H C I Systems Inc
- Based in
- Ontario
- On San Francisco permits
- Aug 2012 to Jun 2026
- Last 24 months
- 20 permits filed
278 permits since 2000: 209 completed, 11 in progress, 45 never finaled, 13 expired or cancelled.
Of the 45 never-finaled permits, 1 is 3 to 5 years old, 22 are 5 to 10 years old, 22 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 278.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 130 Sutter St | 7th floor: as built to bpa: 202507181089 relocated 1 new siga-chr high voltage control relay to door on opposite side of hallway per field conditions.Details
7th floor: as built to bpa: 202507181089 relocated 1 new siga-chr high voltage control relay to door on opposite side of hallway per field conditions. | $8,100 |
| Dec 16, 2025 | In progress filed Dec 2025, not yet issued | 50 Oak St | installation of voluntary cell communicator + monitor module for supervision of communicator to exist. fire alarm system.Details
installation of voluntary cell communicator + monitor module for supervision of communicator to exist. fire alarm system. | $9,900 |
| Oct 3, 2025 | Completed final sign-off May 2026 | 900 Pennsylvania Av | installation of (1) annunciator for erccs supervisory alarm signals per sffd's "notice of violations" violation id: 2507-0066 (07/07/2025).Details
installation of (1) annunciator for erccs supervisory alarm signals per sffd's "notice of violations" violation id: 2507-0066 (07/07/2025). | $15,700 |
| Sep 29, 2025 | Completed final sign-off May 2026 | 900 Pennsylvania Av | hcl to add monitor module to (e) fire alarm system at reference location. monitor module to monitor additional errcs point due to anual inspection failed annunciator at location. errcs annunicator under seperate permit.Details
hcl to add monitor module to (e) fire alarm system at reference location. monitor module to monitor additional errcs point due to anual inspection failed annunciator at location. errcs annunicator under seperate permit. | $1,200 |
| Sep 12, 2025 | Completed final sign-off Sep 2026 | 2200 Pacific Av | provide design, engineering and submittal drawings to local authority having jurisdiction. furnish & install (1) das-erce 700/800 mhz system; furnish & install (1) ups battery back-up unit for the public safety system w/ a minimum back up of 24hrs standby powerDetails
provide design, engineering and submittal drawings to local authority having jurisdiction. furnish & install (1) das-erce 700/800 mhz system; furnish & install (1) ups battery back-up unit for the public safety system w/ a minimum back up of 24hrs standby power | $91,924 |
| Aug 5, 2025 | In progress filed Aug 2025, not yet issued | 575 Harrison St | bps-1 has been relocated to the garage level on the floor plan and riser diagram. added waterproof notification applicances to the roof floor plan and riser diagram. ref#: 202501218720.Details
bps-1 has been relocated to the garage level on the floor plan and riser diagram. added waterproof notification applicances to the roof floor plan and riser diagram. ref#: 202501218720. | |
| Jul 18, 2025 | In progress issued Jul 2025 | 130 Sutter St | 7th fl - hci to provide a secure door interface; add 1 new sigh-crh high voltage control relayDetails
7th fl - hci to provide a secure door interface; add 1 new sigh-crh high voltage control relay | $8,100 |
| Jun 27, 2025 | In progress issued Jun 2025 | 550 California St | 14th fl ref pa # 2025-0509-6137 as built scope add 1 new speaker/strobeDetails
14th fl ref pa # 2025-0509-6137 as built scope add 1 new speaker/strobe | $18,043 |
| May 9, 2025 | In progress issued May 2025 | 550 California St | 14th/f: provide a modification of e) fire alarm system for the 14th fl t.i. add 1 new booster power supply w/ 2 mew 12v 2ah batteries, add 2 new ceiling strobes, add 1 new speaker/ strobes. ref to 202503273173Details
14th/f: provide a modification of e) fire alarm system for the 14th fl t.i. add 1 new booster power supply w/ 2 mew 12v 2ah batteries, add 2 new ceiling strobes, add 1 new speaker/ strobes. ref to 202503273173 | $18,043 |
| May 6, 2025 | In progress issued May 2025 | 550 California St | 9th fl: modification of fire alarm system for the common areas & restroom upgrades. the modification shall consist of (1) new ceiling strobe & 10 new speaker strobes ref arch 202411225540 ref fa 202212097979Details
9th fl: modification of fire alarm system for the common areas & restroom upgrades. the modification shall consist of (1) new ceiling strobe & 10 new speaker strobes ref arch 202411225540 ref fa 202212097979 | $19,799 |
| Apr 15, 2025 | In progress issued Apr 2025 | 550 California St | 6th fl - provide a modification of (e) fire alarm system common areas & restroom upgrades; add 1 new ceiling strobe and add 8 new speaker/strobes ref pa 202411225537Details
6th fl - provide a modification of (e) fire alarm system common areas & restroom upgrades; add 1 new ceiling strobe and add 8 new speaker/strobes ref pa 202411225537 | $25,000 |
| Apr 4, 2025 | Completed final sign-off Apr 2025 | 550 California St | 10th/fl: provide modification of existing fire alarm system for the 10 floor commom area restrooom upgrades. add 2 new ceiling strobes, add 8 new speaker/strobes.Details
10th/fl: provide modification of existing fire alarm system for the 10 floor commom area restrooom upgrades. add 2 new ceiling strobes, add 8 new speaker/strobes. | $19,779 |
| Mar 12, 2025 | Completed final sign-off Apr 2025 | 550 California St | 7th floor:provide a modification of the existing fire alarm system for the existing corridor. the modification shall consist of the following: add 6 new ceiling speaker strobes. no changes shall be made t0 existing sequence of operation and smoke control management.Details
7th floor:provide a modification of the existing fire alarm system for the existing corridor. the modification shall consist of the following: add 6 new ceiling speaker strobes. no changes shall be made t0 existing sequence of operation and smoke control management. | $27,290 |
| Feb 18, 2025 | Completed final sign-off Feb 2025 | 2025 Van Ness Av | fire alarm: relocate roof devices for rtus to the ground fl. added conduit runs per electrical constractors markups for the rtus. relocate bell per elec contractor. ref pa# 202407267343.Details
fire alarm: relocate roof devices for rtus to the ground fl. added conduit runs per electrical constractors markups for the rtus. relocate bell per elec contractor. ref pa# 202407267343. | $14,900 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 550 California St | 8th fl/ ste 830- ref pa # 202411255623 & t.i. 202408158724. add (1) wall speaker strobe. remove one ceiling speaker strobeDetails
8th fl/ ste 830- ref pa # 202411255623 & t.i. 202408158724. add (1) wall speaker strobe. remove one ceiling speaker strobe | $23,630 |
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 550 California St | 7th/f, ste 710: provide a modification of e) fire alarm system per ste 710 t.i.(ref t.i. pa#202409181012): add 7 new ceiling strobes, add 10 new speaker/strobes, remove all e) a/v devices in ste 710 & safe off. these drawings are based on as-built for pa 202212097979.Details
7th/f, ste 710: provide a modification of e) fire alarm system per ste 710 t.i.(ref t.i. pa#202409181012): add 7 new ceiling strobes, add 10 new speaker/strobes, remove all e) a/v devices in ste 710 & safe off. these drawings are based on as-built for pa 202212097979. | $26,630 |
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 1044 Howard St | as built ref pa 202407267322 relocated head end equipment to new closet location in meeting room 2 (112). added 1 new dual input monitor module for tamper switches; added 1 new relay module for fsd shutdown. remove reference of piv on drawingDetails
as built ref pa 202407267322 relocated head end equipment to new closet location in meeting room 2 (112). added 1 new dual input monitor module for tamper switches; added 1 new relay module for fsd shutdown. remove reference of piv on drawing | $30,270 |
| Jan 21, 2025 | In progress issued Feb 2025 | 575 Harrison St | provide a one for one replacement of the (e) fire alarm at address referenced and upgrade fire alarm system to comply with current codes and sffc 1103.7.6.1. emergency replacement.Details
provide a one for one replacement of the (e) fire alarm at address referenced and upgrade fire alarm system to comply with current codes and sffc 1103.7.6.1. emergency replacement. | $39,273 |
| Dec 4, 2024 | Completed final sign-off Mar 2026 | 340 Fell St | as builts: added 1 smoke detector in facp electrical room. add 1 dual input module for waterflow and valve tamper in service waiting area.Details
as builts: added 1 smoke detector in facp electrical room. add 1 dual input module for waterflow and valve tamper in service waiting area. | $15,500 |
| Nov 25, 2024 | Completed final sign-off Apr 2025 | 550 California St | 8th fl ref pa # 2024-0815-8724 provide a modification of the (e) fire alarm system for suite 830 tiDetails
8th fl ref pa # 2024-0815-8724 provide a modification of the (e) fire alarm system for suite 830 ti | $26,630 |
| Aug 29, 2024 | In progress issued Aug 2024 | 340 Fell St | hci to provide & install (n) edwards io64 fire alarm control panel located referenced location to include the following: cellular alarm communicator monitoring, fire sprinkler monitoring, (1) smoke detector for facu room coverage, notification at main entrance, fsd shutdown, (1) pull station,Details
hci to provide & install (n) edwards io64 fire alarm control panel located referenced location to include the following: cellular alarm communicator monitoring, fire sprinkler monitoring, (1) smoke detector for facu room coverage, notification at main entrance, fsd shutdown, (1) pull station, | $15,500 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 1044 Howard St | provide a new automatic fire alarm system for the united playaz bldg. edwards i064 fire alarm control unit, annunciator, cellular alarm communicator, notification throughout path of travel, common areas, smoke detectors, elevator recall, sprinkler monitoring, 1 pull station at location ofDetails
provide a new automatic fire alarm system for the united playaz bldg. edwards i064 fire alarm control unit, annunciator, cellular alarm communicator, notification throughout path of travel, common areas, smoke detectors, elevator recall, sprinkler monitoring, 1 pull station at location of | $30,270 |
| Jul 26, 2024 | Completed final sign-off Feb 2025 | 2025 Van Ness Av | provide a dedicated function system to the new citibank van ness bulding. shall consist of providing the following (1) new fire alarm control panel. (1) new cellualr alarm communicator. (1) new pull station. (3) new smoke detectors, (2) new relay modules,. (1) new single input module, (1) new dualDetails
provide a dedicated function system to the new citibank van ness bulding. shall consist of providing the following (1) new fire alarm control panel. (1) new cellualr alarm communicator. (1) new pull station. (3) new smoke detectors, (2) new relay modules,. (1) new single input module, (1) new dual | $14,900 |
| Jun 12, 2024 | In progress filed Jun 2024, not yet issued | 25 Taylor St | fire alarm as built: relocate annunciator as shown on sheet fa402. add pump phase reversal and theater duct to the control display module on sheet fa203. relocate facp bps to gr fl as fiel conditions depicted.Details
fire alarm as built: relocate annunciator as shown on sheet fa402. add pump phase reversal and theater duct to the control display module on sheet fa203. relocate facp bps to gr fl as fiel conditions depicted. | $14,310 |
| Apr 1, 2024 | In progress issued Apr 2024 | 25 Taylor St | installation of new edwards est3 gann annunciator at the loading dock/security location referenced on sheet fa-401 and fa-402. the annunciator will tie into an existing fire alarm system in the theater.Details
installation of new edwards est3 gann annunciator at the loading dock/security location referenced on sheet fa-401 and fa-402. the annunciator will tie into an existing fire alarm system in the theater. | $14,310 |
| Mar 8, 2024 | Completed final sign-off Mar 2025 | 417 Montgomery St | provide a modificaton of the (e) fire alarm system for the elevator modification the modification shall consist of providing the following add (3) new control relays voluntary upgrade these drawings are based on as builts dated may 3, 2008 provide by customerDetails
provide a modificaton of the (e) fire alarm system for the elevator modification the modification shall consist of providing the following add (3) new control relays voluntary upgrade these drawings are based on as builts dated may 3, 2008 provide by customer | $20,000 |
| Feb 13, 2024 | Completed final sign-off Mar 2025 | 900 Pennsylvania Av | provide a modification of the (e) sprinkler monitor system t.i. the modificaiton shall consist of providing the following: (1) new wall horn/strobe. ref# 202012080509Details
provide a modification of the (e) sprinkler monitor system t.i. the modificaiton shall consist of providing the following: (1) new wall horn/strobe. ref# 202012080509 | $4,620 |
| Oct 31, 2023 | Completed final sign-off Nov 2023 | 928 Harrison St | as built ref 202207158541. revised as built sow: updataed addresses.Details
as built ref 202207158541. revised as built sow: updataed addresses. | |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 900 Pennsylvania Av | provide plans and pemrits for the relocation of (e) 3 no single input monitor module. 2 no dual input monitor module. ref 202012080509.Details
provide plans and pemrits for the relocation of (e) 3 no single input monitor module. 2 no dual input monitor module. ref 202012080509. | $3,990 |
| Jun 8, 2023 | Completed final sign-off Oct 2024 | 140 Sutter St | f/a system, add (2)relays, (1)av shutdown, (1)rtu supply shutdown, relocate (1)relay for fsd shutdown to storage room @ bps loc, update slc addresses, add (1)dd to rtu supply on roof, remove rts switches for fc units. ref bpa#202302081589Details
f/a system, add (2)relays, (1)av shutdown, (1)rtu supply shutdown, relocate (1)relay for fsd shutdown to storage room @ bps loc, update slc addresses, add (1)dd to rtu supply on roof, remove rts switches for fc units. ref bpa#202302081589 | |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 900 Pennsylvania Av | f/a system, (3)monitor mods, (2)dual monitor mods to monitor new nitrogen generator outside freezer & 1/f, tamper switch, (2)wf @ new sprinkler riser to an (e) facp system. ref ba;#202012080509Details
f/a system, (3)monitor mods, (2)dual monitor mods to monitor new nitrogen generator outside freezer & 1/f, tamper switch, (2)wf @ new sprinkler riser to an (e) facp system. ref ba;#202012080509 | $11,200 |
| May 25, 2023 | Completed final sign-off Aug 2025 | 1142 Van Ness Av | basement: hci to add (3) new monitor mod to monitor new pump in pump room. ref pa#201708104529, 202206015388, ew202305181227Details
basement: hci to add (3) new monitor mod to monitor new pump in pump room. ref pa#201708104529, 202206015388, ew202305181227 | $12,926 |
| May 12, 2023 | Completed final sign-off Jul 2024 | 140 Sutter St | fire alarm addition of 2 new pull stations as built: 202302081589Details
fire alarm addition of 2 new pull stations as built: 202302081589 | $27,100 |
| Feb 8, 2023 | Completed final sign-off Jul 2024 | 140 Sutter St | installation of a new bps 10 amp inside the storage room at the ground floor. all new notification devices to be tied into a new bps. installation of new (3) control relay modules, (7) duct detectors to shutdown hvac units. this building will tie into an (e) edwards est3 located @ 130 sutterDetails
installation of a new bps 10 amp inside the storage room at the ground floor. all new notification devices to be tied into a new bps. installation of new (3) control relay modules, (7) duct detectors to shutdown hvac units. this building will tie into an (e) edwards est3 located @ 130 sutter | $27,100 |
| Dec 27, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | as built fire alarm ref to 2022 0329 1079Details
as built fire alarm ref to 2022 0329 1079 | |
| Nov 23, 2022 | Completed final sign-off Jan 2023 | 1580 Valencia St | for unit 802: to obtain final inspection for work approved under pa# 201403281915: all work is completed.Details
for unit 802: to obtain final inspection for work approved under pa# 201403281915: all work is completed. | |
| Nov 18, 2022 | Never finaled issued Nov 2022, no final | 575 Florida St | a new common connection bet. 1960 bryant & 575 florida st. both buildings are protected by their own manual and automatic fire alarm system & monitored independently. addressable fire alarm relays from both facp will be installed to released both sets of doors simultaneously.Details
a new common connection bet. 1960 bryant & 575 florida st. both buildings are protected by their own manual and automatic fire alarm system & monitored independently. addressable fire alarm relays from both facp will be installed to released both sets of doors simultaneously. | $8,728 |
| Nov 18, 2022 | Completed final sign-off Jan 2023 | 1960 Bryant St | to provide bps for new notification devices, sprinkler waterflow system to include (2) relays for a new roll-up door interface.Details
to provide bps for new notification devices, sprinkler waterflow system to include (2) relays for a new roll-up door interface. | $12,968 |
| Sep 14, 2022 | Completed final sign-off Oct 2022 | 900 Pennsylvania Av | 1/f: remove (1) smoke detector. ref bpa#202202077480Details
1/f: remove (1) smoke detector. ref bpa#202202077480 | |
| Sep 14, 2022 | Completed final sign-off May 2023 | 611 Folsom St | 6/f: expand (e) bldg fas to accommodate addition of new crah unit 604 (new vecda detector/subfloor smoke detector), provide sufficient battery backup to systain 24 hrs standby & (10) minutes alarm operation. fas wiring shall be in accordance w/nfpa 70 to article 760Details
6/f: expand (e) bldg fas to accommodate addition of new crah unit 604 (new vecda detector/subfloor smoke detector), provide sufficient battery backup to systain 24 hrs standby & (10) minutes alarm operation. fas wiring shall be in accordance w/nfpa 70 to article 760 | $21,790 |
| Jul 15, 2022 | Completed final sign-off Nov 2023 | 928 Harrison St | as built fire alarm system. ref ti #202204252888Details
as built fire alarm system. ref ti #202204252888 | |
| Jun 1, 2022 | Completed final sign-off Dec 2022 | 625 Market St | ste 400 - install control relay module 1 for water source heat pump to be programmed & tested by hcl systemsDetails
ste 400 - install control relay module 1 for water source heat pump to be programmed & tested by hcl systems | $11,549 |
| Apr 25, 2022 | Completed final sign-off Feb 2024 | 928 Harrison St | provide part & smarts only for an emergency panel replacement, & waterflow monitoring system. all conduct boxes, fittings, installation of all devices is provided by others.Details
provide part & smarts only for an emergency panel replacement, & waterflow monitoring system. all conduct boxes, fittings, installation of all devices is provided by others. | $11,958 |
| Mar 29, 2022 | Completed final sign-off Apr 2022 | 575 Florida St | fire as-build. ref pa# 202106293430Details
fire as-build. ref pa# 202106293430 | |
| Mar 29, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | installation of new fire alarm notification devices to provide proper area coverage. new slc line for associated fan/ahu shutdown including smoke detector & manual pull station. new notification devices to be tied to (e) booster power supply as shown in fa-301.Details
installation of new fire alarm notification devices to provide proper area coverage. new slc line for associated fan/ahu shutdown including smoke detector & manual pull station. new notification devices to be tied to (e) booster power supply as shown in fa-301. | $26,140 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 900 Pennsylvania Av | to install a stand-alone fire alarm control panel, cell dialer&devices for a waterflow monitoring system to include havac duct smoke detectors on the roof, and fire pump paints.Details
to install a stand-alone fire alarm control panel, cell dialer&devices for a waterflow monitoring system to include havac duct smoke detectors on the roof, and fire pump paints. | $20,854 |
| Jan 24, 2022 | Completed final sign-off Feb 2022 | 701 03rd St | installation of new addressable control relay module to interface w/the audio/video equipment to the existing fire alarm system on the rooftop area of hyatt placeDetails
installation of new addressable control relay module to interface w/the audio/video equipment to the existing fire alarm system on the rooftop area of hyatt place | $9,262 |
| Oct 5, 2021 | Completed final sign-off Oct 2022 | 27 Maiden Ln | replace extg conventional facp with new addressable fa panel. replace extg annunciator with a new one. providing and install a new cell communicator next to the nw annunciator in the lobby of the geary st. side of the building.Details
replace extg conventional facp with new addressable fa panel. replace extg annunciator with a new one. providing and install a new cell communicator next to the nw annunciator in the lobby of the geary st. side of the building. | $48,100 |
| Sep 2, 2021 | Never finaled issued Sep 2021, no final | 1050 Battery St | modify an extg building monitoring system, to replace and install new panel, add smoke detector above panel, a manual pull station, an annunciator at main lobby, monitor modules for water flow and tamper switch.Details
modify an extg building monitoring system, to replace and install new panel, add smoke detector above panel, a manual pull station, an annunciator at main lobby, monitor modules for water flow and tamper switch. | $18,978 |
| Jun 29, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | install new booster power supply inside electrical rooms on all floors. notification throughout path of travel/common areas, low frequency horns inside nap rooms, elevator recall, damper shutdown, sprinkler monitoring, etc.Details
install new booster power supply inside electrical rooms on all floors. notification throughout path of travel/common areas, low frequency horns inside nap rooms, elevator recall, damper shutdown, sprinkler monitoring, etc. | $54,266 |
| Apr 1, 2021 | Never finaled issued May 2021, no final | 604 Mission St | replacement of existing qs1 facp to a new edwards est4 fire alarm panel located on basement level due to obsolescence and no loger supported by the manufacturer.Details
replacement of existing qs1 facp to a new edwards est4 fire alarm panel located on basement level due to obsolescence and no loger supported by the manufacturer. | |
| Nov 19, 2020 | Expired or cancelled withdrawn Dec 2020 | 604 Mission St | as-built for 2019-1230-0939Details
as-built for 2019-1230-0939 | |
| Nov 19, 2020 | Completed final sign-off Jun 2021 | 1455 Custer Av | installation of new 1064 sprinkler monitoring control panel located @ front office room # 101. ref. sheet 401 exact location. installation of one new audio video & new manual pull station located @ front office room # 101.Details
installation of new 1064 sprinkler monitoring control panel located @ front office room # 101. ref. sheet 401 exact location. installation of one new audio video & new manual pull station located @ front office room # 101. | $3,500 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 28 Geary St | installation of new audio/visual notification devices throughout the area of work. replacing of existing smoke detectors w/new throughout the area of work on level seven. replacement of existing duct smoke detectors with new.Details
installation of new audio/visual notification devices throughout the area of work. replacing of existing smoke detectors w/new throughout the area of work on level seven. replacement of existing duct smoke detectors with new. | $31,130 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 625 Market St | installation of new audio/visual notification appliances throughout the area of work to meet proper coverage per nfpa 72 requirements due to ti. all new devices to be tied into new booster power supply provided. removal of existing & replacing them w/ new marked as ern on plans.Details
installation of new audio/visual notification appliances throughout the area of work to meet proper coverage per nfpa 72 requirements due to ti. all new devices to be tied into new booster power supply provided. removal of existing & replacing them w/ new marked as ern on plans. | $9,920 |
| Oct 29, 2020 | Never finaled filed Oct 2020, never issued | 1550 Bryant St | installation of 3 control relay modules for elevator recall function inside elevator machine room on level 12Details
installation of 3 control relay modules for elevator recall function inside elevator machine room on level 12 | $18,000 |
| Oct 29, 2020 | Completed final sign-off Mar 2021 | 677 Ellis St | replacement of existing fire alarm control panel located @ level one.Details
replacement of existing fire alarm control panel located @ level one. | $22,366 |
| Sep 28, 2020 | Completed final sign-off Dec 2022 | 1550 Evans Av | design a two way communication system @ each elevator lobby that is above the ground level so tgat a person unable to use stairs for exiting can call for assistance.Details
design a two way communication system @ each elevator lobby that is above the ground level so tgat a person unable to use stairs for exiting can call for assistance. | $13,839 |
| Jun 30, 2020 | Completed final sign-off Aug 2020 | 840 Van Ness Av | replacement of e facp w new edwards 1064 facp system in building as an emergency replacement located at level one. installation of new remote lcd annunciator next to control panel on level oneDetails
replacement of e facp w new edwards 1064 facp system in building as an emergency replacement located at level one. installation of new remote lcd annunciator next to control panel on level one | $11,183 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 625 Market St | 15/f: install new audio/visual notification devices througout area of work, removal and replacement of devices marked "ern" on plans, removal of devices makred "er" on plans, and covered with blank plate if needed. ref pa# 201908148751Details
15/f: install new audio/visual notification devices througout area of work, removal and replacement of devices marked "ern" on plans, removal of devices makred "er" on plans, and covered with blank plate if needed. ref pa# 201908148751 | $13,550 |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 1550 Bryant St | install new audis & audio/visual notification appliances throughout the area of work at suite 760 and 770. new device to be tied into extg booster power supply. ref app#202001272793Details
install new audis & audio/visual notification appliances throughout the area of work at suite 760 and 770. new device to be tied into extg booster power supply. ref app#202001272793 | $9,650 |
| Feb 25, 2020 | Completed final sign-off Dec 2020 | 130 Sutter St | install new control relay modules at basement leve, removal and replacement of all extg smoke detectors at elevator lobbies from basement to level7, installation of nw smoke detector at the top of elevator shaft. ref app#201911016184.Details
install new control relay modules at basement leve, removal and replacement of all extg smoke detectors at elevator lobbies from basement to level7, installation of nw smoke detector at the top of elevator shaft. ref app#201911016184. | $24,113 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 2 Stockton St | basement: to obtain final inspection for work approved udner pa's 201510139457 for original permit and 201602058919 as-built. all work is complete.Details
basement: to obtain final inspection for work approved udner pa's 201510139457 for original permit and 201602058919 as-built. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Feb 2020 | 1550 Bryant St | 5th floor: to obtain final inspection for work approved under pa's 201603141936 and 201601278096. all work is complete.Details
5th floor: to obtain final inspection for work approved under pa's 201603141936 and 201601278096. all work is complete. | |
| Dec 30, 2019 | Never finaled issued Dec 2019, no final | 604 Mission St | fire alarm: replacement of existing qs1 to a new edwards 10 1000gd system located on basement level due to absolescense & no longer supported by manufacturer. re-utilize existing facp location, wires & conduits. install new wires/conduit as necessary.Details
fire alarm: replacement of existing qs1 to a new edwards 10 1000gd system located on basement level due to absolescense & no longer supported by manufacturer. re-utilize existing facp location, wires & conduits. install new wires/conduit as necessary. | $15,950 |
| Dec 3, 2019 | Completed final sign-off Apr 2020 | 750 Ofarrell St | replacement of e esl 500 facp w new fire.lite es 200 x system located on level 1 elevator lobby due to failure of e control panel. control panel e location, wires, conduits to be reutilizedDetails
replacement of e esl 500 facp w new fire.lite es 200 x system located on level 1 elevator lobby due to failure of e control panel. control panel e location, wires, conduits to be reutilized | $9,419 |
| Dec 3, 2019 | Completed final sign-off Feb 2020 | 575 Ofarrell St | replacement of e fire lite ms 2 facp with a new fire lite es 200 x system located on level 1 elevator lobby area. control panel e location, wires, conduits to be reutilizedDetails
replacement of e fire lite ms 2 facp with a new fire lite es 200 x system located on level 1 elevator lobby area. control panel e location, wires, conduits to be reutilized | $9,461 |
| Sep 24, 2019 | Expired or cancelled expired Nov 2021 | 1550 Bryant St | to obtain final inspection for work approved under pa# 201805189587 + 201303132061Details
to obtain final inspection for work approved under pa# 201805189587 + 201303132061 | |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 1550 Bryant St | as built 2013-0313-2069 install fa control module on 2nd fl to release elevator doors during building alarmDetails
as built 2013-0313-2069 install fa control module on 2nd fl to release elevator doors during building alarm | |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 625 Market St | 15th fl - insstallation of new audio/visual notification appliance. removal of existing devices & replace w/new marked as "ern" on plans. removal of existing devices marked as "er" on plans due to tenantDetails
15th fl - insstallation of new audio/visual notification appliance. removal of existing devices & replace w/new marked as "ern" on plans. removal of existing devices marked as "er" on plans due to tenant | $13,550 |
| Aug 28, 2019 | Completed final sign-off Sep 2019 | 1550 Bryant St | removal of all (e) audio and audio/visual appliances within the area of work and replacing them with new. installation of a new booster power supply. (e) fire alarm control panel in the bld is edwards est 3Details
removal of all (e) audio and audio/visual appliances within the area of work and replacing them with new. installation of a new booster power supply. (e) fire alarm control panel in the bld is edwards est 3 | $5,000 |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 212 Stockton St | fire alarm as built ref 201601278093Details
fire alarm as built ref 201601278093 | |
| Jul 26, 2019 | Completed final sign-off Dec 2019 | 212 Stockton St | to obtain final inspection for work approved under pa 201601278093. all work is completeDetails
to obtain final inspection for work approved under pa 201601278093. all work is complete | |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 888 Brannan St | to obtain final inspection for work approved under pa 201604154934. all work is completeDetails
to obtain final inspection for work approved under pa 201604154934. all work is complete | |
| May 28, 2019 | Completed final sign-off May 2019 | 400 02nd St | as-builts for facp replace. reference pa201803063010. maher n/a.Details
as-builts for facp replace. reference pa201803063010. maher n/a. | |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 1250 Columbus Av | 1/f: installation of 1 (n) smoke detector for electromag door holders at golden gate room. (n) device to be rited into nearst (e) initiating device.ref sheet fa-3d.installationg of (n) high power control relay module. (e) facp is edwards est3 system. ref t.i. 201808308750. maher n/a.Details
1/f: installation of 1 (n) smoke detector for electromag door holders at golden gate room. (n) device to be rited into nearst (e) initiating device.ref sheet fa-3d.installationg of (n) high power control relay module. (e) facp is edwards est3 system. ref t.i. 201808308750. maher n/a. | $300 |
| Jan 15, 2019 | Completed final sign-off Mar 2019 | 555 Montgomery St | 6th fl - installation of new visual & audio visual notification devices to meet nfpa 72 requirements due to ti new audio visual notification devices to be tied into the (e) booster power supply on this fl located in tel/elec'l room, fa-201 existing fa control panel in the bldg is est 3 systemDetails
6th fl - installation of new visual & audio visual notification devices to meet nfpa 72 requirements due to ti new audio visual notification devices to be tied into the (e) booster power supply on this fl located in tel/elec'l room, fa-201 existing fa control panel in the bldg is est 3 system | $4,033 |
| Jan 15, 2019 | Never finaled issued Jan 2019, no final | 251 Post St | on 3rd floor suite 310 -installation of new fa notification appliances due to ti to meet proper coverage per nfpa 72 req. new appliances to be tied into (e) power booster supply. inside telephone room on level 2, ref.fa 201 the existing fa control panel in the bldg is edward i0500gdDetails
on 3rd floor suite 310 -installation of new fa notification appliances due to ti to meet proper coverage per nfpa 72 req. new appliances to be tied into (e) power booster supply. inside telephone room on level 2, ref.fa 201 the existing fa control panel in the bldg is edward i0500gd | $1,935 |
| Nov 27, 2018 | Completed final sign-off Feb 2019 | 555 Montgomery St | installation of a new visual & audio visual notification devices throughout the area of work to meet proper coverage per nfpa 72 requirements. removal and installation of existing devices due to ceiling upgrade. the existing fire alarm control panel in this building is an edward est3 systemDetails
installation of a new visual & audio visual notification devices throughout the area of work to meet proper coverage per nfpa 72 requirements. removal and installation of existing devices due to ceiling upgrade. the existing fire alarm control panel in this building is an edward est3 system | $6,520 |
| Nov 9, 2018 | Completed final sign-off Jan 2019 | 555 Montgomery St | installation of new visual and audio visual nofification devices on 9th & 10th fl. and corregidor upgrade on 10th fl. removal of (e) devices marked as "er" due to t.i. work. (e) device location to be covered w/ blank cover plate, (e) facp in this bldg is an edwards est3Details
installation of new visual and audio visual nofification devices on 9th & 10th fl. and corregidor upgrade on 10th fl. removal of (e) devices marked as "er" due to t.i. work. (e) device location to be covered w/ blank cover plate, (e) facp in this bldg is an edwards est3 | $3,028 |
| Oct 31, 2018 | Expired or cancelled withdrawn Jan 2019 | 625 Market St | installation of new fire alarm devices due to elevator modernization. n smoke detectors to be installed on 1/f & 15/f elevator lobbies & elevator machine rm on penthouse lvl, fls basement, 2-14 fls have (e) smoke detectors & are to remain. new control relay modules to be instaled for elevator recallDetails
installation of new fire alarm devices due to elevator modernization. n smoke detectors to be installed on 1/f & 15/f elevator lobbies & elevator machine rm on penthouse lvl, fls basement, 2-14 fls have (e) smoke detectors & are to remain. new control relay modules to be instaled for elevator recall | |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 214 Grant Av | installation of new fire alarm devices on all floors except on 2nd floor. new smoke detectors to be install on 1st floor elevator lobby. new control relay modules to be installed for elevator recall and functions. extg fire alarm control panel in the bldg is an edwards i0500gd.Details
installation of new fire alarm devices on all floors except on 2nd floor. new smoke detectors to be install on 1st floor elevator lobby. new control relay modules to be installed for elevator recall and functions. extg fire alarm control panel in the bldg is an edwards i0500gd. | $4,449 |
| Sep 19, 2018 | Completed final sign-off Jan 2019 | 555 Montgomery St | 17th fl: installation of nw visual & audio/visual notification devices throughout the area of work to meet proper coverage per nfpa 72 requirements due to t.i. removal & reinstallation of extg devices, marked as err on plans due to ceiling upgrades. ref floor plan fa-201. extg f/a control panel inDetails
17th fl: installation of nw visual & audio/visual notification devices throughout the area of work to meet proper coverage per nfpa 72 requirements due to t.i. removal & reinstallation of extg devices, marked as err on plans due to ceiling upgrades. ref floor plan fa-201. extg f/a control panel in | $6,476 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 631 Howard St | installation of new smoke detector on the ground floor and removal of a heat detector from roof floor to comply with fire inspector comments. ref pa 2018-0111-8425Details
installation of new smoke detector on the ground floor and removal of a heat detector from roof floor to comply with fire inspector comments. ref pa 2018-0111-8425 | |
| Jul 30, 2018 | Completed final sign-off Aug 2018 | 1550 Bryant St | relocation of existing wall-mounted horn strobe device labeled as rr to meet proper area coverage. existing location to be replace w/ blank cover plate. (e) fire alarm system in building is edwards est3 systemDetails
relocation of existing wall-mounted horn strobe device labeled as rr to meet proper area coverage. existing location to be replace w/ blank cover plate. (e) fire alarm system in building is edwards est3 system | $4,985 |
| May 31, 2018 | Completed final sign-off Aug 2018 | 30 Geary St | 1/f: installation of (6) new ceiling mount strobes & (2) horn strobes & control modules. all ceiling mount devices to be pendent mounted. installation of (4) new duct smk det. new duct smk det tied into nearest initiaiting devices (2) control modules, 1 pull station, 1 booster supply maher naDetails
1/f: installation of (6) new ceiling mount strobes & (2) horn strobes & control modules. all ceiling mount devices to be pendent mounted. installation of (4) new duct smk det. new duct smk det tied into nearest initiaiting devices (2) control modules, 1 pull station, 1 booster supply maher na | $15,996 |
| May 31, 2018 | Completed final sign-off Jun 2022 | 1550 Bryant St | revision to 201805159199. revise (e) sequence of operation to reflect security access door locks and 2,3,8,9 flrs. the partial floor plan for 2,3,8,9 where security access door locks are located have been added to this submittal package to show security access- this adds 2nd floor to last as built-Details
revision to 201805159199. revise (e) sequence of operation to reflect security access door locks and 2,3,8,9 flrs. the partial floor plan for 2,3,8,9 where security access door locks are located have been added to this submittal package to show security access- this adds 2nd floor to last as built- | |
| May 31, 2018 | Completed final sign-off Jun 2019 | 100 34th Av | add one new audio/visual device per client request. n/a for maherDetails
add one new audio/visual device per client request. n/a for maher | |
| May 18, 2018 | Expired or cancelled expired Nov 2021 | 1550 Bryant St | to obtain final inspection for work approved under pa#201303132069. all work is complete.Details
to obtain final inspection for work approved under pa#201303132069. all work is complete. | |
| May 15, 2018 | Completed final sign-off Jun 2022 | 1550 Bryant St | as_built replace of (e) irc-3 facp to new edward est3. install new wire as necessary. all (e) devices to remain. replace (e) remote annunciator that is compatable with est33 panel ref 201711174283Details
as_built replace of (e) irc-3 facp to new edward est3. install new wire as necessary. all (e) devices to remain. replace (e) remote annunciator that is compatable with est33 panel ref 201711174283 | |
| Apr 23, 2018 | Completed final sign-off Sep 2018 | 1080 Sutter St | common area-ground level. required inspection of pull station inside fcc. this pull station was approved on pa# 201401317529 sheet fa 4-1 null seq of operation was approved on sheet fa1-2. monitoring company changed from crime alert to hci systems.Details
common area-ground level. required inspection of pull station inside fcc. this pull station was approved on pa# 201401317529 sheet fa 4-1 null seq of operation was approved on sheet fa1-2. monitoring company changed from crime alert to hci systems. | |
| Apr 23, 2018 | Completed final sign-off Nov 2018 | 625 Market St | installation of new fire alarm devices due to elevator modernation. new smk det on 1st & 15th flr elevator lobbies & elevator machine rm on penthouse lvl. install new notification device inside elevator machinerm. new control relay module to be installedDetails
installation of new fire alarm devices due to elevator modernation. new smk det on 1st & 15th flr elevator lobbies & elevator machine rm on penthouse lvl. install new notification device inside elevator machinerm. new control relay module to be installed | $2,166 |
| Mar 30, 2018 | Completed final sign-off Apr 2018 | 1550 Bryant St | 2/f: installtion of new visual notification devices labeled as "n" w/the area of work to provide proper coverage per nfpa 72 requirements. relocation of existing fire alarm notification devices labeled as rr to meet proper area coverage due to ti. n/a maherDetails
2/f: installtion of new visual notification devices labeled as "n" w/the area of work to provide proper coverage per nfpa 72 requirements. relocation of existing fire alarm notification devices labeled as rr to meet proper area coverage due to ti. n/a maher | $18,939 |
| Mar 6, 2018 | Completed final sign-off May 2019 | 400 02nd St | replacement of (e) fire alarm control panel to new edwards est3 system. one for one replacement of all (e) initiating devices to new. reutilize exsting wire and junction boxes, install as necessary. existing alarm sequence to remain the same. maher naDetails
replacement of (e) fire alarm control panel to new edwards est3 system. one for one replacement of all (e) initiating devices to new. reutilize exsting wire and junction boxes, install as necessary. existing alarm sequence to remain the same. maher na | $4,500 |
| Feb 23, 2018 | Completed final sign-off Jun 2018 | 2051 03rd St | provide new fire alarm system with single zone voice occupant notification. revision to pa#201406278714 s5 maher naDetails
provide new fire alarm system with single zone voice occupant notification. revision to pa#201406278714 s5 maher na | |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 1550 Bryant St | revision to pa 2018-0126-9660 - demo of (e) fa devices in suites 400, 420 and 490. relocation of exsting horn strobes and strobes to provide minimum coverage in suites 400 and 420Details
revision to pa 2018-0126-9660 - demo of (e) fa devices in suites 400, 420 and 490. relocation of exsting horn strobes and strobes to provide minimum coverage in suites 400 and 420 | |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 1550 Bryant St | demolition of existing fa system devices in suite 400, 420 and 490. relocation of existing horn strobe to provide minimum coverage in suite 400 and 420Details
demolition of existing fa system devices in suite 400, 420 and 490. relocation of existing horn strobe to provide minimum coverage in suite 400 and 420 | $11,367 |
| Jan 18, 2018 | Completed final sign-off Feb 2018 | 214 Grant Av | 4th floor suite 400 - as built drawing for ref #201711022949 - power supply changed from 4th floor to 3rd floor,minor code updates, no fans in /hvac in building updated sooDetails
4th floor suite 400 - as built drawing for ref #201711022949 - power supply changed from 4th floor to 3rd floor,minor code updates, no fans in /hvac in building updated soo | |
| Jan 18, 2018 | Never finaled issued Jan 2018, no final | 1441 Powell St | as built drawing - replacement of quick start fire alarm control panel with a new est 3 control panel. replacement of remote annunicator with a new annunicator. ref #201603242961.Details
as built drawing - replacement of quick start fire alarm control panel with a new est 3 control panel. replacement of remote annunicator with a new annunicator. ref #201603242961. | |
| Jan 11, 2018 | Completed final sign-off Nov 2018 | 631 Howard St | installation of new fire alarm device due to freight elevator modification. installation of new smk det on 3rd and 4th. elev lobby elev, machine room on roof and in elev - top of shaft. installation of new heat detector on ground levelDetails
installation of new fire alarm device due to freight elevator modification. installation of new smk det on 3rd and 4th. elev lobby elev, machine room on roof and in elev - top of shaft. installation of new heat detector on ground level | $10,121 |