Back to kitchen remodel contractors
Paul K Vou
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Oct 2025
- Last 24 months
- 2 permits filed
42 permits since 2000: 37 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 21 completed, 1 in progress. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | In progress issued Apr 2025 | 217 Randall St | renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade....Details
renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade.... | $643,814 |
| Sep 27, 2023 | Completed final sign-off Dec 2023 | 227 Clinton Pk | unit #4: remodel 1 bathroom in kind- change tile, cabinet, sink, new paint. remodel 1 kitchen in kind- change cabinet, counter, sink, faucet, stove, new paint. all in kind. no structural work. no floor layout change. no wall layout change.Details
unit #4: remodel 1 bathroom in kind- change tile, cabinet, sink, new paint. remodel 1 kitchen in kind- change cabinet, counter, sink, faucet, stove, new paint. all in kind. no structural work. no floor layout change. no wall layout change. | $15,000 |
| Oct 18, 2022 | Completed final sign-off Oct 2023 | 48 Dearborn St | remodeling one bathroom and one kitchen. change new water heater, add new heater. change new electric wire.Details
remodeling one bathroom and one kitchen. change new water heater, add new heater. change new electric wire. | $35,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 66 Elsie St | revision to no-plan pa 202204202626. additional renovations: open wall at 3/f btw kitchen and living room. replace windows & sliding door, add prop. line window w/ab-09. 2/f: relocate bath, expand closet. modify windows at rear. replace sliding door. (continue)Details
revision to no-plan pa 202204202626. additional renovations: open wall at 3/f btw kitchen and living room. replace windows & sliding door, add prop. line window w/ab-09. 2/f: relocate bath, expand closet. modify windows at rear. replace sliding door. (continue) | $130,000 |
| Apr 20, 2022 | Completed final sign-off Oct 2023 | 66 Elsie St | remodeling kitchen and two bathrooms. non structural.Details
remodeling kitchen and two bathrooms. non structural. | $10,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2024 | 105 08th Av | remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.Details
remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level. | $150,000 |
| Oct 25, 2021 | Completed final sign-off Apr 2022 | 46 Dearborn St | remodeling one bathroom and one kitchen. new tile, bathtop, faucet, cabinet, countertop. new paint. change new water heater. add the new heater. non structural.Details
remodeling one bathroom and one kitchen. new tile, bathtop, faucet, cabinet, countertop. new paint. change new water heater. add the new heater. non structural. | $20,000 |
| Apr 26, 2021 | Completed final sign-off May 2022 | 114 Linda St | remodel kitchen & bath. add washer/dryer to unit. remove wall between kitchen & bedroom. move bedroom to front.Details
remodel kitchen & bath. add washer/dryer to unit. remove wall between kitchen & bedroom. move bedroom to front. | $65,000 |
| Mar 12, 2021 | Completed final sign-off Jul 2021 | 103 08th Av | kitchen and bathroom remodel in kind. replace water heater & furnise.Details
kitchen and bathroom remodel in kind. replace water heater & furnise. | $45,000 |
| Feb 21, 2019 | Completed final sign-off Sep 2020 | 231 Gates St | interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent buildingDetails
interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent building | $200,000 |
| May 4, 2018 | Completed final sign-off Sep 2018 | 223 Anderson St | remodeling kitchen - replace kitchen counter, sinkDetails
remodeling kitchen - replace kitchen counter, sink | $10,000 |
| Oct 27, 2017 | Completed final sign-off Feb 2019 | 506 Banks St | create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg.Details
create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg. | $190,000 |
| Aug 8, 2017 | Completed final sign-off Apr 2018 | 149 Bradford St | infill under rear overhang (less than 12' above grade); 1st floor renovations - add master bedroom, bathroom and remodel family room; remodel kitchen and bath on 2nd floor. add (n) skylightsDetails
infill under rear overhang (less than 12' above grade); 1st floor renovations - add master bedroom, bathroom and remodel family room; remodel kitchen and bath on 2nd floor. add (n) skylights | $50,000 |
| Jul 5, 2017 | Completed final sign-off Dec 2017 | 126 Randolph St | remodel 1 ½ bathroom located at the second floor - remodel kitchen , new plumbing , revised 2nd floor electrical, new dry wall and insulation, outside painting, change window, repair roof -window at the front will be wood interior exterior aluminum cladding. please note all interior work will be onDetails
remodel 1 ½ bathroom located at the second floor - remodel kitchen , new plumbing , revised 2nd floor electrical, new dry wall and insulation, outside painting, change window, repair roof -window at the front will be wood interior exterior aluminum cladding. please note all interior work will be on | $110,000 |
| Sep 21, 2007 | Completed final sign-off Jan 2008 | 1200 Taylor St | 1 bthroom 1 kitchen remodel. replacing in kind. no structural. 50% of kitchen wattage to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor.Details
1 bthroom 1 kitchen remodel. replacing in kind. no structural. 50% of kitchen wattage to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $14,500 |
| Jul 16, 2007 | Completed final sign-off May 2008 | 2190 26th Av | to legalize existing family room and bathroom, and add a guest room in 1st floor. remodel existing bath & kitchen in 2nd floor. replace all existing windowsDetails
to legalize existing family room and bathroom, and add a guest room in 1st floor. remodel existing bath & kitchen in 2nd floor. replace all existing windows | $40,000 |
| Jul 2, 2007 | Completed final sign-off Dec 2007 | 1200 Taylor St | unit #24-kitchen to legalize work done without permit to comply with complaint# 200706762-no changes to partitions or windows. 50% of kitchen light watts must be flourscentDetails
unit #24-kitchen to legalize work done without permit to comply with complaint# 200706762-no changes to partitions or windows. 50% of kitchen light watts must be flourscent | $6,300 |
| Jan 17, 2007 | Completed final sign-off Mar 2007 | 1200 Taylor St | replace 1 kitchen in kind-cabinets, tile, counter tops, paint. replace 1 bathroom in kind-tile and paint. no window or door work.Details
replace 1 kitchen in kind-cabinets, tile, counter tops, paint. replace 1 bathroom in kind-tile and paint. no window or door work. | $15,000 |
| Oct 12, 2006 | Completed final sign-off Nov 2006 | 1200 Taylor St | work @ unit# 4 only. replace 1 kitchen counter & tile floor. replace shower door & tile floor at 1 bathroom.Details
work @ unit# 4 only. replace 1 kitchen counter & tile floor. replace shower door & tile floor at 1 bathroom. | $3,000 |
| Oct 6, 2006 | Completed final sign-off Mar 2007 | 1200 Taylor St | kitchen to legalize work done without a permit. to comply w/complaint#200671107 50% high efficacy lighting.Details
kitchen to legalize work done without a permit. to comply w/complaint#200671107 50% high efficacy lighting. | $6,800 |
| Jul 25, 2006 | Completed final sign-off Jan 2007 | 707 03rd Av | bathroom & kitchen remodel. replacing in kind. no structural work.Details
bathroom & kitchen remodel. replacing in kind. no structural work. | $45,000 |
| Jun 28, 2006 | Completed final sign-off Sep 2006 | 1200 Taylor St | remodel kitchen & bathrm in kind no work in bedrms.Details
remodel kitchen & bathrm in kind no work in bedrms. | $18,000 |