90,000 | |
| Nov 19, 2026 | In progress issued Nov 2026 | 1800 Bryant St | Ted Construction Llc | unit 213: kitchen and 2 bathrooms remodel. remove (e) non load bearing wall between primary bath and closet to enlarge bathroom. convert tub/shower to walk-in shower. replace cabinets/ countertops, plumbing and electrical lighting finishes,install new floor throught the unit. no change of use.Details
unit 213: kitchen and 2 bathrooms remodel. remove (e) non load bearing wall between primary bath and closet to enlarge bathroom. convert tub/shower to walk-in shower. replace cabinets/ countertops, plumbing and electrical lighting finishes,install new floor throught the unit. no change of use. | $30,000 |
| Nov 19, 2026 | In progress issued Nov 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 1603: rehabitlitate existing kitchen and bathroom. install kitchen and bathroom. no removal of structural walls.Details
unit#: 1603: rehabitlitate existing kitchen and bathroom. install kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 1036 Polk St | unit #406: 1)rehabilitate existing kitchen. 2)install washer and dryer. 3)no removal of structural walls.Details
unit #406: 1)rehabilitate existing kitchen. 2)install washer and dryer. 3)no removal of structural walls. | $46,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 24 Presidio Av | interior remodel: raising (e) openings (4) from 78" to 93"; widening 2 of these openings for desired flow. opening from kitchen to family room to go from 30" to 48". opening from entry to family room to go from 59" to 108 1/4"Details
interior remodel: raising (e) openings (4) from 78" to 93"; widening 2 of these openings for desired flow. opening from kitchen to family room to go from 30" to 48". opening from entry to family room to go from 59" to 108 1/4" | $10,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 2303 Lake St | Ohana Construction Inc | g/f: add full utility bathroom w/ roll in shower. 3/f unit#2303: kitchen renovation to include new cabinets, remove dishwasher, new appliances, fixtures and finishes. in-kind, bathroom renovation to include closet removal to increase shower area, new finishes and fixtures.Details
g/f: add full utility bathroom w/ roll in shower. 3/f unit#2303: kitchen renovation to include new cabinets, remove dishwasher, new appliances, fixtures and finishes. in-kind, bathroom renovation to include closet removal to increase shower area, new finishes and fixtures. | $265,250 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 4168 26th St | basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet.Details
basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet. | $330,000 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 1 Cabrillo St | Axel8 Construction | unit#: 103: 1) convert existing kitchen to bedroom. 2) relocate kitchen 3) rehabilitate existing bathroom. 4) install washer and dryer.Details
unit#: 103: 1) convert existing kitchen to bedroom. 2) relocate kitchen 3) rehabilitate existing bathroom. 4) install washer and dryer. | $65,000 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 297 Richland Av | comply with nov 202665076 remodel upper unit - new kitchent, new hall, bedroom w/shower; remodel (e) hall main bathroom; add skylights & roof hatch (existing flat room)Details
comply with nov 202665076 remodel upper unit - new kitchent, new hall, bedroom w/shower; remodel (e) hall main bathroom; add skylights & roof hatch (existing flat room) | $90,000 | |
| Nov 19, 2026 | In progress issued Nov 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#:509: rehabitlitate existing kitchen and bathroom. install kitchen and bathroom. no removal of structural walls.Details
unit#:509: rehabitlitate existing kitchen and bathroom. install kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 18, 2026 | In progress issued Nov 2026 | 551 09th Av | Faith N Jason Construction Llc | interior demo of existing lath and plaster throughout. patch back in-kind. demo 1 kitchen and baths. all rough electrical and plumbing. kitchen 2nd fl./bath 3rd fl & 2nd fl.Details
interior demo of existing lath and plaster throughout. patch back in-kind. demo 1 kitchen and baths. all rough electrical and plumbing. kitchen 2nd fl./bath 3rd fl & 2nd fl. | $20,000 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 250 Jersey St | main & lower kitchen interior remodel replacing plumbing & appliances, finishes, & cabinetry. bath interior remodel throughout house in-kind & same location for fixtures. decorative light fixtures throughtout. new interior paint & door hardware throughout. (e) sliding closet doors replace w/ new.Details
main & lower kitchen interior remodel replacing plumbing & appliances, finishes, & cabinetry. bath interior remodel throughout house in-kind & same location for fixtures. decorative light fixtures throughtout. new interior paint & door hardware throughout. (e) sliding closet doors replace w/ new. | $400,000 | |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 1211 Guerrero St | Padraig Devlin Construction | to comply with nov 202664087 - moved the kitchen to new location and added 2 new bathrooms. downstairs: kitchen remodel and added 1 bathroom.Details
to comply with nov 202664087 - moved the kitchen to new location and added 2 new bathrooms. downstairs: kitchen remodel and added 1 bathroom. | $100,000 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 474 Mangels Av | Dcs Plumbing Llc | 1st floor: convert ± 287 sq ft storage into new entry, laundry and bath. 2nd floor: remodel kitchen, dining, bath 1 and closets.Details
1st floor: convert ± 287 sq ft storage into new entry, laundry and bath. 2nd floor: remodel kitchen, dining, bath 1 and closets. | $260,000 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 1790 Dolores St | remodel 2nd story kitchen/ great room, about 300sf. remove walls and fireplace/chase. install cabinets and island. add structural framing, supports and shear wall on both stories. vent the kitchen hood through the roof. remodel both baths, about 104sf. convert the upper tub to shower and separate...Details
remodel 2nd story kitchen/ great room, about 300sf. remove walls and fireplace/chase. install cabinets and island. add structural framing, supports and shear wall on both stories. vent the kitchen hood through the roof. remodel both baths, about 104sf. convert the upper tub to shower and separate... | $179,514 | |
| Nov 18, 2026 | In progress issued Nov 2026 | 373 Chenery St | Brendan Waters Construction Inc | (n) dormer & enlarged bathroom on the upper level. kitchen remodel & wall removal on the main level.Details
(n) dormer & enlarged bathroom on the upper level. kitchen remodel & wall removal on the main level. | $175,000 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 1239 09th Av | tenant improvement of an existing commercial space. remove existing kitchen hood, replace and add kitchen equipment, install new lighting, and provide associated electrical and plumbing work. no change to building area, exterior facade, or existing hvac system.Details
tenant improvement of an existing commercial space. remove existing kitchen hood, replace and add kitchen equipment, install new lighting, and provide associated electrical and plumbing work. no change to building area, exterior facade, or existing hvac system. | $120,000 | |
| Nov 18, 2026 | In progress issued Nov 2026 | 2109 Taraval St | Fides Construction Inc. | tenant improvement of an (e) retails space for retail food and merchandise sales. coffee & bakery service and supporting commercial kitchen. new unisex restroom accessibility upgrades. new service counters & display. 3 new commercial kitchen w/ kitchen equipment, type 1 exhaust hood. associated....Details
tenant improvement of an (e) retails space for retail food and merchandise sales. coffee & bakery service and supporting commercial kitchen. new unisex restroom accessibility upgrades. new service counters & display. 3 new commercial kitchen w/ kitchen equipment, type 1 exhaust hood. associated.... | $280,000 |