Block 4154, lot 001
1001 Potrero Ave
- City’s use
- Commercial Misc
- Built
- 1915
- Stories
- 5
- Lot
- 656,562 sq ft
- Zoning
- P
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
76 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2025 | In progress filed May 2025, not yet issued | 1001 Potrero Av | bldg #3: carr auditorium to provide accessible seating, new carpeting, with contract stripe & new handrails at e) auditorium. provide new accessible unisex restroom, upgrade e) signage to direct to revised spaces, mod, e) entry door thresholdDetails
bldg #3: carr auditorium to provide accessible seating, new carpeting, with contract stripe & new handrails at e) auditorium. provide new accessible unisex restroom, upgrade e) signage to direct to revised spaces, mod, e) entry door threshold | $450,000 | |
| Jun 14, 2023 | Never finaled issued Jun 2023, no final | 2540 23rd St | per request from ucsf, to create an address at building #7 at apn 4154/001 as ; 2540 23rd street.Details
per request from ucsf, to create an address at building #7 at apn 4154/001 as ; 2540 23rd street. | ||
| Aug 23, 2022 | Completed final sign-off Aug 2024 | 1001 Potrero Av | buildings 10, 20, & 30: each building built equally: installation of vertical strips of stainles steel welded wire mesh to function as a debris containment netting as the 5th floor level of bldgs.Details
buildings 10, 20, & 30: each building built equally: installation of vertical strips of stainles steel welded wire mesh to function as a debris containment netting as the 5th floor level of bldgs. | $20,000 | |
| Dec 8, 2020 | Never finaled issued Dec 2020, no final | 1001 Potrero Av | Boldt California Inc | request to shift fire hydrant #1 north approx. 50 feet and tie in at same location as fh #2. request to shift fh #3 east approx. 37 feet. no change to size of hydrants. hydrants within 100" of approved fdcs. original locations of hydrants approved in dbi building app. 20201-0116-2041. also referenceDetails
request to shift fire hydrant #1 north approx. 50 feet and tie in at same location as fh #2. request to shift fh #3 east approx. 37 feet. no change to size of hydrants. hydrants within 100" of approved fdcs. original locations of hydrants approved in dbi building app. 20201-0116-2041. also reference | |
| Sep 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | Boldt California Inc | revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbingDetails
revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbing | |
| Aug 11, 2020 | Never finaled issued Aug 2020, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Mar 2, 2020 | Never finaled issued Mar 2020, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jan 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | Boldt California Inc | special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street.Details
special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street. | $3,950,000 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 1001 Potrero Av | demolish 2 doors/frames and finish with gyp bd misc demo of e sink, counters, casework and electrical data. e data to receive faceplates in bldg bhc, behavioral health center, supervised patient careDetails
demolish 2 doors/frames and finish with gyp bd misc demo of e sink, counters, casework and electrical data. e data to receive faceplates in bldg bhc, behavioral health center, supervised patient care | $63,000 | |
| Apr 12, 2019 | Expired or cancelled cancelled Jan 2026 | 1001 Potrero Av | building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom.Details
building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom. | $550,000 | |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| May 15, 2017 | Completed final sign-off May 2017 | 1001 Potrero Av | Sabah International Incorporated | building 40 - as builts for pa 2017-0201-8384, strobes to bps revised to connect via module to facu instead.Details
building 40 - as builts for pa 2017-0201-8384, strobes to bps revised to connect via module to facu instead. | |
| Feb 1, 2017 | Completed final sign-off May 2017 | 1001 Potrero Av | Sabah International Incorporated | bldg 40 - install (2) new strobes in ada restroom #4116 & #4118. new notification circuit will bed fed from exisitng remote power supply bpsi located in the basement bldg 9. ref t.i. #201605258296. n/a maher ordianceDetails
bldg 40 - install (2) new strobes in ada restroom #4116 & #4118. new notification circuit will bed fed from exisitng remote power supply bpsi located in the basement bldg 9. ref t.i. #201605258296. n/a maher ordiance | $6,972 |
| Dec 21, 2016 | Expired or cancelled cancelled Oct 2017 | 1001 Potrero Av | Pacific Engineering & Construction Inc. | revision to pa 2014-0723-1913, removal to replacment of storm drain lineDetails
revision to pa 2014-0723-1913, removal to replacment of storm drain line | $1,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 1001 Potrero Av | Garnett Signs Llc | install (4) evac signs on ground & 1st flr. maher naDetails
install (4) evac signs on ground & 1st flr. maher na | $1,600 |
| May 25, 2016 | Never finaled issued Jun 2016, no final | 1001 Potrero Av | bldg 40: revision to permit 201501216205; change to layout of toilet rooms to meet accessible clearances as a result of field discovered conditions; maher n/a.Details
bldg 40: revision to permit 201501216205; change to layout of toilet rooms to meet accessible clearances as a result of field discovered conditions; maher n/a. | ||
| May 19, 2016 | Never finaled issued Sep 2016, no final | 1001 Potrero Av | Mc Millan Electric | verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher.Details
verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher. | $10,000 |
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 1001 Potrero Av | Integrated Sign Installations Inc | install revised monument sign base/footing, revision to pa#201510220466. n/a ordinance #155-13Details
install revised monument sign base/footing, revision to pa#201510220466. n/a ordinance #155-13 | $2,500 |
| Oct 22, 2015 | Never finaled issued Nov 2015, no final | 1001 Potrero Av | Integrated Sign Installations Inc | fabricate and install new concrete base support for new sign. structural work only under this pa (sharing plan set with lighting and sign under separate pa 201510200166) n/a ordinance #155-13Details
fabricate and install new concrete base support for new sign. structural work only under this pa (sharing plan set with lighting and sign under separate pa 201510200166) n/a ordinance #155-13 | $30,000 |
| Oct 20, 2015 | Never finaled issued Nov 2015, no final | 1001 Potrero Av | Integrated Sign Installations Inc | to erect ground, electric, single faced sign. erect illuminated single faced sign "zuckerberg san francisco general hospital and trauma center". ** maher: n/a **Details
to erect ground, electric, single faced sign. erect illuminated single faced sign "zuckerberg san francisco general hospital and trauma center". ** maher: n/a ** | $75,000 |
| Jul 14, 2015 | Completed final sign-off Oct 2015 | 1001 Potrero Av | to obtain final insepction for work approved under pa# 200901230738. all work is complete.Details
to obtain final insepction for work approved under pa# 200901230738. all work is complete. | ||
| May 12, 2015 | Completed final sign-off Jun 2015 | 1001 Potrero Av | Sabah International Incorporated | as-built plans: revision to pa # 2014-01-03-5508. n/a for maher. to address all plan check notes on the approved plans. sagiv of sffd 5/12/2015. comments addressed 6/2/15--thDetails
as-built plans: revision to pa # 2014-01-03-5508. n/a for maher. to address all plan check notes on the approved plans. sagiv of sffd 5/12/2015. comments addressed 6/2/15--th | |
| Jan 21, 2015 | Never finaled issued Dec 2015, no final | 1001 Potrero Av | bldg 40; demolition of (e) toilet room,(e)janitor closet & (e)office to be replaced with 92) accessible toilet rooms, both men's & women's; maher n/aDetails
bldg 40; demolition of (e) toilet room,(e)janitor closet & (e)office to be replaced with 92) accessible toilet rooms, both men's & women's; maher n/a | $350,000 | |
| Nov 7, 2014 | Completed final sign-off Aug 2016 | 1001 Potrero Av | barrier site work per cbc title 24 ch. 11b-202.4 except no. 4 new accessible ramp and stairs and re-grading and paving of the an existing drive aisle in an existing parking lot between building #80 and teh behavioral health ctr. on campus. maher n/a.Details
barrier site work per cbc title 24 ch. 11b-202.4 except no. 4 new accessible ramp and stairs and re-grading and paving of the an existing drive aisle in an existing parking lot between building #80 and teh behavioral health ctr. on campus. maher n/a. | $495,000 | |
| Sep 24, 2014 | Never finaled issued Sep 2014, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Sep 23, 2014 | Never finaled issued Sep 2014, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jul 23, 2014 | Completed final sign-off Sep 2017 | 1001 Potrero Av | bldg #3: construct of new accessible ramp and stair. demolition of extg walkway with install of new accessible walkway with access to /from parking lot new accessible activator to be installed at extg porch. demo of concrete curb, install of new lights, new planters. n/a maher ordinance#155-13Details
bldg #3: construct of new accessible ramp and stair. demolition of extg walkway with install of new accessible walkway with access to /from parking lot new accessible activator to be installed at extg porch. demo of concrete curb, install of new lights, new planters. n/a maher ordinance#155-13 | $497,250 | |
| May 21, 2014 | Completed final sign-off Aug 2015 | 1001 Potrero Av | revision to pa# 201211134067 structural opening detail changed. n/a ordinance #155-13Details
revision to pa# 201211134067 structural opening detail changed. n/a ordinance #155-13 | ||
| Apr 21, 2014 | Never finaled issued Oct 2014, no final | 1001 Potrero Av | Rodan Builders Inc | bldg 100: parapet bracing/ site fencing. bldg 10-40:entry canopy/site fencing. n/a for the maher ordinance #155-13Details
bldg 100: parapet bracing/ site fencing. bldg 10-40:entry canopy/site fencing. n/a for the maher ordinance #155-13 | $250,000 |
| Jan 3, 2014 | Completed final sign-off Jun 2015 | 1001 Potrero Av | Sabah International Incorporated | provide & install elevator recall for bldg 80 & 90(connected bldg) at sf general hospital. revision add 14 speaker / strobes. ** maher: compliance with ordinance no# 155-13 not required **Details
provide & install elevator recall for bldg 80 & 90(connected bldg) at sf general hospital. revision add 14 speaker / strobes. ** maher: compliance with ordinance no# 155-13 not required ** | $49,849 |
| Oct 8, 2013 | Completed final sign-off Oct 2015 | 1001 Potrero Av | mayor's office on disability ada barrier removal project per cbc work involves renovating a primary entrance to sfgh building 9 for accessibility compliance including new ramps, stairs & landscaping.Details
mayor's office on disability ada barrier removal project per cbc work involves renovating a primary entrance to sfgh building 9 for accessibility compliance including new ramps, stairs & landscaping. | $275,000 | |
| Nov 13, 2012 | Completed final sign-off Aug 2015 | 1001 Potrero Av | barrier removal project consisting of 2 existing elevators, upgrade access to provide elevator, including new rear access to provide redundant elevator access to bldg portion of facility.Details
barrier removal project consisting of 2 existing elevators, upgrade access to provide elevator, including new rear access to provide redundant elevator access to bldg portion of facility. | $3,200,000 | |
| Nov 2, 2012 | Never finaled issued Nov 2012, no final | 1001 Potrero Av | Yerba Buena Engineering & Construction | grading permit per mayors office on disability-barrier removal ada complaint landing, crosswalk & parking (repairs & grading-ada compliance)Details
grading permit per mayors office on disability-barrier removal ada complaint landing, crosswalk & parking (repairs & grading-ada compliance) | $125,000 |
| Oct 24, 2012 | Completed final sign-off Dec 2013 | 1001 Potrero Av | mayors office of disablity-ada conform- 1 accessible entrance to building including new ramp, crosswalk ramp, new doors and slip resistent coatings, some drywall and painting.Details
mayors office of disablity-ada conform- 1 accessible entrance to building including new ramp, crosswalk ramp, new doors and slip resistent coatings, some drywall and painting. | $125,000 | |
| May 10, 2012 | Never finaled issued May 2012, no final | 1001 Potrero Av | Rubecon General Contracting Inc | providing revised battery spill containment and fuel oil containment from previously approved document. sffd approval only. oshpd juristriction revision 201003037463Details
providing revised battery spill containment and fuel oil containment from previously approved document. sffd approval only. oshpd juristriction revision 201003037463 | |
| Feb 15, 2012 | Never finaled issued Feb 2012, no final | 1001 Potrero Av | Rodan Builders Inc | revision to 201111229421.to add additional information for non bearing wall framing and housekeeping padDetails
revision to 201111229421.to add additional information for non bearing wall framing and housekeeping pad | |
| Dec 20, 2011 | Completed final sign-off Apr 2012 | 1001 Potrero Av | Sabah International Incorporated | bldg 30, 2nd floor - provide & test new est-3 fire alarm system. add 1 facp, 1 ann., 1 bps, 2 cc1s, 1 ct1, 4 cr, 3 mm, 2 pull stations, 25 smoke det, 9 strobes, and 8 horn/strobes.Details
bldg 30, 2nd floor - provide & test new est-3 fire alarm system. add 1 facp, 1 ann., 1 bps, 2 cc1s, 1 ct1, 4 cr, 3 mm, 2 pull stations, 25 smoke det, 9 strobes, and 8 horn/strobes. | $41,146 |
| Nov 30, 2011 | Never finaled issued Nov 2011, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Nov 22, 2011 | Completed final sign-off Apr 2012 | 1001 Potrero Av | Rodan Builders Inc | barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application.Details
barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application. | $947,230 |
| Apr 28, 2011 | Never finaled issued Apr 2011, no final | 1001 Potrero Av | street space permitDetails
street space permit | ||
| Apr 25, 2011 | Completed final sign-off Nov 2011 | 1001 Potrero Av | Colin Construction Co | medical equipment replacement in kind in avon building.Details
medical equipment replacement in kind in avon building. | $37,100 |
| Feb 3, 2011 | Expired or cancelled withdrawn Jan 2012 | 1001 Potrero Av | Webcor Construction Lp | install tower crane including concrete foundation, temporary electrical and liebherr 630 el-h 20/40.Details
install tower crane including concrete foundation, temporary electrical and liebherr 630 el-h 20/40. | $150,000 |
| Dec 6, 2010 | Completed final sign-off Aug 2012 | 1001 Potrero Av | 1st floor-barrier removal project-interior renovation only. replace 3 corridor doors, replace 1 public drinking fountain, relocate lavatory & toilet accessories in one male & female pair of single accomodation toilet rooms, replace signageDetails
1st floor-barrier removal project-interior renovation only. replace 3 corridor doors, replace 1 public drinking fountain, relocate lavatory & toilet accessories in one male & female pair of single accomodation toilet rooms, replace signage | $25,000 | |
| Sep 7, 2010 | Never finaled issued Sep 2010, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jul 23, 2010 | Never finaled issued Jul 2010, no final | 1001 Potrero Av | Yerba Buena Engineering & Construction | revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit.Details
revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit. | $1,500 |
| Jun 7, 2010 | Never finaled issued Jul 2010, no final | 1001 Potrero Av | Yerba Buena Engineering & Construction | building 80 & 90: modify existing parking lot to create a van accessible passenger drop-off and loading zone with an accessible pedestrian path of travel to the rear entrance of building 80 & 90.Details
building 80 & 90: modify existing parking lot to create a van accessible passenger drop-off and loading zone with an accessible pedestrian path of travel to the rear entrance of building 80 & 90. | $200,000 |
| Jun 4, 2010 | Completed final sign-off Jun 2011 | 1001 Potrero Av | Webcor Construction Lp | bldg #1, slab cut at tunnel slab. (the tunnel is located near by at potrero ave. & 22nd. st.Details
bldg #1, slab cut at tunnel slab. (the tunnel is located near by at potrero ave. & 22nd. st. | $7,500 |
| Apr 13, 2010 | Completed final sign-off Jul 2010 | 1001 Potrero Av | Accutite Technology Engineering | replace spill bucket on underground storage tank storing diesel fuel.Details
replace spill bucket on underground storage tank storing diesel fuel. | $1,500 |
| Apr 6, 2010 | Never finaled issued Apr 2010, no final | 1001 Potrero Av | street space permitDetails
street space permit | ||
| Mar 3, 2010 | Never finaled issued May 2012, no final | 1001 Potrero Av | Rubecon General Contracting Inc | new emergency power system, 5 generator sets, walls & other 2-hr. construction enclosure 5 radiators,fuel oil system, hvac system, steam boilers, dearator tank, gas piping, 380 gallon fuel-oil day tankDetails
new emergency power system, 5 generator sets, walls & other 2-hr. construction enclosure 5 radiators,fuel oil system, hvac system, steam boilers, dearator tank, gas piping, 380 gallon fuel-oil day tank | $3,885 |
| Feb 2, 2010 | Completed final sign-off Aug 2011 | 1001 Potrero Av | Webcor Construction Lp | to add a steel canopy outside the hospital entrance. the new canopy will not attach to (e) hospital building and is self supported.Details
to add a steel canopy outside the hospital entrance. the new canopy will not attach to (e) hospital building and is self supported. | $123,000 |
| Nov 10, 2009 | Completed final sign-off Dec 2009 | 1001 Potrero Av | general hospital - avon breast center. install repalcement x-ray machine in existing trailer office room # 22, builidng 4Details
general hospital - avon breast center. install repalcement x-ray machine in existing trailer office room # 22, builidng 4 | $285,000 | |
| Oct 21, 2009 | Completed final sign-off Nov 2010 | 1001 Potrero Av | Webcor Construction Lp | bldg 10 & 20 -construct temporary construction barriers and provide new temporary exits to the outside on 1st fl of 1915 and 1950 buildings numbered 10/20. work includes new exit doors, partition walls, exit sign relocation. minor demo, electrical rerouteDetails
bldg 10 & 20 -construct temporary construction barriers and provide new temporary exits to the outside on 1st fl of 1915 and 1950 buildings numbered 10/20. work includes new exit doors, partition walls, exit sign relocation. minor demo, electrical reroute | $20,000 |
| Oct 21, 2009 | Completed final sign-off Nov 2010 | 1001 Potrero Av | Webcor Construction Lp | bldg 30 & 40 - construct temporary construction barriers and provide new temporary exits to the outside on 1st floor of 1915 and 1950 buildings (numbered 30/40) work includes new exit doors, partition walls, exit sign relocation, minor demo, elec rerouteDetails
bldg 30 & 40 - construct temporary construction barriers and provide new temporary exits to the outside on 1st floor of 1915 and 1950 buildings (numbered 30/40) work includes new exit doors, partition walls, exit sign relocation, minor demo, elec reroute | $20,000 |
| Oct 14, 2009 | Completed final sign-off Oct 2010 | 1001 Potrero Av | Webcor Construction Lp | underpinning one story portion of building 20 on sfgh campus.underpinning provides vertical support & shoring to allow construction of utilities and a permanent retaining wall.Details
underpinning one story portion of building 20 on sfgh campus.underpinning provides vertical support & shoring to allow construction of utilities and a permanent retaining wall. | $30,000 |
| Aug 31, 2009 | Completed final sign-off Dec 2009 | 1001 Potrero Av | Ordway Construction Inc. | install pad for x-ray equipment in existing trailer office (no machine)Details
install pad for x-ray equipment in existing trailer office (no machine) | $6,000 |
| Jan 23, 2009 | Completed final sign-off Oct 2015 | 1001 Potrero Av | underground site utilities, fire, plumb, strom drain, electrical, relocation for new sf general hospital build, demo existing underground tunnel.Details
underground site utilities, fire, plumb, strom drain, electrical, relocation for new sf general hospital build, demo existing underground tunnel. | $3,500,000 | |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 1001 Potrero Av | street space permitDetails
street space permit | ||
| Jun 11, 2008 | Never finaled issued Jun 2008, no final | 1001 Potrero Av | street space permit only.Details
street space permit only. | ||
| Jan 24, 2008 | Never finaled issued Jan 2008, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jan 3, 2008 | Never finaled issued Jan 2008, no final | 1001 Potrero Av | street space permit only.Details
street space permit only. | ||
| Dec 19, 2007 | Never finaled issued Dec 2007, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Sep 25, 2007 | Never finaled issued Sep 2007, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Aug 23, 2007 | Never finaled issued Aug 2007, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jun 13, 2007 | Never finaled issued Jun 2007, no final | 1001 Potrero Av | street spaceDetails
street space | ||
| Jan 19, 2007 | Completed final sign-off Jul 2007 | 1001 Potrero Av | Sabah International Incorporated | modify extg fire alarm system by relocating 2 smoke detectors. 1 manual pull station and installing the devices due to 3rd floor tenant improvementsDetails
modify extg fire alarm system by relocating 2 smoke detectors. 1 manual pull station and installing the devices due to 3rd floor tenant improvements | $18,195 |
| Mar 21, 2006 | Completed final sign-off Oct 2006 | 1001 Potrero Av | office tenant improvement rm 116, bldg 80: demolition of 1 full wall and one partial wall both interior, non structural)Details
office tenant improvement rm 116, bldg 80: demolition of 1 full wall and one partial wall both interior, non structural) | $70,000 | |
| Jul 15, 2005 | Completed final sign-off Jun 2007 | 1001 Potrero Av | city job-disability access site work consist of accessible parking,elevator/path of travel upgrades.Details
city job-disability access site work consist of accessible parking,elevator/path of travel upgrades. | ||
| Jul 15, 2005 | Completed final sign-off Jul 2007 | 1001 Potrero Av | city job -t.i.work consists of renovating 3/f outpatient substance abuse in bldg.90.Details
city job -t.i.work consists of renovating 3/f outpatient substance abuse in bldg.90. | ||
| Feb 6, 2004 | Never finaled issued Apr 2004, no final | 1001 Potrero Av | Sabah International Incorporated | furnish & test fire alarm system at sfgh avon foundationDetails
furnish & test fire alarm system at sfgh avon foundation | $33,125 |
| Aug 14, 2003 | Never finaled issued Sep 2003, no final | 2401 22nd St | to erect permanent trailer for out patient med. officeDetails
to erect permanent trailer for out patient med. office | $800,000 | |
| Oct 30, 2002 | Expired or cancelled expired Dec 2003 | 1001 Potrero Av | Roberts And Sons Builders | revise 2002/03/07/0869.additional(n)lighting for offices&corridor. no mech work.rm#106,107,108&111.Details
revise 2002/03/07/0869.additional(n)lighting for offices&corridor. no mech work.rm#106,107,108&111. | $10,000 |
| Aug 26, 2002 | Never finaled issued Aug 2002, no final | 1001 Potrero Av | Roberts And Sons Builders | revise to joint detail at new wall and (e) ceiling for basement elevator smoke doors reviseDetails
revise to joint detail at new wall and (e) ceiling for basement elevator smoke doors revise | $100 |
| Apr 3, 2002 | Never finaled issued Apr 2002, no final | 1001 Potrero Av | Roberts And Sons Builders | interior improvements,repl lighting,new elevator smoke doors at basement & 1st flr (ref.200203070869Details
interior improvements,repl lighting,new elevator smoke doors at basement & 1st flr (ref.200203070869 | $30,000 |
| Mar 7, 2002 | Completed final sign-off Mar 2003 | 1001 Potrero Av | Roberts And Sons Builders | interior improvement including liting,finishes,elevator,lobby doors,built in furn. in basement renewDetails
interior improvement including liting,finishes,elevator,lobby doors,built in furn. in basement renew | $120,000 |
| Aug 27, 2001 | Expired or cancelled expired Feb 2002 | 1001 Potrero Av | street spaceDetails
street space |