Block 0697, lot 039
1400 Geary Blvd
- City’s use
- Multi-Family Residential
- Built
- 1969
- Stories
- 27
- Units
- 300
- Rooms
- 416 bathrooms
- Building
- 406,047 sq ft
- Lot
- 94,981 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1400 Geary Bl | Peninsula Custom Construction Inc | elevator lobby improvements in support of elevator replacement. (e) elevator cabs remain in place, interior finishes & related cab components. upgraded as modernization, replacement of traction machines, counterweights, controls, & equipment for destination dispatch elevator system.Details
elevator lobby improvements in support of elevator replacement. (e) elevator cabs remain in place, interior finishes & related cab components. upgraded as modernization, replacement of traction machines, counterweights, controls, & equipment for destination dispatch elevator system. | $250,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1400 Geary Bl | unit 2501 25/f: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room + living room/entry area. (no exterior work).Details
unit 2501 25/f: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room + living room/entry area. (no exterior work). | $94,000 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior workDetails
unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior work | $98,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | 24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work)Details
24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work) | $98,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 1400 Geary Bl | replacement of exterior glazing systems throughout the entire facility,including windows,storefronts,entrances & curtain walls.replacement of elevators,traction machines & counterweights with(n) cabs,controls & equipment for a(n)destination dispatch elevator system.Details
replacement of exterior glazing systems throughout the entire facility,including windows,storefronts,entrances & curtain walls.replacement of elevators,traction machines & counterweights with(n) cabs,controls & equipment for a(n)destination dispatch elevator system. | $19,500,000 | |
| Jul 13, 2026 | In progress issued Jul 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 19th floor (unit 1907) interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room / entry area. there is no exterior work.Details
19th floor (unit 1907) interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room / entry area. there is no exterior work. | $70,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 18th fl,unit 1804 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
18th fl,unit 1804 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $94,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | 21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $139,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work.Details
unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work. | $98,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | C J Reed Construction Co | unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work.Details
unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work. | $98,000 |
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 7th floor unit 709, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
7th floor unit 709, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $98,000 |
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 14th flr: 1408, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
14th flr: 1408, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $70,000 |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 10th floor. unit 1003: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work.Details
10th floor. unit 1003: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work. | $80,940 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | 15/f/unit 1502. interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
15/f/unit 1502. interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $98,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | C J Reed Construction Co | 7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work.Details
7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work. | $112,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | C J Reed Construction Co | 23rd fl/unit 2309: interior remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. there is no exterior work.Details
23rd fl/unit 2309: interior remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. there is no exterior work. | $139,000 |
| May 7, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | C J Reed Construction Co | 15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $80,940 |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 1602, 16th fl interior remodel: replace plumbing fixtures. install fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
unit 1602, 16th fl interior remodel: replace plumbing fixtures. install fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $80,940 |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 401, 4th fl interior remodel: replace plumbing fixtures. install fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
unit 401, 4th fl interior remodel: replace plumbing fixtures. install fixtures. install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $80,940 |
| Mar 27, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 18th fl, unit 1807 interior remodel: replace plumbing smoke alarm at sleeping room and living room/engry area (no exterior work)Details
18th fl, unit 1807 interior remodel: replace plumbing smoke alarm at sleeping room and living room/engry area (no exterior work) | $70,000 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 24th fl, unit 2402 interior remode: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work)Details
24th fl, unit 2402 interior remode: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work) | $90,000 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work)Details
20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work) | $139,000 |
| Mar 6, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $94,000 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | C J Reed Construction Co | 13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $139,000 |
| Mar 5, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $98,000 |
| Feb 13, 2026 | In progress filed Feb 2026, not yet issued | 1525 Post St | installation of new fuel cell equipment with associated structural platform support, plumbing and electrical engineering. all exterior work and no modificationsto existing building or use impacted. loading dock will remain in use.Details
installation of new fuel cell equipment with associated structural platform support, plumbing and electrical engineering. all exterior work and no modificationsto existing building or use impacted. loading dock will remain in use. | $1,000,000 | |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 1706: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
unit 1706: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $92,000 |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 402: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
unit 402: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $98,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | C J Reed Construction Co | unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette.Details
unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette. | $112,000 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | C J Reed Construction Co | 10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $98,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 1400 Geary Bl | C J Reed Construction Co | 10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $92,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | C J Reed Construction Co | 6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $80,940 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | C J Reed Construction Co | 9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work.Details
9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work. | $81,000 |
| Sep 29, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | 6th/f unit 6n: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work, no cooktop in kitcheetteDetails
6th/f unit 6n: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work, no cooktop in kitcheette | $112,000 | |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | C J Reed Construction Co | 25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work)Details
25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work) | $78,810 |
| Aug 7, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | C J Reed Construction Co | 6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior workDetails
6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior work | $80,940 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work).Details
12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work). | $80,940 |
| Aug 6, 2025 | Completed final sign-off Dec 2025 | 1400 Geary Bl | C J Reed Construction Co | 8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work)Details
8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work) | $112,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | C J Reed Construction Co | 13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work.Details
13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work. | $122,000 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette.Details
18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette. | $113,600 |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $115,000 |
| Jul 23, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | C J Reed Construction Co | 14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $122,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | C J Reed Construction Co | 9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work.Details
9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work. | $98,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $112,000 |
| Jun 9, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $112,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $132,000 |
| May 9, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | C J Reed Construction Co | unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $115,000 |
| Apr 29, 2025 | Completed final sign-off Jul 2025 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenetteDetails
4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenette | $57,246 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | C J Reed Construction Co | 10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenetteDetails
10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenette | $92,000 |
| Mar 24, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work)Details
17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work) | $112,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenetteDetails
6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette | $132,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette.Details
15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette. | $92,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior workDetails
7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work | $132,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 1400 Geary Bl | C J Reed Construction Co | 18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work.Details
18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work. | $98,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | C J Reed Construction Co | 13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work | $112,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | C J Reed Construction Co | 16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior work | $98,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | 7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenette | $132,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | 8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenette | $92,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenetteDetails
unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenette | $178,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 1400 Geary Bl | C J Reed Construction Co | interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette.Details
interior remodel. combine units 508 & 510 to make 1 large unit (unit 510). replace plumbing fixture, install grab bar backing. add local smoke alarm at sleeping room & living room/entry area. add washer/elec dryer. no exterior work. no cooktop in kitchenette. | $128,000 |
| Jun 18, 2024 | Completed final sign-off Sep 2024 | 1400 Geary Bl | C J Reed Construction Co | unit 1303/13th floor:interior remodel: replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work.Details
unit 1303/13th floor:interior remodel: replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work. | $38,750 |
| Jun 18, 2024 | Completed final sign-off Oct 2024 | 1400 Geary Bl | C J Reed Construction Co | unit 2102/21st floor:interior remodel: replace existing tub with new shower, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work.Details
unit 2102/21st floor:interior remodel: replace existing tub with new shower, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no extrior work. | $55,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 1400 Geary Bl | C J Reed Construction Co | 18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior)Details
18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior) | $17,000 |
| Mar 13, 2024 | In progress issued Mar 2024 | 1400 Geary Bl | San Francisco Roofing Services Inc | re-roofing; coating the roof with liquatec roof coating. approx 5500 sqftDetails
re-roofing; coating the roof with liquatec roof coating. approx 5500 sqft | $230,000 |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 1400 Geary Bl | C J Reed Construction Co | 5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior work | $62,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | C J Reed Construction Co | 3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b.Details
3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b. | $62,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | C J Reed Construction Co | 6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette.Details
6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | C J Reed Construction Co | 15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work.Details
15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. | $68,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | C J Reed Construction Co | 16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette).Details
16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette). | $105,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 1400 Geary Bl | C J Reed Construction Co | 9/f-unit 902: interior remodel, replace (e)tub w/new shower, shower grab bar backing, add local smoke alarm @ sleeping room & living room/entry area. no exterior workDetails
9/f-unit 902: interior remodel, replace (e)tub w/new shower, shower grab bar backing, add local smoke alarm @ sleeping room & living room/entry area. no exterior work | $20,000 |
| Jul 3, 2023 | Completed final sign-off Nov 2023 | 1400 Geary Bl | C J Reed Construction Co | 21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette.Details
21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette. | $48,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 1400 Geary Bl | C J Reed Construction Co | 7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work.Details
7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work. | $55,000 |
| Mar 28, 2023 | Completed final sign-off Jul 2023 | 1400 Geary Bl | C J Reed Construction Co | 22nd fl unit 2205: interior remodel. replace plumbing fixtures, install shower grab bar backing, local smoke detector at sleeping room and living room/entry area. no exterior workDetails
22nd fl unit 2205: interior remodel. replace plumbing fixtures, install shower grab bar backing, local smoke detector at sleeping room and living room/entry area. no exterior work | $55,000 |
| Feb 16, 2023 | Completed final sign-off Apr 2023 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior workDetails
4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior work | $32,000 |
| Jan 26, 2023 | Completed final sign-off May 2024 | 1400 Geary Bl | Everon Llc | replace 196 speakers with new. add 257 speakers, add 2 smoke detectors, 3 speaker strobesDetails
replace 196 speakers with new. add 257 speakers, add 2 smoke detectors, 3 speaker strobes | $148,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1400 Geary Bl | C J Reed Construction Co | 22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette.Details
22/f unit #2209: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room enrty. no exterior work. no cooktop in kitchenette. | $48,000 |
| Dec 27, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | H C I Systems Inc | as built fire alarm ref to 2022 0329 1079Details
as built fire alarm ref to 2022 0329 1079 | |
| Dec 16, 2022 | Completed final sign-off Apr 2023 | 1400 Geary Bl | C J Reed Construction Co | 5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror workDetails
5th fl. unit 502: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area relocation of kitchenette no exteror work | $55,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2023 | 1400 Geary Bl | C J Reed Construction Co | 9th fl. unit 901: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area no exterior workDetails
9th fl. unit 901: interior remodel replace plumbing fixtures install shower grab bar backing and local smoke detector (alarm) at sleeping room and livng room /enrty area no exterior work | $55,000 |
| Dec 1, 2022 | Completed final sign-off Mar 2023 | 1400 Geary Bl | C J Reed Construction Co | 10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior workDetails
10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work | $55,000 |
| Dec 1, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | C J Reed Construction Co | 21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior workDetails
21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior work | $32,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | C J Reed Construction Co | 5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette.Details
5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Oct 25, 2022 | Completed final sign-off May 2023 | 1400 Geary Bl | C J Reed Construction Co | unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work.Details
unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. | $65,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | C J Reed Construction Co | 11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit.Details
11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit. | $127,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | C J Reed Construction Co | 13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work)Details
13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) | $65,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 1400 Geary Bl | C J Reed Construction Co | 16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior workDetails
16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior work | $65,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 1400 Geary Bl | C J Reed Construction Co | 1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306.Details
1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306. | $87,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette.Details
unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette. | $48,000 |
| Mar 29, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | H C I Systems Inc | installation of new fire alarm notification devices to provide proper area coverage. new slc line for associated fan/ahu shutdown including smoke detector & manual pull station. new notification devices to be tied to (e) booster power supply as shown in fa-301.Details
installation of new fire alarm notification devices to provide proper area coverage. new slc line for associated fan/ahu shutdown including smoke detector & manual pull station. new notification devices to be tied to (e) booster power supply as shown in fa-301. | $26,140 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work.Details
unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work. | |
| Jan 28, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | C J Reed Construction Co | 5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h.Details
5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h. | $47,000 |
| Jan 27, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $18,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $41,000 |
| Dec 3, 2021 | Never finaled issued Jan 2022, no final | 1400 Geary Bl | Sure Fire Protection | level a: due to addition of new walk and celings and partial new mech: add 1 new ssu under duct. add 1 new srssu and relocate 2 (e) sr ssu for new full ht wall. add (n) sr concealed ssp, add change out 3 semi rec to new concealed ssp.Details
level a: due to addition of new walk and celings and partial new mech: add 1 new ssu under duct. add 1 new srssu and relocate 2 (e) sr ssu for new full ht wall. add (n) sr concealed ssp, add change out 3 semi rec to new concealed ssp. | $5,800 |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | C J Reed Construction Co | apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work.Details
apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work. | $34,760 |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | C J Reed Construction Co | 12th fl unit 1208: interior remodel: replace tub with shower, grab bar backing, add. local smoke detector at sleeping roomand living roojm/entry area. no exterior workDetails
12th fl unit 1208: interior remodel: replace tub with shower, grab bar backing, add. local smoke detector at sleeping roomand living roojm/entry area. no exterior work | $34,760 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $29,704 |
| Sep 1, 2021 | Completed final sign-off Sep 2021 | 1400 Geary Bl | C J Reed Construction Co | 23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior workDetails
23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work | $38,750 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | C J Reed Construction Co | units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work.Details
units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work. | $75,000 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | C J Reed Construction Co | unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette.Details
unit 1901/19th flr: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cooktop in kitchenette. | $38,000 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 1400 Geary Bl | C J Reed Construction Co | unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette.Details
unit 1409 - interior remodel: replace plumbing fixtures, intall shower grab bar backing, add local smoke detector at sleeping room and living room/entry way area. no exterior work, no cooktop in kitchenette. | $38,000 |
| Sep 28, 2020 | Completed final sign-off Dec 2020 | 1400 Geary Bl | unit 1609. interior remodel- replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room entry area.Details
unit 1609. interior remodel- replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. | $38,000 | |
| May 11, 2020 | Completed final sign-off Sep 2020 | 1400 Geary Bl | C J Reed Construction Co | unit 2206: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work.Details
unit 2206: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work. | $24,000 |
| May 11, 2020 | Completed final sign-off Sep 2020 | 1400 Geary Bl | C J Reed Construction Co | unit 605: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work.Details
unit 605: interior remodel. replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room entry aera. there is no exterior work. | $24,000 |
| Mar 13, 2020 | Completed final sign-off Aug 2020 | 1400 Geary Bl | Johnson Controls Fire | level b parking garage. reroute 1 branch line, relocation of 2 heads and add 1 head in process.Details
level b parking garage. reroute 1 branch line, relocation of 2 heads and add 1 head in process. | $6,700 |
| Dec 10, 2019 | Completed final sign-off Jan 2020 | 1400 Geary Bl | C J Reed Construction Co | 8th/fl suite 803 interor remodel, replace plumbing fixtures install shower grab bar backing, add local smoke detector at sleeping room and living room entry area. no exterior workDetails
8th/fl suite 803 interor remodel, replace plumbing fixtures install shower grab bar backing, add local smoke detector at sleeping room and living room entry area. no exterior work | $27,000 |
| Dec 10, 2019 | Completed final sign-off Apr 2020 | 1400 Geary Bl | C J Reed Construction Co | 23rd fl unit 2301, interior remodel. replace plumbinb fixtures, install shower grabbar backing, add local smoke detector at sleeping room and living rm entry area. no exterior workDetails
23rd fl unit 2301, interior remodel. replace plumbinb fixtures, install shower grabbar backing, add local smoke detector at sleeping room and living rm entry area. no exterior work | $48,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2020 | 1400 Geary Bl | C J Reed Construction Co | 17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenetteDetails
17th suite 1710 interior remodel. replace plumbing fix, install show grab bar backing, add local smoke detector at sleeping room, living rm entry area. no exterior work no cooktop in kitchenette | $79,000 |
| Oct 16, 2019 | Completed final sign-off Jul 2023 | 1400 Geary Bl | renovation of an extg level a resident store room into a fitness center. the relocation of an extg level a staff workroom. and the relocation of resident storage to an area within the level b parking garage.Details
renovation of an extg level a resident store room into a fitness center. the relocation of an extg level a staff workroom. and the relocation of resident storage to an area within the level b parking garage. | $1,100,000 | |
| Oct 16, 2019 | Never finaled issued Jan 2020, no final | 1400 Geary Bl | renovation of 2 exhaust hoods in the level a kitchen as well as the replacement of an air handling unit. exhaust fan and pollution control unit in the level g mechanical room that serve the level a kitchen and associated dining area.Details
renovation of 2 exhaust hoods in the level a kitchen as well as the replacement of an air handling unit. exhaust fan and pollution control unit in the level g mechanical room that serve the level a kitchen and associated dining area. | $1,300,000 | |
| Oct 4, 2019 | Completed final sign-off Jan 2020 | 1400 Geary Bl | C J Reed Construction Co | unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette.Details
unit #2002: interior remodel, replace plmg fixtures, install shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. relocation of kitchenette. | |
| Oct 4, 2019 | Completed final sign-off Nov 2019 | 1400 Geary Bl | C J Reed Construction Co | unit #608: interior remodel, replace tub with shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area.Details
unit #608: interior remodel, replace tub with shower, grab bar backing, add local smoke detector at sleeping room and living room/entry area. | $10,000 |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 1400 Geary Bl | C J Reed Construction Co | 20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette.Details
20th fl/unit #2009: interior remodel: replace plumbing frixtures, add power outlet at (n) wall and at living room; (n) sitch at (e) closet light fixture. (n) shower grab bar backing, (n) local smoke detector at sleeproom/living room entry area. no exterior work. no cook top kitchenette. | $6,000 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 1400 Geary Bl | C J Reed Construction Co | 3rd flr/unit 3f - interior remodel - replace plm fixtures, install shower grab bar backing add local smk det at sleeping rm and liv rm/entry area. no ext work. ele includedDetails
3rd flr/unit 3f - interior remodel - replace plm fixtures, install shower grab bar backing add local smk det at sleeping rm and liv rm/entry area. no ext work. ele included | $15,000 |
| May 9, 2019 | Completed final sign-off Jun 2019 | 1400 Geary Bl | C J Reed Construction Co | unit 1705. interior remodel. replace plumb fixtures. install shower grab bar, add local smoke detector at sleeping room & living room, entry area. there is no exterior work.Details
unit 1705. interior remodel. replace plumb fixtures. install shower grab bar, add local smoke detector at sleeping room & living room, entry area. there is no exterior work. | $5,000 |
| May 7, 2019 | Completed final sign-off Jun 2019 | 1400 Geary Bl | C J Reed Construction Co | 11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl unit 1106 replace plumbing fixtures, install grab bar backing. add local smoke detector at sleeping room and livnbv rm, entry area. no exterior work, no cooktop in kitchenette | $15,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 1400 Geary Bl | C J Reed Construction Co | 3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work)Details
3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work) | $74,000 |
| Feb 11, 2019 | Completed final sign-off Mar 2019 | 1400 Geary Bl | C J Reed Construction Co | 11th, unit 1107- interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no exterior workDetails
11th, unit 1107- interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no exterior work | $6,000 |
| Dec 14, 2018 | Expired or cancelled cancelled Jan 2026 | 1400 Geary Bl | refurbishment and mino renovation of (e) meeting rooms and addociated accessory spaceDetails
refurbishment and mino renovation of (e) meeting rooms and addociated accessory space | $600,000 | |
| Nov 13, 2018 | Completed final sign-off Jan 2019 | 1400 Geary Bl | C J Reed Construction Co | unit 407: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room. entry area. no exterior work.Details
unit 407: interior remodel: replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room. entry area. no exterior work. | $6,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2018 | 1400 Geary Bl | C J Reed Construction Co | (7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar.Details
(7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar. | $73,868 |
| Sep 26, 2018 | Completed final sign-off Jan 2019 | 1400 Geary Bl | C J Reed Construction Co | 12th, ste 1205: interior remodel replace plumbing fixtures install shower bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work.Details
12th, ste 1205: interior remodel replace plumbing fixtures install shower bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. | $6,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2019 | 1400 Geary Bl | C J Reed Construction Co | 10th fl, ste 1005 interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke detector at sleeping room/living room entry area. no exterior workDetails
10th fl, ste 1005 interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke detector at sleeping room/living room entry area. no exterior work | $6,000 |
| Jul 27, 2018 | Completed final sign-off Aug 2018 | 1400 Geary Bl | C J Reed Construction Co | 21st fl unit 2104 - ti interior remodel and replace tub with shower. install shower grab bar backing and local smoke detectors at sleeping room and living room/entry area (no exterior work)Details
21st fl unit 2104 - ti interior remodel and replace tub with shower. install shower grab bar backing and local smoke detectors at sleeping room and living room/entry area (no exterior work) | $5,000 |
| Jun 19, 2018 | Completed final sign-off Aug 2018 | 1400 Geary Bl | C J Reed Construction Co | 21st flr suite 2105 - interior remodel - replace plumbing fixtures, install grab bar backing, add local smk det at sleeping rm and liv rm/entry area. no exterior workDetails
21st flr suite 2105 - interior remodel - replace plumbing fixtures, install grab bar backing, add local smk det at sleeping rm and liv rm/entry area. no exterior work | $6,000 |
| Apr 19, 2018 | Completed final sign-off May 2018 | 1400 Geary Bl | C J Reed Construction Co | 7th fl unit 7d interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area, no exterior workDetails
7th fl unit 7d interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area, no exterior work | $6,000 |
| Jan 22, 2018 | Never finaled issued Dec 2018, no final | 1400 Geary Bl | Pacific Coast Trane Service Co. | remove and replace h ot water storage tanks and associated flat plate heat exchangers in e level b mech room b1.6Details
remove and replace h ot water storage tanks and associated flat plate heat exchangers in e level b mech room b1.6 | $450,000 |
| Jan 22, 2018 | Completed final sign-off Mar 2018 | 1400 Geary Bl | C J Reed Construction Co | 7th flr - unit 7f, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele workDetails
7th flr - unit 7f, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele work | $6,000 |
| Jan 22, 2018 | Completed final sign-off Apr 2018 | 1400 Geary Bl | C J Reed Construction Co | 25th flr - unit 2501, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele workDetails
25th flr - unit 2501, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele work | $6,000 |
| Nov 21, 2017 | Completed final sign-off Feb 2018 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 4p - interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work)Details
4th fl, unit 4p - interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) | $6,000 |
| Nov 1, 2017 | Completed final sign-off Dec 2017 | 1400 Geary Bl | C J Reed Construction Co | unit 1204: interior remodel: replace (e) plumbing fixtures, install shower grab bar and backing. add local smoke alarm at sleeping room and living room/ entry area. there is no exterior work.Details
unit 1204: interior remodel: replace (e) plumbing fixtures, install shower grab bar and backing. add local smoke alarm at sleeping room and living room/ entry area. there is no exterior work. | $6,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 1400 Geary Bl | C J Reed Construction Co | 25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette.Details
25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette. | |
| Oct 17, 2017 | Never finaled issued Oct 2017, no final | 1400 Geary Bl | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 1400 Geary Bl | C J Reed Construction Co | 25th fl/suite 2502: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm/entry area. no exterior work.Details
25th fl/suite 2502: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm/entry area. no exterior work. | $6,000 |
| Aug 18, 2017 | Completed final sign-off Aug 2017 | 1400 Geary Bl | Red Hawk Fire & Security Ca Llc | laundry room: add voice message to design for record. as built app#201703030609 and 201707242690. t.i. app#201608255951Details
laundry room: add voice message to design for record. as built app#201703030609 and 201707242690. t.i. app#201608255951 | |
| Jul 24, 2017 | Completed final sign-off Aug 2017 | 1400 Geary Bl | Red Hawk Fire & Security Ca Llc | fire alarm as builts, laundry room. ref 201703030609 - remove 1 duct detector because coverage provided by adjacent smoke detectors, add 1 smoke detector, show two existing corridor smoke detectors.Details
fire alarm as builts, laundry room. ref 201703030609 - remove 1 duct detector because coverage provided by adjacent smoke detectors, add 1 smoke detector, show two existing corridor smoke detectors. | |
| Jun 26, 2017 | Completed final sign-off Jul 2017 | 1400 Geary Bl | C J Reed Construction Co | 10th fl: unit #1007: interior remodel: replace plumbing fixtures, install shower grab bar backing. add smoke detectors at sleeping rooms and living room/entry area. no exterior work.Details
10th fl: unit #1007: interior remodel: replace plumbing fixtures, install shower grab bar backing. add smoke detectors at sleeping rooms and living room/entry area. no exterior work. | $6,000 |
| May 18, 2017 | Completed final sign-off Oct 2017 | 1400 Geary Bl | C J Reed Construction Co | unit # 3a, interior finish upgrades, replacement wet bar, no change to square footageDetails
unit # 3a, interior finish upgrades, replacement wet bar, no change to square footage | $50,000 |
| May 9, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | R L H Fire Protection Inc | basement level b: relocate 26, add 3, and delete 2 pendent sprinklers. relocate 6 and add 3 upright sprinklers. t.i. #2016-0825-5951.Details
basement level b: relocate 26, add 3, and delete 2 pendent sprinklers. relocate 6 and add 3 upright sprinklers. t.i. #2016-0825-5951. | $16,400 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a denDetails
7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a den | |
| Mar 15, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | C J Reed Construction Co | 4th floor, unit 4n interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. thereis no exterior workDetails
4th floor, unit 4n interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. thereis no exterior work | $40,000 |
| Mar 15, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior workDetails
4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work | $45,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | C J Reed Construction Co | #5b: 5th flr: interior remodel: replace plumbing fixtures, install shower grab bar caking, add local smoke detector at sleeping room and living riim/entry area. no exterior workDetails
#5b: 5th flr: interior remodel: replace plumbing fixtures, install shower grab bar caking, add local smoke detector at sleeping room and living riim/entry area. no exterior work | $6,000 |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 1400 Geary Bl | Red Hawk Fire & Security Ca Llc | level b, laundry room fire alarm t.i. - add (6) speakers/strobes, (6) duct detectors for f.s.d.s. (1) duct detector for ahu, (2) smoke detectors, (1) heat detector. ref pa #201608255951.Details
level b, laundry room fire alarm t.i. - add (6) speakers/strobes, (6) duct detectors for f.s.d.s. (1) duct detector for ahu, (2) smoke detectors, (1) heat detector. ref pa #201608255951. | $6,000 |
| Feb 14, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 16th fl unit 1608 interior remodel, replace plumbing fixtures. install shower grab bar backing add smoke detectorDetails
16th fl unit 1608 interior remodel, replace plumbing fixtures. install shower grab bar backing add smoke detector | $6,000 |
| Feb 1, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | Red Hawk Fire & Security Ca Llc | 3/f- add 1 relay module. t.i. pa#201610180566. n/a ordinance #155-13Details
3/f- add 1 relay module. t.i. pa#201610180566. n/a ordinance #155-13 | $2,500 |
| Dec 16, 2016 | Expired or cancelled cancelled Jan 2026 | 1400 Geary Bl | 5th floor: unit 5c and 5d revision to 201611172964 - combine the two units to make a larger unit 5c. fire under deferred submittals.Details
5th floor: unit 5c and 5d revision to 201611172964 - combine the two units to make a larger unit 5c. fire under deferred submittals. | ||
| Dec 16, 2016 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette.Details
7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette. | $30,000 |
| Dec 1, 2016 | Completed final sign-off Mar 2017 | 1400 Geary Bl | C J Reed Construction Co | 5th floor, unit 505 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area.Details
5th floor, unit 505 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. | $6,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | (4th fl, 4g-4h) interior remodel: 2 studio units combined into one unit, (1 bedroom, full bath & powder room), replace plumbing fixtures, install shower grab bar backing , add smoke detectors at sleepng room & living room /entry, electricalDetails
(4th fl, 4g-4h) interior remodel: 2 studio units combined into one unit, (1 bedroom, full bath & powder room), replace plumbing fixtures, install shower grab bar backing , add smoke detectors at sleepng room & living room /entry, electrical | $100,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2017 | 1400 Geary Bl | C J Reed Construction Co | (6th flr, unit 6e) interior remodel. replace plumbing fixtures, install shower grab bar backing, add battery powered smoke alarms at sleeping room & living room/entry areaDetails
(6th flr, unit 6e) interior remodel. replace plumbing fixtures, install shower grab bar backing, add battery powered smoke alarms at sleeping room & living room/entry area | $6,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 5th flr ,5c, & 5d interior remodel: (e) one bedroom , combo unit, replacing plumbing fixtures, installing shower grab backing add local smoke detectors at sleeping rooms, living room & entry area, electricalDetails
5th flr ,5c, & 5d interior remodel: (e) one bedroom , combo unit, replacing plumbing fixtures, installing shower grab backing add local smoke detectors at sleeping rooms, living room & entry area, electrical | $75,000 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 25th fl/unit 2507 interior replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living rm/entry area. there is no exterior work,no cooktop in kitchenetteDetails
25th fl/unit 2507 interior replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living rm/entry area. there is no exterior work,no cooktop in kitchenette | $6,000 |
| Oct 18, 2016 | Completed final sign-off Dec 2016 | 1400 Geary Bl | C J Reed Construction Co | unit 6m, 6th floor interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area; no exterior work. no cooktop in kitchenetteDetails
unit 6m, 6th floor interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area; no exterior work. no cooktop in kitchenette | $6,000 |
| Oct 18, 2016 | Completed final sign-off May 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | involves the addition of door closers/hold open hardware w/inter smoke detectors to 20 (e) corridor and entry doors of asst. living apts on 3/f. connection to fire alarm system under separate appl.Details
involves the addition of door closers/hold open hardware w/inter smoke detectors to 20 (e) corridor and entry doors of asst. living apts on 3/f. connection to fire alarm system under separate appl. | $30,000 |
| Oct 13, 2016 | Never finaled issued Oct 2016, no final | 1400 Geary Bl | Red Hawk Fire & Security Ca Llc | relocation/addition of av devices to remodeled dining areaDetails
relocation/addition of av devices to remodeled dining area | $9,900 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior workDetails
6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior work | $6,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette).Details
20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). | $10,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette.Details
7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette. | $5,000 |
| Aug 25, 2016 | Completed final sign-off Mar 2018 | 1400 Geary Bl | Dome Construction Corp | level b - laundry reconstruction project: renovate (e) storage room & office area into new commercial laundry facility w/assoc clean soiled linen room. an addition of epo switches & trench drains to an (e) ele room. fire alarm and sprinkler system revisions under separate applicationDetails
level b - laundry reconstruction project: renovate (e) storage room & office area into new commercial laundry facility w/assoc clean soiled linen room. an addition of epo switches & trench drains to an (e) ele room. fire alarm and sprinkler system revisions under separate application | $200,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | C J Reed Construction Co | 24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | C J Reed Construction Co | 9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Aug 1, 2016 | Completed final sign-off Aug 2016 | 1400 Geary Bl | correction of 2015-0824-5150 combine units 53 & df reducing unit count from 299 to 298.Details
correction of 2015-0824-5150 combine units 53 & df reducing unit count from 299 to 298. | ||
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette.Details
unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $85,000 |
| Apr 6, 2016 | Never finaled issued Jun 2016, no final | 1400 Geary Bl | Dome Construction Corp | level b: relocation of (e) office & storage areas & conversion of demolished office & storage areas into new storage rooms.Details
level b: relocation of (e) office & storage areas & conversion of demolished office & storage areas into new storage rooms. | $200,000 |
| Mar 30, 2016 | Completed final sign-off Aug 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 1400 Geary Bl | C J Reed Construction Co | 17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not reqDetails
17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not req | $12,000 |
| Mar 30, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 30, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | C J Reed Construction Co | 17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $20,000 |
| Mar 22, 2016 | Never finaled issued Jan 2017, no final | 1400 Geary Bl | Dome Construction Corp | equipment & finishes upgrades to (e) dining room in multifamily residence building.Details
equipment & finishes upgrades to (e) dining room in multifamily residence building. | $1,000,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | C J Reed Construction Co | 20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work.Details
6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work. | $130,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th floor, unit 406: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
4th floor, unit 406: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jun 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th floor, unit 402: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
4th floor, unit 402: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $43,890 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 7th floor, unit 706: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
7th floor, unit 706: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work.Details
16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work. | $42,350 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette).Details
7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette). | $37,345 |
| Jan 11, 2016 | Completed final sign-off Mar 2016 | 1400 Geary Bl | C J Reed Construction Co | 15th floor (unit 1501): interior remodel, replace plmg fixture, add or replace certain light fixture, add power outlets, add local smoke detector at bedroom. install shower grab bars, and backing. there is no cooktop at kitchenette.Details
15th floor (unit 1501): interior remodel, replace plmg fixture, add or replace certain light fixture, add power outlets, add local smoke detector at bedroom. install shower grab bars, and backing. there is no cooktop at kitchenette. | $30,000 |
| Dec 23, 2015 | Completed final sign-off Feb 2016 | 1400 Geary Bl | C J Reed Construction Co | #7th floor, unit #7n - interior remodel, replacement of plumbing fixtures, install shower, grab barsars and backing. no exterior work.Details
#7th floor, unit #7n - interior remodel, replacement of plumbing fixtures, install shower, grab barsars and backing. no exterior work. | $35,000 |
| Dec 3, 2015 | Completed final sign-off Mar 2016 | 1400 Geary Bl | C J Reed Construction Co | 18th floor, ste 1803 ti replacing fixtures, add or replace certain light fixtures, power outlets, add local smoke detector. install shower grab bars & backing. no exterior workDetails
18th floor, ste 1803 ti replacing fixtures, add or replace certain light fixtures, power outlets, add local smoke detector. install shower grab bars & backing. no exterior work | $24,000 |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | C J Reed Construction Co | 14th fl suite 1408. interior remodel, replace plumbing fixutres, add or replace certain light fixtures. add power outlets for convencience appliances at kitchenette. add local. smoke detector. install shower grab bar backingDetails
14th fl suite 1408. interior remodel, replace plumbing fixutres, add or replace certain light fixtures. add power outlets for convencience appliances at kitchenette. add local. smoke detector. install shower grab bar backing | $37,730 |
| Nov 13, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | Sure Fire Protection | due to new entry add (1) (n) ssp using new 2x1 mech tee for supply egress only. ref pa 2015-0824-5150Details
due to new entry add (1) (n) ssp using new 2x1 mech tee for supply egress only. ref pa 2015-0824-5150 | $3,900 |
| Oct 6, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 3rd floor, unit 3p interior remodel, one two bedroom one bath unit into a one bedroom one bath unit with den. no exterior workDetails
3rd floor, unit 3p interior remodel, one two bedroom one bath unit into a one bedroom one bath unit with den. no exterior work | $74,151 |
| Oct 2, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | C J Reed Construction Co | unit #507: interior remodel, replace plumbing fixtures, add or replace certain light fixtures, no exterior work.Details
unit #507: interior remodel, replace plumbing fixtures, add or replace certain light fixtures, no exterior work. | $37,730 |
| Sep 25, 2015 | Completed final sign-off Aug 2016 | 1400 Geary Bl | Dome Construction Corp | upgrade ti the (e) chiller & pump in the level g chiller enclosure. located outside of the main bld.Details
upgrade ti the (e) chiller & pump in the level g chiller enclosure. located outside of the main bld. | $130,000 |
| Aug 24, 2015 | Completed final sign-off Aug 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | combine units 5f and 5e to make 5f. remodel 2 bedroom unit and a studio apt into a 2 bedroom unit with a den with 3 full baths. no exterior work.Details
combine units 5f and 5e to make 5f. remodel 2 bedroom unit and a studio apt into a 2 bedroom unit with a den with 3 full baths. no exterior work. | $168,720 |
| May 20, 2015 | Completed final sign-off Jul 2015 | 1400 Geary Bl | Sure Fire Protection | 4th floor/ unit 4c/d: add 1 new ssp using new 2x1 mt for new supply egress only ref pa 2015 0508 5733Details
4th floor/ unit 4c/d: add 1 new ssp using new 2x1 mt for new supply egress only ref pa 2015 0508 5733 | $3,900 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work.Details
4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work. | $85,000 |
| Mar 27, 2015 | Completed final sign-off May 2015 | 1400 Geary Bl | Sure Fire Protection | 6th flr: due to new entry, add (1) new ssp using new 2x1 mt for supply - egress only unit 6aDetails
6th flr: due to new entry, add (1) new ssp using new 2x1 mt for supply - egress only unit 6a | $3,900 |
| Mar 24, 2015 | Completed final sign-off Jun 2015 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work.Details
6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work. | $136,000 |
Find contractors for work like this