Permit GraphShortlistSan Francisco building permits since 2000

Block 1368, lot 001

105 08th Ave

City’s use
Multi-Family Residential
Built
1921
Stories
2
Units
3
Rooms
8 bedrooms, 5 bathrooms
Building
4,237 sq ft
Lot
2,438 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 13, 2026In progress
issued Mar 2026
105 08th AvD K G Construction Inc2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10'
Details
Permit
202603137496
Status
issued
Filed
Mar 13, 2026
Permit issued
Mar 13, 2026
Declared cost
$20,000
Address
105 08th Av

2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10'

Open the permit page

$20,000
Dec 16, 2022Expired or cancelled
cancelled Jan 2026
101 08th Avinterior kitchen and bath renovation of 3rd fl unit in a 3 story, 3 unit building. interior work includes new fixtures, finishes, casework in e kitchen and bath. removal and modification to interior non structural and load bearing wood framed partitons
Details
Permit
202212168511
Status
cancelled
Filed
Dec 16, 2022
Declared cost
$60,454
Address
101 08th Av

interior kitchen and bath renovation of 3rd fl unit in a 3 story, 3 unit building. interior work includes new fixtures, finishes, casework in e kitchen and bath. removal and modification to interior non structural and load bearing wood framed partitons

Open the permit page

$60,454
Dec 16, 2022Expired or cancelled
cancelled Jan 2026
101 08th Avremove window and infill opening on south elevatoin. patch with 1-hr rated assembly
Details
Permit
202212168516
Status
cancelled
Filed
Dec 16, 2022
Declared cost
$2,000
Address
101 08th Av

remove window and infill opening on south elevatoin. patch with 1-hr rated assembly

Open the permit page

$2,000
Mar 15, 2022Completed
final sign-off Jul 2024
105 08th AvPaul K Vouremodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.
Details
Permit
202203159999
Status
complete
Filed
Mar 15, 2022
Permit issued
Dec 5, 2022
Final sign-off
Jul 23, 2024
Declared cost
$150,000
Address
105 08th Av

remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.

Open the permit page

$150,000
Mar 12, 2021Completed
final sign-off Jul 2021
103 08th AvPaul K Voukitchen and bathroom remodel in kind. replace water heater & furnise.
Details
Permit
202103126480
Status
complete
Filed
Mar 12, 2021
Permit issued
Mar 12, 2021
Final sign-off
Jul 26, 2021
Declared cost
$45,000
Address
103 08th Av

kitchen and bathroom remodel in kind. replace water heater & furnise.

Open the permit page

$45,000
Feb 7, 2008Completed
final sign-off Mar 2008
101 08th AvDissmeyer Corp, Dba Acme Roofing Coreroofing
Details
Permit
200802074236
Status
complete
Filed
Feb 7, 2008
Permit issued
Feb 7, 2008
Final sign-off
Mar 4, 2008
Declared cost
$24,473
Address
101 08th Av

reroofing

Open the permit page

$24,473

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Paul K Vou (2), D K G Construction Inc, Dissmeyer Corp, Dba Acme Roofing Co
Architects
Troy Kashanipour
Engineers
Chad Hamilton, Derrick Roorda

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.