James Dyer
- Listed as
- authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Edesign C Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Feb 2021
32 permits since 2000 (authorized agent-others on 18 permits, pmt consultant/expediter on 9 permits, engineer on 5 permits): 20 completed, 6 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030.Details
add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030. | $50,000 |
| Dec 28, 2020 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709Details
construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709 | $68,000,000 |
| Dec 5, 2019 | Completed final sign-off Jun 2025 | 798 Wisconsin St | sffd station 37: replacement of (e) emergency diesel generator at grade on patio with a new 521 gallon diesel generator to provide for 72 hr of runtime. this includes an inground fuel filler in sidewalk. maher n/a.Details
sffd station 37: replacement of (e) emergency diesel generator at grade on patio with a new 521 gallon diesel generator to provide for 72 hr of runtime. this includes an inground fuel filler in sidewalk. maher n/a. | $500,000 | |
| Dec 5, 2019 | Completed final sign-off Jun 2025 | 1298 Girard St | replacement of emergency disel generator at grade on patio with a new 434 gallons disel generator to provide for 72 hours of run time.Details
replacement of emergency disel generator at grade on patio with a new 434 gallons disel generator to provide for 72 hours of run time. | $400,000 | |
| Jul 21, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinanceDetails
to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinance | $54,000 | |
| Mar 4, 2015 | Expired or cancelled cancelled Jan 2026 | 700 Montgomery St | demo & remove (e) concrete sidewalk; repair (e) sidewalk framing within work area only; remove damaged ocncrete encasement at three steel beams & place new concrete encasement to restove beams to a like for like condition. n/a maher ordinanceDetails
demo & remove (e) concrete sidewalk; repair (e) sidewalk framing within work area only; remove damaged ocncrete encasement at three steel beams & place new concrete encasement to restove beams to a like for like condition. n/a maher ordinance | $10,000 | |
| Sep 16, 2014 | Expired or cancelled cancelled Jan 2020 | 100 Van Ness Av | demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not requiredDetails
demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not required | $150,000 | |
| Sep 16, 2014 | Completed final sign-off Jan 2016 | 150 Van Ness Av | removal of all exterior non load bearing vertical surfaces of (e) 7 story bldg at 150 van ness/155 hayes. existing interior and structure will remain. comply with maher ordinance no.155-13 not required.Details
removal of all exterior non load bearing vertical surfaces of (e) 7 story bldg at 150 van ness/155 hayes. existing interior and structure will remain. comply with maher ordinance no.155-13 not required. | $125,000 | |
| Sep 10, 2014 | Completed final sign-off Mar 2015 | 1401 Polk St | Discount Signs & Neon Inc | to erect electrical sign( led projecting sign) double faced.Details
to erect electrical sign( led projecting sign) double faced. | $400 |
| Sep 10, 2014 | Completed final sign-off Mar 2015 | 1401 Polk St | Discount Signs & Neon Inc | to erect electrical sign( led projecting sign) single faced.Details
to erect electrical sign( led projecting sign) single faced. | $2,000 |
| Apr 23, 2014 | Completed final sign-off May 2019 | 555 Fulton St | Fulton Street Construction Inc | provide shoring per plans - ref to app #201501036062 for new bldg - compliance with ordinance no.155-13 required.Details
provide shoring per plans - ref to app #201501036062 for new bldg - compliance with ordinance no.155-13 required. | $1,700,000 |
| Mar 18, 2014 | Completed final sign-off Aug 2015 | 458 Brunswick St | install 1 full bathroom, 1 playroom & 1 office in ground level.Details
install 1 full bathroom, 1 playroom & 1 office in ground level. | $16,000 | |
| Jan 28, 2014 | Expired or cancelled cancelled Mar 2020 | 1355 Market St | exterior remodel to include (e) storefront (removal) between column lines, addition of (n) double doors at storefront, & addition of (n) fresh air intake at storefront. compliance with ordinance 3155-13 not required.Details
exterior remodel to include (e) storefront (removal) between column lines, addition of (n) double doors at storefront, & addition of (n) fresh air intake at storefront. compliance with ordinance 3155-13 not required. | $30,000 | |
| Jan 28, 2014 | Completed final sign-off Feb 2015 | 1355 Market St | W. Wong Construction Co. Inc. | ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| Nov 6, 2013 | Completed final sign-off Feb 2020 | 580 Capp St | Cahill Contractors Inc | remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout.Details
remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout. | $200,000 |
| Oct 29, 2013 | Completed final sign-off Mar 2014 | 2809 San Bruno Av | W. Wong Construction Co. Inc. | to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms.Details
to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms. | $60,000 |
| Aug 13, 2013 | Completed final sign-off Feb 2016 | 101 Polk St | Build Group Inc. | temporary lateral support of excavation for new construction by soldier beams, tiebacks and wood laggingDetails
temporary lateral support of excavation for new construction by soldier beams, tiebacks and wood lagging | $225,000 |
| Aug 13, 2013 | Completed final sign-off Jun 2016 | 101 Polk St | Build Group Inc. | provide mechanical, electrical and plumbing for new bldg under bpa#201307051190Details
provide mechanical, electrical and plumbing for new bldg under bpa#201307051190 | $400,000 |
| Jul 16, 2013 | Expired or cancelled expired Dec 2018 | 2620 Jones St | Continental Contractors Inc | ground floor public area, interior renovations & finish. improvement/renovate partial bathroom, renovate bar area. occupant load calc's sep permit- sffd assembly permit required.Details
ground floor public area, interior renovations & finish. improvement/renovate partial bathroom, renovate bar area. occupant load calc's sep permit- sffd assembly permit required. | $200,000 |
| May 15, 2013 | Completed final sign-off Feb 2014 | 1409 Sutter St | replace existing windows in kind with double paned windows at 3rd & 4th floors, visible form street, no change of size, no change of outside profile, add glaze only.Details
replace existing windows in kind with double paned windows at 3rd & 4th floors, visible form street, no change of size, no change of outside profile, add glaze only. | $25,000 | |
| May 3, 2013 | Completed final sign-off Apr 2019 | 555 Fulton St | Fulton Street Construction Inc | to demolish 2 stories of auto repair buildingDetails
to demolish 2 stories of auto repair building | $100,000 |
| May 3, 2013 | Never finaled issued Mar 2014, no final | 555 Fulton St | Fulton Street Construction Inc | to erect 5 stories of 139 dwelling units, retail, parking, storage office utility, assemblyDetails
to erect 5 stories of 139 dwelling units, retail, parking, storage office utility, assembly | $30,000,000 |
| Apr 18, 2013 | Never finaled issued Apr 2013, no final | 180 New Montgomery St | Hathaway Dinwiddie Co. | install 2 hours fire rated ceiling, or apply fire caulk as necessary to achieve 2 hour rating, in telephone rooms on all floors (basement-8th flr). all work related to fire sprinkler system, fire alarm, mep will be submitted under separate permit.Details
install 2 hours fire rated ceiling, or apply fire caulk as necessary to achieve 2 hour rating, in telephone rooms on all floors (basement-8th flr). all work related to fire sprinkler system, fire alarm, mep will be submitted under separate permit. | $25,000 |
| Mar 22, 2013 | Expired or cancelled withdrawn Feb 2014 | 1916 Octavia St | abate nov# 201053528-restore, storage/garage use. install new windows & door.Details
abate nov# 201053528-restore, storage/garage use. install new windows & door. | $2,000 | |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 165 Jefferson St | W. Wong Construction Co. Inc. | install new marquee at front of building. install new storefront at front of building. refer to ti pa# 2012-1102-3470Details
install new marquee at front of building. install new storefront at front of building. refer to ti pa# 2012-1102-3470 | $20,000 |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 165 Jefferson St | W. Wong Construction Co. Inc. | erect a non electric single faced marquee new signDetails
erect a non electric single faced marquee new sign | $1,000 |
| Mar 7, 2012 | Completed final sign-off Nov 2012 | 4016 Geary Bl | W. Wong Construction Co. Inc. | comply with nov 201203181 for 200793296 & 200562598.to obtain bldg permit to convert (e) 2nd fl dwelling unit to commercial use in 3 story commercial bldg per planning case 20090945c.provide soft demo to (e) space to prepare for future tenants (include 2 offices and roof deck) under seperate permit.Details
comply with nov 201203181 for 200793296 & 200562598.to obtain bldg permit to convert (e) 2nd fl dwelling unit to commercial use in 3 story commercial bldg per planning case 20090945c.provide soft demo to (e) space to prepare for future tenants (include 2 offices and roof deck) under seperate permit. | $12,000 |
| Nov 25, 2008 | Expired or cancelled cancelled Jan 2026 | 2250 Hayes St | partial 6th flr remodel into new doctor's office consisting of 6 accessible exam rooms, accessible mens & womens public toilets and an accessible employee toilet. all other rooms and functions are fully accessibleDetails
partial 6th flr remodel into new doctor's office consisting of 6 accessible exam rooms, accessible mens & womens public toilets and an accessible employee toilet. all other rooms and functions are fully accessible | $300,000 | |
| Oct 28, 2008 | Never finaled issued Oct 2008, no final | 2250 Hayes St | approx 14200 sf of non structural full gut demo of e 1st fl medical office blg. elements include only partitions, ceiling assemblies, int finishes, mep systems, partial removal of concrete slab on gradeDetails
approx 14200 sf of non structural full gut demo of e 1st fl medical office blg. elements include only partitions, ceiling assemblies, int finishes, mep systems, partial removal of concrete slab on grade | $20,000 | |
| Feb 19, 2008 | Completed final sign-off Apr 2008 | 1097 Howard St | construct new bathroom on mezzanine, unit 201Details
construct new bathroom on mezzanine, unit 201 | $8,000 | |
| Jul 31, 2007 | Never finaled issued Aug 2007, no final | 355 Berry St | revision to appl#200502085025 berm calculation to verify that 50% of bldg. primeter is surrounded by berm with elevation of 103.00. therefore ground level is an basement, provide signature of y.y. chew & barbara schulthes, install lowers at northeast corner of roof.Details
revision to appl#200502085025 berm calculation to verify that 50% of bldg. primeter is surrounded by berm with elevation of 103.00. therefore ground level is an basement, provide signature of y.y. chew & barbara schulthes, install lowers at northeast corner of roof. | $84,000 | |
| Oct 19, 2004 | Completed final sign-off Jul 2005 | 201 Mission St | 6/f- provide mechanical,electrical,plumbing,sprinkler,fire alarm under seperate permitDetails
6/f- provide mechanical,electrical,plumbing,sprinkler,fire alarm under seperate permit | $150,000 |