Block 1368, lot 001
105 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 2
- Units
- 3
- Rooms
- 8 bedrooms, 5 bathrooms
- Building
- 4,237 sq ft
- Lot
- 2,438 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | In progress issued Mar 2026 | 105 08th Av | D K G Construction Inc | 2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10'Details
2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10' | $20,000 |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 101 08th Av | interior kitchen and bath renovation of 3rd fl unit in a 3 story, 3 unit building. interior work includes new fixtures, finishes, casework in e kitchen and bath. removal and modification to interior non structural and load bearing wood framed partitonsDetails
interior kitchen and bath renovation of 3rd fl unit in a 3 story, 3 unit building. interior work includes new fixtures, finishes, casework in e kitchen and bath. removal and modification to interior non structural and load bearing wood framed partitons | $60,454 | |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 101 08th Av | remove window and infill opening on south elevatoin. patch with 1-hr rated assemblyDetails
remove window and infill opening on south elevatoin. patch with 1-hr rated assembly | $2,000 | |
| Mar 15, 2022 | Completed final sign-off Jul 2024 | 105 08th Av | Paul K Vou | remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.Details
remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level. | $150,000 |
| Mar 12, 2021 | Completed final sign-off Jul 2021 | 103 08th Av | Paul K Vou | kitchen and bathroom remodel in kind. replace water heater & furnise.Details
kitchen and bathroom remodel in kind. replace water heater & furnise. | $45,000 |
| Feb 7, 2008 | Completed final sign-off Mar 2008 | 101 08th Av | Dissmeyer Corp, Dba Acme Roofing Co | reroofingDetails
reroofing | $24,473 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Paul K Vou (2), D K G Construction Inc, Dissmeyer Corp, Dba Acme Roofing Co
- Architects
- Troy Kashanipour
- Engineers
- Chad Hamilton, Derrick Roorda
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.