Sc Builders, Inc
- Based in
- Sunnyvale
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 84 permits filed
415 permits since 2000: 328 completed, 42 in progress, 35 never finaled, 10 expired or cancelled.
Of the 35 never-finaled permits, 1 is 3 to 5 years old, 23 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 415.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 315 Montgomery St | 9th and 10th floor:submittal of differed mechanical, electrical and structural drawings related to building pa #202607295731 (anchrage of phone boothDetails
9th and 10th floor:submittal of differed mechanical, electrical and structural drawings related to building pa #202607295731 (anchrage of phone booth | $60,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 555 California St | 17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishesDetails
17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes | $1,068,636 |
| Aug 31, 2026 | In progress issued Sep 2026 | 2 Harrison St | 5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes.Details
5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes. | $470,000 |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | 4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers.Details
4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers. | $40,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 555 California St | 45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout.Details
45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout. | $581,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 181 Fremont St | 9/12/fl- ref 202606113030 and 202604300372- deferred submittal for seismic anchorage for fan powered boxDetails
9/12/fl- ref 202606113030 and 202604300372- deferred submittal for seismic anchorage for fan powered box | |
| Aug 12, 2026 | In progress issued Aug 2026 | 555 California St | 17th fl tenant improvment for new demising wall to create 2 suites.Details
17th fl tenant improvment for new demising wall to create 2 suites. | $810,960 |
| Aug 11, 2026 | In progress issued Aug 2026 | 555 California St | revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)Details
revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing) | |
| Aug 6, 2026 | In progress issued Aug 2026 | 345 Spear St | revision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms.Details
revision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms. | $120,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | 4/5/fl- ref ti 202606294074 deferred mepsDetails
4/5/fl- ref ti 202606294074 deferred meps | $1,600,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered)Details
ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered) | $139,000 |
| Jul 31, 2026 | In progress issued Sep 2026 | 181 Fremont St | 30th fl - revision to pa 202604239936, removal of scope from conference room/yoga room which includes lighting & mechanicalDetails
30th fl - revision to pa 202604239936, removal of scope from conference room/yoga room which includes lighting & mechanical | |
| Jul 29, 2026 | In progress issued Aug 2026 | 315 Montgomery St | 9th & 10th/f t.i. demo walls, ceilings, light fixture, eletrical, plumbing, minor mech, doors, casework, & finiesh. addition of new walls, ceilings, light fixture, eletrical, plumbing, minor mech, doors, casework, & finieshDetails
9th & 10th/f t.i. demo walls, ceilings, light fixture, eletrical, plumbing, minor mech, doors, casework, & finiesh. addition of new walls, ceilings, light fixture, eletrical, plumbing, minor mech, doors, casework, & finiesh | $1,200,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 181 Fremont St | installation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control.Details
installation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control. | $50,000 |
| Jul 7, 2026 | In progress issued Sep 2026 | 181 Fremont St | 25/fl- ti includes soft demo to create more seating, flex space and showers. (n) non strutrual partitions and doors, adjustment of millwork and addition of light fixtures and outletsDetails
25/fl- ti includes soft demo to create more seating, flex space and showers. (n) non strutrual partitions and doors, adjustment of millwork and addition of light fixtures and outlets | $750,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 121 Spear St | 4/fl-deferred seismic anchoring for workout equipment for 202512192304Details
4/fl-deferred seismic anchoring for workout equipment for 202512192304 | |
| Jul 2, 2026 | In progress issued Jul 2026 | 345 Spear St | permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scopeDetails
permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scope | $20,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 555 California St | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl openingDetails
revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 181 Fremont St | ref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11Details
ref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11 | $10,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 2 Henry Adams St | 4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdrDetails
4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdr | $454,400 |
| Jun 22, 2026 | In progress issued Jul 2026 | 121 Spear St | 4th flr mep deferred pa#: 202512192304.Details
4th flr mep deferred pa#: 202512192304. | $266,400 |
| Jun 11, 2026 | In progress issued Jul 2026 | 181 Fremont St | 9/fl- demo of select light fixtures, non strutrucal walls. adding (n) non structural partitions and doors, new equipment, overhead, mechanical and electrical, new pantry cabinets, equipment and millwork.Details
9/fl- demo of select light fixtures, non strutrucal walls. adding (n) non structural partitions and doors, new equipment, overhead, mechanical and electrical, new pantry cabinets, equipment and millwork. | $203,611 |
| May 28, 2026 | In progress issued Aug 2026 | 50 California St | unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.Details
unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights. | $1,308,872 |
| May 22, 2026 | In progress issued Sep 2026 | 181 Fremont St | demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31Details
demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31 | $1,300,000 |
| May 22, 2026 | In progress issued Jun 2026 | 555 California St | 19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes.Details
19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes. | $1,485,000 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 400 Howard St | 4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mepDetails
4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mep | $7,050 |
| May 21, 2026 | In progress filed May 2026, not yet issued | 345 Spear St | level 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain.Details
level 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain. | $90,000 |
| May 14, 2026 | In progress issued May 2026 | 345 Spear St | level 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms.Details
level 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms. | $150,000 |
| May 6, 2026 | In progress issued Jun 2026 | 2 Henry Adams St | 4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5.Details
4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5. | $30,000 |
| Apr 30, 2026 | In progress issued May 2026 | 181 Fremont St | parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishesDetails
parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishes | $3,000,000 |
| Apr 23, 2026 | In progress issued May 2026 | 181 Fremont St | 30/f: addition of power, modifications to (e) millwork in (e) pantry. conversion of storage room into conference room.Details
30/f: addition of power, modifications to (e) millwork in (e) pantry. conversion of storage room into conference room. | $250,000 |
| Apr 15, 2026 | In progress issued May 2026 | 181 Fremont St | level 11 - interior only - scope includes demolition of select light fixtures, non structural walls, new non structural partitons and doors, new equipment for pantry, mechanical & electrical work, new millwork and plumbing fixtures.Details
level 11 - interior only - scope includes demolition of select light fixtures, non structural walls, new non structural partitons and doors, new equipment for pantry, mechanical & electrical work, new millwork and plumbing fixtures. | $500,000 |
| Apr 8, 2026 | In progress issued May 2026 | 555 California St | 11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughoutDetails
11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout | $990,000 |
| Apr 6, 2026 | Completed final sign-off Aug 2026 | 555 California St | 17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.Details
17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes. | $947,000 |
| Apr 1, 2026 | In progress issued May 2026 | 181 Fremont St | 10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equipment, fixtures and overhead mechanical and electricalDetails
10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equipment, fixtures and overhead mechanical and electrical | $450,000 |
| Mar 24, 2026 | In progress issued Mar 2026 | 181 Fremont St | to comply with disables access - per ab-056. in order to demonstrate compliance with diabled access requirments for commericial office building access at 181 fremont st.Details
to comply with disables access - per ab-056. in order to demonstrate compliance with diabled access requirments for commericial office building access at 181 fremont st. | |
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 685 Market St | 4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantryDetails
4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantry | $2,500,000 |
| Jan 16, 2026 | Completed final sign-off Jul 2026 | 315 Montgomery St | level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes.Details
level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes. | $958,720 |
| Jan 6, 2026 | Completed final sign-off Apr 2026 | 685 Market St | 8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213Details
8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213 | $120,000 |
| Dec 19, 2025 | In progress issued May 2026 | 121 Spear St | 4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with an expanded fitness area. deferred submittals: mep, fire sprinklers, fire alarm, security systems, and seismic anchorage of fitness equipment work will be submitted separately.Details
4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with an expanded fitness area. deferred submittals: mep, fire sprinklers, fire alarm, security systems, and seismic anchorage of fitness equipment work will be submitted separately. | $450,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 555 California St | l23; deferred mep to 202510157422.Details
l23; deferred mep to 202510157422. | $500,000 |
| Oct 17, 2025 | In progress issued Oct 2025 | 555 California St | 31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out.Details
31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out. | $400,000 |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope.Details
7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope. | $2,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 555 California St | 23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089.Details
23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089. | $2,891,600 |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 685 Market St | installation of non structural partition and security door at lower levelDetails
installation of non structural partition and security door at lower level | $19,500 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 50 California St | 28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.Details
28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep. | $4,135,200 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 555 California St | demo of non structural partitions glazing millwork, ceilings lighting electrical and finishesDetails
demo of non structural partitions glazing millwork, ceilings lighting electrical and finishes | $400,000 |
| Sep 8, 2025 | Completed final sign-off Apr 2026 | 685 Market St | revise 202507281741 & 202508072566 (7th fl. tenant improvement p/a) to document various field/construction related conditions including replacement of previously shown phone rooms with pre-fabricated phone booths.Details
revise 202507281741 & 202508072566 (7th fl. tenant improvement p/a) to document various field/construction related conditions including replacement of previously shown phone rooms with pre-fabricated phone booths. | |
| Sep 3, 2025 | Completed final sign-off Jul 2026 | 685 Market St | 1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788.Details
1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788. | |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 555 California St | 23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement.Details
23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement. | $420,000 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 160 Spear St | 10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage.Details
10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage. | $80,000 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 7/f: deffered mep to pa 202507281741.Details
7/f: deffered mep to pa 202507281741. | $1,200,000 |
| Jul 29, 2025 | Completed final sign-off Dec 2025 | 40 Jessie St | renovation of core restrooms on floors 1 through 6. inlcudes new flor finisehs lighting & fixtures. no structural work. electrical included. (mech & plumbing, f/s & f/a system under sep permit).Details
renovation of core restrooms on floors 1 through 6. inlcudes new flor finisehs lighting & fixtures. no structural work. electrical included. (mech & plumbing, f/s & f/a system under sep permit). | $550,000 |
| Jul 28, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred.Details
7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred. | $2,500,000 |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | level 1: deferred mep for permit 202506168762Details
level 1: deferred mep for permit 202506168762 | $257,040 |
| Jun 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit.Details
first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit. | $40,000 |
| Jun 17, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 2nd fl deferred mep for pa # 2025-0410-4123Details
2nd fl deferred mep for pa # 2025-0410-4123 | $1,635,840 |
| Jun 16, 2025 | Completed final sign-off Jul 2026 | 685 Market St | 1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttranceDetails
1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttrance | $999,000 |
| Jun 13, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferredDetails
2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferred | |
| Jun 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | 4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structuralDetails
4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural | |
| May 22, 2025 | Completed final sign-off Oct 2025 | 685 Market St | demo plan for floor 1, 2, and 7 including demo of (e) mep, ceiling, floors, and walls. ti will be on sep permitDetails
demo plan for floor 1, 2, and 7 including demo of (e) mep, ceiling, floors, and walls. ti will be on sep permit | $274,000 |
| Apr 30, 2025 | Completed final sign-off Oct 2025 | 100 California St | 6/f: deferred mechanical and electrical for t.i permit 202503071767Details
6/f: deferred mechanical and electrical for t.i permit 202503071767 | $58,000 |
| Apr 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area.Details
2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area. | $2,500,000 |
| Apr 8, 2025 | Completed final sign-off Sep 2026 | 1270 Bush St | revision 202407196876- layout changes due to utlility needs to have a larger vault room. stair rotated structrual support revision to mech and electrialDetails
revision 202407196876- layout changes due to utlility needs to have a larger vault room. stair rotated structrual support revision to mech and electrial | |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 10th fl- structural attachments for phone boothsDetails
10th fl- structural attachments for phone booths | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213Details
8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213 | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 9th fl- structural attachments for phone booths. ref pa 2025-0113-8214Details
9th fl- structural attachments for phone booths. ref pa 2025-0113-8214 | $5,000 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | 4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishesDetails
4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes | $3,283,298 |
| Mar 28, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard.Details
1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard. | $315,000 |
| Mar 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 8th /f: mechanical & electrical ref to t.i. 202501138213Details
8th /f: mechanical & electrical ref to t.i. 202501138213 | |
| Mar 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 2nd/f, ste 200: floor structural renforcement & slab opening for future t.i.Details
2nd/f, ste 200: floor structural renforcement & slab opening for future t.i. | $340,000 |
| Mar 7, 2025 | Completed final sign-off Oct 2025 | 100 California St | demolition and construction of non structural partitions, ceilings, lighting and finishes. no structural work. no change in occupancy or use.Details
demolition and construction of non structural partitions, ceilings, lighting and finishes. no structural work. no change in occupancy or use. | $308,566 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 10/f: mech & electrical for pa-202501138215Details
10/f: mech & electrical for pa-202501138215 | $90,000 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 9/f: mech & electrical for pa-202501138214.Details
9/f: mech & electrical for pa-202501138214. | $90,000 |
| Jan 24, 2025 | Completed final sign-off Aug 2025 | 160 Spear St | 10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg.Details
10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg. | $612,626 |
| Jan 23, 2025 | In progress issued Jan 2025 | 1155 Battery St | 5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for projectDetails
5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for project | |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | 9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Dec 23, 2024 | Completed final sign-off Apr 2026 | 685 Market St | 8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit.Details
8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit. | $274,608 |
| Nov 12, 2024 | Completed final sign-off Feb 2025 | 333 Bush St | 22,23rd, and 24th fl: phone booths 4 added, strucutral drawings included. office area onlyDetails
22,23rd, and 24th fl: phone booths 4 added, strucutral drawings included. office area only | $34,932 |
| Oct 30, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | 11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture.Details
11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture. | $600,000 |
| Oct 25, 2024 | In progress issued Nov 2024 | 850 Brannan St | 2nd flr. revision to 202403046994 structural.Details
2nd flr. revision to 202403046994 structural. | |
| Oct 17, 2024 | Completed final sign-off Jan 2025 | 140 New Montgomery St | 11th flr. decommissioning. scope includes demo of existing lighting and crac units. minor lighting elevation lobby and wall finisher.Details
11th flr. decommissioning. scope includes demo of existing lighting and crac units. minor lighting elevation lobby and wall finisher. | $150,000 |
| Sep 27, 2024 | In progress issued Jan 2025 | 1155 Battery St | 4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sfDetails
4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sf | $300,000 |
| Sep 26, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | 25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed)Details
25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed) | $188,000 |
| Sep 26, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | 28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinklDetails
28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinkl | $188,000 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | 3rd fl revision to pa 2024-0725-7264 redoing the communication opening.Details
3rd fl revision to pa 2024-0725-7264 redoing the communication opening. | |
| Sep 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | 2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc.Details
2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc. | |
| Sep 17, 2024 | Completed final sign-off Nov 2024 | 160 Spear St | 14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if neededDetails
14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if needed | $12,000 |
| Sep 16, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | 2nd fl ref 202406215032. electrical and mech for permitDetails
2nd fl ref 202406215032. electrical and mech for permit | $300,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | 3rd fl tenant improvement construction of non load bearing walls, celings & lightingDetails
3rd fl tenant improvement construction of non load bearing walls, celings & lighting | $454,164 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | 14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible lockerDetails
14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker | $93,408 |
| Jul 25, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517.Details
sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517. | |
| Jul 19, 2024 | Completed final sign-off Sep 2026 | 1270 Bush St | 1st & 2nd fl: installation of new interior transformer vault room to support the proposed current automobile use. work shall include new partitions enclosing the transformer vault, relocation of (e) stairwell on larking st to accomodate the proposed transformer vault.Details
1st & 2nd fl: installation of new interior transformer vault room to support the proposed current automobile use. work shall include new partitions enclosing the transformer vault, relocation of (e) stairwell on larking st to accomodate the proposed transformer vault. | $600,000 |
| Jun 24, 2024 | Completed final sign-off Aug 2024 | 160 Spear St | 14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permitsDetails
14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permits | $47,210 |
| Jun 21, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | 2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support ofDetails
2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support of | $1,386,230 |
| Jun 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | 2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044Details
2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044 | $59,844 |
| Mar 4, 2024 | In progress issued Jun 2024 | 850 Brannan St | 2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred.Details
2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred. | $987,468 |
| Nov 20, 2023 | Completed final sign-off Oct 2024 | 181 Fremont St | 7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevatorDetails
7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevator | $175,000 |