Jeffrey J Tarantino
- License
- C63936
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C63936 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Freyer And Laureta
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Aug 2024
14 permits since 2000 (engineer on 13 permits, architect on 1 permit): 10 completed, 1 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Truebeck Construction (3), Boldt California Inc (2), Lend Lease (Us) Construction Inc (2), Rodan Builders Inc (2), Hoseley Corporation, Silverado Contractors Inc
- Architects
- Marcel Wilson, Paul Cooper, Randall Dowler
- Engineers
- Bruce Douglas, C.K. Allen Jr, James Dyer, Mark Koenigs, Robert Henderson, Silva Reshmeen
- Authorized agents
- Benito Olguin
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2024 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | Rodan Builders Inc | revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordinationDetails
revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordination | |
| Oct 4, 2022 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | revision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane.Details
revision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane. | |
| May 3, 2022 | Never finaled filed May 2022, never issued | 0 Unknown | port prj-22-0458: clearing, grubbing, rough grading & soil import on the site of 700 innes.Details
port prj-22-0458: clearing, grubbing, rough grading & soil import on the site of 700 innes. | $1,017,974 | |
| Apr 21, 2022 | Never finaled filed Apr 2022, never issued | 0 Earl St | proj-26-0629: ed 17-02 priority permit. removal of existing utilities and roadway within existing arelious walker drive. clearing, grubbing and rough grading of site to prepare for surcharging of future right of way.Details
proj-26-0629: ed 17-02 priority permit. removal of existing utilities and roadway within existing arelious walker drive. clearing, grubbing and rough grading of site to prepare for surcharging of future right of way. | $3,229,726 | |
| Sep 23, 2021 | In progress issued Feb 2024 | 375 Laguna Honda Bl | Rodan Builders Inc | replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is includedDetails
replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is included | $2,303,000 |
| May 28, 2021 | Never finaled filed May 2021, never issued | 725 Jamestown Av | reference site permit for building 1 - 20: pa# 201912179780-s, 9781-s, 9782-s, 9783-s, 9784-s, 9785-s, 9786-s, 9787-s, 9788-s, 9789-s, 9790-s, 9791-s, 9792-s, 9793-s, 9794-s, 9795-s, 9796-s, 9797-s, 9798-s, 9799-s. prep for residential development. work includes mass area grading & soil nail wall.Details
reference site permit for building 1 - 20: pa# 201912179780-s, 9781-s, 9782-s, 9783-s, 9784-s, 9785-s, 9786-s, 9787-s, 9788-s, 9789-s, 9790-s, 9791-s, 9792-s, 9793-s, 9794-s, 9795-s, 9796-s, 9797-s, 9798-s, 9799-s. prep for residential development. work includes mass area grading & soil nail wall. | $1,000,000 | |
| Dec 28, 2020 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709Details
construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709 | $68,000,000 |
| Sep 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | Boldt California Inc | revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbingDetails
revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbing | |
| Jan 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | Boldt California Inc | special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street.Details
special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street. | $3,950,000 |
| Oct 7, 2019 | Completed final sign-off Nov 2021 | 1050 03rd St | Hoseley Corporation | new private fire hydrantDetails
new private fire hydrant | $90,000 |
| May 17, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | plumbing review. revision to pa# 2018-1002-2074. installation of man holes & sandtrap for perpoint ln & open space.Details
plumbing review. revision to pa# 2018-1002-2074. installation of man holes & sandtrap for perpoint ln & open space. | |
| Dec 5, 2017 | Completed final sign-off May 2019 | 385 Channel | Silverado Contractors Inc | demolish 1 story storage bldgDetails
demolish 1 story storage bldg | $179,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | Lend Lease (Us) Construction Inc | grading plan for work associated with site permit applications 2014 0813 3775 s & 2014 0873 3766sDetails
grading plan for work associated with site permit applications 2014 0813 3775 s & 2014 0873 3766s | $45,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | Lend Lease (Us) Construction Inc | preliminary site prep demolition and erosion control associated with site permit 2014081333775s and 201408133766s (under review). n/a maher ordinanceDetails
preliminary site prep demolition and erosion control associated with site permit 2014081333775s and 201408133766s (under review). n/a maher ordinance | $15,000 |