Akshat Jain
- License
- C35286
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, designer
- On San Francisco permits
- Dec 2015 to Apr 2016
8 permits since 2000 (architect on 7 permits, designer on 1 permit): 6 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rudolph Commercial Interiors Inc, Rci (2), Fisher Development Inc, Peacock Construction, Richlen Construction, Rossi Builders Inc., Source Planning And Construction Inc
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 10th flr: permit revision to 201603212626, new nanawall to be installed in this scope, minimal interior structural work; maher n/aDetails
10th flr: permit revision to 201603212626, new nanawall to be installed in this scope, minimal interior structural work; maher n/a | |
| Mar 28, 2016 | Completed final sign-off May 2016 | 160 Spear St | Rossi Builders Inc. | ada barrier removal, providing pull side restroom entry for men & women, and womens' automatic door opener to stall. project consists of replacing all interior restroom finishes. scope includes new lighting, new toilet partitions, sinks & finishes. maher naDetails
ada barrier removal, providing pull side restroom entry for men & women, and womens' automatic door opener to stall. project consists of replacing all interior restroom finishes. scope includes new lighting, new toilet partitions, sinks & finishes. maher na | $70,000 |
| Mar 23, 2016 | Completed final sign-off Mar 2017 | 595 Market St | Source Planning And Construction Inc | barrier removal project - adding a platform lift & compliant stair in place of (2) existing non-compliant stairs.Details
barrier removal project - adding a platform lift & compliant stair in place of (2) existing non-compliant stairs. | $200,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | tenant improvement 10th fl of a 25 story building. buildout consists of new interior partitions with glazing configuration, ceiling, power/data workk finishes. life safety, mech plumb, sprinkler mods under seperate permit.Details
tenant improvement 10th fl of a 25 story building. buildout consists of new interior partitions with glazing configuration, ceiling, power/data workk finishes. life safety, mech plumb, sprinkler mods under seperate permit. | $1,379,763 |
| Feb 23, 2016 | Completed final sign-off Jul 2016 | 85 02nd St | 2nd floor - scope consists of selective demolition & safe-off in vacant space. no new construction is considered in this scope of work. tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintainedDetails
2nd floor - scope consists of selective demolition & safe-off in vacant space. no new construction is considered in this scope of work. tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintained | $1,000 | |
| Feb 4, 2016 | Completed final sign-off Dec 2016 | 201 Mission St | Richlen Construction | suite #2150: project consists of a t.i on a multi-tenant floor. build-out consists of demo of existing walls & construction of new walls and glazing configuration ceiling, power data and finishes. sprinkler system modification is under sep permitDetails
suite #2150: project consists of a t.i on a multi-tenant floor. build-out consists of demo of existing walls & construction of new walls and glazing configuration ceiling, power data and finishes. sprinkler system modification is under sep permit | $236,000 |
| Jan 5, 2016 | Completed final sign-off Mar 2016 | 601 California St | Fisher Development Inc | project consists of ti on a multi tenant floor. build out consists of 3 new offices & new break area with new millwork. new finishes throughout. space is currently unoccupied. mep, sprinkler & life safety will be under separate permitDetails
project consists of ti on a multi tenant floor. build out consists of 3 new offices & new break area with new millwork. new finishes throughout. space is currently unoccupied. mep, sprinkler & life safety will be under separate permit | $80,000 |
| Dec 23, 2015 | Completed final sign-off May 2017 | 601 California St | Peacock Construction | 8th floor - project consists of upgrading finishes in elevator lobby corridor & core restroom, as well as construction of a new single accomodation unisex ada compliant restroom. any alteration to mep, sprinkler & life safety systems under separate permit.Details
8th floor - project consists of upgrading finishes in elevator lobby corridor & core restroom, as well as construction of a new single accomodation unisex ada compliant restroom. any alteration to mep, sprinkler & life safety systems under separate permit. | $140,000 |