Christopher James Wood
- Listed as
- engineer
- Firm
- Luke And Associated
- Based in
- Hercules
- On San Francisco permits
- Sep 2017 to Apr 2025
7 permits since 2000 (engineer on 7 permits): 4 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2025 | In progress issued Mar 2026 | 4080 Mission St | Ck Water Systems And Landscape Developme | prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5.Details
prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5. | $785,000 |
| Apr 9, 2025 | In progress issued Feb 2026 | 1011 Garfield St | Art Garden Design Inc Dba Art Garden Des | prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entranceDetails
prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entrance | $290,000 |
| Jan 21, 2025 | In progress issued Jun 2025 | 1060 Key Av | Cbre Gws Licential Llc. | voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.Details
voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building. | $4,260,000 |
| Mar 1, 2023 | Completed final sign-off Jul 2023 | 135 Mississippi St | Lusardi Construction Co | revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lotDetails
revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lot | $12,500 |
| Oct 13, 2021 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordableDetails
full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable | $6,670,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...Details
priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping... | $2,000,000 |
| Sep 29, 2017 | Completed final sign-off Sep 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/aDetails
revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/a |