Block 0268, lot 017
240 Montgomery St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 17
- Units
- 3
- Rooms
- 6 bathrooms
- Building
- 115,878 sq ft
- Lot
- 3,150 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
179 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2026 | In progress issued Feb 2026 | 250 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 4th floor: documentation and anchoring of phone booths (2) with new power, fire strobes and fire sprinkler at each booth and new signage to accessible phone room. electrical and fire sprinkler is deffered.Details
4th floor: documentation and anchoring of phone booths (2) with new power, fire strobes and fire sprinkler at each booth and new signage to accessible phone room. electrical and fire sprinkler is deffered. | $10,000 |
| Jun 4, 2024 | In progress issued Jun 2024 | 250 Montgomery St | Bilcor Inc | suite 400: install 1 ceiling mount speaker-strobe. relocate 1 ceiling mount speaker-strobe. arch ref# 202403278707Details
suite 400: install 1 ceiling mount speaker-strobe. relocate 1 ceiling mount speaker-strobe. arch ref# 202403278707 | $666 |
| May 20, 2024 | Completed final sign-off May 2024 | 250 Montgomery St | Golden Gate Fire Protection Inc | fire sprinklers relocate 4 pendents on the 4th fl ref pa 202403278707Details
fire sprinklers relocate 4 pendents on the 4th fl ref pa 202403278707 | $2,500 |
| Mar 27, 2024 | Completed final sign-off Jul 2024 | 250 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 4/f interior tenant improvement & suite demising. scope includes non-structural partitions, new ceilings, light fixtures, office doors & frames & plumbing.Details
4/f interior tenant improvement & suite demising. scope includes non-structural partitions, new ceilings, light fixtures, office doors & frames & plumbing. | $400,000 |
| Jan 10, 2024 | Completed final sign-off Mar 2024 | 250 Montgomery St | Modus Rex Llc | revision to bpa# 202208311620: dish wireless - add beam splice and pipe mast gusset details. remove camlock and manual switch cabinet from details and e sheets. fiber design added.Details
revision to bpa# 202208311620: dish wireless - add beam splice and pipe mast gusset details. remove camlock and manual switch cabinet from details and e sheets. fiber design added. | |
| Sep 13, 2023 | Completed final sign-off Mar 2024 | 250 Montgomery St | Modus Rex Llc | revision to 202208311620: revise fiber p.o.c. revise 100 a,p breaker to 125 amp breaker. no change to approved rf report, no change to approved betteriesDetails
revision to 202208311620: revise fiber p.o.c. revise 100 a,p breaker to 125 amp breaker. no change to approved rf report, no change to approved betteries | |
| May 3, 2023 | Never finaled issued May 2023, no final | 250 Montgomery St | Mcclure Electric Inc | 6/f-suite 600: title 24, lighting only. ref bpa#202207259234Details
6/f-suite 600: title 24, lighting only. ref bpa#202207259234 | |
| Apr 13, 2023 | Completed final sign-off May 2023 | 250 Montgomery St | Mcclure Electric Inc | on 2nd floor, title 24 lighting only.Details
on 2nd floor, title 24 lighting only. | |
| Nov 2, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | E. J. Weber Elect.Co Inc | 9th floor: title 24 energy compliant electricl drawings to be added to permit # pa202104208943Details
9th floor: title 24 energy compliant electricl drawings to be added to permit # pa202104208943 | $80,000 |
| Oct 14, 2022 | Completed final sign-off May 2023 | 250 Montgomery St | R M I Mechanical Contractors | ste 200. add one vav box, add supply and return air registers, add new ductwork and heating water piping, add and relocate (e) thermostates. ref pa# 202207259238Details
ste 200. add one vav box, add supply and return air registers, add new ductwork and heating water piping, add and relocate (e) thermostates. ref pa# 202207259238 | $20,000 |
| Sep 16, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | Bilcor Inc | 9/f: install (2) wall mount speaker strobes, (7) ceiling mount speaker strobes, remove/install (4) new model smoke detectors. ref bpa#202104208943Details
9/f: install (2) wall mount speaker strobes, (7) ceiling mount speaker strobes, remove/install (4) new model smoke detectors. ref bpa#202104208943 | $8,580 |
| Sep 16, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | R M I Mechanical Contractors | 9/f: add vav box, add diffusers & registers in the t.i. space, provide new ductwork, relocate (1) thermostat & air balance. ref bpa#202104208943Details
9/f: add vav box, add diffusers & registers in the t.i. space, provide new ductwork, relocate (1) thermostat & air balance. ref bpa#202104208943 | $25,000 |
| Sep 16, 2022 | Never finaled issued Sep 2022, no final | 250 Montgomery St | Bilcor Inc | 2/f-suite 200: install (7) ceiling mount speaker strobes, remove/replace (1) ceiling mount speaker strobes, remove/replace (4) smoke detectors. ref bpa#202207259238Details
2/f-suite 200: install (7) ceiling mount speaker strobes, remove/replace (1) ceiling mount speaker strobes, remove/replace (4) smoke detectors. ref bpa#202207259238 | $7,920 |
| Aug 31, 2022 | Completed final sign-off Mar 2024 | 250 Montgomery St | Modus Rex Llc | dish wireles: insatll 3 (n) antennas, 6 new rrus, 1 new equipment platform in 1 new cabinet. install 2 new batteires. install new electrical panel.Details
dish wireles: insatll 3 (n) antennas, 6 new rrus, 1 new equipment platform in 1 new cabinet. install 2 new batteires. install new electrical panel. | $145,000 |
| Aug 26, 2022 | Never finaled issued Aug 2022, no final | 250 Montgomery St | Bilcor Inc | install (11) ceiling mount speaker strobes, install (1) smoke detector. arch 202205093778 mech 202206075762Details
install (11) ceiling mount speaker strobes, install (1) smoke detector. arch 202205093778 mech 202206075762 | $8,580 |
| Jul 25, 2022 | Completed final sign-off May 2023 | 250 Montgomery St | Rudolph Commercial Interiors Inc, Rci | suite 600: demolition existing doors, partitions, millwork, lt fixtures new gyp bd partitoins, ceiling, plumbing, millwork, light fixtures. mep is design build. deferred submittalDetails
suite 600: demolition existing doors, partitions, millwork, lt fixtures new gyp bd partitoins, ceiling, plumbing, millwork, light fixtures. mep is design build. deferred submittal | $196,000 |
| Jul 25, 2022 | Never finaled issued Aug 2022, no final | 250 Montgomery St | Rudolph Commercial Interiors Inc, Rci | suite 200: demo of e doors, partitoins, ceiling and millwork, plumbing, ltg, new gyp bd partitions, ceiling, plumbing, lighting, millwork. mep design build deferred submittalDetails
suite 200: demo of e doors, partitoins, ceiling and millwork, plumbing, ltg, new gyp bd partitions, ceiling, plumbing, lighting, millwork. mep design build deferred submittal | $365,000 |
| Jul 11, 2022 | Completed final sign-off Mar 2023 | 250 Montgomery St | R L H Fire Protection Inc | 9th fl: fire sprinkler permit. remove 39 pendent sprinklers and install 47 new uprights. ref pa# 202104208943.Details
9th fl: fire sprinkler permit. remove 39 pendent sprinklers and install 47 new uprights. ref pa# 202104208943. | $11,000 |
| Jun 7, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | Novo Construction Inc | mechanical, electrical, and plumbing for tenant improvement on the 15th floor. ref arch 202205093778Details
mechanical, electrical, and plumbing for tenant improvement on the 15th floor. ref arch 202205093778 | $55,000 |
| May 24, 2022 | Never finaled issued May 2022, no final | 250 Montgomery St | Bilcor Inc | fire life safety: replace 1 fire alarm control board. replace 1 audio amplifier power supply.Details
fire life safety: replace 1 fire alarm control board. replace 1 audio amplifier power supply. | $1,320 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 15/f: fire sprinklers. add 9, relocate 52 sprinkler heads per t.i pa202205093778.Details
15/f: fire sprinklers. add 9, relocate 52 sprinkler heads per t.i pa202205093778. | $15,825 |
| May 9, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | Novo Construction Inc | 15/f: demolition of (e) ceiling height partitions, construction of (n) full height partitions, associated disabled access path of travel upgrades. work on the 15th floorDetails
15/f: demolition of (e) ceiling height partitions, construction of (n) full height partitions, associated disabled access path of travel upgrades. work on the 15th floor | $1,940,000 |
| Dec 21, 2021 | Completed final sign-off Mar 2022 | 250 Montgomery St | Bilcor Inc | ste 1210 fire life safety: install 5 ceiling mount speaker strobes. arch ref to 202104208946Details
ste 1210 fire life safety: install 5 ceiling mount speaker strobes. arch ref to 202104208946 | $3,300 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | suite 1210 - 12th flr: new mechanical air ductwork (vav) and diffusers. ref t.i. pa202104208946.Details
suite 1210 - 12th flr: new mechanical air ductwork (vav) and diffusers. ref t.i. pa202104208946. | $42,000 |
| Dec 10, 2021 | Completed final sign-off May 2022 | 250 Montgomery St | Mcclure Electric Inc | title 24 lighting only ref 202104208946Details
title 24 lighting only ref 202104208946 | |
| Nov 8, 2021 | Completed final sign-off Nov 2021 | 250 Montgomery St | R L H Fire Protection Inc | 12/f: fire sprinkler permit. relocate 6, add 12 and delete 14 sprinklers. ref. ti permit 202104208946Details
12/f: fire sprinkler permit. relocate 6, add 12 and delete 14 sprinklers. ref. ti permit 202104208946 | $7,500 |
| May 18, 2021 | Never finaled issued Jun 2021, no final | 250 Montgomery St | Bilcor Inc | fire life safety: install (1) smoke detector, (3) control relaysDetails
fire life safety: install (1) smoke detector, (3) control relays | $2,640 |
| Apr 20, 2021 | Completed final sign-off Apr 2023 | 250 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 9th fl spec suite ti: demolition of existing partitions & millwork. provide new millwork,new restroom accessories, light fixtures & finishes. mep under separate permit.Details
9th fl spec suite ti: demolition of existing partitions & millwork. provide new millwork,new restroom accessories, light fixtures & finishes. mep under separate permit. | $566,726 |
| Apr 20, 2021 | Completed final sign-off May 2022 | 250 Montgomery St | Bevilacqua & Sons | suite 1210, 12th fl ti: demolition of existing partitions, act ceiling & millwork. provide new millwork, act ceiling, lighting fixtures & finishes.Details
suite 1210, 12th fl ti: demolition of existing partitions, act ceiling & millwork. provide new millwork, act ceiling, lighting fixtures & finishes. | $295,780 |
| Dec 21, 2020 | Completed final sign-off Mar 2021 | 250 Montgomery St | R L H Fire Protection Inc | fire sprinkler elevator modification: deleted pendent sprinklers, 10 deleted upright sprinklers, 1 additional upright sprinkler.Details
fire sprinkler elevator modification: deleted pendent sprinklers, 10 deleted upright sprinklers, 1 additional upright sprinkler. | $6,979 |
| Dec 14, 2018 | Completed final sign-off Dec 2018 | 250 Montgomery St | Bilcor Inc | fire alarm ti on 12th fl: install 4 cieling speaker strobes. ref ti #201810193686.Details
fire alarm ti on 12th fl: install 4 cieling speaker strobes. ref ti #201810193686. | $2,400 |
| Dec 7, 2018 | Completed final sign-off Jan 2019 | 250 Montgomery St | City Mechanical Inc | reloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher naDetails
reloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher na | $35,000 |
| Dec 6, 2018 | Completed final sign-off Jan 2019 | 250 Montgomery St | Mcclure Electric Inc | ref pa# 201810193686; title 24 lighting only at 12th flr suite 1200Details
ref pa# 201810193686; title 24 lighting only at 12th flr suite 1200 | |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 250 Montgomery St | Pioneer Fire Inc. | 12th fl, ste 1200 - relocate 22 pendents and remove 10 pendents. ref pa 2018-1019-3686. maher n/a.Details
12th fl, ste 1200 - relocate 22 pendents and remove 10 pendents. ref pa 2018-1019-3686. maher n/a. | $4,642 |
| Oct 19, 2018 | Completed final sign-off Jan 2019 | 250 Montgomery St | Field Construction Inc. | tenant improvement: suite 1200 remove e partitons, doors and frames, millwork, ceiling system, lights, floor finishes. new ceiling system light fixtures, gyp bd header, glazing, frames, door/frames. 12th fl restrooms: upgrade, barrier removal, lighting and finishes. n/a for maher.Details
tenant improvement: suite 1200 remove e partitons, doors and frames, millwork, ceiling system, lights, floor finishes. new ceiling system light fixtures, gyp bd header, glazing, frames, door/frames. 12th fl restrooms: upgrade, barrier removal, lighting and finishes. n/a for maher. | $400,000 |
| Oct 9, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Bilcor Inc | 3rd floor: as built in reference to app#201806302886. corrections to reflect extg sequence of operations. n/a for maherDetails
3rd floor: as built in reference to app#201806302886. corrections to reflect extg sequence of operations. n/a for maher | |
| Oct 5, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Field Construction Inc. | revision to 208/04/17/2647. add new cover sheet - smoke control statement and access control elevatory lobby statement per sffd request.Details
revision to 208/04/17/2647. add new cover sheet - smoke control statement and access control elevatory lobby statement per sffd request. | |
| Jun 26, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Bilcor Inc | 3rd flr - fa ti - relocate 2 ceiling mount speaker/strobes, 3 ceiling speakers/strobes, install 1 (n) viking call station for 2 way communications to access controlled elevator lobby. ref 201804176603; n/a maherDetails
3rd flr - fa ti - relocate 2 ceiling mount speaker/strobes, 3 ceiling speakers/strobes, install 1 (n) viking call station for 2 way communications to access controlled elevator lobby. ref 201804176603; n/a maher | $2,500 |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Field Construction Inc. | ref pa# 201804176603; mep new lighting control for tenant space, install power for desks/furniture & general-use receptacles, install power for it room, workroom & offices, install power/data/av for flat screens & floor monuments, install new water source heat pump and vav, add new panel 3b,Details
ref pa# 201804176603; mep new lighting control for tenant space, install power for desks/furniture & general-use receptacles, install power for it room, workroom & offices, install power/data/av for flat screens & floor monuments, install new water source heat pump and vav, add new panel 3b, | $160,000 |
| May 30, 2018 | Completed final sign-off May 2025 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 3rd flr relocate fire sprinklers per ti, 9 relocate ref 201804176603Details
3rd flr relocate fire sprinklers per ti, 9 relocate ref 201804176603 | $2,025 |
| Apr 17, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Field Construction Inc. | 3rd flr- demo of finishes & light fixtures. new partitions, doors, frames, glazing, ceiling-system, lighting, ele, tele/data and finishes. mep under sep permit. maher naDetails
3rd flr- demo of finishes & light fixtures. new partitions, doors, frames, glazing, ceiling-system, lighting, ele, tele/data and finishes. mep under sep permit. maher na | $450,000 |
| Apr 13, 2018 | Never finaled issued Apr 2018, no final | 250 Montgomery St | C B F Inc | provide new lighting & branch circuiting to existing panel, maintained some of the existing power & signal outlets & provide additonal new power branch circuiting and raceway systems as required to new power and signal outlets. ref pa# 201712227248. maher naDetails
provide new lighting & branch circuiting to existing panel, maintained some of the existing power & signal outlets & provide additonal new power branch circuiting and raceway systems as required to new power and signal outlets. ref pa# 201712227248. maher na | $55,000 |
| Apr 6, 2018 | Completed final sign-off Aug 2018 | 250 Montgomery St | Bcci Construction Company | reduced scope of work permit 2016-1101-1590. notice no work in elevator cabsDetails
reduced scope of work permit 2016-1101-1590. notice no work in elevator cabs | |
| Mar 8, 2018 | Completed final sign-off Apr 2018 | 250 Montgomery St | Bilcor Inc | suite 1400 - fire alarm ti - install 6 wall mount stribes. install 2 ceiling mount speaker/strobes ref 201801199018 maher naDetails
suite 1400 - fire alarm ti - install 6 wall mount stribes. install 2 ceiling mount speaker/strobes ref 201801199018 maher na | $4,000 |
| Mar 6, 2018 | Completed final sign-off Mar 2018 | 250 Montgomery St | Bilcor Inc | 4th flr - install 2 ceiling mount speaker/strobes ref 201712227248. maher naDetails
4th flr - install 2 ceiling mount speaker/strobes ref 201712227248. maher na | $1,000 |
| Feb 14, 2018 | Never finaled issued Feb 2018, no final | 250 Montgomery St | Pioneer Fire Inc. | relocate 8 pendents gc pa 2017-1222-7248Details
relocate 8 pendents gc pa 2017-1222-7248 | $4,795 |
| Jan 19, 2018 | Completed final sign-off Oct 2018 | 250 Montgomery St | Bcci Construction Company | #1400 - single floor ti - new walls, finishes, ceiling, lighting and electrical fixtures. restroom upgrades maher naDetails
#1400 - single floor ti - new walls, finishes, ceiling, lighting and electrical fixtures. restroom upgrades maher na | $750,000 |
| Dec 22, 2017 | Never finaled issued Jan 2018, no final | 250 Montgomery St | Field Construction Inc. | on 4th floor - tenant improvement demo existing finishes and light fixtures. new partitions, doors/frames, glazing, ceiling system, electrical, tile data and finshes; n/a maherDetails
on 4th floor - tenant improvement demo existing finishes and light fixtures. new partitions, doors/frames, glazing, ceiling system, electrical, tile data and finshes; n/a maher | $63,000 |
| Dec 21, 2017 | Completed final sign-off Jan 2018 | 250 Montgomery St | Pioneer Fire Inc. | remodel of all outlined areas consisting of returning to shell condition. maher n/aDetails
remodel of all outlined areas consisting of returning to shell condition. maher n/a | $7,871 |
| Dec 18, 2017 | Completed final sign-off Jan 2018 | 250 Montgomery St | Field Construction Inc. | demo of e partitions, elec, tel/data outlets, ceiling system, light fixtures, plumbing, millwork. fire sprinler under separate permit. tenant improvement under separate permit.Details
demo of e partitions, elec, tel/data outlets, ceiling system, light fixtures, plumbing, millwork. fire sprinler under separate permit. tenant improvement under separate permit. | $40,000 |
| Oct 3, 2017 | Completed final sign-off Nov 2017 | 250 Montgomery St | Bilcor Inc | 8/f- fire alarm t.i., install (4) ceiling mount speaker stobes, remove & replace (2) wall mount speaker strobes & (3) ceiling mount speaker strobes. t.i. pa#201707283220. n/a maherDetails
8/f- fire alarm t.i., install (4) ceiling mount speaker stobes, remove & replace (2) wall mount speaker strobes & (3) ceiling mount speaker strobes. t.i. pa#201707283220. n/a maher | $4,500 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 8th fl, suite #800: mechanical and electircal for pa #201707283220. maher naDetails
8th fl, suite #800: mechanical and electircal for pa #201707283220. maher na | $120,000 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 3rd fl: electrical for pa #201707283215. provide new lighting & branch circuits to (e) panel. maintain some (e) power & signal outlets & provide aditional new power branch circuiting & raceway systems as required to new power signal outlets. provide t24 compliance. maher naDetails
3rd fl: electrical for pa #201707283215. provide new lighting & branch circuits to (e) panel. maintain some (e) power & signal outlets & provide aditional new power branch circuiting & raceway systems as required to new power signal outlets. provide t24 compliance. maher na | $42,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 250 Montgomery St | R L H Fire Protection Inc | 8/f- fire sprinkler t.i., replace 16 pendent ceiling heads with new brass pendent and 21 pendent ceiling heads with uprights. t.i. pa#201707283220. n/a ordinance #155-13Details
8/f- fire sprinkler t.i., replace 16 pendent ceiling heads with new brass pendent and 21 pendent ceiling heads with uprights. t.i. pa#201707283220. n/a ordinance #155-13 | $7,361 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 250 Montgomery St | R L H Fire Protection Inc | 3/f- fire sprinkler t.i., relocate 3 sprinklers. t.i. pa#201707283215. n/a ordinance #155-13Details
3/f- fire sprinkler t.i., relocate 3 sprinklers. t.i. pa#201707283215. n/a ordinance #155-13 | $2,784 |
| Aug 23, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 6/f #610- mechanical & electrical work to pa#201707071218, isolate vav to serve new conference room, new lighting & branch circuiting to (e) panel, maintain same (e) power, signal outlets. provide additional new power branch circuiting & raceway systems as required to new power & signal. n/a maherDetails
6/f #610- mechanical & electrical work to pa#201707071218, isolate vav to serve new conference room, new lighting & branch circuiting to (e) panel, maintain same (e) power, signal outlets. provide additional new power branch circuiting & raceway systems as required to new power & signal. n/a maher | $30,000 |
| Jul 28, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 8/f- demo (e) partitions, ceiling and millwork. provide new millwork, light fixtures and finishes, new resteroom accessories, light fixtures and finishes. mep under seperate permit. n/a ordinance #155-13Details
8/f- demo (e) partitions, ceiling and millwork. provide new millwork, light fixtures and finishes, new resteroom accessories, light fixtures and finishes. mep under seperate permit. n/a ordinance #155-13 | $450,000 |
| Jul 28, 2017 | Completed final sign-off Sep 2017 | 250 Montgomery St | Field Construction Inc. | 3/f- demo (e) partitions and millwork. new partitions, millwork, electrical, light fixtures and finishes, new resteroom accessories, light fixtures and finishes. mep & life safety under seperate permit. n/a ordinance #155-13. alarm & sprinklers deferred.Details
3/f- demo (e) partitions and millwork. new partitions, millwork, electrical, light fixtures and finishes, new resteroom accessories, light fixtures and finishes. mep & life safety under seperate permit. n/a ordinance #155-13. alarm & sprinklers deferred. | $175,000 |
| Jul 7, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 6th floor suite 610 - modify portion of exisitng ceiling & two light fixtures. remove flooring finishes. provide new ceiling system, light fixtures, gyp. board header, glazing, frames, door & finishes. mep/fire deferred submittal. n/a maher ordinanceDetails
6th floor suite 610 - modify portion of exisitng ceiling & two light fixtures. remove flooring finishes. provide new ceiling system, light fixtures, gyp. board header, glazing, frames, door & finishes. mep/fire deferred submittal. n/a maher ordinance | $80,000 |
| Apr 18, 2017 | Completed final sign-off May 2017 | 250 Montgomery St | Weidner Architectural Signage | 1/f lobby- install new evacuation map. n/a ordinance #155-13Details
1/f lobby- install new evacuation map. n/a ordinance #155-13 | $262 |
| Mar 14, 2017 | Completed final sign-off Mar 2017 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 7th floor - add & relocate fire sprinklers per tenant improvements (3 add) & (2 relocate). ref pa #201702109184. n/a maher ordinanceDetails
7th floor - add & relocate fire sprinklers per tenant improvements (3 add) & (2 relocate). ref pa #201702109184. n/a maher ordinance | $2,625 |
| Mar 6, 2017 | Completed final sign-off Aug 2017 | 250 Montgomery St | Field Construction Inc. | #700 -provide new supply & return diffusers, transfer grill, partial demo, relocate t-stat,add 1 pneumatic vav, rebalance,provide new branch circuiting & new lighting. maintain some existing signal outlets, provide add'l new pwr branch circuiting & raceway sys as rer'd,provide ca t-24. #201702109184Details
#700 -provide new supply & return diffusers, transfer grill, partial demo, relocate t-stat,add 1 pneumatic vav, rebalance,provide new branch circuiting & new lighting. maintain some existing signal outlets, provide add'l new pwr branch circuiting & raceway sys as rer'd,provide ca t-24. #201702109184 | $40,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 250 Montgomery St | Bilcor Inc | 4th floor: fire alarm t.i. to remove and replace 2 wall mount speaker-strobes. remove and replace 3 ceiling mount speaker strobes. install 3 ceiling mount speaker strobes. ref app#2016-1212-4685. n/a for maher.Details
4th floor: fire alarm t.i. to remove and replace 2 wall mount speaker-strobes. remove and replace 3 ceiling mount speaker strobes. install 3 ceiling mount speaker strobes. ref app#2016-1212-4685. n/a for maher. | $3,200 |
| Feb 14, 2017 | Completed final sign-off Mar 2017 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 4/f: relocate fire sprinklers per tenant improvements, relocate 5 ref 201612124685. maher ord 155-13 naDetails
4/f: relocate fire sprinklers per tenant improvements, relocate 5 ref 201612124685. maher ord 155-13 na | $2,625 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 250 Montgomery St | Field Construction Inc. | ste. 700, 7th lfr: ti, new gyp board partitions, doors. assemblies, glass and finishes. new ceiling light fixtures and electrical recpt. mep deffered submittal. maher naDetails
ste. 700, 7th lfr: ti, new gyp board partitions, doors. assemblies, glass and finishes. new ceiling light fixtures and electrical recpt. mep deffered submittal. maher na | $80,000 |
| Jan 30, 2017 | Never finaled issued Jan 2017, no final | 250 Montgomery St | Bcci Construction Company | electrical work associated with approved under 201611011590. including new lighting fixtures & controls maher naDetails
electrical work associated with approved under 201611011590. including new lighting fixtures & controls maher na | $32,500 |
| Jan 13, 2017 | Completed final sign-off Feb 2018 | 250 Montgomery St | Golden Gate Fire Protection Inc | lobby - fire sprinklers; relocate 4 pendent sprinklers in the lobby level. ref pa 2016-1101-1590. maher naDetails
lobby - fire sprinklers; relocate 4 pendent sprinklers in the lobby level. ref pa 2016-1101-1590. maher na | $2,000 |
| Dec 28, 2016 | Completed final sign-off Jun 2017 | 250 Montgomery St | Field Construction Inc. | demo partital and extend existing ductwork, install new supply/return grilles. relocate thermostats, rebalance.provide new lighting & branch circuiting to existing panel. reuse some e outlets. provide new power and raceway as req to new outlets. provide ca title 24 compliance forms ref 201612124685Details
demo partital and extend existing ductwork, install new supply/return grilles. relocate thermostats, rebalance.provide new lighting & branch circuiting to existing panel. reuse some e outlets. provide new power and raceway as req to new outlets. provide ca title 24 compliance forms ref 201612124685 | $100,000 |
| Dec 14, 2016 | Completed final sign-off Jul 2017 | 250 Montgomery St | Bilcor Inc | 1st floor: fire alarm tenant improvement remove and replace 1 ceiling mount speaker strobe. remove & replace 1 wall mount speaker strobe. r/r 1 smoke detector with base. r/r 1 pull station. ref app#201611011590Details
1st floor: fire alarm tenant improvement remove and replace 1 ceiling mount speaker strobe. remove & replace 1 wall mount speaker strobe. r/r 1 smoke detector with base. r/r 1 pull station. ref app#201611011590 | $1,600 |
| Dec 12, 2016 | Completed final sign-off Jun 2017 | 250 Montgomery St | Field Construction Inc. | full floor 4th floor ti/spec suite: demo (e) partitions, millwork ceiling & finishes. new partitions, doors, glazing, elect/power and finishes, (e) restrooms: new finishes, equipment, lighting, mep and fire under separate permit. maher naDetails
full floor 4th floor ti/spec suite: demo (e) partitions, millwork ceiling & finishes. new partitions, doors, glazing, elect/power and finishes, (e) restrooms: new finishes, equipment, lighting, mep and fire under separate permit. maher na | $510,000 |
| Nov 1, 2016 | Completed final sign-off Aug 2018 | 250 Montgomery St | Bcci Construction Company | g/f- minor demolition & base bldg improvements to g/f lobby & elevator cabs including new exterior entry finishes and new bike storage secure room in loading area. mep and fire/life safety deferred. n/a ordinance #155-13Details
g/f- minor demolition & base bldg improvements to g/f lobby & elevator cabs including new exterior entry finishes and new bike storage secure room in loading area. mep and fire/life safety deferred. n/a ordinance #155-13 | $682,899 |
| Oct 17, 2016 | Completed final sign-off Nov 2016 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 6/f, suite 600: add 4 and relocate 17 sprinklers to conform with the new wall ceiling layout of the tenant improvementDetails
6/f, suite 600: add 4 and relocate 17 sprinklers to conform with the new wall ceiling layout of the tenant improvement | $5,557 |
| Oct 11, 2016 | Completed final sign-off Dec 2016 | 250 Montgomery St | Field Construction Inc. | 6/f- mech/elec demo plenums & ductwork, provide new ductwork, diffusers & grilles, relocate t-stats, rebalance (e) vav's, provide new branch lighting & circuiting to (e) panels, provide new raceway & outlets, branch circuiting as required. t.i. pa#201608266082. n/a ordinance #155-13Details
6/f- mech/elec demo plenums & ductwork, provide new ductwork, diffusers & grilles, relocate t-stats, rebalance (e) vav's, provide new branch lighting & circuiting to (e) panels, provide new raceway & outlets, branch circuiting as required. t.i. pa#201608266082. n/a ordinance #155-13 | $150,000 |
| Oct 7, 2016 | Completed final sign-off Dec 2016 | 250 Montgomery St | Bilcor Inc | 6/f #600- fire alarm t.i., install (5) ceiling mount speaker-strobes, (2) ceiling mount strobes. t.i. pa#201608266082. n/a ordinance #155-13Details
6/f #600- fire alarm t.i., install (5) ceiling mount speaker-strobes, (2) ceiling mount strobes. t.i. pa#201608266082. n/a ordinance #155-13 | $2,800 |
| Aug 26, 2016 | Completed final sign-off Dec 2016 | 250 Montgomery St | Field Construction Inc. | 6th floor suite 600 t.i.: demolitoinof (e) partitions, millwork, ceiling & finishes, new finishes in elevator lobby, corridor & tenant space, new electrical, ceiling & light fixtures.mep deferred submittal. (e) restrooms to be upgrades, finishes & fixtures equipment. n/a maher ordinanceDetails
6th floor suite 600 t.i.: demolitoinof (e) partitions, millwork, ceiling & finishes, new finishes in elevator lobby, corridor & tenant space, new electrical, ceiling & light fixtures.mep deferred submittal. (e) restrooms to be upgrades, finishes & fixtures equipment. n/a maher ordinance | $272,000 |
| May 25, 2016 | Completed final sign-off Jun 2016 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | 14th floor: add relocate & remove fire sprinklers per t.i (2) add, (6) relocate, (1) remove. ref#2016-03-21-2645Details
14th floor: add relocate & remove fire sprinklers per t.i (2) add, (6) relocate, (1) remove. ref#2016-03-21-2645 | $4,160 |
| May 19, 2016 | Completed final sign-off May 2016 | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | per ti relocate (10) fire sprinklers on 5th floor to conform with new wall/ceiling & layout. ref pa 2016-0321-2649 n/a for maher.Details
per ti relocate (10) fire sprinklers on 5th floor to conform with new wall/ceiling & layout. ref pa 2016-0321-2649 n/a for maher. | $5,200 |
| Apr 28, 2016 | Completed final sign-off Jul 2016 | 250 Montgomery St | Field Construction Inc. | provide & install new ductwork, diffusers & grilles. relocate thermostats provide and install new lighting. provide power to new outlets. ref pa 2016-0321-2649Details
provide & install new ductwork, diffusers & grilles. relocate thermostats provide and install new lighting. provide power to new outlets. ref pa 2016-0321-2649 | $150,000 |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 250 Montgomery St | Bilcor Inc | 10th flr:fire alarm ti - . install 5 ceiling mount speaker/strobes. 1 smoke detector with base. 1 central relay module maher na. ref ti 2016-0106-6420.Details
10th flr:fire alarm ti - . install 5 ceiling mount speaker/strobes. 1 smoke detector with base. 1 central relay module maher na. ref ti 2016-0106-6420. | $2,800 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 250 Montgomery St | Field Construction Inc. | 10th floor - new lighting with controls, add and relocate duct work. fire safety permit pulled separately. ref #201601066420. maher naDetails
10th floor - new lighting with controls, add and relocate duct work. fire safety permit pulled separately. ref #201601066420. maher na | $154,780 |
| Jan 14, 2016 | Completed final sign-off Mar 2016 | 250 Montgomery St | Pioneer Fire Inc. | 10th flr: relocate (9) pendants, t.i. 201601066420; maher n/aDetails
10th flr: relocate (9) pendants, t.i. 201601066420; maher n/a | $4,242 |
| Jul 1, 2015 | Completed final sign-off Jul 2015 | 250 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler: relocate 45 upright sprinklers on the 10th floor.Details
fire sprinkler: relocate 45 upright sprinklers on the 10th floor. | $23,175 |
| May 28, 2015 | Completed final sign-off Jul 2015 | 250 Montgomery St | Peacock Construction | 10th floor: project consists of demo of all extg build-out and finishes, as well as capping and safe off of all utilities. new work consists of new lighting. any mep and sprinkler upgrades will be under seperate permit. n/a for the maher.Details
10th floor: project consists of demo of all extg build-out and finishes, as well as capping and safe off of all utilities. new work consists of new lighting. any mep and sprinkler upgrades will be under seperate permit. n/a for the maher. | $52,467 |
| Nov 19, 2014 | Never finaled issued Nov 2014, no final | 250 Montgomery St | Bilcor Inc | 11th floor:as- built. revision to app#201410290248. only 5 ceiling mount speaker-strobes were installed. n/a for the maher ordinance.Details
11th floor:as- built. revision to app#201410290248. only 5 ceiling mount speaker-strobes were installed. n/a for the maher ordinance. | |
| Oct 29, 2014 | Completed final sign-off Nov 2014 | 250 Montgomery St | Bilcor Inc | 11th floor fire alarm tenant improvement: install 6 ceiling mount speaker-strobes. t.i. 2014 0925 7294. maher n/aDetails
11th floor fire alarm tenant improvement: install 6 ceiling mount speaker-strobes. t.i. 2014 0925 7294. maher n/a | $2,400 |
| Oct 17, 2014 | Completed final sign-off Nov 2014 | 250 Montgomery St | Golden Gate Fire Protection Inc | 11th floor: relocate 3 pendent sprinklers. ref. appl. 2014.0925.7294. maher n/a.Details
11th floor: relocate 3 pendent sprinklers. ref. appl. 2014.0925.7294. maher n/a. | $1,545 |
| Sep 25, 2014 | Completed final sign-off Dec 2014 | 250 Montgomery St | Peacock Construction | 11th flr: new work consists of new ceiling ht. partitions, doors, frames, & hardware, new millwork, new power/data, and finishes throughout space is currently unoccupied. any mep and sprinkler upgrades will be under separate permits; maher n/aDetails
11th flr: new work consists of new ceiling ht. partitions, doors, frames, & hardware, new millwork, new power/data, and finishes throughout space is currently unoccupied. any mep and sprinkler upgrades will be under separate permits; maher n/a | $51,300 |
| Aug 28, 2014 | Completed final sign-off Aug 2015 | 250 Montgomery St | Terra Visual Inc | install 12 new evacuation maps, 3 per floor. on floors 5, 10, 14, 15 to comply with current sffd evac map guideslines. compliance with maher ordinance no 155-13 not reuqired.Details
install 12 new evacuation maps, 3 per floor. on floors 5, 10, 14, 15 to comply with current sffd evac map guideslines. compliance with maher ordinance no 155-13 not reuqired. | $3,750 |
| Feb 7, 2014 | Completed final sign-off Mar 2014 | 250 Montgomery St | Bilcor Inc | #780: install 2 ceiling mounted speakers-strobes. ref app#201401226801. n/a for the maher ordinance #155-13Details
#780: install 2 ceiling mounted speakers-strobes. ref app#201401226801. n/a for the maher ordinance #155-13 | $800 |
| Dec 16, 2013 | Completed final sign-off Jan 2014 | 250 Montgomery St | Bilcor Inc | install 2 ceiling mount speaker-strobes, 2 ceiling mount speaker strobes, relocate 1 wall mount strobe, and remove 2 wall mount speaker strobesDetails
install 2 ceiling mount speaker-strobes, 2 ceiling mount speaker strobes, relocate 1 wall mount strobe, and remove 2 wall mount speaker strobes | $2,800 |
| Dec 12, 2013 | Completed final sign-off Jan 2014 | 250 Montgomery St | Golden Gate Fire Protection Inc | relocate 2 pendent sprinkler heads on basement & relocate 6 upright heads. ti pa# 201309176990Details
relocate 2 pendent sprinkler heads on basement & relocate 6 upright heads. ti pa# 201309176990 | $4,120 |
| Dec 12, 2013 | Completed final sign-off Jan 2014 | 250 Montgomery St | Golden Gate Fire Protection Inc | relocate 4 pendent sprinkler heads on the 16th floor. ti 201311151986Details
relocate 4 pendent sprinkler heads on the 16th floor. ti 201311151986 | $2,060 |
| Nov 27, 2013 | Never finaled issued Nov 2013, no final | 250 Montgomery St | Bilcor Inc | install 7 ceiling mount speakers/stobes. install 1 ceiling mount speakerDetails
install 7 ceiling mount speakers/stobes. install 1 ceiling mount speaker | $3,200 |
| Nov 20, 2013 | Completed final sign-off Feb 2014 | 250 Montgomery St | Peacock Construction Inc | 10th fl: new wall at existing conference room as shown on plan. ceiling lighting and other utilities to remain. mep ls separate permitDetails
10th fl: new wall at existing conference room as shown on plan. ceiling lighting and other utilities to remain. mep ls separate permit | $13,971 |
| Sep 30, 2013 | Completed final sign-off Nov 2013 | 250 Montgomery St | Bilcor Inc | 9th floor-install 6 ceiling mount speaker strobes, install 1 smoke detectorDetails
9th floor-install 6 ceiling mount speaker strobes, install 1 smoke detector | $2,800 |
| Sep 24, 2013 | Completed final sign-off Nov 2013 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | 9th floor: fire spirnkler system t.i. 11 new sprinklers, and 16 relocated sprinklers. ref app#201309035824Details
9th floor: fire spirnkler system t.i. 11 new sprinklers, and 16 relocated sprinklers. ref app#201309035824 | $13,500 |
| Sep 12, 2013 | Completed final sign-off Nov 2013 | 250 Montgomery St | Principal Builders Inc. | 9th floor-mech-replace & relocate vav terminals & associated air distribution, new transfer fan. plumbing-new break room sink, water heater, dishwasher, plumbing connections. electrical-addition of new lights, power & data, receptaclesDetails
9th floor-mech-replace & relocate vav terminals & associated air distribution, new transfer fan. plumbing-new break room sink, water heater, dishwasher, plumbing connections. electrical-addition of new lights, power & data, receptacles | $192,000 |
| Sep 3, 2013 | Completed final sign-off Nov 2013 | 250 Montgomery St | Principal Builders Inc. | 9th floor-full floor tenant improvement to (e) office space including new partitions, electrical, mechanical, plumbing, life safety, millwork & finishes. m.e.p design will be under a seperate permitDetails
9th floor-full floor tenant improvement to (e) office space including new partitions, electrical, mechanical, plumbing, life safety, millwork & finishes. m.e.p design will be under a seperate permit | $360,000 |
| Apr 12, 2013 | Completed final sign-off May 2013 | 250 Montgomery St | Bilcor Inc | 12th floor #1205 - install 3 ceiling mount speakers - strobes, relocate 1 smoke detectors. t.i ref pa# 201303202569Details
12th floor #1205 - install 3 ceiling mount speakers - strobes, relocate 1 smoke detectors. t.i ref pa# 201303202569 | $1,200 |
| Mar 28, 2013 | Never finaled issued Apr 2013, no final | 250 Montgomery St | C B F Inc | 11th floor-install 1 ceiling mount speaker-strobe, install 1 wall mount speaker-strobe, remove & replace 2 wall mount speaker-strobesDetails
11th floor-install 1 ceiling mount speaker-strobe, install 1 wall mount speaker-strobe, remove & replace 2 wall mount speaker-strobes | $1,600 |
| Mar 27, 2013 | Completed final sign-off Apr 2013 | 250 Montgomery St | Golden Gate Fire Protection Inc | 11th floor-relocate 49 upright sprinkler heads, relocate 4 pendent sprinkler heads.Details
11th floor-relocate 49 upright sprinkler heads, relocate 4 pendent sprinkler heads. | $27,295 |
| Mar 20, 2013 | Expired or cancelled cancelled Jan 2026 | 250 Montgomery St | demo of all (e) build out & finishes with the exception of ceiling & light fixtures on 16th flr. ab-017Details
demo of all (e) build out & finishes with the exception of ceiling & light fixtures on 16th flr. ab-017 | $10,000 | |
| Mar 20, 2013 | Completed final sign-off Jun 2013 | 250 Montgomery St | Peacock Construction Inc | 12th floor, ste #1205: project consists of demo of existing millwork & finishes throughout. extend existing demising walls to full height, mep & life safety under separate permitDetails
12th floor, ste #1205: project consists of demo of existing millwork & finishes throughout. extend existing demising walls to full height, mep & life safety under separate permit | $46,675 |
| Mar 14, 2013 | Completed final sign-off Jun 2013 | 250 Montgomery St | Peacock Construction Inc | new work consists of new ceiling partitions, doors, frames & hardware, new millwork, new power data, plumbing & finishes throughout. mep & life safety under separate permitDetails
new work consists of new ceiling partitions, doors, frames & hardware, new millwork, new power data, plumbing & finishes throughout. mep & life safety under separate permit | $120,000 |
| Jan 16, 2013 | Completed final sign-off Jun 2013 | 250 Montgomery St | Peacock Construction Inc | 2nd fl project consists of demo of (e) ceiling height partitions & associated power data, new ceiling tile & light fixtures. me & life safety under separate permit.Details
2nd fl project consists of demo of (e) ceiling height partitions & associated power data, new ceiling tile & light fixtures. me & life safety under separate permit. | $66,577 |
| Dec 31, 2012 | Never finaled issued Dec 2012, no final | 250 Montgomery St | C B F Inc | install 4 ceiling mount speakers, strobes, and connect new devices to existing circuits. ref 201211284989Details
install 4 ceiling mount speakers, strobes, and connect new devices to existing circuits. ref 201211284989 | $2,000 |
| Dec 27, 2012 | Completed final sign-off Jan 2013 | 250 Montgomery St | Golden Gate Fire Protection Inc | ti pa#2012-11-28-4989. fire sprinkler system upgrade. relocate 11 pendent sprinkler heads on the 12th fl.Details
ti pa#2012-11-28-4989. fire sprinkler system upgrade. relocate 11 pendent sprinkler heads on the 12th fl. | $5,665 |
| Dec 18, 2012 | Completed final sign-off Aug 2015 | 250 Montgomery St | Comfort Dynamics Inc. | #720 - connect new ductwork with new diffusor back to existing supply trunk. provide new pneumatic thermostat & connect to existing vav box. t.i. under pa #2012.1023.2599.Details
#720 - connect new ductwork with new diffusor back to existing supply trunk. provide new pneumatic thermostat & connect to existing vav box. t.i. under pa #2012.1023.2599. | $6,650 |
| Dec 17, 2012 | Never finaled issued Dec 2012, no final | 250 Montgomery St | Pribuss Engineering Inc | ti pa#2012-10-23-2599. fire sprinkler ti add 1 head, relocate 20 heads, total of 21 heads.Details
ti pa#2012-10-23-2599. fire sprinkler ti add 1 head, relocate 20 heads, total of 21 heads. | $10,800 |
| Dec 13, 2012 | Completed final sign-off Jan 2013 | 250 Montgomery St | C B F Inc | ti pa#2012-10-23-2599. 7th floor, intall 5 ceiling mount speakers-strobes, connect new strobes to (e) circuit, tie speakers to (e) speakers loop.Details
ti pa#2012-10-23-2599. 7th floor, intall 5 ceiling mount speakers-strobes, connect new strobes to (e) circuit, tie speakers to (e) speakers loop. | $2,000 |
| Dec 7, 2012 | Completed final sign-off Dec 2012 | 250 Montgomery St | C B F Inc | install 7 ceiling mount speakers/strobes, connect new strobes to extg circuit, tie speakers to extg speaker loop. app#201210232601Details
install 7 ceiling mount speakers/strobes, connect new strobes to extg circuit, tie speakers to extg speaker loop. app#201210232601 | $3,000 |
| Dec 5, 2012 | Completed final sign-off Dec 2012 | 250 Montgomery St | Golden Gate Fire Protection Inc | 14th floor fire sprinklersystem upgrade, relocate 2 pendent sprinkler heads, delete 1 head. ref pt#2012.10.23.2601Details
14th floor fire sprinklersystem upgrade, relocate 2 pendent sprinkler heads, delete 1 head. ref pt#2012.10.23.2601 | $1,030 |
| Nov 28, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | ti 12th floor, demolition of (e) millwork & finishes. new ceiling height glazing, door, frame & hardware @ closet room. new power/data, millwork, finishes throughout. me & life safety under separate permit.Details
ti 12th floor, demolition of (e) millwork & finishes. new ceiling height glazing, door, frame & hardware @ closet room. new power/data, millwork, finishes throughout. me & life safety under separate permit. | $90,000 |
| Oct 23, 2012 | Completed final sign-off Jan 2013 | 250 Montgomery St | Jones Lang La Salle Construction Company | suite 720:project consists of demolition of extg ceiling ht partitions and associated power/data, new ceiling ht partial, doors and side lights, millwork, new ceiling grid and tile and finishes through out. me and sprinkler under seperate permit.Details
suite 720:project consists of demolition of extg ceiling ht partitions and associated power/data, new ceiling ht partial, doors and side lights, millwork, new ceiling grid and tile and finishes through out. me and sprinkler under seperate permit. | $120,000 |
| Oct 23, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | suite 1410:project consists of demolition of extg ceiling ht partitions and associated power/data, new full ht glasing in conference room.new millwork, finishes throughout. space b currently vacant. me and sprinkler under seperate permit.Details
suite 1410:project consists of demolition of extg ceiling ht partitions and associated power/data, new full ht glasing in conference room.new millwork, finishes throughout. space b currently vacant. me and sprinkler under seperate permit. | $113,000 |
| Sep 12, 2012 | Completed final sign-off Sep 2012 | 250 Montgomery St | Golden Gate Fire Protection Inc | 6th floor-fire sprinkler system upgrade, relocate 2 upright sprinkler heads & add 1 upright sprinkler head. ti pa# 2012-0828-8371Details
6th floor-fire sprinkler system upgrade, relocate 2 upright sprinkler heads & add 1 upright sprinkler head. ti pa# 2012-0828-8371 | $1,545 |
| Aug 28, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | 6th floor - build out of new storage/copy room + phone closet in a currently unoccupied space with associated power, ceiling, lighting & finishes. new t.i. under separate permit.Details
6th floor - build out of new storage/copy room + phone closet in a currently unoccupied space with associated power, ceiling, lighting & finishes. new t.i. under separate permit. | $95,000 |
| Aug 15, 2012 | Completed final sign-off Oct 2012 | 250 Montgomery St | Peacock Construction Inc | 2nd floor project consists of demolition of existing ceiling height partitions & associated power/data. new full height glazing in conf room, finishes thru-out. mep, sprinklesr and fire alarm under separate permit. space is currently vacant.Details
2nd floor project consists of demolition of existing ceiling height partitions & associated power/data. new full height glazing in conf room, finishes thru-out. mep, sprinklesr and fire alarm under separate permit. space is currently vacant. | $93,000 |
| Jul 26, 2012 | Completed final sign-off Sep 2012 | 250 Montgomery St | C B F Inc | 2nd floor:install 5 speaker strobeDetails
2nd floor:install 5 speaker strobe | $3,000 |
| Jun 12, 2012 | Completed final sign-off Jul 2012 | 250 Montgomery St | C B F Inc | 12th floor install 5 speaker/strobes.Details
12th floor install 5 speaker/strobes. | $3,000 |
| Jun 6, 2012 | Completed final sign-off Oct 2012 | 250 Montgomery St | Peacock Construction Inc | 11th floor: interior alteration to remove partitions, finishes and carpet. vacant space to remain.Details
11th floor: interior alteration to remove partitions, finishes and carpet. vacant space to remain. | $30,000 |
| May 31, 2012 | Never finaled issued May 2012, no final | 250 Montgomery St | Terra Visual Inc | floor 2, 11, 12 & 16 - remove & replace evacuation map signage.Details
floor 2, 11, 12 & 16 - remove & replace evacuation map signage. | $2,000 |
| Apr 13, 2012 | Completed final sign-off May 2012 | 250 Montgomery St | C B F Inc | 3rd floor t.i.: installing 5 spekaer strobes, 1 smoke detector to existing fire alarm systemDetails
3rd floor t.i.: installing 5 spekaer strobes, 1 smoke detector to existing fire alarm system | $3,000 |
| Apr 10, 2012 | Completed final sign-off May 2012 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. tenant improvements. 10 added sprinklers, 5 relocate sprinkler 3rd flDetails
existing fire sprinkler system. tenant improvements. 10 added sprinklers, 5 relocate sprinkler 3rd fl | $7,500 |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 250 Montgomery St | Socha Visual Inc | 6th floor-install 3 evac signsDetails
6th floor-install 3 evac signs | $1,000 |
| Mar 12, 2012 | Completed final sign-off Mar 2012 | 250 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate 8 pendent sprinkler heads on the 6th fl. relocate 20 upright sprinkler headsDetails
fire sprinkler system upgrade. relocate 8 pendent sprinkler heads on the 6th fl. relocate 20 upright sprinkler heads | $14,420 |
| Feb 15, 2012 | Completed final sign-off Mar 2012 | 250 Montgomery St | Starlite Electric Inc. | relocate 1 smoke detector, install 1 smoke detector, intall 5 speaker strobesDetails
relocate 1 smoke detector, install 1 smoke detector, intall 5 speaker strobes | $3,000 |
| Feb 8, 2012 | Completed final sign-off Apr 2012 | 250 Montgomery St | Peacock Construction Inc | 6th floor new spec suite in a currently vacant office space, new work includes new ceiling, lighting, power/plumbing & finishes.Details
6th floor new spec suite in a currently vacant office space, new work includes new ceiling, lighting, power/plumbing & finishes. | $127,000 |
| Oct 17, 2011 | Completed final sign-off Nov 2011 | 250 Montgomery St | Socha Visual Inc | lobby, 3rd floor & 9th floor - install new evacuation maps to code.Details
lobby, 3rd floor & 9th floor - install new evacuation maps to code. | $3,500 |
| Oct 14, 2011 | Completed final sign-off Oct 2011 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | 3rd floor & 9th floor - tenant improvement to existing fire sprinkler system, 3rd floor -45 new sprinklers, 76 removed. 9th floor - 45 new sprinklers, 74 removed.Details
3rd floor & 9th floor - tenant improvement to existing fire sprinkler system, 3rd floor -45 new sprinklers, 76 removed. 9th floor - 45 new sprinklers, 74 removed. | $45,000 |
| Oct 4, 2011 | Completed final sign-off Nov 2011 | 250 Montgomery St | Starlite Electric Inc. | install 4 ceiling mount speaker strobe. remove and replace 4 wall mount speaker strobesDetails
install 4 ceiling mount speaker strobe. remove and replace 4 wall mount speaker strobes | $2,500 |
| Sep 16, 2011 | Completed final sign-off Jan 2012 | 250 Montgomery St | Bcci Construction Company | 3rd floor-market ready prep consists of demo of all build out and finishes. new work consists of all new ceiling, lighting, and paint. floor is currently onoccupied. mep and sprinkler upgrades under separate permitDetails
3rd floor-market ready prep consists of demo of all build out and finishes. new work consists of all new ceiling, lighting, and paint. floor is currently onoccupied. mep and sprinkler upgrades under separate permit | $48,824 |
| Sep 16, 2011 | Completed final sign-off Jan 2012 | 250 Montgomery St | Bcci Construction Company | 9th floor-market ready prep consists of demo of all build out and finishes. new ork consists of new ceiling, lights, and paint. floor is currently unoccupied. mep and sprinler upgrades under separate permit.Details
9th floor-market ready prep consists of demo of all build out and finishes. new ork consists of new ceiling, lights, and paint. floor is currently unoccupied. mep and sprinler upgrades under separate permit. | $48,824 |
| Mar 21, 2011 | Completed final sign-off Apr 2011 | 250 Montgomery St | Novo Construction Inc | 4th floor. add new vav boxes to 2 new conference rooms. add one water source heat pump for new la closet. add ceiling supply diffusers and return air grilles for new layout. ref app#201102089823. fully sprinklered bldg.Details
4th floor. add new vav boxes to 2 new conference rooms. add one water source heat pump for new la closet. add ceiling supply diffusers and return air grilles for new layout. ref app#201102089823. fully sprinklered bldg. | $15,000 |
| Mar 10, 2011 | Completed final sign-off Apr 2011 | 250 Montgomery St | Pioneer Fire Inc. | 4th floor-relocate 41 sprinkler, add 6 fire sprinkler & remove 1 sprinklerDetails
4th floor-relocate 41 sprinkler, add 6 fire sprinkler & remove 1 sprinkler | $6,000 |
| Feb 23, 2011 | Completed final sign-off Apr 2011 | 250 Montgomery St | Starlite Electric Inc. | 4th floor-install 11 ceiling mount speaker/strobes, install 1 smoke detectorDetails
4th floor-install 11 ceiling mount speaker/strobes, install 1 smoke detector | $5,500 |
| Feb 8, 2011 | Completed final sign-off Apr 2011 | 250 Montgomery St | Novo Construction Inc | 4th floor-t.i demo of non structural partitions & building of new non structural partitions. all new or revised hvac, electrical, plubming & life safety work will be design build and submitted under seperate permit, full sprinklered. card readers installed as per plans.Details
4th floor-t.i demo of non structural partitions & building of new non structural partitions. all new or revised hvac, electrical, plubming & life safety work will be design build and submitted under seperate permit, full sprinklered. card readers installed as per plans. | $132,000 |
| Sep 10, 2010 | Completed final sign-off Apr 2011 | 250 Montgomery St | Starlite Electric Inc. | revision to pa# 2010.08.13,8773. change 2 wall mount speaker/strobes to 2 ceiling mount speaker/strobes. install 1 ceiling mount speaker/strobe. install 1 control module. work on the 15th floor.Details
revision to pa# 2010.08.13,8773. change 2 wall mount speaker/strobes to 2 ceiling mount speaker/strobes. install 1 ceiling mount speaker/strobe. install 1 control module. work on the 15th floor. | $700 |
| Aug 23, 2010 | Never finaled issued Aug 2010, no final | 250 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per ti on the 15th floor. 22 relocateDetails
relocate fire sprinkler heads per ti on the 15th floor. 22 relocate | $6,600 |
| Aug 13, 2010 | Completed final sign-off Apr 2011 | 250 Montgomery St | Starlite Electric Inc. | fire alarm system ti on the 15th floor. install 6 wall mount speaker/ strobes, 1 ceilimg mount strobe, 1 strobe, 1 smoke detectorDetails
fire alarm system ti on the 15th floor. install 6 wall mount speaker/ strobes, 1 ceilimg mount strobe, 1 strobe, 1 smoke detector | $7,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 250 Montgomery St | Bcci Construction Company | mech and electrical work associated with approvedpa# 2010.04.19.0514Details
mech and electrical work associated with approvedpa# 2010.04.19.0514 | $50,000 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 250 Montgomery St | Starlite Electric Inc. | 8th floor-furnish and install: 7 wall mount speaker strobes, 2 strobes, 3 ceiling mount speaker/strobes, 2 smoke detectors.Details
8th floor-furnish and install: 7 wall mount speaker strobes, 2 strobes, 3 ceiling mount speaker/strobes, 2 smoke detectors. | $9,500 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | 8th floor-tenant improvement to the existing fire sprinkler system. 3 added sprinklers, 21 relocated sprinklersDetails
8th floor-tenant improvement to the existing fire sprinkler system. 3 added sprinklers, 21 relocated sprinklers | $12,000 |
| Apr 19, 2010 | Completed final sign-off Jul 2010 | 250 Montgomery St | Bcci Construction Company | demolition and construction of non structural partitions, reworking of ceiling rid and lighting. provide new furniture and finishes throughoutDetails
demolition and construction of non structural partitions, reworking of ceiling rid and lighting. provide new furniture and finishes throughout | $205,065 |
| Feb 1, 2010 | Completed final sign-off Jul 2010 | 240 Montgomery St | Starlite Electric Inc. | floor 10. install 2 strobes, 8 speaker/strobe units. one smoke detector with base. 2 control modules, one pam relay, remove one control moduleDetails
floor 10. install 2 strobes, 8 speaker/strobe units. one smoke detector with base. 2 control modules, one pam relay, remove one control module | $6,000 |
| Jul 17, 2009 | Never finaled issued Jul 2009, no final | 250 Montgomery St | Starlite Electric Inc. | to obtain final inspection for work approved under pa# 200606275075. all work is complete.Details
to obtain final inspection for work approved under pa# 200606275075. all work is complete. | |
| Jul 17, 2009 | Completed final sign-off Aug 2009 | 250 Montgomery St | Starlite Electric Inc. | to obtain final inspection for work approved under pa# 200804089149. all work is complete.Details
to obtain final inspection for work approved under pa# 200804089149. all work is complete. | |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | Teamwrkx Construction | revision to pa 200808048346 to provide voluntary barrier removal as stated on da check list, women & men restroom floor 5,7,11,12,14,16.Details
revision to pa 200808048346 to provide voluntary barrier removal as stated on da check list, women & men restroom floor 5,7,11,12,14,16. | |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | Teamwrkx Construction | revision to pa #200807106413, to provide voluntary barrier removal as stated on da check list, women & men restroom on floor 4,8,9 & 10.Details
revision to pa #200807106413, to provide voluntary barrier removal as stated on da check list, women & men restroom on floor 4,8,9 & 10. | |
| Nov 10, 2008 | Never finaled issued Nov 2008, no final | 250 Montgomery St | Starlite Electric Inc. | install 3 smoke detectors. install 2 speakersDetails
install 3 smoke detectors. install 2 speakers | $2,500 |
| Sep 29, 2008 | Never finaled issued Sep 2008, no final | 250 Montgomery St | street spaceDetails
street space | ||
| Aug 4, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | 5th, 7th, 11th, 12th, 14th & 16th floors-restroom upgrades to full comply, no structural work performed, life safety under seperate permit.Details
5th, 7th, 11th, 12th, 14th & 16th floors-restroom upgrades to full comply, no structural work performed, life safety under seperate permit. | $125,000 | |
| Jul 10, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | upgrade to fully comply restroom upgrade floor 4,8,9,& 10. no structural work performed.Details
upgrade to fully comply restroom upgrade floor 4,8,9,& 10. no structural work performed. | $100,000 | |
| May 22, 2008 | Completed final sign-off Aug 2010 | 250 Montgomery St | demo only of selective partitions, safe off in vacant suite. no new construction. all work to be done on the 7th floor.Details
demo only of selective partitions, safe off in vacant suite. no new construction. all work to be done on the 7th floor. | $1,500 | |
| Apr 8, 2008 | Expired or cancelled expired Jul 2009 | 250 Montgomery St | Starlite Electric Inc. | as-built of pa# 200710115181 (fire alarm)Details
as-built of pa# 200710115181 (fire alarm) | |
| Nov 20, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | 1st floor.tenant improvements to existing fire sprinkler system. (1)new head, (5) relocates, (2) removed.Details
1st floor.tenant improvements to existing fire sprinkler system. (1)new head, (5) relocates, (2) removed. | $1,000 |
| Oct 18, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | sprinkler system modification: add 1, relocate 6.Details
sprinkler system modification: add 1, relocate 6. | $1,000 |
| Oct 11, 2007 | Never finaled issued Oct 2007, no final | 250 Montgomery St | Starlite Electric Inc. | 2nd - 16th floors-revision to appl. #2006.06.27.5075. delete (14) smoke detector total from 2nd floor to 16th floor.Details
2nd - 16th floors-revision to appl. #2006.06.27.5075. delete (14) smoke detector total from 2nd floor to 16th floor. | |
| Oct 2, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | Starlite Electric Inc. | install 10 wall mounted strobes, 5 ceiling speakers and 1 smoke detector on the 2nd floorDetails
install 10 wall mounted strobes, 5 ceiling speakers and 1 smoke detector on the 2nd floor | $15,000 |
| Sep 19, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | Teamwrkx Inc. | construct new non-rated partition walls for new office space. mechanical, electrical & fire safety will be done under separate permit. ref. pa # 200708301306 for demolition work. d. a. requirement under separate permit.Details
construct new non-rated partition walls for new office space. mechanical, electrical & fire safety will be done under separate permit. ref. pa # 200708301306 for demolition work. d. a. requirement under separate permit. | $110,000 |
| Sep 7, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | Teamwrkx Inc. | recessed ceiling lights relocated. 1 sprinkler head relocated, carpet replaced. bldg directory relocated. security desk modified, relocated and made compliant. 1 storefront replaced, ext. finishes repaired/ replaced. remove barners and stone panels. add handrails mechanica wk under separate permit.Details
recessed ceiling lights relocated. 1 sprinkler head relocated, carpet replaced. bldg directory relocated. security desk modified, relocated and made compliant. 1 storefront replaced, ext. finishes repaired/ replaced. remove barners and stone panels. add handrails mechanica wk under separate permit. | $98,000 |
| Sep 5, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | Anderson, Rowe & Buckley, Inc. | add 44fsp/remove 4fsp at 15th floorDetails
add 44fsp/remove 4fsp at 15th floor | $9,000 |
| Aug 30, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | Teamwrkx Inc. | 2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work.Details
2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work. | $4,200 |
| Aug 8, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | Teamwrkx Inc. | furnish and install new t-bar ceiling. m.e.p. under separate permitDetails
furnish and install new t-bar ceiling. m.e.p. under separate permit | $50,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 250 Montgomery St | Teamwrkx Inc. | 3rd floor - soft demo non structural partitions- removal 3rd floor.Details
3rd floor - soft demo non structural partitions- removal 3rd floor. | $10,000 |
| Apr 27, 2007 | Completed final sign-off Jul 2007 | 250 Montgomery St | Teamwrkx Inc. | soft demo non structural partitions- removal 15th floor.Details
soft demo non structural partitions- removal 15th floor. | $40,000 |
| Apr 26, 2007 | Completed final sign-off Jun 2007 | 250 Montgomery St | Teamwrkx Inc. | soft demo non structural partitions- removal 6th floor.Details
soft demo non structural partitions- removal 6th floor. | $10,000 |
| Jun 27, 2006 | Expired or cancelled expired Mar 2009 | 250 Montgomery St | Starlite Electric Inc. | replace extg fire alarm panel. bring building's core & basement up to code. install facp, 8 booster panel, 131 smoke detectors, 1 heat detector, 1 strobe, 33 wall speaker/strobe, 45 cieling spk/strobe, 1 pull station, 123 modula, 1 printer, 54 phone jacks, 4 amps. remove extg panel, pull statn/smkDetails
replace extg fire alarm panel. bring building's core & basement up to code. install facp, 8 booster panel, 131 smoke detectors, 1 heat detector, 1 strobe, 33 wall speaker/strobe, 45 cieling spk/strobe, 1 pull station, 123 modula, 1 printer, 54 phone jacks, 4 amps. remove extg panel, pull statn/smk | $150,000 |
| Nov 2, 2005 | Expired or cancelled expired Jun 2007 | 250 Montgomery St | to abate sffd notice of violation for work done by previous tenant on 16th floor. repair openings in telephone room done without permit/repairs are to restore and match extg 2hr fire rated shaft construction/aprox 2- 12"x 14" holesDetails
to abate sffd notice of violation for work done by previous tenant on 16th floor. repair openings in telephone room done without permit/repairs are to restore and match extg 2hr fire rated shaft construction/aprox 2- 12"x 14" holes | $8,600 | |
| Dec 3, 2004 | Completed final sign-off Feb 2005 | 250 Montgomery St | g/f- t.i. of (e)restaurant.minor electrical & plumbing work,lighting to remain as is,Details
g/f- t.i. of (e)restaurant.minor electrical & plumbing work,lighting to remain as is, | $8,300 | |
| Oct 30, 2003 | Never finaled issued Nov 2003, no final | 250 Montgomery St | Team Commercial Construction Inc. | oti-2 14th fl-el, me, spDetails
oti-2 14th fl-el, me, sp | $80,000 |
| Jul 24, 2003 | Never finaled issued Aug 2003, no final | 250 Montgomery St | Team Commercial Construction Inc. | oti-1, 14th floor-el, me, ls, spDetails
oti-1, 14th floor-el, me, ls, sp | $88,450 |
| Oct 27, 2000 | Expired or cancelled expired Mar 2001 | 250 Montgomery St | provide mechanical per plansDetails
provide mechanical per plans | ||
| Sep 25, 2000 | Expired or cancelled expired Jan 2001 | 250 Montgomery St | Aquamatic Fire Protection | add &/or relocate pendant sprinklers to accommodate the tenant remodel on 15th flrDetails
add &/or relocate pendant sprinklers to accommodate the tenant remodel on 15th flr | $3,000 |
| Sep 7, 2000 | Expired or cancelled expired Jan 2001 | 250 Montgomery St | revise to appln #200007185377 15/fDetails
revise to appln #200007185377 15/f | ||
| Jul 18, 2000 | Expired or cancelled expired Aug 2001 | 250 Montgomery St | t/i provide partition walls and doorsDetails
t/i provide partition walls and doors | $45,000 | |
| May 20, 2000 | Expired or cancelled expired May 2001 | 250 Montgomery St | remove walls & re-aligne walls to construct training roomDetails
remove walls & re-aligne walls to construct training room | $60,000 | |
| May 19, 2000 | Expired or cancelled expired Jul 2001 | 250 Montgomery St | Robbins General Contr Inc | oti-2 8th floor electrical,mechanical lifesafty,sprinklerDetails
oti-2 8th floor electrical,mechanical lifesafty,sprinkler | $73,000 |
| Mar 29, 2000 | Expired or cancelled expired Apr 2001 | 250 Montgomery St | Robbins General Contr Inc | oti-1 8th floor, el, me, ls, spDetails
oti-1 8th floor, el, me, ls, sp | $92,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bilcor Inc (24), Field Construction Inc. (20), Starlite Electric Inc. (14), Golden Gate Fire Protection Inc (11), Peacock Construction Inc (10), Anderson, Rowe & Buckley, Inc. (8), Ayoob & Peery Plumbing Co Inc (8), Bcci Construction Company (8), C B F Inc (8), Teamwrkx Inc. (7), Pioneer Fire Inc. (5), R L H Fire Protection Inc (5), Rudolph Commercial Interiors Inc, Rci (5), Mcclure Electric Inc (4), Novo Construction Inc (4), Modus Rex Llc (3), Peacock Construction (2), Principal Builders Inc. (2), R M I Mechanical Contractors (2), Robbins General Contr Inc (2), Socha Visual Inc (2), Team Commercial Construction Inc. (2), Teamwrkx Construction (2), Terra Visual Inc (2), Aquamatic Fire Protection, Bevilacqua & Sons, City Mechanical Inc, Comfort Dynamics Inc., E. J. Weber Elect.Co Inc, Jones Lang La Salle Construction Company, Pribuss Engineering Inc, Weidner Architectural Signage
- Architects
- Stanley H Lew (13), Nichols Booth (6), Martha Breed (2), Michael Steiner (2), Virginie Manichon (2), Bartley Mcclelland, Clark Manus, John Lum, Levi F Malabayo, Michael Heublein, Michael Knauff, Nichols Booth, Omied Arvin, Stanley Lew
- Engineers
- Jesus Cabellon Jr. (8), Alexander Joseph Pacheco, Brian Featherston, Christopher Wener, Craig Ristow, Habtom Nugusse Tewelde, Kobi Yamasaka, Lewis James Burrows, Mathew J Chase, Meng Hsiu Chen, Michael Steiner, Pablo Orozco, Peter Kogan, Rudolfo P Bustos Iii, Sherry Chaumpluke, Virginie Manichon
- Authorized agent-otherss
- Alex Wong (4), Joey Rodriguez (2), Donald D. Dammen
- Designers
- R L H Fire Protection Inc
Find contractors for work like this