C J Reed Construction Co
- Based in
- Petaluma
- On San Francisco permits
- Jan 2007 to Aug 2026
- Last 24 months
- 42 permits filed
134 permits since 2000: 130 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 134.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior workDetails
unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior work | $98,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | 24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work)Details
24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work) | $98,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | 21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $139,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work.Details
unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work. | $98,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work.Details
unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work. | $98,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | 15/f/unit 1502. interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
15/f/unit 1502. interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $98,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | 7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work.Details
7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work. | $112,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | 23rd fl/unit 2309: interior remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. there is no exterior work.Details
23rd fl/unit 2309: interior remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. there is no exterior work. | $139,000 |
| May 7, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | 15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $80,940 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | 20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work)Details
20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work) | $139,000 |
| Mar 6, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | 4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $94,000 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | 13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $139,000 |
| Mar 5, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | 22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $98,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette.Details
unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette. | $112,000 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | 10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $98,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 1400 Geary Bl | 10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $92,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | 6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $80,940 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | 9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work.Details
9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work. | $81,000 |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | 25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work)Details
25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work) | $78,810 |
| Aug 7, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | 6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior workDetails
6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior work | $80,940 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | 12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work).Details
12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work). | $80,940 |
| Aug 6, 2025 | Completed final sign-off Dec 2025 | 1400 Geary Bl | 8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work)Details
8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work) | $112,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | 13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work.Details
13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work. | $122,000 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | 18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette.Details
18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette. | $113,600 |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | 21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $115,000 |
| Jul 23, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | 14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $122,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | 9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work.Details
9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work. | $98,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | 6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $112,000 |
| Jun 9, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | 6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $112,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | 6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $132,000 |
| May 9, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $115,000 |
| Apr 29, 2025 | Completed final sign-off Jul 2025 | 1400 Geary Bl | 4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenetteDetails
4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenette | $57,246 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | 10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenetteDetails
10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenette | $92,000 |
| Mar 24, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work)Details
17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work) | $112,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenetteDetails
6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette | $132,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette.Details
15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette. | $92,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior workDetails
7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work | $132,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 1400 Geary Bl | 18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work.Details
18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work. | $98,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | 13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work | $112,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | 16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior work | $98,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | 7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenette | $132,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | 8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenette | $92,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenetteDetails
unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenette | $178,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 1400 Geary Bl | interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette.Details
interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette. | $128,000 |
| Jun 18, 2024 | Completed final sign-off Sep 2024 | 1400 Geary Bl | unit 1303/13th floor:interior remodel: replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work.Details
unit 1303/13th floor:interior remodel: replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work. | $38,750 |
| Jun 18, 2024 | Completed final sign-off Oct 2024 | 1400 Geary Bl | unit 2102/21st floor:interior remodel: replace existing tub with new shower, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work.Details
unit 2102/21st floor:interior remodel: replace existing tub with new shower, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work. | $55,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 1400 Geary Bl | 18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior)Details
18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior) | $17,000 |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 1400 Geary Bl | 5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior work | $62,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | 3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b.Details
3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b. | $62,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | 6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette.Details
6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | 15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work.Details
15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. | $68,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | 16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette).Details
16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette). | $105,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 1400 Geary Bl | 9/f-unit 902: interior remodel, replace (e)tub w/new shower, shower grab bar backing, add local smoke alarm @ sleeping room & living room/entry area. no exterior workDetails
9/f-unit 902: interior remodel, replace (e)tub w/new shower, shower grab bar backing, add local smoke alarm @ sleeping room & living room/entry area. no exterior work | $20,000 |
| Jul 3, 2023 | Completed final sign-off Nov 2023 | 1400 Geary Bl | 21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette.Details
21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette. | $48,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 1400 Geary Bl | 7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work.Details
7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work. | $55,000 |
| Mar 28, 2023 | Completed final sign-off Jul 2023 | 1400 Geary Bl | 22nd fl unit 2205: interior remodel. replace plumbing fixtures, install shower grab bar backing, local smoke detector at sleeping room and living room/entry area. no exterior workDetails
22nd fl unit 2205: interior remodel. replace plumbing fixtures, install shower grab bar backing, local smoke detector at sleeping room and living room/entry area. no exterior work | $55,000 |
| Feb 16, 2023 | Completed final sign-off Apr 2023 | 1400 Geary Bl | 4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior workDetails
4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior work | $32,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1400 Geary Bl | 22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette.Details
22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette. | $48,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2023 | 1400 Geary Bl | 5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror workDetails
5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror work | $55,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2023 | 1400 Geary Bl | 9th fl. unit 901: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area no exterior workDetails
9th fl. unit 901: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area no exterior work | $55,000 |
| Dec 1, 2022 | Completed final sign-off Mar 2023 | 1400 Geary Bl | 10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior workDetails
10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work | $55,000 |
| Dec 1, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | 21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior workDetails
21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior work | $32,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | 5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette.Details
5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Oct 25, 2022 | Completed final sign-off May 2023 | 1400 Geary Bl | unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work.Details
unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. | $65,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | 11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit.Details
11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit. | $127,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | 13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work)Details
13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) | $65,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 1400 Geary Bl | 16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior workDetails
16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior work | $65,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 1400 Geary Bl | 1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306.Details
1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306. | $87,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1400 Geary Bl | unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette.Details
unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette. | $48,000 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 1400 Geary Bl | unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work.Details
unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work. | |
| Jan 28, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | 5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h.Details
5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h. | $47,000 |
| Jan 27, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $18,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 1400 Geary Bl | unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $41,000 |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work.Details
apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work. | $34,760 |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | 12th fl unit 1208: interior remodel: replace tub with shower, grab bar backing, add. local smoke detector at sleeping roomand living roojm/entry area. no exterior workDetails
12th fl unit 1208: interior remodel: replace tub with shower, grab bar backing, add. local smoke detector at sleeping roomand living roojm/entry area. no exterior work | $34,760 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $29,704 |
| Sep 1, 2021 | Completed final sign-off Sep 2021 | 1400 Geary Bl | 23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior workDetails
23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work | $38,750 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work.Details
units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work. | $75,000 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette.Details
unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette. | $38,000 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette.Details
unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette. | $38,000 |
| May 11, 2020 | Completed final sign-off Sep 2020 | 1400 Geary Bl | unit 2206: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work.Details
unit 2206: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work. | $24,000 |
| May 11, 2020 | Completed final sign-off Sep 2020 | 1400 Geary Bl | unit 605: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work.Details
unit 605: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work. | $24,000 |
| Dec 10, 2019 | Completed final sign-off Jan 2020 | 1400 Geary Bl | 8th/fl suite 803 interor remodel, replace plumbing fixtures install shower grab bar backing, add local smoke detector at sleeping room and living room entry area. no exterior workDetails
8th/fl suite 803 interor remodel, replace plumbing fixtures install shower grab bar backing, add local smoke detector at sleeping room and living room entry area. no exterior work | $27,000 |
| Dec 10, 2019 | Completed final sign-off Apr 2020 | 1400 Geary Bl | 23rd fl unit 2301, interior remodel. replace plumbinb fixtures, install shower grabbar backing, add local smoke detector at sleeping room and living rm entry area. no exterior workDetails
23rd fl unit 2301, interior remodel. replace plumbinb fixtures, install shower grabbar backing, add local smoke detector at sleeping room and living rm entry area. no exterior work | $48,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2020 | 1400 Geary Bl | 17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenetteDetails
17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenette | $79,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2020 | 1400 Geary Bl | unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette.Details
unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette. | |
| Oct 4, 2019 | Completed final sign-off Nov 2019 | 1400 Geary Bl | unit #608: interior remodel, replace tub with shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area.Details
unit #608: interior remodel, replace tub with shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. | $10,000 |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 1400 Geary Bl | 20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette.Details
20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette. | $6,000 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 1400 Geary Bl | 3rd flr/unit 3f - interior remodel - replace plm fixtures, install shower grab bar backing add local smk det at sleeping rm and liv rm/entry area. no ext work. ele includedDetails
3rd flr/unit 3f - interior remodel - replace plm fixtures, install shower grab bar backing add local smk det at sleeping rm and liv rm/entry area. no ext work. ele included | $15,000 |
| May 9, 2019 | Completed final sign-off Jun 2019 | 1400 Geary Bl | unit 1705. interior remodel. replace plumb fixtures. install shower grab bar, add local smoke detector at sleeping room & living room, entry area. there is no exterior work.Details
unit 1705. interior remodel. replace plumb fixtures. install shower grab bar, add local smoke detector at sleeping room & living room, entry area. there is no exterior work. | $5,000 |
| May 7, 2019 | Completed final sign-off Jun 2019 | 1400 Geary Bl | 11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenette | $15,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 1400 Geary Bl | 3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work)Details
3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work) | $74,000 |
| Feb 11, 2019 | Completed final sign-off Mar 2019 | 1400 Geary Bl | 11th, unit 1107- interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no exterior workDetails
11th, unit 1107- interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no exterior work | $6,000 |
| Nov 13, 2018 | Completed final sign-off Jan 2019 | 1400 Geary Bl | unit 407: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room. entry area. no exterior work.Details
unit 407: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room. entry area. no exterior work. | $6,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2018 | 1400 Geary Bl | (7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar.Details
(7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar. | $73,868 |