Back to kitchen remodel contractors
C J Reed Construction Co
- Based in
- Petaluma
- On San Francisco permits
- Jan 2007 to Aug 2026
- Last 24 months
- 42 permits filed
134 permits since 2000: 130 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 42 completed, 1 never finaled. Typically 8 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette.Details
unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette. | $112,000 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | 12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work).Details
12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work). | $80,940 |
| Jun 9, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | 6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $112,000 |
| Apr 29, 2025 | Completed final sign-off Jul 2025 | 1400 Geary Bl | 4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenetteDetails
4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenette | $57,246 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | 10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenetteDetails
10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenette | $92,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenetteDetails
6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette | $132,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette.Details
15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette. | $92,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 1400 Geary Bl | 18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work.Details
18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work. | $98,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | 7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenette | $132,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | 8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenette | $92,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenetteDetails
unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenette | $178,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 1400 Geary Bl | interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette.Details
interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette. | $128,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | 6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette.Details
6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | 16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette).Details
16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette). | $105,000 |
| Jul 3, 2023 | Completed final sign-off Nov 2023 | 1400 Geary Bl | 21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette.Details
21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette. | $48,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1400 Geary Bl | 22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette.Details
22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette. | $48,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2023 | 1400 Geary Bl | 5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror workDetails
5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror work | $55,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | 5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette.Details
5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | 11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit.Details
11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit. | $127,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 1400 Geary Bl | 16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior workDetails
16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior work | $65,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 1400 Geary Bl | 1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306.Details
1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306. | $87,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1400 Geary Bl | unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette.Details
unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette. | $48,000 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette.Details
unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette. | $38,000 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette.Details
unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette. | $38,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2020 | 1400 Geary Bl | 17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenetteDetails
17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenette | $79,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2020 | 1400 Geary Bl | unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette.Details
unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette. | |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 1400 Geary Bl | 20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette.Details
20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette. | $6,000 |
| May 7, 2019 | Completed final sign-off Jun 2019 | 1400 Geary Bl | 11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenette | $15,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 1400 Geary Bl | 25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette.Details
25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette. | |
| Oct 18, 2016 | Completed final sign-off Dec 2016 | 1400 Geary Bl | unit 6m, 6th floor interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area; no exterior work. no cooktop in kitchenetteDetails
unit 6m, 6th floor interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area; no exterior work. no cooktop in kitchenette | $6,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | 6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior workDetails
6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior work | $6,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | 20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette).Details
20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). | $10,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | 7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette.Details
7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette. | $5,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | 24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | 9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Mar 30, 2016 | Completed final sign-off Aug 2016 | 1400 Geary Bl | 7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 1400 Geary Bl | 17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not reqDetails
17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not req | $12,000 |
| Mar 30, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | 17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $20,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 1400 Geary Bl | 7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette).Details
7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette). | $37,345 |
| Jan 11, 2016 | Completed final sign-off Mar 2016 | 1400 Geary Bl | 15th floor (unit 1501): interior remodel, replace plmg fixture, add or replace certain light fixture, add power outlets, add local smoke detector at bedroom. install shower grab bars, and backing. there is no cooktop at kitchenette.Details
15th floor (unit 1501): interior remodel, replace plmg fixture, add or replace certain light fixture, add power outlets, add local smoke detector at bedroom. install shower grab bars, and backing. there is no cooktop at kitchenette. | $30,000 |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | 14th fl suite 1408. interior remodel, replace plumbing fixutres, add or replace certain light fixtures. add power outlets for convencience appliances at kitchenette. add local. smoke detector. install shower grab bar backingDetails
14th fl suite 1408. interior remodel, replace plumbing fixutres, add or replace certain light fixtures. add power outlets for convencience appliances at kitchenette. add local. smoke detector. install shower grab bar backing | $37,730 |
| Jan 24, 2007 | Completed final sign-off Apr 2007 | 324 Arguello Bl | kitchen remodel-new cabinets, appliances, floors, range, refridgerator. relocate new laundry service in (e) store closet. 1 bathrm remodel-new fixtures, tub change to shower, tile stall & floors, closet alterations to bedrooms. 1 & 2 including built in casework as shown.Details
kitchen remodel-new cabinets, appliances, floors, range, refridgerator. relocate new laundry service in (e) store closet. 1 bathrm remodel-new fixtures, tub change to shower, tile stall & floors, closet alterations to bedrooms. 1 & 2 including built in casework as shown. | $150,000 |