Rudolph Commercial Interiors Inc, Rci
- Based in
- Oakland
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 23 permits filed
839 permits since 2000: 662 completed, 13 in progress, 83 never finaled, 81 expired or cancelled.
Of the 83 never-finaled permits, 10 are 3 to 5 years old, 24 are 5 to 10 years old, 49 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 839.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 600 Harrison St | suite #650: interior demolition & construction of non-structural elements including interior partition, doors, finishes, ceilings, lighting,mechanical systems, modification & electrical outlets & switches. mech & elect plans tobe submitted under separate permits. no change of use or path of travel.Details
suite #650: interior demolition & construction of non-structural elements including interior partition, doors, finishes, ceilings, lighting,mechanical systems, modification & electrical outlets & switches. mech & elect plans tobe submitted under separate permits. no change of use or path of travel. | $2,000,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 255 California St | interior ti: demolition of non structual partitions, new partitions light fixtures and finishes. mechanica and electrical fire life safety deferredDetails
interior ti: demolition of non structual partitions, new partitions light fixtures and finishes. mechanica and electrical fire life safety deferred | $100,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 455 Market St | 20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures.Details
20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures. | $62,370 |
| Jul 23, 2026 | In progress issued Sep 2026 | 1 California St | 31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and light fixtures.Details
31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and light fixtures. | $112,286 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 388 Market St | 14/fl- partial ti to include adding partition walls for 3 (n) offices and upgrade hvac system and electrical.Details
14/fl- partial ti to include adding partition walls for 3 (n) offices and upgrade hvac system and electrical. | $130,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 115 Sansome St | 7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractorDetails
7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractor | $32,000 |
| May 28, 2026 | In progress issued Jun 2026 | 115 Sansome St | interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat.Details
interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat. | $351,895 |
| Apr 17, 2026 | In progress issued May 2026 | 555 Montgomery St | ste 1500 / 15/f: seismic bolting of phone booths.Details
ste 1500 / 15/f: seismic bolting of phone booths. | $5,000 |
| Mar 11, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | 7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd.Details
7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd. | $650,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 250 Montgomery St | 4th floor: documentation and anchoring of phone booths (2) with new power, fire strobes and fire sprinkler at each booth and new signage to accessible phone room. electrical and fire sprinkler is deffered.Details
4th floor: documentation and anchoring of phone booths (2) with new power, fire strobes and fire sprinkler at each booth and new signage to accessible phone room. electrical and fire sprinkler is deffered. | $10,000 |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 400 Howard St | 4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.Details
4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred. | $473,200 |
| Dec 8, 2025 | In progress issued Jan 2026 | 100 Montgomery St | tenant improvemet demolition of non structuctural partitions, existing breakroom, new partitions, new millwork, finishes. mep and fire life safety under sep permit.Details
tenant improvemet demolition of non structuctural partitions, existing breakroom, new partitions, new millwork, finishes. mep and fire life safety under sep permit. | $360,035 |
| Sep 19, 2025 | In progress filed Sep 2025, not yet issued | 160 Pine St | 3 standard booths, spaced 4 feet bewtween each unit. 4 securely ancohored to the floorDetails
3 standard booths, spaced 4 feet bewtween each unit. 4 securely ancohored to the floor | $2,800 |
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 251 Post St | 6th floor/ suite 600: t.i. includes demo of non-structural partitions. all new or revised. mep, life safty will be design build and submitted for permit separatly.Details
6th floor/ suite 600: t.i. includes demo of non-structural partitions. all new or revised. mep, life safty will be design build and submitted for permit separatly. | $24,992 |
| Jul 11, 2025 | Completed final sign-off Dec 2025 | 555 Montgomery St | 6th and 17th floor/suites 600 and 17th floor) t.i include seismic bolting of existing phone booth.Details
6th and 17th floor/suites 600 and 17th floor) t.i include seismic bolting of existing phone booth. | $7,500 |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 333 Market St | 8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work.Details
8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work. | $175,000 |
| May 30, 2025 | Completed final sign-off Jan 2026 | 400 Howard St | 5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back.Details
5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back. | $20,000 |
| May 28, 2025 | Completed final sign-off Jan 2026 | 333 Market St | basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support.Details
basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support. | $15,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 101 Mission St | suite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades.Details
suite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades. | $180,244 |
| Apr 2, 2025 | Completed final sign-off May 2025 | 455 Market St | suite 700 & 800: anchoring existing furniture phone boothsDetails
suite 700 & 800: anchoring existing furniture phone booths | $34,560 |
| Mar 10, 2025 | Completed final sign-off Dec 2025 | 185 Post St | 6th fl - ti, demo of non-structural partitions and building new non-structural partitions; all new or revised mep, life safety, fire alarm & sprinklers if needed will be design build & submitted separatelyDetails
6th fl - ti, demo of non-structural partitions and building new non-structural partitions; all new or revised mep, life safety, fire alarm & sprinklers if needed will be design build & submitted separately | $225,000 |
| Feb 19, 2025 | Completed final sign-off Dec 2025 | 400 Howard St | 4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures.Details
4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures. | $210,586 |
| Dec 19, 2024 | Completed final sign-off Jul 2025 | 100 Montgomery St | 20th fl - non structural interior constructionof new partitions, ceiling lighting fixtures, electrical and mechanical fixtures and finishes. mep modifications by design building contractorDetails
20th fl - non structural interior constructionof new partitions, ceiling lighting fixtures, electrical and mechanical fixtures and finishes. mep modifications by design building contractor | $145,000 |
| Sep 26, 2024 | Completed final sign-off Jun 2025 | 101 Mission St | 9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred.Details
9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred. | $150,000 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 333 Market St | 9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft.Details
9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft. | $150,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 333 Market St | 1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room andDetails
1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room and | $150,000 |
| Aug 23, 2024 | Completed final sign-off Aug 2025 | 1560 40th Av | minor demolition to existing kitchen and servery including new case works and suspend ceilingDetails
minor demolition to existing kitchen and servery including new case works and suspend ceiling | $140,000 |
| Jul 15, 2024 | Completed final sign-off Feb 2025 | 333 Market St | 9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work.Details
9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work. | $220,000 |
| Apr 26, 2024 | Completed final sign-off Aug 2024 | 240 Stockton St | 9th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revised meps, and life safety work will be design build and submitted. separately (building is fully sprinklered)Details
9th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revised meps, and life safety work will be design build and submitted. separately (building is fully sprinklered) | $445,000 |
| Apr 23, 2024 | Completed final sign-off Oct 2024 | 190 Post St | rev 202310239225 r1- structural submitted for infilling elevator pit and cold formed framing details for demising walls. (n) element for structrual build out shall comply w/table 601 cbc2022Details
rev 202310239225 r1- structural submitted for infilling elevator pit and cold formed framing details for demising walls. (n) element for structrual build out shall comply w/table 601 cbc2022 | |
| Apr 4, 2024 | Completed final sign-off Dec 2024 | 455 Market St | 17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferredDetails
17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferred | $1,085,600 |
| Mar 27, 2024 | Completed final sign-off Jul 2024 | 250 Montgomery St | 4/f interior tenant improvement & suite demising. scope includes non-structural partitions, new ceilings, light fixtures, office doors & frames & plumbing.Details
4/f interior tenant improvement & suite demising. scope includes non-structural partitions, new ceilings, light fixtures, office doors & frames & plumbing. | $400,000 |
| Mar 19, 2024 | In progress filed Mar 2024, not yet issued | 278 Post St | replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generatorDetails
replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator | $190,000 |
| Feb 27, 2024 | In progress issued Mar 2024 | 455 Market St | ste 900:minor revision to 202307142182. revised deteails and plan to show existing ada compliant breakroom sink.Details
ste 900:minor revision to 202307142182. revised deteails and plan to show existing ada compliant breakroom sink. | |
| Feb 14, 2024 | Completed final sign-off Apr 2024 | 251 Post St | 4/f: addressing the notice of correction dated 8/5/21 from sf fire inspection. improvements are repairing the fire rated plaster ceiling.Details
4/f: addressing the notice of correction dated 8/5/21 from sf fire inspection. improvements are repairing the fire rated plaster ceiling. | $165,000 |
| Feb 12, 2024 | Completed final sign-off Jul 2024 | 333 Market St | 9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.Details
9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan. | $175,000 |
| Feb 5, 2024 | Completed final sign-off Nov 2024 | 251 Post St | roof: building improvement including demo for extg roof, elevator penthouse and building new elevator penthouse. all new or revissed mep & life safety work will be design build & submitted for permit seperately. bldg is fully sprinklered. 170 sq ft area of work.Details
roof: building improvement including demo for extg roof, elevator penthouse and building new elevator penthouse. all new or revissed mep & life safety work will be design build & submitted for permit seperately. bldg is fully sprinklered. 170 sq ft area of work. | |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 185 Post St | 5th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revvised meps, life safety work will be design build and submitted for permit separately. bldg fully sprinkleredDetails
5th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revvised meps, life safety work will be design build and submitted for permit separately. bldg fully sprinklered | $215,000 |
| Oct 23, 2023 | Completed final sign-off Oct 2024 | 190 Post St | basement, 1st & 2nd - shell emising includes demo of non-structural partitions and building non structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered). structural work elevator pitDetails
basement, 1st & 2nd - shell emising includes demo of non-structural partitions and building non structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered). structural work elevator pit | $425,000 |
| Sep 14, 2023 | Completed final sign-off Feb 2024 | 101 Mission St | 16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547Details
16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547 | $650,360 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 278 Post St | 1/f and 2/f. ti demo of non structural partition and removal of existing ceilings. existing fire sprinkler will e turned up under sep permit. # 202309116283Details
1/f and 2/f. ti demo of non structural partition and removal of existing ceilings. existing fire sprinkler will e turned up under sep permit. # 202309116283 | $56,016 |
| Aug 23, 2023 | Completed final sign-off Jul 2024 | 333 Market St | ground fl loading dock. infill existing loading dock ramp.Details
ground fl loading dock. infill existing loading dock ramp. | $225,000 |
| Aug 21, 2023 | Completed final sign-off Aug 2023 | 550 California St | (parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040.Details
(parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040. | $5,000 |
| Aug 3, 2023 | Completed final sign-off Apr 2024 | 33 New Montgomery St | suite 2010: new partitions, doors/frames, new lighting & relocated millworkDetails
suite 2010: new partitions, doors/frames, new lighting & relocated millwork | $300,000 |
| Jul 14, 2023 | Never finaled issued Jul 2023, no final | 455 Market St | work include selective demo and construction of non load bearing partitions. relocate light fixture, new office doors and frames. mollwork and sink. new finishes. new drinking fountain in common area. mep deferred.Details
work include selective demo and construction of non load bearing partitions. relocate light fixture, new office doors and frames. mollwork and sink. new finishes. new drinking fountain in common area. mep deferred. | $192,530 |
| Jul 3, 2023 | Completed final sign-off Feb 2024 | 101 Mission St | 16/f:upgrades, drinking fountain and (e) men's and women's mulitple accomdation toilet rooms, scope includes water closets, urinals, lighting accessories nd inishes, no change in use or area.Details
16/f:upgrades, drinking fountain and (e) men's and women's mulitple accomdation toilet rooms, scope includes water closets, urinals, lighting accessories nd inishes, no change in use or area. | $106,488 |
| Jun 21, 2023 | Completed final sign-off Nov 2023 | 400 Post St | demolition or removal of (e) flooring, (e) interior partition walls, (e) interior glazing, (e) hvac ducts & diffusers, (e) wall cladding, (e) casework, (e) light fixtures, (e) electrical conduits. all finishesto be removed back to base structure. no storefront work under this permit.Details
demolition or removal of (e) flooring, (e) interior partition walls, (e) interior glazing, (e) hvac ducts & diffusers, (e) wall cladding, (e) casework, (e) light fixtures, (e) electrical conduits. all finishesto be removed back to base structure. no storefront work under this permit. | $120,000 |
| Jun 21, 2023 | Completed final sign-off Dec 2023 | 333 Market St | 5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new constructionDetails
5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction | $125,000 |
| May 17, 2023 | Completed final sign-off Jan 2024 | 333 Market St | 9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps addedDetails
9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps added | $162,000 |
| May 15, 2023 | Completed final sign-off Sep 2023 | 101 Mission St | 3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area.Details
3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area. | $385,246 |
| Mar 15, 2023 | Never finaled issued Apr 2023, no final | 101 Mission St | ste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area.Details
ste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area. | $772,622 |
| Feb 9, 2023 | Completed final sign-off Jul 2023 | 455 Market St | 18th fl: selective demo and construction of non load bearing partitions,modification to existing ceiling reid and tile, new light fixtures, includes reswitching, new millwork, finishes (mep defferred)Details
18th fl: selective demo and construction of non load bearing partitions,modification to existing ceiling reid and tile, new light fixtures, includes reswitching, new millwork, finishes (mep defferred) | $269,832 |
| Nov 22, 2022 | Never finaled issued Dec 2022, no final | 455 Market St | suite #620: work includes: demo and construction of non-load bearing partitions, modifications to extg ceiling grid & tile, new light fixture and swiching, new office doors and frames, salvage & reuse of extg selected materials, new millwork and sink, & new finishes. (mep deffered)Details
suite #620: work includes: demo and construction of non-load bearing partitions, modifications to extg ceiling grid & tile, new light fixture and swiching, new office doors and frames, salvage & reuse of extg selected materials, new millwork and sink, & new finishes. (mep deffered) | $639,000 |
| Nov 17, 2022 | Never finaled issued Dec 2022, no final | 455 Market St | 19/f - suite 1900: add new bi-fold movable partition in (e) conference roomDetails
19/f - suite 1900: add new bi-fold movable partition in (e) conference room | $83,000 |
| Sep 30, 2022 | Completed final sign-off Mar 2023 | 360 Post St | 8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permitDetails
8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permit | $60,000 |
| Sep 28, 2022 | Never finaled issued Mar 2023, no final | 201 Spear St | demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above.Details
demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above. | $245,000 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 455 Market St | 19/f ste 1900: selective demo and contruction of non bearing partitions, new and relocated light fixture and switching new office doors, new office doors, frames and new finishesDetails
19/f ste 1900: selective demo and contruction of non bearing partitions, new and relocated light fixture and switching new office doors, new office doors, frames and new finishes | $70,798 |
| Aug 18, 2022 | Completed final sign-off Sep 2023 | 333 Market St | 2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/aDetails
2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/a | $250,000 |
| Aug 12, 2022 | Completed final sign-off Jun 2023 | 100 Montgomery St | 13th flr - non structural interior construction and installation of new finishes in (e) vacant suite, const. of interior walls partitions, rcp ligting fixtueres, elec and mech fixtures, millwork, window bunds.Details
13th flr - non structural interior construction and installation of new finishes in (e) vacant suite, const. of interior walls partitions, rcp ligting fixtueres, elec and mech fixtures, millwork, window bunds. | $828,874 |
| Jul 25, 2022 | Completed final sign-off May 2023 | 250 Montgomery St | suite 600: demolition existing doors, partitions, millwork, lt fixtures new gyp bd partitoins, ceiling, plumbing, millwork, light fixtures. mep is design build. deferred submittalDetails
suite 600: demolition existing doors, partitions, millwork, lt fixtures new gyp bd partitoins, ceiling, plumbing, millwork, light fixtures. mep is design build. deferred submittal | $196,000 |
| Jul 25, 2022 | Never finaled issued Aug 2022, no final | 250 Montgomery St | suite 200: demo of e doors, partitoins, ceiling and millwork, plumbing, ltg, new gyp bd partitions, ceiling, plumbing, lighting, millwork. mep design build deferred submittalDetails
suite 200: demo of e doors, partitoins, ceiling and millwork, plumbing, ltg, new gyp bd partitions, ceiling, plumbing, lighting, millwork. mep design build deferred submittal | $365,000 |
| Jul 12, 2022 | Completed final sign-off Feb 2023 | 100 Montgomery St | suite# 1800: non-structural interior construction and installation of (n)finishes in existing vacant suite. mech, elect, plumbing and fire sprinkler modification by design build contractor.Details
suite# 1800: non-structural interior construction and installation of (n)finishes in existing vacant suite. mech, elect, plumbing and fire sprinkler modification by design build contractor. | $650,000 |
| May 20, 2022 | Never finaled issued Jul 2022, no final | 101 Mission St | ti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under sDetails
ti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under s | $183,664 |
| May 6, 2022 | Completed final sign-off Mar 2023 | 333 Market St | 25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.Details
25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms. | $150,000 |
| Apr 13, 2022 | Completed final sign-off Dec 2022 | 100 Montgomery St | 14th floor: suite 1410 non structural interior construction in extg vacant suite. ada upgraded to extg men's and women's restrooms to full compliance. mep and fire sprinkler by design build contractor under separate permit.Details
14th floor: suite 1410 non structural interior construction in extg vacant suite. ada upgraded to extg men's and women's restrooms to full compliance. mep and fire sprinkler by design build contractor under separate permit. | $280,000 |
| Mar 8, 2022 | Completed final sign-off Sep 2022 | 455 Market St | ste #1460: revision to pa# 202201286899. tenant improvement. change of layout.Details
ste #1460: revision to pa# 202201286899. tenant improvement. change of layout. | |
| Feb 25, 2022 | Never finaled issued Feb 2022, no final | 601 Van Ness Av | currently constructed work approved and completed under permit no 202103015584. this permit is a revision to the approved permit 202103015584. this revision permit is for the change from an (e) accessory limited restaurant use to a new accesory full restarant use.Details
currently constructed work approved and completed under permit no 202103015584. this permit is a revision to the approved permit 202103015584. this revision permit is for the change from an (e) accessory limited restaurant use to a new accesory full restarant use. | |
| Jan 28, 2022 | Completed final sign-off Sep 2022 | 455 Market St | suite 1460: tenant improvement: demo & constructon of non-load bearing partitions, new lighting fixtures and compliant millwork and finishes.Details
suite 1460: tenant improvement: demo & constructon of non-load bearing partitions, new lighting fixtures and compliant millwork and finishes. | $535,000 |
| Jan 12, 2022 | Completed final sign-off Feb 2023 | 214 Grant Av | 4/f t.i includes the demo of non structural partitions and building new non stru partitions. all new or revised mep and life safety/sprinler will be submitted separately.Details
4/f t.i includes the demo of non structural partitions and building new non stru partitions. all new or revised mep and life safety/sprinler will be submitted separately. | $282,000 |
| Oct 22, 2021 | Never finaled issued Oct 2021, no final | 444 Fair Oaks St | to obtain a final inspection for work approved under pa 200205166814 & 200212234114. all work is complete.Details
to obtain a final inspection for work approved under pa 200205166814 & 200212234114. all work is complete. | |
| Sep 21, 2021 | Completed final sign-off Mar 2022 | 845 Market St | minor tenant improvement for blondies pizza in food court space. front counter, signage, misc work in existing space. not same equip to remain. minor plumbing and electrical.Details
minor tenant improvement for blondies pizza in food court space. front counter, signage, misc work in existing space. not same equip to remain. minor plumbing and electrical. | $28,500 |
| Aug 24, 2021 | Completed final sign-off May 2022 | 455 Market St | +/- 300 sq ft interior office t.i. to convert 2 offices to a mailroom in an extg office space with non-bearing partitions, finishes, ceilig, lighting, outlets, and door. replacing elevator lobby door with new. rework lighting/outlets in conferance rooms and open office area.Details
+/- 300 sq ft interior office t.i. to convert 2 offices to a mailroom in an extg office space with non-bearing partitions, finishes, ceilig, lighting, outlets, and door. replacing elevator lobby door with new. rework lighting/outlets in conferance rooms and open office area. | $25,000 |
| Aug 10, 2021 | Completed final sign-off Oct 2021 | 455 Market St | ste 1500. this project involves modification of existing t.i to include selective demolition & construction of non load bearing partitions, new lights fixtures (e) ceiling grid and tile, new office doors and frames, and new finishes.Details
ste 1500. this project involves modification of existing t.i to include selective demolition & construction of non load bearing partitions, new lights fixtures (e) ceiling grid and tile, new office doors and frames, and new finishes. | $83,724 |
| Aug 6, 2021 | Completed final sign-off Sep 2023 | 635 Sacramento St | assembly permit only to establish assembly area on the first floor in the meeting room of the approved permit pa#201907125763. ref pages t-1,a-2 & t-3 that required the a-3 stamp establishing the occupancy load by sffd. no work under this permit. maher n/a.Details
assembly permit only to establish assembly area on the first floor in the meeting room of the approved permit pa#201907125763. ref pages t-1,a-2 & t-3 that required the a-3 stamp establishing the occupancy load by sffd. no work under this permit. maher n/a. | |
| Aug 6, 2021 | Completed final sign-off Sep 2023 | 455 Market St | suite 1690: minor renovation: new partitions, revised power and lighting, minor mechanical changes.Details
suite 1690: minor renovation: new partitions, revised power and lighting, minor mechanical changes. | $250,000 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 600 Harrison St | modification of (e) t.i.-selective demo of construction of non-load bearing partitions, modificate to (e) ceiling tile and grid. 3 (n) light fixture & re-switching, (n) doors frames, sauvay of (e) selective material if practicable. new finishes.Details
modification of (e) t.i.-selective demo of construction of non-load bearing partitions, modificate to (e) ceiling tile and grid. 3 (n) light fixture & re-switching, (n) doors frames, sauvay of (e) selective material if practicable. new finishes. | $127,930 |
| Jul 16, 2021 | Completed final sign-off Nov 2022 | 333 Market St | 20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.Details
20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit. | $1,530,000 |
| Apr 20, 2021 | Completed final sign-off Apr 2023 | 250 Montgomery St | 9th fl spec suite ti: demolition of existing partitions & millwork. provide new millwork,new restroom accessories, light fixtures & finishes. mep under separate permit.Details
9th fl spec suite ti: demolition of existing partitions & millwork. provide new millwork,new restroom accessories, light fixtures & finishes. mep under separate permit. | $566,726 |
| Apr 19, 2021 | Completed final sign-off Jan 2022 | 333 Market St | 9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.Details
9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction. | $466,000 |
| Apr 6, 2021 | Completed final sign-off Sep 2021 | 333 Market St | 4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work.Details
4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work. | $75,000 |
| Mar 1, 2021 | Completed final sign-off Nov 2021 | 601 Van Ness Av | upgrading seats. overall seat count reduced from 300 to 199 seats. replace & enlarge concessions counter. add seating booth. replace & repair interior finishes. replace (e) store front glazing.Details
upgrading seats. overall seat count reduced from 300 to 199 seats. replace & enlarge concessions counter. add seating booth. replace & repair interior finishes. replace (e) store front glazing. | $120,000 |
| Feb 17, 2021 | Completed final sign-off Jan 2022 | 1455 Market St | lower level 2: demo of non-load bearing walls and the remodel of the (e) gym and restrooms with new ada compliant showers, sink, countertop. new light fixtures, outlets and finishes.Details
lower level 2: demo of non-load bearing walls and the remodel of the (e) gym and restrooms with new ada compliant showers, sink, countertop. new light fixtures, outlets and finishes. | $209,611 |
| Jan 13, 2021 | Completed final sign-off Dec 2023 | 394 Pacific Av | remove and replace sidewalk slab & underground vaultDetails
remove and replace sidewalk slab & underground vault | $350,000 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 455 Market St | ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes.Details
ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes. | $1,000,000 |
| Nov 23, 2020 | Never finaled issued Jan 2021, no final | 1 Warriors Wy | replace (e) door 254 a.4 with new doorDetails
replace (e) door 254 a.4 with new door | $5,000 |
| Sep 15, 2020 | Completed final sign-off Apr 2021 | 550 California St | 11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces.Details
11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces. | $137,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 375 Brannan St | barrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work onlyDetails
barrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work only | $137,000 |
| Jul 10, 2020 | Completed final sign-off Jun 2021 | 75 Hawthorne St | 19th flr - interior tenant improvement. scope includes demo of non structural partitions, construction of non structural partitions, doors, interior glazing, light fixtures and finishes. new two-way comm and evac signs in elev lobby under sep permit. ls/fa/sprinklers under sep permit.Details
19th flr - interior tenant improvement. scope includes demo of non structural partitions, construction of non structural partitions, doors, interior glazing, light fixtures and finishes. new two-way comm and evac signs in elev lobby under sep permit. ls/fa/sprinklers under sep permit. | $35,752 |
| May 26, 2020 | Completed final sign-off Feb 2021 | 317 06th Av | dry rot repair: install new siding on north wall ~300sf.Details
dry rot repair: install new siding on north wall ~300sf. | $10,000 |
| May 21, 2020 | Completed final sign-off Feb 2022 | 100 Montgomery St | 18th flr. non-structural interior alteration in (e) vacant suite. ada upgrades to (e) men and women's restrooms to full compliance. mep and fire sprinkler by design-build contractorDetails
18th flr. non-structural interior alteration in (e) vacant suite. ada upgrades to (e) men and women's restrooms to full compliance. mep and fire sprinkler by design-build contractor | $742,398 |
| Feb 13, 2020 | Completed final sign-off Apr 2021 | 555 Montgomery St | ste 1210 - ti improvement to include the demo of non-structural partitions and building of new non-structural partitions mep & fire life safety under sep permit n/a maherDetails
ste 1210 - ti improvement to include the demo of non-structural partitions and building of new non-structural partitions mep & fire life safety under sep permit n/a maher | $394,000 |
| Feb 13, 2020 | Completed final sign-off Mar 2021 | 49 Stevenson St | suite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom.Details
suite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom. | $850,000 |
| Feb 13, 2020 | Completed final sign-off Sep 2020 | 555 Montgomery St | rev to pa# 201907176142 (new partition locations). n/a maherDetails
rev to pa# 201907176142 (new partition locations). n/a maher | |
| Jan 13, 2020 | Completed final sign-off Dec 2021 | 100 Montgomery St | 15th floor: non structural interior construction in extg vacant suite. ada upgrade to extg men's and women's by design build contractors.Details
15th floor: non structural interior construction in extg vacant suite. ada upgrade to extg men's and women's by design build contractors. | $1,600,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 455 Market St | suite 1920: selective demo and construction of non load bearing partitions, new ceiling grid and tile, new light fixtures and switching, new office doors, frames, salvage and reuse of selected materials, new millwork, new sink and new finishesDetails
suite 1920: selective demo and construction of non load bearing partitions, new ceiling grid and tile, new light fixtures and switching, new office doors, frames, salvage and reuse of selected materials, new millwork, new sink and new finishes | $240,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 455 Market St | selective demo and construction of non load bearing partitions, modification to existing ceiling grid, tile, light fixture relocation and new switching, slavage and reuse of existing selected materials, new millwork, and plumbing and new finishesDetails
selective demo and construction of non load bearing partitions, modification to existing ceiling grid, tile, light fixture relocation and new switching, slavage and reuse of existing selected materials, new millwork, and plumbing and new finishes | $350,000 |
| Dec 27, 2019 | Completed final sign-off Aug 2020 | 455 Market St | selective demo and construction of non load bearing partitions, modification to ceiling grid and tile, light fixture relocation and switching, salvage and reuse of e selective materials if practicable millwork new sink new finishesDetails
selective demo and construction of non load bearing partitions, modification to ceiling grid and tile, light fixture relocation and switching, salvage and reuse of e selective materials if practicable millwork new sink new finishes | $120,000 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 101 Mission St | 3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher naDetails
3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na | $689,106 |
| Dec 10, 2019 | Completed final sign-off Jun 2020 | 33 New Montgomery St | scope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restroomsDetails
scope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restrooms | $166,157 |
| Nov 22, 2019 | Completed final sign-off Aug 2020 | 455 Market St | 21st floor - #2100 -project involves selective demolition of non-load bearing partition, millwork, plumbing and finishes n/a haher;ab-017 applies. no ceiling work.Details
21st floor - #2100 -project involves selective demolition of non-load bearing partition, millwork, plumbing and finishes n/a haher;ab-017 applies. no ceiling work. | $13,580 |