Ted Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2026 to Nov 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2026 | In progress issued Nov 2026 | 1800 Bryant St | unit 213: kitchen and 2 bathrooms remodel. remove (e) non load bearing wall between primary bath and closet to enlarge bathroom. convert tub/shower to walk-in shower. replace cabinets/ countertops, plumbing and electrical lighting finishes,install new floor throught the unit. no change of use.Details
unit 213: kitchen and 2 bathrooms remodel. remove (e) non load bearing wall between primary bath and closet to enlarge bathroom. convert tub/shower to walk-in shower. replace cabinets/ countertops, plumbing and electrical lighting finishes,install new floor throught the unit. no change of use. | $30,000 |