Stephen Howarter
- Listed as
- authorized agent-others, engineer
- Firm
- Edesignc Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Aug 2025
17 permits since 2000 (engineer on 16 permits, authorized agent-others on 1 permit): 14 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2025 | In progress issued Aug 2026 | 301 14th Av | Singular Builders, Robert L Brown Construction Inc. | new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave.Details
new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave. | $3,000,000 |
| Jun 4, 2025 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilatorDetails
revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator | $196,400 |
| Apr 30, 2025 | In progress issued Oct 2025 | 835 Turk St | D & H Construction | ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Details
ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. | $16,000,000 |
| Jun 25, 2024 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | 100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.Details
100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures. | $2,500,000 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |
| May 23, 2023 | Completed final sign-off Aug 2024 | 1527 Grant Av | Bbi - Con Inc | revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed.Details
revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed. | $30,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows...Details
mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows... | $700,000 |
| Oct 19, 2022 | Completed final sign-off Oct 2023 | 555 Larkin St | Zone 4 Power Inc | 1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signageDetails
1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signage | $925,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 3138 Kamille Ct | Nibbi Bros Assoc Inc. | mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposedDetails
mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposed | $375,000 |
| Apr 26, 2021 | Completed final sign-off Nov 2025 | 11 Innes Ct | Nibbi Bros Assoc Inc. | 100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement.Details
100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement. | $28,704,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2022 | 900 Jackson St | Amone Corp | rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.Details
rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing. | $1,500,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2023 | 1204 Mason St | Bbi - Con Inc | 100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use.Details
100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use. | $7,600,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use.Details
rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use. | $6,100,000 |
| Sep 29, 2017 | Completed final sign-off Sep 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/aDetails
revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/a | |
| Oct 1, 2015 | Completed final sign-off Dec 2018 | 3270 24th St | Edgewood Builders Inc | gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate perDetails
gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate per | $500,000 |
| Nov 6, 2013 | Completed final sign-off Feb 2020 | 580 Capp St | Cahill Contractors Inc | remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout.Details
remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout. | $200,000 |
| Jun 13, 2005 | Completed final sign-off Aug 2005 | 101 California St | provide mechanical & electrical.ref.appl#200506034176 approved t.i.Details
provide mechanical & electrical.ref.appl#200506034176 approved t.i. | $100,000 |