Peter Pfau
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Pfau Long Architecture
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Dec 2025
53 permits since 2000 (architect on 49 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 32 completed, 4 in progress, 13 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 26, 2025 | In progress issued Jul 2026 | 3153 17th St | Singular Builders | alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the twoDetails
alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two | $105 |
| Dec 9, 2025 | In progress issued Jul 2026 | 3175 17th St | Singular Builders | change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.Details
change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings. | $7,273,634 |
| May 29, 2025 | In progress issued Jun 2025 | 1060 Key Av | Cbre Gws Licential Llc. | interior demo work per ab-017Details
interior demo work per ab-017 | $5,000 |
| Jan 21, 2025 | In progress issued Jun 2025 | 1060 Key Av | Cbre Gws Licential Llc. | voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.Details
voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building. | $4,260,000 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 200 Rhode Island St | Skyline Construction | revision to bpa# 201910023333: to designate 12,333 gsf of office and 3035 gsf retail on first floor; designate 21,317 gsf to pdr on second floor.Details
revision to bpa# 201910023333: to designate 12,333 gsf of office and 3035 gsf retail on first floor; designate 21,317 gsf to pdr on second floor. | |
| May 3, 2023 | Expired or cancelled cancelled Jan 2026 | 680 Indiana St | T R E Construction And Management Inc | for leasing office provide 3/4" conduit w/ 3x #10 wire for mini slip unit. provide disconnect & whip fro condenser, (1) 2 20 amp circuit breaker in (e) panel. condenser unit to be mounted on exterior. indoor slit unit to be mounted inside leasing officeDetails
for leasing office provide 3/4" conduit w/ 3x #10 wire for mini slip unit. provide disconnect & whip fro condenser, (1) 2 20 amp circuit breaker in (e) panel. condenser unit to be mounted on exterior. indoor slit unit to be mounted inside leasing office | $33,000 |
| Dec 2, 2022 | Never finaled filed Dec 2022, never issued | 490 Brannan St | Dpr Construction A | demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389.Details
demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389. | $10,000 |
| Dec 1, 2022 | Completed final sign-off Mar 2025 | 200 Rhode Island St | Skyline Capital Builders Llc | revision to bpa#201910023333 fabricate a transom window to match adjacent, transom windows. steel tube crossmember to match the roll up door. new manual rolup door 11' x 14'-7" to match (e) frames @ other baysDetails
revision to bpa#201910023333 fabricate a transom window to match adjacent, transom windows. steel tube crossmember to match the roll up door. new manual rolup door 11' x 14'-7" to match (e) frames @ other bays | |
| Nov 22, 2022 | Never finaled filed Nov 2022, never issued | 490 Brannan St | Dpr Construction A | demolish a 1 story retail-bank bldg type 3-b.Details
demolish a 1 story retail-bank bldg type 3-b. | $150,000 |
| Jun 17, 2022 | Never finaled issued Jan 2023, no final | 200 Rhode Island St | Skyline Capital Builders Llc | new roof top patio built on top of the (e) 5-story bldg portion of the site. roof deck consist of pedestal pavers and planters with seating area. ref 201910023333 for c + s approvals and roof deck entitlements as a deffered submittal.Details
new roof top patio built on top of the (e) 5-story bldg portion of the site. roof deck consist of pedestal pavers and planters with seating area. ref 201910023333 for c + s approvals and roof deck entitlements as a deffered submittal. | $500,000 |
| Feb 9, 2022 | Never finaled issued Jun 2022, no final | 899 Howard St | Plant Construction Co, Lp | cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs.Details
cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs. | $3,000,000 |
| Feb 9, 2022 | Never finaled issued Aug 2022, no final | 899 Howard St | Plant Construction Co, Lp | addition of a 4,415 sf indoor office amnity space & additional unclosed rooftop amenity space approved per planning commission motion #2015-0091 to establish 70,881 sf of additional office use at 875-899 howardDetails
addition of a 4,415 sf indoor office amnity space & additional unclosed rooftop amenity space approved per planning commission motion #2015-0091 to establish 70,881 sf of additional office use at 875-899 howard | $3,000,000 |
| Feb 9, 2022 | Never finaled issued May 2022, no final | 899 Howard St | Plant Construction Co, Lp | exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofaDetails
exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofa | $9,000,000 |
| Nov 15, 2021 | Never finaled issued Jun 2023, no final | 899 Howard St | Plant Construction Co, Lp | all floors: ab-017 demo interior partitions, demolish all mep equipment back to trunklines or mpoe, patch and repair rated conditions as necessary, remove selected vertical circulation and retain all interior rated conditions, and comply with pid complaint # 2021182084.Details
all floors: ab-017 demo interior partitions, demolish all mep equipment back to trunklines or mpoe, patch and repair rated conditions as necessary, remove selected vertical circulation and retain all interior rated conditions, and comply with pid complaint # 2021182084. | $877,988 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 3250 18th St | place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities.Details
place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities. | $125,000 | |
| Nov 19, 2020 | Never finaled issued Jan 2021, no final | 885 Folsom St | Guzman - Suffolk Jv Llc | interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . .............................................................Details
interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . ............................................................. | $250,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 1 De Haro St | Hathaway Dinwiddie Co. | revision to pa# 201710121125 s3. revision is limited to include access hatch added to top of elevator shaft. added to provide access to a smoke detector mounted in the elevator shaft.Details
revision to pa# 201710121125 s3. revision is limited to include access hatch added to top of elevator shaft. added to provide access to a smoke detector mounted in the elevator shaft. | |
| Jun 4, 2020 | Never finaled filed Jun 2020, never issued | 2800 03rd St | to erect a 6 stories, type 1b, factory and low-hazard storage bldg.**comply w/ maher ord# 155-13, route to dph**Details
to erect a 6 stories, type 1b, factory and low-hazard storage bldg.**comply w/ maher ord# 155-13, route to dph** | $90,000,000 | |
| Oct 2, 2019 | Completed final sign-off Jun 2025 | 200 Rhode Island St | Skyline Construction | priority project: core & shell alteration & integration of (3) structures (on same lot) ada upgrades, preservation of 5-story building & removal of non-historic features. (n) entry lobby on rhode island street @ old loading dock. other facade abd rooftop changes compatible with historic character.Details
priority project: core & shell alteration & integration of (3) structures (on same lot) ada upgrades, preservation of 5-story building & removal of non-historic features. (n) entry lobby on rhode island street @ old loading dock. other facade abd rooftop changes compatible with historic character. | $5,000,000 |
| Sep 13, 2019 | Never finaled filed Sep 2019, never issued | 3250 18th St | renovation of existing school bldg, including new elevator.Details
renovation of existing school bldg, including new elevator. | $7,578,000 | |
| Sep 13, 2019 | Never finaled filed Sep 2019, never issued | 741 South Van Ness Av | seismic improvement to existing school. building & addition of elevator. outdoor to be developed.Details
seismic improvement to existing school. building & addition of elevator. outdoor to be developed. | $8,878,000 | |
| Jul 29, 2019 | Completed final sign-off Jun 2022 | 200 Rhode Island St | A M Rocca Inc. | interior soft demo per ab-017Details
interior soft demo per ab-017 | $15,000 |
| May 14, 2019 | Completed final sign-off May 2019 | 1960 Bryant St | Mizen Construction Inc | partial compliance with nov 201947091; demo or tenant unpermitted work. electrical demo under separate permitDetails
partial compliance with nov 201947091; demo or tenant unpermitted work. electrical demo under separate permit | $34,900 |
| May 1, 2019 | Completed final sign-off Mar 2021 | 260 Valencia St | de-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only.Details
de-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only. | $7,500 | |
| Mar 22, 2019 | Expired or cancelled withdrawn Jan 2020 | 1960 Bryant St | administrative permit to document land use as training & skill development center w/o any school accreditation; music/sound testing room/acoustic labratory; office per plans; light fabrication focused on wood working and assembling. no construction. comply w/ nov#20185361,201847593,20180018.Details
administrative permit to document land use as training & skill development center w/o any school accreditation; music/sound testing room/acoustic labratory; office per plans; light fabrication focused on wood working and assembling. no construction. comply w/ nov#20185361,201847593,20180018. | ||
| Oct 12, 2017 | Completed final sign-off Aug 2022 | 1 De Haro St | Hathaway Dinwiddie Co. | build sit in two lots, 003 &004. erect (n) 4-story commercial/office building. building is on (2) lots. need address change before issuance. 11/20/18: new building sit on two lots, 3800/003 & 3800/004. wfDetails
build sit in two lots, 003 &004. erect (n) 4-story commercial/office building. building is on (2) lots. need address change before issuance. 11/20/18: new building sit on two lots, 3800/003 & 3800/004. wf | $25,000,000 |
| Jun 12, 2017 | Completed final sign-off May 2018 | 1031 Balboa St | Ventana 76 | renovation of (e) 2 story (above garage) sfd including interior modifications, (e) window replacement, new back stair & deck. less than 50 cu yds of soil is being removed.Details
renovation of (e) 2 story (above garage) sfd including interior modifications, (e) window replacement, new back stair & deck. less than 50 cu yds of soil is being removed. | $400,000 |
| Feb 9, 2017 | Completed final sign-off Sep 2017 | 2558 Mission St | Plant Construction Co, Lp | scope of work limited to 2,034 sq ft of interior construction for common core elements for any potential ground floor use. work includes new construction of mechanical platform, ceiling & floor infills at (e) entry door to make accessible. no exterior work, mep, life safety under spearate permit.Details
scope of work limited to 2,034 sq ft of interior construction for common core elements for any potential ground floor use. work includes new construction of mechanical platform, ceiling & floor infills at (e) entry door to make accessible. no exterior work, mep, life safety under spearate permit. | $50,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2017 | 875 Howard St | Swinerton Builders | interior non-strucutral demolition of interior finishes in accordance with the sf building code ab-17. scope of work includes the proper removal of interior non-load bearing walls, doors, casework, and mepDetails
interior non-strucutral demolition of interior finishes in accordance with the sf building code ab-17. scope of work includes the proper removal of interior non-load bearing walls, doors, casework, and mep | $125,000 |
| Oct 7, 2016 | Completed final sign-off Aug 2017 | 680 Indiana St | Palisade Builders Inc | revision to 201312244992 s3: relocate fdc along indiana st. this permit removes fdc at strs plaza formerly a public right of way per street improvement permit no 14ie-0978Details
revision to 201312244992 s3: relocate fdc along indiana st. this permit removes fdc at strs plaza formerly a public right of way per street improvement permit no 14ie-0978 | |
| Aug 16, 2016 | Completed final sign-off Oct 2017 | 680 Indiana St | Palisade Builders Inc | revision to pa 2013-1224-4992 (s3) clarification of non-combustile assemblies at gas appliances on community roof deck. includes roof deck layout identifying extent of non-combustible pads over roofing assembly, details for roof and counter top framing at gas and bbq and fireplaces. drawing set alsoDetails
revision to pa 2013-1224-4992 (s3) clarification of non-combustile assemblies at gas appliances on community roof deck. includes roof deck layout identifying extent of non-combustible pads over roofing assembly, details for roof and counter top framing at gas and bbq and fireplaces. drawing set also | |
| Jul 5, 2016 | Completed final sign-off Aug 2017 | 680 Indiana St | Palisade Builders Inc | revision to ref pa 2013 1224 4992 s3. change flr and roof assemblies of the bay windows and juliet balconies at 680 indiana st. to non-ventilated assemblies, closed cell spray foam that will be used to fill any air gaps in the floors and roofs, including sleeper space. maher ord 155-13/n.a.Details
revision to ref pa 2013 1224 4992 s3. change flr and roof assemblies of the bay windows and juliet balconies at 680 indiana st. to non-ventilated assemblies, closed cell spray foam that will be used to fill any air gaps in the floors and roofs, including sleeper space. maher ord 155-13/n.a. | |
| Jun 16, 2016 | Expired or cancelled cancelled Nov 2022 | 899 Howard St | interior addition of (2)(n) elevators, restrooms & janitor's closet on the 2nd & 3rd fl, removal of an escalator from 1st thru 3rd fl, infill of the floor opening.Details
interior addition of (2)(n) elevators, restrooms & janitor's closet on the 2nd & 3rd fl, removal of an escalator from 1st thru 3rd fl, infill of the floor opening. | $1,100,000 | |
| Aug 21, 2015 | Completed final sign-off Feb 2016 | 270 Brannan St | Charles Pankow Builders Ltd | revision to arch/mep/landscaping addendum pa# 201312174402 s-3, changes to exterior wall detali assemblies and exterior waterproofing details. n/a ordinance #155-13Details
revision to arch/mep/landscaping addendum pa# 201312174402 s-3, changes to exterior wall detali assemblies and exterior waterproofing details. n/a ordinance #155-13 | |
| May 21, 2015 | Never finaled issued Aug 2015, no final | 100 Hooper St | remove asphalt topping for soils testing. removal of existing shipping storage containers.Details
remove asphalt topping for soils testing. removal of existing shipping storage containers. | $50,000 | |
| Jan 6, 2015 | Never finaled issued Sep 2015, no final | 680 Indiana St | Palisade Builders Inc | revised site permit for pa# 201312244992-s. increase number of dwellint units to 55. ** maher: compliance with ordinance no# 155-13 not required **Details
revised site permit for pa# 201312244992-s. increase number of dwellint units to 55. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Oct 20, 2014 | Completed final sign-off Jul 2020 | 100 Hooper St | Dpr Construction | erect a four story office and retail commercial building. compliance w/ ordinance 155-13 is not required.Details
erect a four story office and retail commercial building. compliance w/ ordinance 155-13 is not required. | $52,500,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2018 | 199 Museum Wy | primarily interior renovation. construct geology exhibit. new zoology exhibit. renovate live animal exhibit,science lab,multipurpose room,3 bathrooms,lobby,concession & office area. install elevator. accessibility upgrades. new sprinkler at bsmt level.Details
primarily interior renovation. construct geology exhibit. new zoology exhibit. renovate live animal exhibit,science lab,multipurpose room,3 bathrooms,lobby,concession & office area. install elevator. accessibility upgrades. new sprinkler at bsmt level. | $3,500,000 | |
| Dec 24, 2013 | Completed final sign-off May 2019 | 680 Indiana St | Palisade Builders Inc, Leaf Communications Inc | to erect 5 stories of 51 dwelling units with assembly/parkingDetails
to erect 5 stories of 51 dwelling units with assembly/parking | $12,000,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2017 | 270 Brannan St | Charles Pankow Builders Ltd | to erect 7 stories, 1 basement, office, parking, assembly building.Details
to erect 7 stories, 1 basement, office, parking, assembly building. | $32,000,000 |
| Jun 6, 2013 | Completed final sign-off Dec 2013 | 654 Mission St | ground floor minor tenant improvement - demo of non-structural partitions, addition of new partitions, doors side lights, adjustment to lighting & mechanical.Details
ground floor minor tenant improvement - demo of non-structural partitions, addition of new partitions, doors side lights, adjustment to lighting & mechanical. | $64,756 | |
| Jul 16, 2012 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separateDetails
core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate | $2,500,000 |
| May 4, 2012 | Completed final sign-off Sep 2013 | 275 Brannan St | structural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017.Details
structural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017. | $525,000 | |
| Mar 16, 2012 | Completed final sign-off Apr 2013 | 275 Brannan St | Bluewater Environmentl Svc Inc | abatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017Details
abatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017 | $40,000 |
| Apr 13, 2010 | Completed final sign-off Nov 2011 | 45 Raycliff Tr | Ventana 76 | structural upgrade of foundation for single family home.Details
structural upgrade of foundation for single family home. | $74,000 |
| Jun 11, 2008 | Completed final sign-off Oct 2008 | 2750 Jackson St | interior non-structural renovations to areas on 1st, 2nd and 3rd floorsDetails
interior non-structural renovations to areas on 1st, 2nd and 3rd floors | $390,000 | |
| Jun 10, 2008 | Completed final sign-off Oct 2008 | 2750 Jackson St | installation of structural supports for safety barrier netting on (2) rooftop playfields.Details
installation of structural supports for safety barrier netting on (2) rooftop playfields. | $104,550 | |
| Jun 20, 2007 | Completed final sign-off Aug 2008 | 250 Valencia St | excavation in vacant bldg for new work to be approved under app #2006/10/27/6270s no excavation greater than 5 feet.Details
excavation in vacant bldg for new work to be approved under app #2006/10/27/6270s no excavation greater than 5 feet. | $76,000 | |
| Apr 11, 2007 | Completed final sign-off Aug 2008 | 250 Valencia St | interior non-structural demolition of mechanical & electrical system and non bearing partitions. asbestos abatement. removal of 1/f flooring & rat-proofing on partial floor for soil mitigation work.Details
interior non-structural demolition of mechanical & electrical system and non bearing partitions. asbestos abatement. removal of 1/f flooring & rat-proofing on partial floor for soil mitigation work. | $135,000 | |
| Oct 27, 2006 | Completed final sign-off Nov 2009 | 250 Valencia St | adaptive remodel of extg levi strauss manufacturing plant. change of use to elementry school. site permitDetails
adaptive remodel of extg levi strauss manufacturing plant. change of use to elementry school. site permit | $11,500,000 | |
| Nov 4, 2005 | Completed final sign-off May 2007 | 131 Cherry St | Robison Nieri White Construction | structural design changes. change in engineer of record.existing pa# 2003/09/30/6144.changes in roof & floor framings.Details
structural design changes. change in engineer of record.existing pa# 2003/09/30/6144.changes in roof & floor framings. | |
| May 11, 2005 | Completed final sign-off May 2006 | 2706 Union St | interior remodel od comdominium : includes (e) kitchen, addition of new bathroom & remodel to (e)Details
interior remodel od comdominium : includes (e) kitchen, addition of new bathroom & remodel to (e) | $50,000 | |
| Oct 16, 2001 | Expired or cancelled expired Jul 2003 | 2830 20th St | revise to appln #200110050081 substitute plans in entirety to clarify prop line prot wrk scope inDetails
revise to appln #200110050081 substitute plans in entirety to clarify prop line prot wrk scope in | $500 |