Block 3789, lot 009
275 Brannan St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 3
- Rooms
- 6 bathrooms
- Building
- 52,182 sq ft
- Lot
- 17,558 sq ft
- Zoning
- SSO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
69 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2025 | Completed final sign-off Feb 2025 | 275 Brannan St | Gigabyte Graphics Inc. Dba Fastsigns | install 2 emergency evacuation sign in an office on the 2nd floorDetails
install 2 emergency evacuation sign in an office on the 2nd floor | $800 |
| Jan 15, 2025 | Completed final sign-off Feb 2025 | 275 Brannan St | Bilcor Inc | install 2 wall mount horn strobes, install 3 wall mount strobes, install 7 ceiling mount horn strobes, relocate 6 wall mount horn strobes. arch ti 2024-0621-5032Details
install 2 wall mount horn strobes, install 3 wall mount strobes, install 7 ceiling mount horn strobes, relocate 6 wall mount horn strobes. arch ti 2024-0621-5032 | $7,992 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 275 Brannan St | Bilcor Inc | deprogram & remove 2 smoke detectors, 2 control relay. revision to 202409301954. arch ref t.i. 202406215032 (275 brannan), arch ref t.i. 20240725764 ( 625 2nd st). complete seperate a fa system fa ref 202202017074. share plans w/202501077849 ((625 2nd st)Details
deprogram & remove 2 smoke detectors, 2 control relay. revision to 202409301954. arch ref t.i. 202406215032 (275 brannan), arch ref t.i. 20240725764 ( 625 2nd st). complete seperate a fa system fa ref 202202017074. share plans w/202501077849 ((625 2nd st) | $2,664 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 275 Brannan St | Bilcor Inc | deprogram & remove (2) smoke detector, (2) control relay. ref arch 202406215032 (275 brannan st) & 202407257264 (625 2nd st). complete seperate two fire alarm systems. one system per each building address with no connection between them fa ref : 2022-0201-7074Details
deprogram & remove (2) smoke detector, (2) control relay. ref arch 202406215032 (275 brannan st) & 202407257264 (625 2nd st). complete seperate two fire alarm systems. one system per each building address with no connection between them fa ref : 2022-0201-7074 | $2,664 |
| Sep 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc.Details
2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc. | |
| Sep 16, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2nd fl ref 202406215032. electrical and mech for permitDetails
2nd fl ref 202406215032. electrical and mech for permit | $300,000 |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 275 Brannan St | Golden Gate Fire Protection Inc | fire sprinkler: relocate 18 pendents & 11 concealed pendents & delete 3 uprights and the associated piping on 2nd flDetails
fire sprinkler: relocate 18 pendents & 11 concealed pendents & delete 3 uprights and the associated piping on 2nd fl | $7,250 |
| Jun 21, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support ofDetails
2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support of | $1,386,230 |
| Jun 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044Details
2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044 | $59,844 |
| Feb 7, 2022 | Completed final sign-off Mar 2022 | 275 Brannan St | Golden Gate Fire Protection Inc | 2/f: fire sprinkler as built to pa# 202112234955, add 4 concealed sprinklers. t.i ref pa# 202111020836Details
2/f: fire sprinkler as built to pa# 202112234955, add 4 concealed sprinklers. t.i ref pa# 202111020836 | $1,000 |
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 275 Brannan St | Sotello Graphic Associates | create drawings - print and laminate 2 evacuation signs.Details
create drawings - print and laminate 2 evacuation signs. | $2,100 |
| Feb 1, 2022 | Completed final sign-off Feb 2022 | 275 Brannan St | Bilcor Inc | 2/f: fire life safety: install (3) wall mount horn strobes, (1) ceiling mount horn strobe and (3) ceiling mount strobes. relocate (1) wall mount horn strobe. arch ref pa# 202110200836Details
2/f: fire life safety: install (3) wall mount horn strobes, (1) ceiling mount horn strobe and (3) ceiling mount strobes. relocate (1) wall mount horn strobe. arch ref pa# 202110200836 | $4,620 |
| Dec 23, 2021 | Completed final sign-off Feb 2022 | 275 Brannan St | Golden Gate Fire Protection Inc | 2/f: fire sprinklers: relocate 5 pendent sprinklers and delete 4 pendents. ref ti permit 202110200836.Details
2/f: fire sprinklers: relocate 5 pendent sprinklers and delete 4 pendents. ref ti permit 202110200836. | $1,125 |
| Dec 23, 2021 | Completed final sign-off Apr 2022 | 275 Brannan St | Sc Builders, Inc | mep for pa #202110200836. (n) lighting on 2nd fl & hvac upgrade to accomodate the (n) space. (n) working plumbing & adding a bevi drinking machineDetails
mep for pa #202110200836. (n) lighting on 2nd fl & hvac upgrade to accomodate the (n) space. (n) working plumbing & adding a bevi drinking machine | $150,000 |
| Dec 23, 2021 | Completed final sign-off Apr 2022 | 275 Brannan St | Sc Builders, Inc | structural work for pa #202110200836 to depict the building of the room cluster 234-238 phone room podDetails
structural work for pa #202110200836 to depict the building of the room cluster 234-238 phone room pod | $5,000 |
| Oct 20, 2021 | Completed final sign-off Apr 2022 | 275 Brannan St | Sc Builders, Inc | 2nd fl - partial floor ti/single tenant: revised focus room, modification to (e) employee cafeteria w/limited prep. revised furniture layout. paint & carpet refresh and lighting upgrade in office areaDetails
2nd fl - partial floor ti/single tenant: revised focus room, modification to (e) employee cafeteria w/limited prep. revised furniture layout. paint & carpet refresh and lighting upgrade in office area | $276,500 |
| Feb 4, 2021 | Completed final sign-off Mar 2022 | 275 Brannan St | Bilcor Inc | fire life safety: as-built to reference fire alarm permit # 2020-722-0718; install (3) additional control relays for turnstile control.Details
fire life safety: as-built to reference fire alarm permit # 2020-722-0718; install (3) additional control relays for turnstile control. | $1,980 |
| Dec 3, 2020 | Completed final sign-off Jul 2021 | 275 Brannan St | revision to permit 2020-0612-8637. relocate 28, add 31, remove 22 sprinklers on the 1st floor. hydraulic calculation included per reviewers comments.Details
revision to permit 2020-0612-8637. relocate 28, add 31, remove 22 sprinklers on the 1st floor. hydraulic calculation included per reviewers comments. | $22,000 | |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 275 Brannan St | Sotello Graphic Associates | make original drawings for 5 evacuation maps. print, laminate & mount on boards. deliver to client, sc builders, to self install.Details
make original drawings for 5 evacuation maps. print, laminate & mount on boards. deliver to client, sc builders, to self install. | $2,400 |
| Sep 23, 2020 | Completed final sign-off Feb 2022 | 275 Brannan St | Sc Builders, Inc | 1st flr revision to pa 201912179709. structural for platform. structural for the platform interior cold formed frame + mep for project.Details
1st flr revision to pa 201912179709. structural for platform. structural for the platform interior cold formed frame + mep for project. | $575,000 |
| Jul 22, 2020 | Completed final sign-off Feb 2021 | 275 Brannan St | Bilcor Inc | fire life safety: install 9 wall mount strobes, 11 wall mount horn strobes, 3 duct detectors, 5 control relays, 1 notification power supply. relocate 1 existing wall horn strobe. ref it #201912179709Details
fire life safety: install 9 wall mount strobes, 11 wall mount horn strobes, 3 duct detectors, 5 control relays, 1 notification power supply. relocate 1 existing wall horn strobe. ref it #201912179709 | $19,140 |
| Jun 12, 2020 | Completed final sign-off Feb 2021 | 275 Brannan St | 1/f: fire sprinkler t.i. relocate 28, add 31 and remove 22 sprinklers on the 1/f ref t.i. 201912179709. maher n/a.Details
1/f: fire sprinkler t.i. relocate 28, add 31 and remove 22 sprinklers on the 1/f ref t.i. 201912179709. maher n/a. | $22,000 | |
| Feb 10, 2020 | Completed final sign-off Feb 2021 | 275 Brannan St | structural upgrades for building pa#2019-1217-9709Details
structural upgrades for building pa#2019-1217-9709 | $200,000 | |
| Dec 17, 2019 | Completed final sign-off Feb 2021 | 275 Brannan St | Sc Builders, Inc | demo only 1st of non-structural partitions, doors, millwork & glazing. per ab-017. maher naDetails
demo only 1st of non-structural partitions, doors, millwork & glazing. per ab-017. maher na | $200,000 |
| Dec 17, 2019 | Completed final sign-off Feb 2022 | 275 Brannan St | Sc Builders, Inc | 1st & 2nd flr ti: new non-structural partitions, millwork, ceilings. mep & life safety under separate permit. interior alterations only. no change in use. no exterior work. maher naDetails
1st & 2nd flr ti: new non-structural partitions, millwork, ceilings. mep & life safety under separate permit. interior alterations only. no change in use. no exterior work. maher na | $570,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 275 Brannan St | street space | ||
| May 22, 2019 | Completed final sign-off May 2019 | 275 Brannan St | Bilcor Inc | 2nd fl fire alarm ti: install 1 control relay module.Details
2nd fl fire alarm ti: install 1 control relay module. | $660 |
| Jan 9, 2018 | Completed final sign-off Jan 2018 | 275 Brannan St | Golden Gate Fire Protection Inc | fire sprinklers as built of 2017-0718-2117 show pipe located on outside of structure. change detail to 2nd floor from 3rd floor. ref pa 2017-0328-2517; n/a maherDetails
fire sprinklers as built of 2017-0718-2117 show pipe located on outside of structure. change detail to 2nd floor from 3rd floor. ref pa 2017-0328-2517; n/a maher | $1,000 |
| Jul 18, 2017 | Never finaled issued Dec 2017, no final | 275 Brannan St | Golden Gate Fire Protection Inc | 2nd fl: fire sprinklers: add 12 pendant on the 2nd fl at communication area. add 4 upright sprinklers. ref. ti #201703282517. maher naDetails
2nd fl: fire sprinklers: add 12 pendant on the 2nd fl at communication area. add 4 upright sprinklers. ref. ti #201703282517. maher na | $5,200 |
| Jul 6, 2017 | Completed final sign-off Jul 2017 | 275 Brannan St | Bilcor Inc | mezz: f/a t.i. - install 2 smoke detectors with bases, install 2 control relay mods, 1 wall mount strobe. ref t.i. pa#201703282517Details
mezz: f/a t.i. - install 2 smoke detectors with bases, install 2 control relay mods, 1 wall mount strobe. ref t.i. pa#201703282517 | $2,500 |
| Mar 28, 2017 | Completed final sign-off Feb 2018 | 275 Brannan St | Sc Builders, Inc | 2nd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref 625 2nd st pa# 201703282517Details
2nd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref 625 2nd st pa# 201703282517 | $240,000 |
| May 25, 2016 | Completed final sign-off Dec 2016 | 275 Brannan St | Sc Builders, Inc | 1st, 2nd, 3rd ref 201603232883 mep for projectDetails
1st, 2nd, 3rd ref 201603232883 mep for project | $150,000 |
| May 13, 2016 | Completed final sign-off Jul 2016 | 275 Brannan St | Anderson, Rowe & Buckley, Inc. | fire sprinkler for t.i.: relocated 3 heads, added 5 heads, plugged 16 heads, total 8 heads. ref arch pa #201603232883.Details
fire sprinkler for t.i.: relocated 3 heads, added 5 heads, plugged 16 heads, total 8 heads. ref arch pa #201603232883. | $4,500 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 275 Brannan St | Sc Builders, Inc | 1st,2nd,3rd fl: modificiation of e tenant office space to include selective demo, new construction of non load bearing partition. meps, life safety, sprinkler permits on sep permits. n/a ordinance #155-13Details
1st,2nd,3rd fl: modificiation of e tenant office space to include selective demo, new construction of non load bearing partition. meps, life safety, sprinkler permits on sep permits. n/a ordinance #155-13 | $1,000,000 |
| Jul 24, 2015 | Expired or cancelled cancelled Jan 2026 | 275 Brannan St | Truebeck Construction | 3rd floor - demolitoin of (e) stadium seating incl. associated power, demolition of (e) sliding non-struct. partitions. relocate (e) light fixture, install 6 new fixtures, relocate power/data outlets & install new power/data outlets. no structural, no plumbing, no sidewalk use. n/a maher ordinanceDetails
3rd floor - demolitoin of (e) stadium seating incl. associated power, demolition of (e) sliding non-struct. partitions. relocate (e) light fixture, install 6 new fixtures, relocate power/data outlets & install new power/data outlets. no structural, no plumbing, no sidewalk use. n/a maher ordinance | $45,000 |
| Aug 5, 2013 | Completed final sign-off Aug 2013 | 275 Brannan St | Firemaster | install ul-300. ref app#201302130103Details
install ul-300. ref app#201302130103 | $1,500 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 275 Brannan St | Truebeck Construction | installation of card readers. ref arch pa #2013.0213.0103.Details
installation of card readers. ref arch pa #2013.0213.0103. | $3,000 |
| Jul 10, 2013 | Expired or cancelled withdrawn Jul 2013 | 275 Brannan St | install security card readers & perform life safety interface to contractor rpovided hardware at designated egress locationsDetails
install security card readers & perform life safety interface to contractor rpovided hardware at designated egress locations | ||
| Jun 26, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Pj Murphy & Associates Inc Dba Gnu Group | on floors 1, 2, & 3 fabricate and install 8 evacuation maps.Details
on floors 1, 2, & 3 fabricate and install 8 evacuation maps. | $3,000 |
| Jun 17, 2013 | Never finaled issued Jun 2013, no final | 275 Brannan St | street space | ||
| May 31, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | installation of container partitions in existing office area. reference pa# 201302130103. ship ladders are not permitted.Details
installation of container partitions in existing office area. reference pa# 201302130103. ship ladders are not permitted. | $24,000 |
| May 29, 2013 | Completed final sign-off Jul 2013 | 275 Brannan St | Anderson, Rowe & Buckley, Inc. | fire sprinklers existing t.i. 201302130103, 116 added sprinklersDetails
fire sprinklers existing t.i. 201302130103, 116 added sprinklers | $58,000 |
| May 14, 2013 | Completed final sign-off Jul 2016 | 275 Brannan St | Pj Murphy & Associates Inc Dba Gnu Group | erect electric, single-faced, wall, direct, new signDetails
erect electric, single-faced, wall, direct, new sign | $12,500 |
| May 2, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | revision to app#201302130103. revise location of 2nd floor opening and structural columns. addition of non structural partitions in open office area. relocate columns on 1st floor.Details
revision to app#201302130103. revise location of 2nd floor opening and structural columns. addition of non structural partitions in open office area. relocate columns on 1st floor. | $10,000 |
| Apr 22, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Convergint Technologies Lp | fire alarm system - 1 remote annunciator , 2 relays, 3 smoke detectors, 1 duct detector, 1 input module, 2 power supply, 55 notification devices. ref pa #2012.07.16.4925 & 2013.02.13.0103 (under review).Details
fire alarm system - 1 remote annunciator , 2 relays, 3 smoke detectors, 1 duct detector, 1 input module, 2 power supply, 55 notification devices. ref pa #2012.07.16.4925 & 2013.02.13.0103 (under review). | $17,000 |
| Mar 5, 2013 | Never finaled issued Mar 2013, no final | 275 Brannan St | street space permit | ||
| Feb 13, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | tenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only.Details
tenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only. | $1,995,000 |
| Oct 31, 2012 | Never finaled issued Nov 2012, no final | 275 Brannan St | street space permit (scaffolding) | ||
| Oct 23, 2012 | Completed final sign-off Aug 2013 | 275 Brannan St | fire alarm system upgrade. 1 facp, 19 horn/strobes, 2 heat det., 14 smoke det., 1 pull station, 3 duct det. 14 area smoke det. ti build-out to follow. core and shell coverage only.Details
fire alarm system upgrade. 1 facp, 19 horn/strobes, 2 heat det., 14 smoke det., 1 pull station, 3 duct det. 14 area smoke det. ti build-out to follow. core and shell coverage only. | $10,000 | |
| Oct 5, 2012 | Completed final sign-off May 2013 | 275 Brannan St | Allied Fire Protection | existing building with new auto sprinkler system.Details
existing building with new auto sprinkler system. | $253,500 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 275 Brannan St | street space permit | ||
| Jul 16, 2012 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separateDetails
core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate | $2,500,000 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 275 Brannan St | street space | ||
| May 4, 2012 | Completed final sign-off Sep 2013 | 275 Brannan St | structural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017.Details
structural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017. | $525,000 | |
| Apr 30, 2012 | Completed final sign-off Apr 2013 | 275 Brannan St | Bluewater Environmentl Svc Inc | interior demolition of wood columns, diaphram bracing and steel angle collectors to remain core and shell work only. tenant improvement under separate permitDetails
interior demolition of wood columns, diaphram bracing and steel angle collectors to remain core and shell work only. tenant improvement under separate permit | $25,000 |
| Mar 16, 2012 | Completed final sign-off Apr 2013 | 275 Brannan St | Bluewater Environmentl Svc Inc | abatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017Details
abatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017 | $40,000 |
| Jun 2, 2004 | Completed final sign-off Oct 2004 | 275 Brannan St | Bay Alarm Company | provide fire sprinkler monitoring for the bldg. revisions core devices addedDetails
provide fire sprinkler monitoring for the bldg. revisions core devices added | $9,960 |
| Jun 10, 2003 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Behnam And Associates | rev to 200302056768; (n)rebar detailing/spacing for shotcrete wall;demo of (e)int. wall and (n)Details
rev to 200302056768; (n)rebar detailing/spacing for shotcrete wall;demo of (e)int. wall and (n) | $1,000 |
| Feb 5, 2003 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Behnam And Associates | revision to 200105259998 showing new location for water heater room and panel rooms and revised woodDetails
revision to 200105259998 showing new location for water heater room and panel rooms and revised wood | |
| Feb 5, 2003 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Behnam And Associates | alter e room to pge vault room | $30,000 |
| Sep 27, 2002 | Expired or cancelled expired Apr 2005 | 275 Brannan St | Jupiter Enterprises Inc | mechanical ventilation for pg & e, panel room, sub-transformer rmDetails
mechanical ventilation for pg & e, panel room, sub-transformer rm | $10,000 |
| Sep 19, 2002 | Never finaled issued Sep 2002, no final | 275 Brannan St | streetspace | ||
| Sep 17, 2002 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Behnam And Associates | new electrical panel/transformer,power system, scope includes construction new coridors& all electriDetails
new electrical panel/transformer,power system, scope includes construction new coridors& all electri | $60,000 |
| Aug 9, 2002 | Completed final sign-off Oct 2004 | 275 Brannan St | Bay Alarm Company | provide sprinkler monitoring and elevator recallDetails
provide sprinkler monitoring and elevator recall | $9,960 |
| Aug 1, 2002 | Completed final sign-off Feb 2003 | 275 Brannan St | Behnam And Associates | replace extg windows at 2nd and 3rd floor/new mechanical ventilation in lier of natural ventilationDetails
replace extg windows at 2nd and 3rd floor/new mechanical ventilation in lier of natural ventilation | $30,000 |
| Jun 10, 2002 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Jupiter Enterprises Inc | repair & remodel bath room area, stairs area & lobby area, fire sprinkler work only on all 3 fls.Details
repair & remodel bath room area, stairs area & lobby area, fire sprinkler work only on all 3 fls. | $10,000 |
| Mar 22, 2002 | Expired or cancelled expired Mar 2005 | 275 Brannan St | Behnam And Associates | rev to 200105259998 new detail for steel beam connection to floorsDetails
rev to 200105259998 new detail for steel beam connection to floors | |
| Feb 6, 2002 | Never finaled issued Mar 2002, no final | 275 Brannan St | Behnam And Associates | ada work for seismic work to #200105259998 new restrms,elevator,stairsDetails
ada work for seismic work to #200105259998 new restrms,elevator,stairs | $200,000 |
| May 25, 2001 | Completed final sign-off Oct 2004 | 275 Brannan St | provide seismic rtrofit sect 104fDetails
provide seismic rtrofit sect 104f | $91,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sc Builders, Inc (13), Bilcor Inc (8), Behnam And Associates (7), Truebeck Construction (6), Golden Gate Fire Protection Inc (5), Anderson, Rowe & Buckley, Inc. (2), Bay Alarm Company (2), Bluewater Environmentl Svc Inc (2), Jupiter Enterprises Inc (2), Pj Murphy & Associates Inc Dba Gnu Group (2), Sotello Graphic Associates (2), Allied Fire Protection, Convergint Technologies Lp, Firemaster, Gigabyte Graphics Inc. Dba Fastsigns
- Architects
- Daniel Epperson (3), Peter Pfau (3), Victoria Salgado (3), Donnie Lam, Douglas Mehl, Gene Pena
- Engineers
- Rudolfo P Bustos Iii (2), Elisabeth M Allen, Stephen Shafeer, Thomas A Castle
- Designers
- Bilcor Inc
- Pmt consultant/expediters
- Prasad More
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.