Block 0240, lot 002
417 Montgomery St
- City’s use
- Commercial Office
- Built
- 1936
- Stories
- 10
- Units
- 1
- Rooms
- 10 bathrooms
- Building
- 94,537 sq ft
- Lot
- 9,587 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 417 Montgomery St | Ten 5 Construction Inc | 1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior areaDetails
1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior area | $169,068 |
| Aug 19, 2026 | In progress issued Sep 2026 | 417 Montgomery St | interior demo of non-structural elements including partions,doors,finishes,mechanical and elecrical outlets and switches. dropped ceilings and associated lighting to remain intact. per administrative bulletin ab-017: occupancy /exiting to be addressed under seperate permit. fire sprinklers andDetails
interior demo of non-structural elements including partions,doors,finishes,mechanical and elecrical outlets and switches. dropped ceilings and associated lighting to remain intact. per administrative bulletin ab-017: occupancy /exiting to be addressed under seperate permit. fire sprinklers and | $60,000 | |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 417 Montgomery St | Rdl Construction, Inc. | repair isolated concrete and limestone spalls. replace broken window glass. replace missing glazing putty.Details
repair isolated concrete and limestone spalls. replace broken window glass. replace missing glazing putty. | $40,000 |
| Mar 8, 2024 | Completed final sign-off Mar 2025 | 417 Montgomery St | H C I Systems Inc | provide a modificaton of the (e) fire alarm system for the elevator modification the modification shall consist of providing the following add (3) new control relays voluntary upgrade these drawings are based on as builts dated may 3, 2008 provide by customerDetails
provide a modificaton of the (e) fire alarm system for the elevator modification the modification shall consist of providing the following add (3) new control relays voluntary upgrade these drawings are based on as builts dated may 3, 2008 provide by customer | $20,000 |
| Feb 5, 2024 | Completed final sign-off Mar 2024 | 417 Montgomery St | D Construction Inc | to obtain final inspection for work approved under 201910215105. all work is complete.Details
to obtain final inspection for work approved under 201910215105. all work is complete. | |
| Sep 12, 2023 | Completed final sign-off Sep 2023 | 417 Montgomery St | Everon Llc | fire alarm ti on 7th fl. add 1 strobe only. ref 202303314817.Details
fire alarm ti on 7th fl. add 1 strobe only. ref 202303314817. | $700 |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 417 Montgomery St | Golden Gate Fire Protection Inc | f/s: install 1 pendent sprinker in a phone booth on the 7/f. ti ref pa 202303314817Details
f/s: install 1 pendent sprinker in a phone booth on the 7/f. ti ref pa 202303314817 | $1,200 |
| Mar 31, 2023 | Completed final sign-off Oct 2023 | 417 Montgomery St | Source Planning And Construction Inc | 7/f: project scope consists of the installation of seismic requirements for 1 existing phone booth in an existing office. does not affect existing layout, occupancy or egress.Details
7/f: project scope consists of the installation of seismic requirements for 1 existing phone booth in an existing office. does not affect existing layout, occupancy or egress. | $3,000 |
| Jan 27, 2023 | Never finaled issued Feb 2023, no final | 417 Montgomery St | Rdl Construction, Inc. | disconnect & remove the (e) ac units per plan; furnish & install 2 new 15 ton air cooled unit on 4th & 5th fl; furnish & install 2 new 15 ton water cooled units on 7th & 8th fl; reconnect the (e) water lines the (e) electrical and condensate pipeDetails
disconnect & remove the (e) ac units per plan; furnish & install 2 new 15 ton air cooled unit on 4th & 5th fl; furnish & install 2 new 15 ton water cooled units on 7th & 8th fl; reconnect the (e) water lines the (e) electrical and condensate pipe | $192,000 |
| Dec 23, 2022 | Expired or cancelled cancelled Feb 2023 | 417 Montgomery St | Centimark Corporation | reroofingDetails
reroofing | $72,521 |
| May 10, 2022 | Completed final sign-off May 2023 | 417 Montgomery St | Rdl Construction, Inc., Design Heating & Air Conditioning Inc | disconnect and remove the (e) ac unit. furnish and install (1) new 20-ton rooftop ac-unit. disconnect and remove (3) (e) cooling tower. furnish and install (3) three cooling tower like for like.Details
disconnect and remove the (e) ac unit. furnish and install (1) new 20-ton rooftop ac-unit. disconnect and remove (3) (e) cooling tower. furnish and install (3) three cooling tower like for like. | $258,147 |
| Oct 26, 2021 | Never finaled filed Oct 2021, never issued | 417 Montgomery St | test 5Details
test 5 | ||
| Oct 17, 2020 | Expired or cancelled cancelled Apr 2026 | 417 Montgomery St | Discount Signs & Neon Inc | sign "pf planet fitness", electric, wall, single-faced, 43.5 sq ftDetails
sign "pf planet fitness", electric, wall, single-faced, 43.5 sq ft | $4,000 |
| Feb 28, 2020 | Completed final sign-off Apr 2024 | 417 Montgomery St | Coastwest Fire Protection | fire sprinkler as built. adding 7 sprinkler to original permit. ref 201912109153, ref 201910215105Details
fire sprinkler as built. adding 7 sprinkler to original permit. ref 201912109153, ref 201910215105 | $6,500 |
| Feb 24, 2020 | Never finaled issued Feb 2020, no final | 417 Montgomery St | K C Glass Inc | supply & install (19 pieces) 1/8 clear annealed glass into steel frames, seal 30 vents closed. sidewalk canopy on montgomery st for swing stageDetails
supply & install (19 pieces) 1/8 clear annealed glass into steel frames, seal 30 vents closed. sidewalk canopy on montgomery st for swing stage | $25,000 |
| Jan 30, 2020 | Completed final sign-off Sep 2023 | 417 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st & 2nd floor: add 2 power supplies w/ some modules, 2 smoke detectors, 17 duct detectors for heat pumps w/ control relay. 2 duct detectors for fsd's w/ control. 23 horn strobe, 3 weatherproof horn strobes, & 4 strobe only. ref. pa# 2019-1021-5105Details
fire alarm ti on 1st & 2nd floor: add 2 power supplies w/ some modules, 2 smoke detectors, 17 duct detectors for heat pumps w/ control relay. 2 duct detectors for fsd's w/ control. 23 horn strobe, 3 weatherproof horn strobes, & 4 strobe only. ref. pa# 2019-1021-5105 | $15,000 |
| Dec 10, 2019 | Completed final sign-off Sep 2023 | 417 Montgomery St | Coastwest Fire Protection | tenant improvement of existing commercial sprinkler system at 1st fl for new fitness center/gym: 127 sprinklers total ref#201910215105Details
tenant improvement of existing commercial sprinkler system at 1st fl for new fitness center/gym: 127 sprinklers total ref#201910215105 | $6,500 |
| Oct 21, 2019 | Expired or cancelled expired Mar 2024 | 417 Montgomery St | D Construction Inc | ti for planet fitness gym, new partitions, finishes, fixtures for fitness center on 1st and 2nd fl. new mep with new plumbing fixtures. no exterior workDetails
ti for planet fitness gym, new partitions, finishes, fixtures for fitness center on 1st and 2nd fl. new mep with new plumbing fixtures. no exterior work | $1,000,000 |
| Oct 11, 2019 | Completed final sign-off Mar 2024 | 417 Montgomery St | R Saraiva | 1/f & 2/f: demo interior only to include removal of partitions, finishes & fixtures at the (e) restrooms, unused electrical & lighting systems & (e) mechnical systems & control. no exterior work. to comply with ab-017.Details
1/f & 2/f: demo interior only to include removal of partitions, finishes & fixtures at the (e) restrooms, unused electrical & lighting systems & (e) mechnical systems & control. no exterior work. to comply with ab-017. | $3,000 |
| Aug 23, 2018 | Completed final sign-off Nov 2018 | 417 Montgomery St | M C S Construction Services | ref pa# 201806273064; deferred electrical & mechanicalDetails
ref pa# 201806273064; deferred electrical & mechanical | $85,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2018 | 417 Montgomery St | Red Hawk Fire & Security Ca Llc | 2nd flr - fire alarm - add 6 new ceiling h/s. relocate 4 (e) devices as shownDetails
2nd flr - fire alarm - add 6 new ceiling h/s. relocate 4 (e) devices as shown | $6,000 |
| Jul 31, 2018 | Completed final sign-off Aug 2018 | 417 Montgomery St | Pioneer Fire Inc. | relocate 16 pendent fire sprinklers to avccomodate new open ceilingsDetails
relocate 16 pendent fire sprinklers to avccomodate new open ceilings | $5,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 417 Montgomery St | M C S Construction Services | ti on the 2nd fl - demo of existing partition wall and ceilings construction of new walls partitions. mep, fire & life safety under sep. permit.Details
ti on the 2nd fl - demo of existing partition wall and ceilings construction of new walls partitions. mep, fire & life safety under sep. permit. | $170,000 |
| Dec 20, 2016 | Expired or cancelled disapproved Dec 2018 | 417 Montgomery St | administrative permit for change of use on floor 1a from bank (lending institution) to office. no (n) construction proposed under this permit.Details
administrative permit for change of use on floor 1a from bank (lending institution) to office. no (n) construction proposed under this permit. | ||
| Dec 6, 2016 | Completed final sign-off Feb 2017 | 417 Montgomery St | Skender Construction Llc | 4th floor, suite 400 ti new open office space area and new private office. electrical includedDetails
4th floor, suite 400 ti new open office space area and new private office. electrical included | $22,000 |
| Feb 19, 2016 | Never finaled issued Feb 2016, no final | 417 Montgomery St | Almer Corp. | remove arpet, demolish interior non-structural walls, demolish (e) t-bar ceiling and lightingDetails
remove arpet, demolish interior non-structural walls, demolish (e) t-bar ceiling and lighting | $65,000 |
| Dec 21, 2015 | Never finaled issued Dec 2015, no final | 417 Montgomery St | Acco Engineered Systems Inc. Dba Acco En | replace 2 existing 15 ton dx split system ac units with new units of same tonnage. replace all piping and isolation. modify existing ductwork and controls for new unitsDetails
replace 2 existing 15 ton dx split system ac units with new units of same tonnage. replace all piping and isolation. modify existing ductwork and controls for new units | $175,000 |
| Oct 27, 2015 | Completed final sign-off Jan 2016 | 417 Montgomery St | Red Hawk Fire & Security Ca Llc | 17 strobes, 9 horn/strobes, 6 relays & 6 duct detectors. ref pa 2015-0826-5371Details
17 strobes, 9 horn/strobes, 6 relays & 6 duct detectors. ref pa 2015-0826-5371 | $8,000 |
| Oct 27, 2015 | Completed final sign-off Jan 2016 | 417 Montgomery St | Red Hawk Fire & Security Ca Llc | full build out to include 18 strobes, 6 horn strobes, 5 duct detectors 5 control. ref pa 2015-0826-5371Details
full build out to include 18 strobes, 6 horn strobes, 5 duct detectors 5 control. ref pa 2015-0826-5371 | $8,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 417 Montgomery St | Golden Gate Fire Protection Inc | 2nd & 3rd floor fire sprinkler only - cambridge 2nd floor (2015-0826-5371) relocate 57 and 3 (pendent); cambridge 3rd floor (2015-0826-5374) relocate 42, add 1 (pendents), add 14 (upright)Details
2nd & 3rd floor fire sprinkler only - cambridge 2nd floor (2015-0826-5371) relocate 57 and 3 (pendent); cambridge 3rd floor (2015-0826-5374) relocate 42, add 1 (pendents), add 14 (upright) | $58,500 |
| Sep 25, 2015 | Expired or cancelled cancelled Jul 2022 | 417 Montgomery St | Dome Construction Corp | 3rd floor: revision to app#201508265374. adding a louver to room 314 and 310 (revise plan sheet 03-a102 only.)Details
3rd floor: revision to app#201508265374. adding a louver to room 314 and 310 (revise plan sheet 03-a102 only.) | |
| Sep 25, 2015 | Expired or cancelled cancelled Jul 2022 | 417 Montgomery St | Dome Construction Corp | 2nd floor: revision to app# 201508265371. adding 2 louvers in open office room 213. (revise plan sheet 02-a102 only.)Details
2nd floor: revision to app# 201508265371. adding 2 louvers in open office room 213. (revise plan sheet 02-a102 only.) | |
| Sep 21, 2015 | Completed final sign-off Mar 2016 | 417 Montgomery St | Dome Construction Corp | 2nd floor: ti - upgrade electrical, mechanical, plumbing including life safety. ref pa 2015 0826 5371Details
2nd floor: ti - upgrade electrical, mechanical, plumbing including life safety. ref pa 2015 0826 5371 | |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 417 Montgomery St | Dome Construction Corp | 3rd floor: ti -upgrade electrical, mechanical, plumbing including life safety. ref pa 2015 0826 5374Details
3rd floor: ti -upgrade electrical, mechanical, plumbing including life safety. ref pa 2015 0826 5374 | |
| Aug 26, 2015 | Completed final sign-off Mar 2016 | 417 Montgomery St | Dome Construction Corp | 3rd floor:project consists of a t.i. for 9 story bldg. bld out is to demo of extg wall partitions & construction of new wall & glazing configuration, cieling & finishes. no structual work included. life safety, mech, electrical & plmg, and sprinkler are to be under seperate permit. no exterior work.Details
3rd floor:project consists of a t.i. for 9 story bldg. bld out is to demo of extg wall partitions & construction of new wall & glazing configuration, cieling & finishes. no structual work included. life safety, mech, electrical & plmg, and sprinkler are to be under seperate permit. no exterior work. | $350,000 |
| Aug 26, 2015 | Never finaled issued Sep 2015, no final | 417 Montgomery St | Dome Construction Corp | 2nd floor: ti- in 9 story bldg build out consists of demo of () wall partitions & construction of new wall and glazinf configuration, ceiling & fnishes. no structural work included. life safety, mep and sprinkler under sep permit. no exterior work.Details
2nd floor: ti- in 9 story bldg build out consists of demo of () wall partitions & construction of new wall and glazinf configuration, ceiling & fnishes. no structural work included. life safety, mep and sprinkler under sep permit. no exterior work. | $300,000 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 417 Montgomery St | Martinelli Environmental Graph | provide and install 3 evacuation signs for 4th floor.Details
provide and install 3 evacuation signs for 4th floor. | $1,160 |
| Jun 15, 2015 | Completed final sign-off Jun 2015 | 417 Montgomery St | Peacock Construction | revision to 201412224320. remove from scope of work operable partition and associated special inspections.Details
revision to 201412224320. remove from scope of work operable partition and associated special inspections. | |
| Apr 8, 2015 | Completed final sign-off Jun 2015 | 417 Montgomery St | R L H Fire Protection Inc | 4th flr: fire sprinkler permit, relocate 32, add 6 and delete 27 pendant sprinklers, relocate 7 and add 31 upright sprinklers, t.i. #201501206045.Details
4th flr: fire sprinkler permit, relocate 32, add 6 and delete 27 pendant sprinklers, relocate 7 and add 31 upright sprinklers, t.i. #201501206045. | $39,064 |
| Apr 3, 2015 | Completed final sign-off Jun 2015 | 417 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. 4th floor. 6 strobes, 7 horn/strobes. ref app#201501206045. n/a for the maher.Details
fire alarm t.i. 4th floor. 6 strobes, 7 horn/strobes. ref app#201501206045. n/a for the maher. | $7,000 |
| Mar 17, 2015 | Never finaled issued Jun 2015, no final | 417 Montgomery St | Rudolph And Sletten Inc | 4th fl: revision to app#201501206045: adding a restroom to the floor. mech, electrical and plmg included in this permit for full project. life safety and sprinkler work will be submitted seperately if needed.Details
4th fl: revision to app#201501206045: adding a restroom to the floor. mech, electrical and plmg included in this permit for full project. life safety and sprinkler work will be submitted seperately if needed. | $290,000 |
| Jan 21, 2015 | Never finaled issued Jan 2015, no final | 417 Montgomery St | Rudolph And Sletten Inc | 4th floor: demolition include walls, flooring, acoustic ceiling, doors, frames, millwork. t.i. under separate permit.Details
4th floor: demolition include walls, flooring, acoustic ceiling, doors, frames, millwork. t.i. under separate permit. | $25,000 |
| Jan 20, 2015 | Completed final sign-off Nov 2015 | 417 Montgomery St | Rudolph And Sletten Inc | 4th floor: t.i. project includes open office, conference rooms, reception, pantry and copy room. mechanical and electrical permit will be defered on this app.Details
4th floor: t.i. project includes open office, conference rooms, reception, pantry and copy room. mechanical and electrical permit will be defered on this app. | $654,000 |
| Dec 22, 2014 | Completed final sign-off Jun 2015 | 417 Montgomery St | Peacock Construction | selective demo of non load bearing walls. new finishes. removal of interior glass wall, replace with new operable wall system. new interior walls, doors, and windows, gwb partitions.mechanical, electrical, plumbing, fire-life safety under separate permit.Details
selective demo of non load bearing walls. new finishes. removal of interior glass wall, replace with new operable wall system. new interior walls, doors, and windows, gwb partitions.mechanical, electrical, plumbing, fire-life safety under separate permit. | $75,000 |
| Aug 4, 2014 | Never finaled issued Aug 2014, no final | 417 Montgomery St | Dettaglio Construction Inc Dba Dci Const | revision to 201406249297: permit revision to include installation of nanawall operable partiton at large conferenc room 711. width of wall is 16'6.Details
revision to 201406249297: permit revision to include installation of nanawall operable partiton at large conferenc room 711. width of wall is 16'6. | |
| Jun 27, 2014 | Completed final sign-off Sep 2014 | 417 Montgomery St | Bilcor Inc | 7th floor:install 6 ceiling mount horn strobes, install 4 ceiling mount strobes, install 1 control relay, install 1 smoke detector with base.Details
7th floor:install 6 ceiling mount horn strobes, install 4 ceiling mount strobes, install 1 control relay, install 1 smoke detector with base. | $4,800 |
| Jun 27, 2014 | Never finaled issued Jul 2014, no final | 417 Montgomery St | Famand Inc Dba Indoor Environmental Serv | 7th floor - hvac replacement, rerouting duct work. ref #2014.0624.9297.Details
7th floor - hvac replacement, rerouting duct work. ref #2014.0624.9297. | $68,000 |
| Jun 26, 2014 | Completed final sign-off Jan 2015 | 417 Montgomery St | A M West Mechanical Inc. | ti relocation of fire sprinklers, add 3, relocate 27, change out 39 and seismic bracing. reference ti 2014.0624.9297Details
ti relocation of fire sprinklers, add 3, relocate 27, change out 39 and seismic bracing. reference ti 2014.0624.9297 | $3,000 |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 417 Montgomery St | Dettaglio Construction Inc Dba Dci Const | minor demo of partitions, doors, ceiling/lighting, hvac, millwork, finishes. new work consists of new partitons, doors, frames, hardware, millwork, power data, plumbinb, finishes, new ceiling, lighting throughout. space unoccupied. sprinkler, ls, mep sep permitDetails
minor demo of partitions, doors, ceiling/lighting, hvac, millwork, finishes. new work consists of new partitons, doors, frames, hardware, millwork, power data, plumbinb, finishes, new ceiling, lighting throughout. space unoccupied. sprinkler, ls, mep sep permit | $350,000 |
| Sep 10, 2010 | Never finaled issued Sep 2010, no final | 417 Montgomery St | street spaceDetails
street space | ||
| Nov 18, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | 9th floor - revision to 200806124263: remove (e) drinkling fountain at request of building inspector.Details
9th floor - revision to 200806124263: remove (e) drinkling fountain at request of building inspector. | $375 | |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | Diversified Fire Products | at 9th fl: fire alarm t. i. in ste 900.Details
at 9th fl: fire alarm t. i. in ste 900. | $27,000 |
| Jul 21, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | revise layout of 2nd exit. original pa# 2008-0612-4263Details
revise layout of 2nd exit. original pa# 2008-0612-4263 | ||
| Jul 3, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | Pioneer Fire Protection | 9th floor: turn pendant sprinklers to upright position relocate 9, add 2, delete 1.Details
9th floor: turn pendant sprinklers to upright position relocate 9, add 2, delete 1. | $2,500 |
| Jun 24, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | Diversified Fire Products | ti for fire alarm on the 9th floor on suite 900. add 3 strobes and 1 hornstrobeDetails
ti for fire alarm on the 9th floor on suite 900. add 3 strobes and 1 hornstrobe | $4,091 |
| Jun 12, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | 9th floor - tenant improvement, build out of 7 offices, 1 conference rm, 1 it room, 1 coffee rm, 1 copy rm, exit corridor at 9th fl. mechanical under separate permit.Details
9th floor - tenant improvement, build out of 7 offices, 1 conference rm, 1 it room, 1 coffee rm, 1 copy rm, exit corridor at 9th fl. mechanical under separate permit. | $144,000 | |
| May 29, 2008 | Expired or cancelled cancelled Jan 2026 | 417 Montgomery St | 9th floor-build out of 7 offices, 1 conference room, 1 i.t. room, 1 copy room. new power/data outlets and lightingDetails
9th floor-build out of 7 offices, 1 conference room, 1 i.t. room, 1 copy room. new power/data outlets and lighting | $144,000 | |
| Apr 23, 2008 | Expired or cancelled cancelled Jan 2026 | 417 Montgomery St | build out of new office suite including office, conference room, copy & lunch rooms. mep, life safety under separate permit.Details
build out of new office suite including office, conference room, copy & lunch rooms. mep, life safety under separate permit. | $163,000 | |
| Aug 29, 2007 | Completed final sign-off Sep 2007 | 417 Montgomery St | Diversified Fire Products | 4th floor fire alarm tenant improvement: add 1 smoke detectorDetails
4th floor fire alarm tenant improvement: add 1 smoke detector | $8,900 |
| Aug 2, 2007 | Completed final sign-off Sep 2007 | 417 Montgomery St | Ward Alan Emery Construction Inc. | 4th floor-6 new v.a.v to (e) system, modify duct work, relocating (e) lighting fixtures (no new fixtures), arch under pa# 200707176924Details
4th floor-6 new v.a.v to (e) system, modify duct work, relocating (e) lighting fixtures (no new fixtures), arch under pa# 200707176924 | $125,000 |
| Jul 27, 2007 | Completed final sign-off Sep 2007 | 417 Montgomery St | Pioneer Fire Protection | 4th floor-relocation of (e) sprinklersDetails
4th floor-relocation of (e) sprinklers | $10,000 |
| Jul 17, 2007 | Completed final sign-off Sep 2007 | 417 Montgomery St | appl#200707106335 demo only. partition & door & ceiling demoed under seperate. build back partitions & door, ceiling etc. mech., electrical, life safety & sprinkler on seperate permit to follow.Details
appl#200707106335 demo only. partition & door & ceiling demoed under seperate. build back partitions & door, ceiling etc. mech., electrical, life safety & sprinkler on seperate permit to follow. | $165,000 | |
| Jul 10, 2007 | Never finaled issued Jul 2007, no final | 417 Montgomery St | 4th floor - demo walls doors etc. also demo ceiling. interior non stuctural demolition ref ab017 sf bc vacant spaces.Details
4th floor - demo walls doors etc. also demo ceiling. interior non stuctural demolition ref ab017 sf bc vacant spaces. | $45,000 | |
| May 3, 2006 | Completed final sign-off Jul 2006 | 417 Montgomery St | Bevilacqua & Sons | alteration & demolition of one partition and one act. ceiling. minor ceiling repair & light fixture replacement - 10th floor onlyDetails
alteration & demolition of one partition and one act. ceiling. minor ceiling repair & light fixture replacement - 10th floor only | $30,000 |
| Jan 19, 2006 | Completed final sign-off Apr 2006 | 417 Montgomery St | sf retrofit ordinance 377-93 (fire sprinkler high-rise ordinance) purpose of permit - verify that building already complies with ordinance. fpe survey report attached to original f/s plans.Details
sf retrofit ordinance 377-93 (fire sprinkler high-rise ordinance) purpose of permit - verify that building already complies with ordinance. fpe survey report attached to original f/s plans. | ||
| Nov 22, 2005 | Completed final sign-off Mar 2006 | 417 Montgomery St | Capitol Electric Const | install heat detection in elevator mech. room, tamper flows for the sameDetails
install heat detection in elevator mech. room, tamper flows for the same | $10,000 |
| May 6, 2005 | Expired or cancelled expired Nov 2007 | 417 Montgomery St | Pribuss Engineering Inc | upgrade existing system on various floors. 27 heads.Details
upgrade existing system on various floors. 27 heads. | $16,450 |
| Mar 15, 2005 | Completed final sign-off Mar 2006 | 417 Montgomery St | Capitol Electric Const | to renew 200308283269 and 200301074666 for final onlyDetails
to renew 200308283269 and 200301074666 for final only | |
| Aug 28, 2003 | Expired or cancelled expired Mar 2006 | 417 Montgomery St | Capitol Electric Const | resubmit as built plans per fire inspectors note on job card from final inspectors on 07/19/03 add 2Details
resubmit as built plans per fire inspectors note on job card from final inspectors on 07/19/03 add 2 | |
| Jan 7, 2003 | Expired or cancelled expired Mar 2006 | 417 Montgomery St | Capitol Electric Const | installation of new building life safety system, new horn strobes, strobe lights, facp panel,smokeDetails
installation of new building life safety system, new horn strobes, strobe lights, facp panel,smoke | $350,000 |
| Jan 2, 2001 | Expired or cancelled expired Jan 2002 | 417 Montgomery St | street spaceDetails
street space | ||
| Oct 13, 2000 | Completed final sign-off Feb 2001 | 417 Montgomery St | reference to pa #9806086s1Details
reference to pa #9806086s1 | $15,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.