Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 160 Spear St | fire sprinkler permits install 35 new sprinklers for phone booths on floors 10-13, 15 and 19. ti 202508253847 ( 3 heads on the 10th, 8 on 11th, 4 on the 12th, 5 on the 13th ,3 on the 15th & 12 on the 19th )Details
fire sprinkler permits install 35 new sprinklers for phone booths on floors 10-13, 15 and 19. ti 202508253847 ( 3 heads on the 10th, 8 on 11th, 4 on the 12th, 5 on the 13th ,3 on the 15th & 12 on the 19th ) | $24,000 | |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 160 Spear St | Sc Builders, Inc | 10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage.Details
10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage. | $80,000 |
| Mar 7, 2025 | Completed final sign-off Apr 2025 | 160 Spear St | Bilcor Inc | 10th fl- install (1) call station install (1) control relay module ref ti # 2025-0124-9050 and 2 way backbone ref#2019-0718-6194.Details
10th fl- install (1) call station install (1) control relay module ref ti # 2025-0124-9050 and 2 way backbone ref#2019-0718-6194. | $1,332 |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 160 Spear St | 10th fl - ti fire sprinkler add 3, relocate 11 and delete 5 fire sprinklers. ref pa 202501249050Details
10th fl - ti fire sprinkler add 3, relocate 11 and delete 5 fire sprinklers. ref pa 202501249050 | $9,000 | |
| Jan 24, 2025 | Completed final sign-off Aug 2025 | 160 Spear St | Sc Builders, Inc | 10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg.Details
10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg. | $612,626 |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 160 Spear St | Bilcor Inc | 11th fl- install (14) ceiling mount speaker strobes, (1) new call station, (1) control relay module ref pa #2024-1030-4038 & 2019-0718-6194Details
11th fl- install (14) ceiling mount speaker strobes, (1) new call station, (1) control relay module ref pa #2024-1030-4038 & 2019-0718-6194 | $10,656 |
| Dec 19, 2024 | Completed final sign-off Jan 2025 | 160 Spear St | 11/f:ti fire spinkler relocate 8 fire sprinklers ti 202410304038Details
11/f:ti fire spinkler relocate 8 fire sprinklers ti 202410304038 | $5,000 | |
| Nov 1, 2024 | Completed final sign-off Nov 2024 | 160 Spear St | 14/f: ti fire sprinkler. add (3) sprinklers. ti # 202409170918Details
14/f: ti fire sprinkler. add (3) sprinklers. ti # 202409170918 | $1,900 | |
| Oct 30, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Sc Builders, Inc | 11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture.Details
11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture. | $600,000 |
| Oct 28, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Source Planning And Construction Inc | installation of new lobby hidden door, new finishes and required restroom upgrades electrical will be trade permit path of travel previously approved pa# 2023-0223-2487Details
installation of new lobby hidden door, new finishes and required restroom upgrades electrical will be trade permit path of travel previously approved pa# 2023-0223-2487 | $25,000 |
| Oct 4, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | Bilcor Inc | work on 3rd flr and 14th flr. install (6) ceiling mounted speaker strobe. ref#: ref: 202408289611 (3rd flr) and ref: 202408289614 (14th flr).Details
work on 3rd flr and 14th flr. install (6) ceiling mounted speaker strobe. ref#: ref: 202408289611 (3rd flr) and ref: 202408289614 (14th flr). | $3,996 |
| Sep 17, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | 14th fl ti fire sprinkler. relocate 1. add 1 fire sprinkler ti 202408289614Details
14th fl ti fire sprinkler. relocate 1. add 1 fire sprinkler ti 202408289614 | $10,000 | |
| Sep 17, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | 3rd fl ti fire sprinkler. relocate 38 fire sprinklers. ti 202408289611Details
3rd fl ti fire sprinkler. relocate 38 fire sprinklers. ti 202408289611 | $10,000 | |
| Sep 17, 2024 | Completed final sign-off Nov 2024 | 160 Spear St | Sc Builders, Inc | 14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if neededDetails
14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if needed | $12,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | Sc Builders, Inc | 3rd fl tenant improvement construction of non load bearing walls, celings & lightingDetails
3rd fl tenant improvement construction of non load bearing walls, celings & lighting | $454,164 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | Sc Builders, Inc | 14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible lockerDetails
14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker | $93,408 |
| Aug 14, 2024 | Completed final sign-off Aug 2024 | 160 Spear St | Bilcor Inc | 4th fl ref pa# 2024-0508-1664 & 2024-729-7433 install (4) ceiling mounted speaker strobesDetails
4th fl ref pa# 2024-0508-1664 & 2024-729-7433 install (4) ceiling mounted speaker strobes | $2,664 |
| Jul 29, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Source Planning And Construction Inc | 4th/flr-ste 400- ref 202405081664-for mepDetails
4th/flr-ste 400- ref 202405081664-for mep | $340,000 |
| Jul 10, 2024 | Completed final sign-off Jul 2024 | 160 Spear St | 14/f: ti to an (e) fire sprinkler system. add (2) sprinklers. ti pa# 202406245059Details
14/f: ti to an (e) fire sprinkler system. add (2) sprinklers. ti pa# 202406245059 | $2,000 | |
| Jul 3, 2024 | Completed final sign-off Jul 2024 | 160 Spear St | Bilcor Inc | install (2) ceiling mount speaker strobe arch ref pa # 2024-0624-5059Details
install (2) ceiling mount speaker strobe arch ref pa # 2024-0624-5059 | $1,332 |
| Jul 2, 2024 | Completed final sign-off Aug 2024 | 160 Spear St | Pioneer Fire Inc. | relocate (5) pendents, convert (3) uprights to pendents, add (2) pendents and remove (2) pendents. ref pa#202405081664Details
relocate (5) pendents, convert (3) uprights to pendents, add (2) pendents and remove (2) pendents. ref pa#202405081664 | $3,600 |
| Jun 28, 2024 | In progress filed Jun 2024, not yet issued | 160 Spear St | ref pa # 2024-0624-5059 14th fl- ti improvement to an existing fire sprinkler system add 4 sprinklersDetails
ref pa # 2024-0624-5059 14th fl- ti improvement to an existing fire sprinkler system add 4 sprinklers | $2,000 | |
| Jun 24, 2024 | Completed final sign-off Aug 2024 | 160 Spear St | Sc Builders, Inc | 14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permitsDetails
14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permits | $47,210 |
| May 8, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Source Planning And Construction Inc | 4/fl office ti- soft demo of non structural elements including demo of interior partitions, doors, finishes, celings, and lighting. installing (n) finishes and fixtures, ceilings, lighting , and millwork. mep work will be obtain on separate permit.Details
4/fl office ti- soft demo of non structural elements including demo of interior partitions, doors, finishes, celings, and lighting. installing (n) finishes and fixtures, ceilings, lighting , and millwork. mep work will be obtain on separate permit. | $450,000 |
| Jan 12, 2024 | Completed final sign-off May 2024 | 160 Spear St | Bilcor Inc | 15/f: install 2 ceiling mount speaker strobes. ref arch pa 202305177927Details
15/f: install 2 ceiling mount speaker strobes. ref arch pa 202305177927 | $1,332 |
| Jan 12, 2024 | Completed final sign-off Apr 2024 | 160 Spear St | Bilcor Inc | 14/f: install 2 ceiling mount speaker strobes. ref arch pa 202305177962Details
14/f: install 2 ceiling mount speaker strobes. ref arch pa 202305177962 | $1,332 |
| Jan 12, 2024 | Completed final sign-off Jan 2024 | 160 Spear St | Bilcor Inc | 13/f: install 2 ceiling mount speaker strobes. ref arch pa 202401123893Details
13/f: install 2 ceiling mount speaker strobes. ref arch pa 202401123893 | $1,332 |
| Nov 13, 2023 | Completed final sign-off May 2024 | 160 Spear St | 15th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0517-7927Details
15th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0517-7927 | $1,000 | |
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 160 Spear St | 14th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0517-7962Details
14th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0517-7962 | $1,000 | |
| Nov 13, 2023 | Completed final sign-off Jan 2024 | 160 Spear St | 13th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0523-8397Details
13th fl - fire sprinkler permit relocate 4 and delete 2 sprinklers. ref pa 2023-0523-8397 | $1,000 | |
| Oct 6, 2023 | Completed final sign-off Nov 2023 | 160 Spear St | Bilcor Inc | 3rd floor: install (3) ceiling mount speaker strobes. architectural ref bpa# 202302232487Details
3rd floor: install (3) ceiling mount speaker strobes. architectural ref bpa# 202302232487 | $1,320 |
| Oct 5, 2023 | Completed final sign-off Nov 2023 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | 3/f: existing fire sprinkler system-tenant improvements relocate 4 and change out 2 pendent sprinklersDetails
3/f: existing fire sprinkler system-tenant improvements relocate 4 and change out 2 pendent sprinklers | $4,000 |
| Sep 26, 2023 | Never finaled filed Sep 2023, never issued | 160 Spear St | installation of new lobby hidden door, new finishes, and required restroom upgrades. electrical, plumbing, and sprinkler under separate permit (trade and fire only permits). path of travel previously approved under bpa# 202302232487.Details
installation of new lobby hidden door, new finishes, and required restroom upgrades. electrical, plumbing, and sprinkler under separate permit (trade and fire only permits). path of travel previously approved under bpa# 202302232487. | $70,000 | |
| Sep 12, 2023 | Completed final sign-off May 2024 | 160 Spear St | Capital Electric & Sign Co | revision to pa# 202305188090. install (1) electrical single faced wall sign "databrick" revised to mount sign on 2" deep 0.80 alliminum wireway cabinet to exterior.Details
revision to pa# 202305188090. install (1) electrical single faced wall sign "databrick" revised to mount sign on 2" deep 0.80 alliminum wireway cabinet to exterior. | $6,405 |
| May 23, 2023 | Completed final sign-off Jan 2024 | 160 Spear St | Skyline Construction | 13/f: restroom upgrades on floor 13. includes replacement of interior restroom finishes, new lighting , toilet partitions, sinkes, and fixtures. mep and life safety under sep permit path of travel under 202302232487Details
13/f: restroom upgrades on floor 13. includes replacement of interior restroom finishes, new lighting , toilet partitions, sinkes, and fixtures. mep and life safety under sep permit path of travel under 202302232487 | $70,000 |
| May 18, 2023 | Completed final sign-off May 2024 | 160 Spear St | Capital Electric & Sign Co | install 1 electric single faced wall sign "databricks"Details
install 1 electric single faced wall sign "databricks" | $14,085 |
| May 17, 2023 | Completed final sign-off May 2024 | 160 Spear St | Skyline Construction | 15/f: restroom upgrades on floor includes replaceing interior restroom finishes, new lighting, toilet partitions, sinks, and fixtures electrical and life safety under seperate permit path of travel approved per permit 202302232487Details
15/f: restroom upgrades on floor includes replaceing interior restroom finishes, new lighting, toilet partitions, sinks, and fixtures electrical and life safety under seperate permit path of travel approved per permit 202302232487 | $70,000 |
| May 17, 2023 | Completed final sign-off Apr 2024 | 160 Spear St | Skyline Construction | 14th/f: restroom upgrade- replace interior restroom finishes, new lighting, toilet partitions, sinks & fixtures. mep & life safety under separared permit. path of traval previously approved 202302232487Details
14th/f: restroom upgrade- replace interior restroom finishes, new lighting, toilet partitions, sinks & fixtures. mep & life safety under separared permit. path of traval previously approved 202302232487 | $70,000 |
| May 11, 2023 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | 3rd fl. soft demo, commercial interrior ti under separate permitDetails
3rd fl. soft demo, commercial interrior ti under separate permit | $327,500 | |
| May 9, 2023 | Completed final sign-off Sep 2024 | 160 Spear St | Peacock Construction | mechanical work to tenant improvement, electrical to show documentation of existing electrical, lighting controls. new return air wall opening added. ref 202304206101Details
mechanical work to tenant improvement, electrical to show documentation of existing electrical, lighting controls. new return air wall opening added. ref 202304206101 | $20,000 |
| May 4, 2023 | Completed final sign-off Jun 2023 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | 12/f: existing fire sprinkler system. relocate 7 sprinklers. ref ti permit 202303012833Details
12/f: existing fire sprinkler system. relocate 7 sprinklers. ref ti permit 202303012833 | $4,500 |
| Apr 28, 2023 | Completed final sign-off Jun 2023 | 160 Spear St | Bilcor Inc | install (3) ceiling mount speaker strobesDetails
install (3) ceiling mount speaker strobes | $1,980 |
| Apr 20, 2023 | Completed final sign-off Sep 2024 | 160 Spear St | Peacock Construction | 16th & 17th fl: addition of non-rated enclosure of an (e) interconnecting stair to provide security separation between flrs 16 and 17. the (e) stair is not part of means of egress. mep under separate permit.Details
16th & 17th fl: addition of non-rated enclosure of an (e) interconnecting stair to provide security separation between flrs 16 and 17. the (e) stair is not part of means of egress. mep under separate permit. | $42,000 |
| Mar 1, 2023 | Completed final sign-off Nov 2023 | 160 Spear St | Sc Builders, Inc | 12/f: tenant imrpovement of existing space, minor demo and construction of new non-load bearing walls, ceilings, lighting & furniture.Details
12/f: tenant imrpovement of existing space, minor demo and construction of new non-load bearing walls, ceilings, lighting & furniture. | $350,000 |
| Feb 23, 2023 | Completed final sign-off Dec 2023 | 160 Spear St | Skyline Construction | 3/f: restroom upgrades. replacing interior finishes, new lighting, new toilet partitions, sinks, and fixtures. path of travel upgrades (b/m) include new painted parking stripping, domes, and signage for full bldg path of travel accessibility compliance. mep and life safety under separate permit.Details
3/f: restroom upgrades. replacing interior finishes, new lighting, new toilet partitions, sinks, and fixtures. path of travel upgrades (b/m) include new painted parking stripping, domes, and signage for full bldg path of travel accessibility compliance. mep and life safety under separate permit. | $100,000 |
| Dec 16, 2022 | Completed final sign-off Jan 2023 | 160 Spear St | Bilcor Inc | ste 475: install 11 ceiling mount speaker strobes. relocate 1 smoke detector. arch ref pa# 202209152537Details
ste 475: install 11 ceiling mount speaker strobes. relocate 1 smoke detector. arch ref pa# 202209152537 | $7,260 |
| Nov 15, 2022 | Completed final sign-off Feb 2023 | 160 Spear St | Sc Builders, Inc | 4th floor: mechanical and electrical to pa#202209152537Details
4th floor: mechanical and electrical to pa#202209152537 | |
| Sep 15, 2022 | Completed final sign-off Feb 2023 | 160 Spear St | Sc Builders, Inc | 4/f suite 475: interior demolition of non-structural elements including interior partitions, doors, finishes, ceilings, lighting and mechanical. construction of new offices , conference, and treat area. path of travel previously approved under 202010317929 and restroom per 202203311339.Details
4/f suite 475: interior demolition of non-structural elements including interior partitions, doors, finishes, ceilings, lighting and mechanical. construction of new offices , conference, and treat area. path of travel previously approved under 202010317929 and restroom per 202203311339. | $605,681 |
| Aug 2, 2022 | Never finaled issued Aug 2022, no final | 160 Spear St | Peacock Construction | 12/f: hvac modifications to support interior t.i., electrical power, lighting & signal. t.i. pa202204051553.Details
12/f: hvac modifications to support interior t.i., electrical power, lighting & signal. t.i. pa202204051553. | $250,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 4 pendents in restroom on the 4/fDetails
fire sprinkler only. relocate 4 pendents in restroom on the 4/f | $2,000 |
| May 16, 2022 | Completed final sign-off Jul 2022 | 160 Spear St | Golden Gate Fire Protection Inc | ste 1200: fire sprinkler: relocated 26 pendent sprinklers on the 12th flr ste 1200. ref permit 202204051553Details
ste 1200: fire sprinkler: relocated 26 pendent sprinklers on the 12th flr ste 1200. ref permit 202204051553 | $13,650 |
| Mar 31, 2022 | Completed final sign-off Sep 2022 | 160 Spear St | Skyline Construction | 4/f: restroom scope includes replacing interior restroom finishes, lighting toilet partitions, sinks, and fixtures. mep is trade permit only. path of travel prviously approved per #202010317929Details
4/f: restroom scope includes replacing interior restroom finishes, lighting toilet partitions, sinks, and fixtures. mep is trade permit only. path of travel prviously approved per #202010317929 | $70,000 |
| Dec 21, 2021 | Completed final sign-off Jan 2022 | 160 Spear St | Bilcor Inc | suite 1020 fire life safety: install 8 ceiling mount speaker strobes, 1 smoke detector. architectural reference permit 202106293445.Details
suite 1020 fire life safety: install 8 ceiling mount speaker strobes, 1 smoke detector. architectural reference permit 202106293445. | $5,940 |
| Jul 14, 2021 | Completed final sign-off Aug 2021 | 160 Spear St | Sun Graphics | 15/f: fabricate for install (3) emergency evac maps; sub-surface direct-printed digital image printed on 15" x 21" x 1/8" thick nonglare acrylic, mounted to wall wit vhb foam tape/siliconeDetails
15/f: fabricate for install (3) emergency evac maps; sub-surface direct-printed digital image printed on 15" x 21" x 1/8" thick nonglare acrylic, mounted to wall wit vhb foam tape/silicone | $1,200 |
| May 11, 2021 | Completed final sign-off Jul 2021 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | 15th floor: add (2), relocate (4) and change out (20) sprinklers per t.i. ref # : 2020-1031-7929, job #: 21-604Details
15th floor: add (2), relocate (4) and change out (20) sprinklers per t.i. ref # : 2020-1031-7929, job #: 21-604 | $1,950 |
| May 5, 2021 | Completed final sign-off Jul 2021 | 160 Spear St | Bilcor Inc | fire life safety15th fl: install (5) ceiling mount speaker strobes reference ti#: 2020-1031-7929Details
fire life safety15th fl: install (5) ceiling mount speaker strobes reference ti#: 2020-1031-7929 | $3,300 |
| Apr 26, 2021 | Never finaled issued May 2021, no final | 160 Spear St | Sc Builders, Inc | 15th fl: revision to pa# 202010317929. mep for the project.Details
15th fl: revision to pa# 202010317929. mep for the project. | $50,000 |
| Oct 31, 2020 | Completed final sign-off Aug 2021 | 160 Spear St | Sc Builders, Inc | 15th fl, #1500: (e) office partial t.i.. (n) non-structural partition. (n) millwork, (n) flooring, (n) m.e.p. submitted separately.Details
15th fl, #1500: (e) office partial t.i.. (n) non-structural partition. (n) millwork, (n) flooring, (n) m.e.p. submitted separately. | $310,000 |
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | scope consists of demo of all (e) partitions, doors ceiling, electrical, plumbing, millwork, finishes and hvac througout portion of the floor, floor is currently partially occupied spaces being demolished are currently unoccupied, path of travel, accessibility scope not required per ab-017,Details
scope consists of demo of all (e) partitions, doors ceiling, electrical, plumbing, millwork, finishes and hvac througout portion of the floor, floor is currently partially occupied spaces being demolished are currently unoccupied, path of travel, accessibility scope not required per ab-017, | $10,000 | |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 160 Spear St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 29 upright sprinklers on the street level.Details
fire sprinklers: relocate 29 upright sprinklers on the street level. | $14,500 |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 160 Spear St | fire sprinkler pemrit for 18th fl: relocate 6 & add 10 sprinklers on the 18th fl. ti #202001232596.Details
fire sprinkler pemrit for 18th fl: relocate 6 & add 10 sprinklers on the 18th fl. ti #202001232596. | $7,500 | |
| Feb 3, 2020 | Completed final sign-off Oct 2020 | 160 Spear St | Peacock Construction | t-24 electrical for work under pa# 201911137131Details
t-24 electrical for work under pa# 201911137131 | |
| Jan 31, 2020 | Completed final sign-off Nov 2020 | 160 Spear St | Skyline Construction | soft demo removal of existing walls, floor, and wall finishes (e) plumbing and ceiling to remainDetails
soft demo removal of existing walls, floor, and wall finishes (e) plumbing and ceiling to remain | $20,000 |
| Jan 23, 2020 | Completed final sign-off Nov 2020 | 160 Spear St | Skyline Construction | t.i. to include new office spaces, modified open offices, mep to accomodate new layout n/a maherDetails
t.i. to include new office spaces, modified open offices, mep to accomodate new layout n/a maher | $500,000 |
| Jan 15, 2020 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | 3rd fl: interior office demolition only to existing partitions, plumbing, and finishes. per ab-017Details
3rd fl: interior office demolition only to existing partitions, plumbing, and finishes. per ab-017 | $50,000 | |
| Nov 13, 2019 | Completed final sign-off Oct 2020 | 160 Spear St | Peacock Construction | 18/f: restroom upgrades, work to include replacing finishes, new lighting, new toilet partitoins, sinks, finishes. maher n/a.Details
18/f: restroom upgrades, work to include replacing finishes, new lighting, new toilet partitoins, sinks, finishes. maher n/a. | $60,000 |
| Oct 22, 2019 | Never finaled issued Nov 2019, no final | 160 Spear St | Pacific Neon Company | install (1) illuminated singled faced wall sign (work day ) 3'.2" x 8'.8"Details
install (1) illuminated singled faced wall sign (work day ) 3'.2" x 8'.8" | $5,000 |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 160 Spear St | Bilcor Inc | 2nd fl - fire alarm ref pa 2019-0722-6552. install 169 ceiling mount speaker strobes; install 3 duct detectors w/sampling tub; install 3 control relay; relocate 1 smoke detector w/baseDetails
2nd fl - fire alarm ref pa 2019-0722-6552. install 169 ceiling mount speaker strobes; install 3 duct detectors w/sampling tub; install 3 control relay; relocate 1 smoke detector w/base | $14,520 |
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 160 Spear St | suite 200: fire sprinkler ti/upgrade of the existing fire sprinkler system. 47 relpcate pendents, 4 additional pendents, 16 deleted pendents, 1 relocated upright sprinkler. refp a #201907226552.Details
suite 200: fire sprinkler ti/upgrade of the existing fire sprinkler system. 47 relpcate pendents, 4 additional pendents, 16 deleted pendents, 1 relocated upright sprinkler. refp a #201907226552. | $10,800 | |
| Aug 14, 2019 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | ste 100 3/f: demo of all (e) partitions, doors, ceilings, electrical, plumbing, millwork, finishes & hvac throughout portion of the flr. floor is currently partially occupied, space being demo are unoccupied. no demo of ceiling and fire sprinklers and fa devices under this scopeDetails
ste 100 3/f: demo of all (e) partitions, doors, ceilings, electrical, plumbing, millwork, finishes & hvac throughout portion of the flr. floor is currently partially occupied, space being demo are unoccupied. no demo of ceiling and fire sprinklers and fa devices under this scope | $50,000 | |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 160 Spear St | Skyline Construction | int ti - non structual demo of (e) walls, ceilings, doors and finishes, new construction of non structural int partitions, new finishes lighting plm and mechDetails
int ti - non structual demo of (e) walls, ceilings, doors and finishes, new construction of non structural int partitions, new finishes lighting plm and mech | $935,000 |
| Jul 18, 2019 | Completed final sign-off Aug 2019 | 160 Spear St | Bilcor Inc | fire alarm install 3 expansion switches, 1 call stationDetails
fire alarm install 3 expansion switches, 1 call station | $2,640 |
| Jun 4, 2019 | Completed final sign-off Oct 2019 | 160 Spear St | Pioneer Fire Inc. | 19th flr: relocate 8 fire sprinklers. ref pa#201904037039. maher n/a.Details
19th flr: relocate 8 fire sprinklers. ref pa#201904037039. maher n/a. | $4,000 |
| May 8, 2019 | Completed final sign-off Dec 2019 | 160 Spear St | Peacock Construction | replace (e) 17th floor lobby "s" door with new "s" doorDetails
replace (e) 17th floor lobby "s" door with new "s" door | $18,000 |
| Dec 10, 2018 | Never finaled issued Jan 2019, no final | 160 Spear St | Novo Construction Inc | 14th fl - revision to pa 2018-0710-4079 to add new emergency push button and card readers at elevator lobby, (1) exit stairway & it closet roomDetails
14th fl - revision to pa 2018-0710-4079 to add new emergency push button and card readers at elevator lobby, (1) exit stairway & it closet room | |
| Oct 2, 2018 | Completed final sign-off Oct 2018 | 160 Spear St | Bilcor Inc | fire alarm. install: 1 signal module, 1 booster panel 1 power supply, 10 wall mount speaker/strobes, 1 ceiling mount spreaker strobes maher naDetails
fire alarm. install: 1 signal module, 1 booster panel 1 power supply, 10 wall mount speaker/strobes, 1 ceiling mount spreaker strobes maher na | $9,750 |
| Aug 27, 2018 | Completed final sign-off Sep 2018 | 160 Spear St | ref t.i. 201807063889; fire sprinkler permit relocate 2 and delete 2 pendent sprinklers in the 2nd fl. restroomsDetails
ref t.i. 201807063889; fire sprinkler permit relocate 2 and delete 2 pendent sprinklers in the 2nd fl. restrooms | $1,000 | |
| Aug 27, 2018 | Completed final sign-off Sep 2018 | 160 Spear St | ref t.i. 201807063889; fire sprinkler permit- relocate 2 and delete 2 pendent sprinklers in the 16th fl. restroomsDetails
ref t.i. 201807063889; fire sprinkler permit- relocate 2 and delete 2 pendent sprinklers in the 16th fl. restrooms | $1,000 | |
| Aug 27, 2018 | Completed final sign-off Aug 2020 | 160 Spear St | ref t.i. 201807063910; delete 2 pendent sprinklers on the 2nd fl. in suite #214Details
ref t.i. 201807063910; delete 2 pendent sprinklers on the 2nd fl. in suite #214 | $1,000 | |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 160 Spear St | C B F Inc | 14th fl: electrical upgrade: new lighting & power for new break area. new break room equip. new power for conference, team room, open offices, and furniture feed.Details
14th fl: electrical upgrade: new lighting & power for new break area. new break room equip. new power for conference, team room, open offices, and furniture feed. | $15,000 |
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 160 Spear St | Bilcor Inc | 14/f: fire alarm ti install 13 ceiling mount speaker strobe. ref pa 2018-0710-4079. maher n/a.Details
14/f: fire alarm ti install 13 ceiling mount speaker strobe. ref pa 2018-0710-4079. maher n/a. | $6,000 |
| Aug 10, 2018 | Completed final sign-off Aug 2018 | 160 Spear St | Bilcor Inc | fire alarm tenant improvement: install (1) ceiling mount strobe, install (1) ceiling mount speaker-strobe. ref. 2018.0706.3910. all work in unit # 214Details
fire alarm tenant improvement: install (1) ceiling mount strobe, install (1) ceiling mount speaker-strobe. ref. 2018.0706.3910. all work in unit # 214 | $1,000 |
| Aug 10, 2018 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | Gci, Inc | 2md & 16th flr - restroom remodel - ele only. maintain (e) lighting titke 24 ref 201807063889 maher naDetails
2md & 16th flr - restroom remodel - ele only. maintain (e) lighting titke 24 ref 201807063889 maher na | |
| Aug 6, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | Gci, Inc | 1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218Details
1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218 | $250,000 |
| Aug 3, 2018 | Completed final sign-off Aug 2018 | 160 Spear St | 14th flr . fire sprinkler permit. relocate 5 pendent sprinklers. ref#201807144079. n/a for maherDetails
14th flr . fire sprinkler permit. relocate 5 pendent sprinklers. ref#201807144079. n/a for maher | $1,500 | |
| Aug 3, 2018 | Completed final sign-off Nov 2018 | 160 Spear St | Novo Construction Inc | 14th flr. re-distribute ductwork for new floor layout. install 1 new split system for it room. ref# 2018-0710-4079Details
14th flr. re-distribute ductwork for new floor layout. install 1 new split system for it room. ref# 2018-0710-4079 | $5,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 160 Spear St | Gci, Inc | ref pa# 201807063910; lighting, power & signal. 2nd flDetails
ref pa# 201807063910; lighting, power & signal. 2nd fl | |
| Jul 31, 2018 | Completed final sign-off Oct 2018 | 160 Spear St | Pioneer Fire Inc. | relocate 22 pendent fire sprinklers. remove 3 pendent fire sprinklersDetails
relocate 22 pendent fire sprinklers. remove 3 pendent fire sprinklers | $9,000 |
| Jul 20, 2018 | Completed final sign-off Jul 2018 | 160 Spear St | Bilcor Inc | ref pa# 201804247138; install (6) ceiling mount strobes, install (16) ceiling mount speaker strobes, install (1) duct detector w/housing, install (1) control relay moduleDetails
ref pa# 201804247138; install (6) ceiling mount strobes, install (16) ceiling mount speaker strobes, install (1) duct detector w/housing, install (1) control relay module | $12,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2018 | 160 Spear St | Sc Builders, Inc | ste. #1020: mep for ti ref pa 2018-0424-7138- adding fire smoke damper- fire alarm separate permit.Details
ste. #1020: mep for ti ref pa 2018-0424-7138- adding fire smoke damper- fire alarm separate permit. | |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 160 Spear St | Novo Construction Inc | 14th flr - demo of (e) walls, doors and appliances ab-017 maher naDetails
14th flr - demo of (e) walls, doors and appliances ab-017 maher na | $15,000 |
| Jun 14, 2018 | Completed final sign-off Jul 2018 | 160 Spear St | Pribuss Engineering Inc | ref # 201804247138; fire spprinkler ti on 10th fl, total 86 sprinklers- there is a clouded ceiling, calculated hydro demand. hydro requiredDetails
ref # 201804247138; fire spprinkler ti on 10th fl, total 86 sprinklers- there is a clouded ceiling, calculated hydro demand. hydro required | $44,204 |
| May 16, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | Gci, Inc | ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferredDetails
ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred | $760,000 |
| Apr 24, 2018 | Completed final sign-off Oct 2018 | 160 Spear St | Sc Builders, Inc | 10th flr - suite 1020 - interior modifications of (e) office space including demo of non load bearing partitions, new non load bearing partiions new finishes, new ele/plm/lighting under sep permit maher naDetails
10th flr - suite 1020 - interior modifications of (e) office space including demo of non load bearing partitions, new non load bearing partiions new finishes, new ele/plm/lighting under sep permit maher na | $1,400,000 |
| Mar 26, 2018 | Completed final sign-off Apr 2018 | 160 Spear St | Golden Gate Fire Protection Inc | relocate 12 heads (uprights) for a spec suite on ground floorDetails
relocate 12 heads (uprights) for a spec suite on ground floor | $3,000 |
| Mar 1, 2018 | Completed final sign-off Mar 2018 | 160 Spear St | Johnson Controls Fire | 11th flr - adding 5 speak/strobes ti #201801088016 no initiation devices in scope of work. maher naDetails
11th flr - adding 5 speak/strobes ti #201801088016 no initiation devices in scope of work. maher na | $3,000 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 160 Spear St | Bilcor Inc | replace smoke control panel | $20,000 |
| Oct 19, 2017 | Never finaled issued Oct 2017, no final | 160 Spear St | Bilcor Inc | fire alarm ti install ceiling mount speaker strobes. ref ti 2017-0725-2920, 10th fl and 2017-0725-2918, 11th flDetails
fire alarm ti install ceiling mount speaker strobes. ref ti 2017-0725-2920, 10th fl and 2017-0725-2918, 11th fl | $2,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 160 Spear St | street space | ||
| Jul 11, 2017 | Never finaled issued Jul 2017, no final | 160 Spear St | Skyline Construction | ste. 1230: ref pa 2017-0516-6600. update title 24 checklist to correct incorrect original for incorrectly identified inspection and lighting acceptance testing. project has no lighting scopeDetails
ste. 1230: ref pa 2017-0516-6600. update title 24 checklist to correct incorrect original for incorrectly identified inspection and lighting acceptance testing. project has no lighting scope | |
| May 16, 2017 | Completed final sign-off May 2017 | 160 Spear St | Skyline Construction | 12/f-mechanical, electrical & plumbing for ti @ suite 1230. ref pa 201703272364Details
12/f-mechanical, electrical & plumbing for ti @ suite 1230. ref pa 201703272364 | $15,000 |
| Apr 10, 2017 | Completed final sign-off May 2017 | 160 Spear St | Skyline Construction | suite 230 - new millwork counter, new sink and new electricalDetails
suite 230 - new millwork counter, new sink and new electrical | $2,000 |
| Mar 27, 2017 | Completed final sign-off May 2017 | 160 Spear St | Skyline Construction | suite 1230, 12th floor - minimal demolition/construction of new walls, glazing & door. ceiling & lighting to remain. no plumbing. mep under separate permitDetails
suite 1230, 12th floor - minimal demolition/construction of new walls, glazing & door. ceiling & lighting to remain. no plumbing. mep under separate permit | $150,000 |
| Aug 26, 2016 | Completed final sign-off Sep 2016 | 160 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only -; add 9' delete 2 ,20 relo for suite 360. reference ti 2016.07.29.3711Details
fire sprinkler only -; add 9' delete 2 ,20 relo for suite 360. reference ti 2016.07.29.3711 | $15,225 |
| Jun 27, 2016 | Completed final sign-off Jul 2016 | 160 Spear St | Golden Gate Fire Protection Inc | 12th flr: fire sprinkler only, ref. 201605036421,relocate 1 pendant, add 3 pendants for suite #1220; maher n/aDetails
12th flr: fire sprinkler only, ref. 201605036421,relocate 1 pendant, add 3 pendants for suite #1220; maher n/a | $2,000 |
| May 3, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Rossi Builders Inc. | 4th floor ste 405 - demolition and construction of partitions, glazing & door. no elec or plumbing work, exist ceiling, grid, lighting to remain. mech, l/s and sprinkler under sep permit. n/a maher ordinanceDetails
4th floor ste 405 - demolition and construction of partitions, glazing & door. no elec or plumbing work, exist ceiling, grid, lighting to remain. mech, l/s and sprinkler under sep permit. n/a maher ordinance | $10,000 |
| Apr 20, 2016 | Completed final sign-off May 2016 | 160 Spear St | Rossi Builders Inc. | electrical lighting to pa#201603283239. title 24 compliance. n/a ordinance #155-13Details
electrical lighting to pa#201603283239. title 24 compliance. n/a ordinance #155-13 | $10,000 |
| Apr 18, 2016 | Completed final sign-off Aug 2016 | 160 Spear St | Skyline Construction | electrical work for bathroom remodel, title 24, ref pa 2016-0203-8736Details
electrical work for bathroom remodel, title 24, ref pa 2016-0203-8736 | $5,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 160 Spear St | Rossi Builders Inc. | ada barrier removal, providing pull side restroom entry for men & women, and womens' automatic door opener to stall. project consists of replacing all interior restroom finishes. scope includes new lighting, new toilet partitions, sinks & finishes. maher naDetails
ada barrier removal, providing pull side restroom entry for men & women, and womens' automatic door opener to stall. project consists of replacing all interior restroom finishes. scope includes new lighting, new toilet partitions, sinks & finishes. maher na | $70,000 |
| Feb 29, 2016 | Completed final sign-off Jun 2016 | 160 Spear St | Pioneer Fire Inc. | 16/f: 96 relocated pendents and 28 removed. ref pa 2016 0121 7579Details
16/f: 96 relocated pendents and 28 removed. ref pa 2016 0121 7579 | $50,270 |
| Feb 3, 2016 | Never finaled issued May 2016, no final | 160 Spear St | R.M.R. Construction Company | 10th floor - ste. 1000: demo of all interior partitions, glazing, millwork and doors (e) mech/ele and sprinkler system modification is under seperate permit. maher naDetails
10th floor - ste. 1000: demo of all interior partitions, glazing, millwork and doors (e) mech/ele and sprinkler system modification is under seperate permit. maher na | $18,000 |
| Feb 3, 2016 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | 3rd floor: demo of all interior partitions, glazing, millwork and doors (e) mech/ele and sprinkler system modification is under seperate permit. maher naDetails
3rd floor: demo of all interior partitions, glazing, millwork and doors (e) mech/ele and sprinkler system modification is under seperate permit. maher na | $18,000 | |
| Feb 3, 2016 | Completed final sign-off Aug 2016 | 160 Spear St | Skyline Construction | 17th floor: project consists of replacement all interior restroom finishes, scope includes new lighting, new toilet partitions, sinks and finishes. () mech & ele separate permit. maher naDetails
17th floor: project consists of replacement all interior restroom finishes, scope includes new lighting, new toilet partitions, sinks and finishes. () mech & ele separate permit. maher na | $70,000 |
| Feb 1, 2016 | Completed final sign-off Apr 2016 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | 17th flr: existing fire sprinkler system tenant improvements, 13 sprinklers relocated and replaced. ref ti 2015-1221-5597; maher n/aDetails
17th flr: existing fire sprinkler system tenant improvements, 13 sprinklers relocated and replaced. ref ti 2015-1221-5597; maher n/a | $6,500 |
| Jan 21, 2016 | Completed final sign-off Jul 2016 | 160 Spear St | Skyline Construction | 16th floor tenant improvement - new offices, conference room & break room. new lighting & finishes throughout. fire life safety & sprinkler under separate permit. interconnecting stair is under separate permit. n/a maher ordinanceDetails
16th floor tenant improvement - new offices, conference room & break room. new lighting & finishes throughout. fire life safety & sprinkler under separate permit. interconnecting stair is under separate permit. n/a maher ordinance | $1,200,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2016 | 160 Spear St | Skyline Construction | interior tenant improvement consisting of new reception area and conference room rework. f/a, sprinklers, mep under permit.Details
interior tenant improvement consisting of new reception area and conference room rework. f/a, sprinklers, mep under permit. | |
| Dec 21, 2015 | Never finaled issued Jun 2016, no final | 160 Spear St | Skyline Construction | extension of stair from 17th floor to 16th floor- new smoke controll report for this work and entire building- ti for floors separate permits. n/a for maher ordinance no. 155-13.Details
extension of stair from 17th floor to 16th floor- new smoke controll report for this work and entire building- ti for floors separate permits. n/a for maher ordinance no. 155-13. | $140,000 |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 160 Spear St | Principal Builders Inc. | 12th floor - revision to appl #2014.1103.0596 to show conditions of existing restroom for multi-tenant floor and provide drinking fountain signage.Details
12th floor - revision to appl #2014.1103.0596 to show conditions of existing restroom for multi-tenant floor and provide drinking fountain signage. | |
| Dec 15, 2014 | Completed final sign-off Jan 2015 | 160 Spear St | 13th floor ste 1300 fire sprinkler permit - relcoate 4 pendent sprinklers. ref t.i. #2014.1008.8384. n/a maher ordinanceDetails
13th floor ste 1300 fire sprinkler permit - relcoate 4 pendent sprinklers. ref t.i. #2014.1008.8384. n/a maher ordinance | $2,056 | |
| Dec 15, 2014 | Completed final sign-off Jan 2015 | 160 Spear St | 12th floor ste 1200 fire sprinkler permit - relocate 55, add 2 & delete 13 pendents, relocate 2 uprights sprinklers. ref t.i. #2014.1103.0596. n/a maher ordinanceDetails
12th floor ste 1200 fire sprinkler permit - relocate 55, add 2 & delete 13 pendents, relocate 2 uprights sprinklers. ref t.i. #2014.1103.0596. n/a maher ordinance | $31,354 | |
| Dec 3, 2014 | Completed final sign-off Dec 2014 | 160 Spear St | Golden Gate Fire Protection Inc | 17th & 18th flrs: relocate 61 pendant sprinklers on the 17th flr, relocate 14 upright sprinkler heads. relocate 34 pendant sprinkler heads on the 18th flr, relocate 88 upright sprinklers. upgrade earthquake bracing. t.i. #201406279702 17th flr, 201406279707 18th flr; maher n/aDetails
17th & 18th flrs: relocate 61 pendant sprinklers on the 17th flr, relocate 14 upright sprinkler heads. relocate 34 pendant sprinkler heads on the 18th flr, relocate 88 upright sprinklers. upgrade earthquake bracing. t.i. #201406279702 17th flr, 201406279707 18th flr; maher n/a | $101,455 |
| Apr 18, 2014 | Completed final sign-off May 2014 | 160 Spear St | Johnson Controls Fire | fire alarm tenants improvement to 3rd fl. 1 new booster panel, 1 new smoke, 1 new signal module, 1 new strobe, 4 new speaker/strobes. 201403059884. n/a to ordinance #155-13.Details
fire alarm tenants improvement to 3rd fl. 1 new booster panel, 1 new smoke, 1 new signal module, 1 new strobe, 4 new speaker/strobes. 201403059884. n/a to ordinance #155-13. | $4,600 |
| Mar 17, 2014 | Completed final sign-off Apr 2014 | 160 Spear St | 19th floor fire sprinkler permit, relocate 16 & delete 2 pendent, relocate 11 & add 9 uprights. ref t.i. #2014.0214.8524. compliance with ordinance #155-13 not requiredDetails
19th floor fire sprinkler permit, relocate 16 & delete 2 pendent, relocate 11 & add 9 uprights. ref t.i. #2014.0214.8524. compliance with ordinance #155-13 not required | $18,504 | |
| Mar 17, 2014 | Completed final sign-off Apr 2014 | 160 Spear St | 2nd floor #208 fire sprinkler permit, relcoate 3 pendents. ref t.i. #2014.0214.8522. compliance with ordinance #155-13 not requiredDetails
2nd floor #208 fire sprinkler permit, relcoate 3 pendents. ref t.i. #2014.0214.8522. compliance with ordinance #155-13 not required | $1,542 | |
| Aug 30, 2013 | Completed final sign-off Jan 2014 | 160 Spear St | Legacy Partners C D S Inc | 1st floor-replace lighting & provide decorative wall features at (e) lobbyDetails
1st floor-replace lighting & provide decorative wall features at (e) lobby | $75,000 |
| Aug 28, 2013 | Completed final sign-off Sep 2013 | 160 Spear St | relocate 1 pendent, add 1 pendent and delete 1 pendent on 17th fl.Details
relocate 1 pendent, add 1 pendent and delete 1 pendent on 17th fl. | $1,542 | |
| Jun 7, 2013 | Completed final sign-off Jul 2013 | 160 Spear St | Simplexgrinnell Lp. | 16th floor-fire alarm t.i-as builts record drawings for pa# 2013-0524-7825.Details
16th floor-fire alarm t.i-as builts record drawings for pa# 2013-0524-7825. | $2,400 |
| May 24, 2013 | Completed final sign-off Jul 2013 | 160 Spear St | Simplexgrinnell Lp. | fire alarm test to suite 1600. 5 new speaker / strobes, demo 3 existing devices.Details
fire alarm test to suite 1600. 5 new speaker / strobes, demo 3 existing devices. | $2,500 |
| Apr 17, 2013 | Completed final sign-off May 2013 | 160 Spear St | Simplexgrinnell Lp. | fire alarm t.i to 19th fl. 13 new strobes and 2 new synch modules. t.i #201303293417.Details
fire alarm t.i to 19th fl. 13 new strobes and 2 new synch modules. t.i #201303293417. | $6,000 |
| Apr 12, 2013 | Completed final sign-off Apr 2013 | 160 Spear St | 19th floor. fire sprinkler permit. relocate 5 and delete 12 pendent heads. t.i pa# 201303293417Details
19th floor. fire sprinkler permit. relocate 5 and delete 12 pendent heads. t.i pa# 201303293417 | $3,000 | |
| Sep 6, 2012 | Completed final sign-off Nov 2012 | 160 Spear St | Simplexgrinnell Lp. | suite #1100, as built for 201207034017, fire alarm- add 1 speaker strobe and 1 smoke detectorDetails
suite #1100, as built for 201207034017, fire alarm- add 1 speaker strobe and 1 smoke detector | $500 |
| Jul 3, 2012 | Completed final sign-off Nov 2012 | 160 Spear St | Simplexgrinnell Lp. | #1100, 11th floor-fire alarm system t.i-demo (e) 18 fire alarm devices & provide new 1 power supply with batteries. 3 smoke for booster protection and ac shutdown, 3 relays & 15 speaker/strobesDetails
#1100, 11th floor-fire alarm system t.i-demo (e) 18 fire alarm devices & provide new 1 power supply with batteries. 3 smoke for booster protection and ac shutdown, 3 relays & 15 speaker/strobes | $9,800 |
| Jun 15, 2012 | Completed final sign-off Jul 2012 | 160 Spear St | Simplexgrinnell Lp. | fire alarm system tenant improvement. 3 new speaker strobesDetails
fire alarm system tenant improvement. 3 new speaker strobes | $4,500 |
| May 18, 2012 | Completed final sign-off May 2012 | 160 Spear St | Simplexgrinnell Lp. | 2nd floor #250 -fire alarm tenant improvement: (4) new speaker/strobes, (1) new sync control moduleDetails
2nd floor #250 -fire alarm tenant improvement: (4) new speaker/strobes, (1) new sync control module | $5,000 |
| May 9, 2012 | Completed final sign-off Jun 2012 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers per tenant improvements, 3 relocateDetails
relocate fire sprinklers per tenant improvements, 3 relocate | $1,700 |
| May 1, 2012 | Completed final sign-off May 2012 | 160 Spear St | Simplexgrinnell Lp. | 2nd floor:fire alarm system t.i. . one smoke detector, 5 speaker/strobes.Details
2nd floor:fire alarm system t.i. . one smoke detector, 5 speaker/strobes. | $4,500 |
| Apr 18, 2012 | Never finaled issued Apr 2012, no final | 160 Spear St | Aquamatic Fire Protection | relocate 1 fire sprinkler head, add 1 fire sprinkler headDetails
relocate 1 fire sprinkler head, add 1 fire sprinkler head | $2,500 |
| Mar 30, 2012 | Completed final sign-off May 2012 | 160 Spear St | Simplexgrinnell Lp. | fire alarm system t.i. of 14th floor. scope includes 2 smokes, 1 relay, 24 speaker/strobes, 1 speaker, re-program extg system.Details
fire alarm system t.i. of 14th floor. scope includes 2 smokes, 1 relay, 24 speaker/strobes, 1 speaker, re-program extg system. | $22,000 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 160 Spear St | Simplexgrinnell Lp. | additioin of 5 speaker/strobes, multi candela ceiling mount. relocate of 3 existing speaker/strobe multicandela ceiling mount. fire life safety, ti, 17th floor.Details
additioin of 5 speaker/strobes, multi candela ceiling mount. relocate of 3 existing speaker/strobe multicandela ceiling mount. fire life safety, ti, 17th floor. | $3,000 |
| Mar 20, 2012 | Completed final sign-off Apr 2012 | 160 Spear St | 17th floor suite #1750 fire sprinkler only - relocate 11 heads, add 1 head & plug off 3 heads for "workday". seismic calc's includedDetails
17th floor suite #1750 fire sprinkler only - relocate 11 heads, add 1 head & plug off 3 heads for "workday". seismic calc's included | $6,000 | |
| Mar 20, 2012 | Completed final sign-off Apr 2012 | 160 Spear St | relocate 32 heads, add 4 heads and delete 20. tenant improvement 14th floorDetails
relocate 32 heads, add 4 heads and delete 20. tenant improvement 14th floor | $18,000 | |
| Jan 27, 2012 | Completed final sign-off Apr 2012 | 160 Spear St | Simplexgrinnell Lp. | 8th & 9th floors-fire alarm tenant improvement-2 power supplies with batteries, 17 smoke detector, 4 duct detectors, 52 speaker/strobes & 7 speakersDetails
8th & 9th floors-fire alarm tenant improvement-2 power supplies with batteries, 17 smoke detector, 4 duct detectors, 52 speaker/strobes & 7 speakers | $40,000 |
| Mar 8, 2011 | Completed final sign-off Apr 2011 | 160 Spear St | Rossi Builders Inc. | add 2 private offices in existing bldg, 15th flDetails
add 2 private offices in existing bldg, 15th fl | $15,000 |
| Feb 4, 2011 | Completed final sign-off Mar 2011 | 160 Spear St | Simplex Grinnell | 11th floor-addition 1 speaker, 4 multi candela strobes wall mount. relocated existring speakers and remove and cover existing strobes and speaker for tiDetails
11th floor-addition 1 speaker, 4 multi candela strobes wall mount. relocated existring speakers and remove and cover existing strobes and speaker for ti | $6,000 |
| Feb 1, 2011 | Completed final sign-off Mar 2011 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | 11th floor tenant improvements, existing fire sprinkler system - add 3 sprinklers, relcoated 1 sprinklersDetails
11th floor tenant improvements, existing fire sprinkler system - add 3 sprinklers, relcoated 1 sprinklers | $2,000 |
| Feb 4, 2010 | Completed final sign-off May 2010 | 160 Spear St | Simplex Grinnell | 2nd & 17th floors-addition of 11-speaker/strobes, 1-strobe, 1-sync cube, 2-duct smoke detectors with key test switch.Details
2nd & 17th floors-addition of 11-speaker/strobes, 1-strobe, 1-sync cube, 2-duct smoke detectors with key test switch. | $8,000 |
| Apr 23, 2009 | Completed final sign-off Mar 2010 | 160 Spear St | Simplex Grinnell | main lobby- fire alarm control panel replacement. replace (e) 2120 falp and scc w/ new as per approved plans of action 12.30.08. includes installation of new lcd annunciator in main lobbyDetails
main lobby- fire alarm control panel replacement. replace (e) 2120 falp and scc w/ new as per approved plans of action 12.30.08. includes installation of new lcd annunciator in main lobby | $88,000 |
| Jun 18, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | 12th floor-t.i. upgrade of (e) sprinkler system-relocate 12 pendent sprinklers, add 2 pendent sprinklers and delete 5 pendent sprinklersDetails
12th floor-t.i. upgrade of (e) sprinkler system-relocate 12 pendent sprinklers, add 2 pendent sprinklers and delete 5 pendent sprinklers | $2,800 | |
| May 15, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | 13th floor - t/i on the e fire sprinklers system for playfirst, 13th fl. relocate 26 heads, add 4 heads and delete 3 heads. total 30 heads.Details
13th floor - t/i on the e fire sprinklers system for playfirst, 13th fl. relocate 26 heads, add 4 heads and delete 3 heads. total 30 heads. | $6,000 | |
| May 13, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | 12th floor-t.i. upgrade of sprinkler system; 16-relocate, 2-deletes, 3-adds. 19 heads total.Details
12th floor-t.i. upgrade of sprinkler system; 16-relocate, 2-deletes, 3-adds. 19 heads total. | $9,500 | |
| Oct 9, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | 2nd floor - revise app.# 200702023234 new idf to be 1-hr rated for new equipment provide rated walls, door assembly and ceiling.Details
2nd floor - revise app.# 200702023234 new idf to be 1-hr rated for new equipment provide rated walls, door assembly and ceiling. | ||
| Sep 26, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | California Suppresion Dba Calif. Protect | replace 3 non ada strobes with new, add 2 ada strobes, add 1 synchronization module.Details
replace 3 non ada strobes with new, add 2 ada strobes, add 1 synchronization module. | $9,000 |
| Aug 31, 2007 | Never finaled issued Aug 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | 16th floor-addition of 1 smoke det, 1 speaker , 1 strobe @ server roomDetails
16th floor-addition of 1 smoke det, 1 speaker , 1 strobe @ server room | $21,978 |
| Aug 22, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Clinton Heating & A/C Inc | suite 1150 mech ti - 4 new fsd's for corridors, new 1.5ton ac, cap and new duct work/ relo supplys (plenum ceiling)Details
suite 1150 mech ti - 4 new fsd's for corridors, new 1.5ton ac, cap and new duct work/ relo supplys (plenum ceiling) | $18,000 |
| Jul 6, 2007 | Completed final sign-off Feb 2008 | 160 Spear St | Gci, Inc | mech. and elec. for multi tenant floor.Details
mech. and elec. for multi tenant floor. | $125,000 |
| Jun 18, 2007 | Completed final sign-off Feb 2008 | 160 Spear St | Gci, Inc | legacy partners, oti-1, 4th floor, el, me, ls, spDetails
legacy partners, oti-1, 4th floor, el, me, ls, sp | $100,000 |
| May 3, 2007 | Never finaled issued May 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | relocate 10 sprinkler heads, install 5 sprinkler heads.Details
relocate 10 sprinkler heads, install 5 sprinkler heads. | $7,540 |
| Apr 25, 2007 | Expired or cancelled expired Oct 2013 | 160 Spear St | Legacy Partners C D S Inc | new ceilings in elevator lobbys & upgraded counters in restrooms for floors 2, 3, 4, 10-17.Details
new ceilings in elevator lobbys & upgraded counters in restrooms for floors 2, 3, 4, 10-17. | $250,000 |
| Apr 10, 2007 | Expired or cancelled expired Oct 2013 | 160 Spear St | Legacy Partners C D S Inc | oti-1, 16th floor, el, ls, sp | $52,000 |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | Richlen Construction | legacy partners: oti-2 2nd floor el, me.Details
legacy partners: oti-2 2nd floor el, me. | $45,000 |
| Mar 8, 2007 | Completed final sign-off May 2007 | 160 Spear St | Richlen Construction | legacy partners: oti-2 9th floor el.Details
legacy partners: oti-2 9th floor el. | $13,595 |
| Feb 22, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | relocate 8 fire sprinklers for tenant improvement (2nd floor)Details
relocate 8 fire sprinklers for tenant improvement (2nd floor) | $1,200 |
| Feb 7, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Legacy Partners C D S Inc | oti-1, legacy partners inc, 1/fl, el, ls, sp.Details
oti-1, legacy partners inc, 1/fl, el, ls, sp. | $18,094 |
| Feb 2, 2007 | Completed final sign-off May 2007 | 160 Spear St | oti-1, 9th floor, ls, spDetails
oti-1, 9th floor, ls, sp | $50,000 | |
| Feb 2, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | oti-1, 2nd floor, el, ls, spDetails
oti-1, 2nd floor, el, ls, sp | $60,000 | |
| Nov 28, 2006 | Expired or cancelled expired Apr 2008 | 160 Spear St | Novo Construction Inc | sprinkler drawings. ref. appl#200610235792, relocate 10 heads.Details
sprinkler drawings. ref. appl#200610235792, relocate 10 heads. | $3,500 |
| Oct 23, 2006 | Completed final sign-off Jul 2007 | 160 Spear St | t.i. minor demolition build partitions for office reconfiguration & work stations. rer. appl#200512130227. electrical & sprinkler work under seperate permit.Details
t.i. minor demolition build partitions for office reconfiguration & work stations. rer. appl#200512130227. electrical & sprinkler work under seperate permit. | $42,000 | |
| May 10, 2006 | Expired or cancelled expired Apr 2007 | 160 Spear St | Thomas Swan Sign Co Inc | to erect non-electric single faced sign.Details
to erect non-electric single faced sign. | |
| Jan 31, 2006 | Expired or cancelled expired Apr 2007 | 160 Spear St | Bcci Construction Company | minor mechanical work on the 1st floorDetails
minor mechanical work on the 1st floor | $5,500 |
| Dec 28, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Richlen Construction | oti-2, 17th floor, el, me, sp. electrical, mechanical, fire sprinkler.Details
oti-2, 17th floor, el, me, sp. electrical, mechanical, fire sprinkler. | $120,000 |
| Dec 21, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Richlen Construction | oti-1 17th floor el ls me spDetails
oti-1 17th floor el ls me sp | $91,420 |
| Dec 13, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | minor tenant improvement work on 1st floor lobby area for oti-1, lighting, mech, sprinkler & life safety under separate permit.Details
minor tenant improvement work on 1st floor lobby area for oti-1, lighting, mech, sprinkler & life safety under separate permit. | $60,000 |
| Dec 7, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | minor tenant improvement work on gr floor for oti 1Details
minor tenant improvement work on gr floor for oti 1 | $25,000 |
| Nov 29, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | fire sprinkler tenant improvements - relocate sprinkler headsDetails
fire sprinkler tenant improvements - relocate sprinkler heads | $16,000 |
| Aug 26, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | minor work in the corridor & restroomDetails
minor work in the corridor & restroom | $36,000 |
| Aug 26, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | minor work in the corridor & restroomDetails
minor work in the corridor & restroom | $36,000 |
| Aug 26, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | minor work in the corridor & restroomDetails
minor work in the corridor & restroom | $36,000 |
| Jul 8, 2005 | Completed final sign-off Nov 2005 | 160 Spear St | Dpr Construction Inc | oti-2, 18th floor, el, me, sp.Details
oti-2, 18th floor, el, me, sp. | $300,000 |
| Oct 21, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | 7/f- life safetyDetails
7/f- life safety | $30,000 | |
| Oct 21, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | 6/f- life safetyDetails
6/f- life safety | $30,000 | |
| Oct 21, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | 5/f- life safetyDetails
5/f- life safety | $30,000 | |
| Oct 2, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | provide ti, work includes new walls,doors on the 5th flr,no increase in office spaceDetails
provide ti, work includes new walls,doors on the 5th flr,no increase in office space | $500,000 | |
| Apr 24, 2002 | Completed final sign-off Aug 2002 | 160 Spear St | Bcci Construction Company | 14/f- remove approx 60 lin ft. of interior non-bearing, ceiling high partition, patch finishesDetails
14/f- remove approx 60 lin ft. of interior non-bearing, ceiling high partition, patch finishes | $35,000 |
| Dec 5, 2001 | Expired or cancelled cancelled Feb 2003 | 160 Spear St | Bcci Construction Company | oti-1 (14th fl) el, me, le and s/p | $90,000 |
| Dec 5, 2001 | Expired or cancelled cancelled Aug 2002 | 160 Spear St | Bcci Construction Company | oti 1: (15th fl) interior soft demo, new walls, ceiling work & new finishesDetails
oti 1: (15th fl) interior soft demo, new walls, ceiling work & new finishes | $190,000 |
| Jun 18, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-3 2nd floor, l/s only | $5,000 |
| Apr 23, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-2 2nd floor, ltg, mech, sprDetails
oti-2 2nd floor, ltg, mech, spr | $60,000 |
| Mar 15, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-1 2nd flr el, me.l/s & sp | $60,000 |
| Mar 7, 2001 | Completed final sign-off Mar 2001 | 160 Spear St | Turner Construction**See 210639**** | soft demo only non structural at 5th fl location finish ti to be submittedDetails
soft demo only non structural at 5th fl location finish ti to be submitted | $8,500 |
| Feb 23, 2001 | Completed final sign-off Aug 2001 | 160 Spear St | 2 int offices with flr ceiling furniture systm partition 7th fl addendum to 9913856 to mitigate novDetails
2 int offices with flr ceiling furniture systm partition 7th fl addendum to 9913856 to mitigate nov | $1,000 | |
| Feb 13, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-3, 2nd floor, ls | $6,000 |
| Jan 18, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-2, 2nd floor, el, me & sp | $30,000 |
| Jan 18, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-1, 2nd floor, el, me, ls, spDetails
oti-1, 2nd floor, el, me, ls, sp | $30,000 |
| Aug 23, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-3 13th floor spr | $15,000 | |
| Jul 17, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-1 13th floor el, me, l/s, spDetails
oti-1 13th floor el, me, l/s, sp | $500,000 | |
| May 31, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-2 10th floor el, sp | $40,000 | |
| Apr 26, 2000 | Completed final sign-off Oct 2000 | 160 Spear St | oti 3, 12th floor, lsDetails
oti 3, 12th floor, ls | $4,000 | |
| Apr 18, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-1 10th floor, el, me, ls spDetails
oti-1 10th floor, el, me, ls sp | $200,000 | |
| Mar 31, 2000 | Completed final sign-off Oct 2000 | 160 Spear St | oti 1 12th floor, el, me, ls & spDetails
oti 1 12th floor, el, me, ls & sp | $125,000 | |
| Jan 27, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | oti-2, 16th fl, el, me, ls, sp.Details
oti-2, 16th fl, el, me, ls, sp. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bilcor Inc (21), Skyline Construction (17), Sc Builders, Inc (14), Simplexgrinnell Lp. (11), Bcci Construction Company (9), Crk Construction (6), Gci, Inc (6), Golden Gate Fire Protection Inc (6), Peacock Construction (6), Anderson, Rowe & Buckley, Inc. (5), Ayoob & Peery Plumbing Co Inc (4), Legacy Partners C D S Inc (4), Novo Construction Inc (4), Pioneer Fire Inc. (4), Richlen Construction (4), Rossi Builders Inc. (4), California Suppresion Dba Calif. Protect (3), Simplex Grinnell (3), Source Planning And Construction Inc (3), Capital Electric & Sign Co (2), Johnson Controls Fire (2), Aquamatic Fire Protection, C B F Inc, Clinton Heating & A/C Inc, Dpr Construction Inc, Pacific Neon Company, Pribuss Engineering Inc, Principal Builders Inc., R.M.R. Construction Company, Sun Graphics, Thomas Swan Sign Co Inc, Turner Construction**See 210639****
- Architects
- David De Valeria (8), Stanley H Lew (6), Sashikala Murphy (5), Revel Architecture (4), Aston Pereira (3), Ken Eng (3), Martha L. Breed (2), Melissa Pesci (2), Akshat Jain, Dc Kim, Kevin Dai, M. Mose Architects, Matthew H.T. Ma, Steve Suzuki/Douglas Zucher, Steven Perry
- Engineers
- Alexander Joseph Pacheco (2), Habtom Nugusse Tewelde (2), Mozart Faizi (2), Rudolfo P Bustos Iii (2), Stephen Shaffer (2), Zhen Chao Xiong (2), Amit Wadhwa, Ayoob & Peery, Chris Mcnamara, Erik Elmtoft, Forell Elsesser, Joseph Fay, Pablo Orozco, Sherry Chaumpluke, Srdjan Rebraca, Stanley H Lew
- Authorized agents
- Rlh Fire Design Rlh Fire Design
- Designers
- Anderson, Rowe & Buckley, Inc., Jason Norton
- Pmt consultant/expediters
- David Penney
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.