Brett Paloutzian
- License
- C26307
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Harley Ellis Devereaux
- On San Francisco permits
- May 2016 to Dec 2016
3 permits since 2000 (architect on 3 permits): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cameron Builders Inc., Skender Construction Llc
- Engineers
- Jesus Cabellon Jr.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2016 | Completed final sign-off Feb 2017 | 417 Montgomery St | Skender Construction Llc | 4th floor, suite 400 ti new open office space area and new private office. electrical includedDetails
4th floor, suite 400 ti new open office space area and new private office. electrical included | $22,000 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 1500 Owens St | Cameron Builders Inc. | installation of a new swisslog boxpicker, removal of interior shore front glass and minor renovations/relocations to accomodate the new boxpicker equipment. n/a for maher.Details
installation of a new swisslog boxpicker, removal of interior shore front glass and minor renovations/relocations to accomodate the new boxpicker equipment. n/a for maher. | $90,000 |
| May 25, 2016 | Never finaled issued Jun 2016, no final | 1001 Potrero Av | bldg 40: revision to permit 201501216205; change to layout of toilet rooms to meet accessible clearances as a result of field discovered conditions; maher n/a.Details
bldg 40: revision to permit 201501216205; change to layout of toilet rooms to meet accessible clearances as a result of field discovered conditions; maher n/a. |