Nichols Booth
- License
- C14777
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Apr 2009 to Nov 2012
6 permits since 2000 (architect on 6 permits): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ward Alan Emery Construction Inc. (2), Ayoob & Peery Plumbing Co Inc, Bcci Construction Company, Peacock Construction Inc, Teamwrkx Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 6
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 28, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | ti 12th floor, demolition of (e) millwork & finishes. new ceiling height glazing, door, frame & hardware @ closet room. new power/data, millwork, finishes throughout. me & life safety under separate permit.Details
ti 12th floor, demolition of (e) millwork & finishes. new ceiling height glazing, door, frame & hardware @ closet room. new power/data, millwork, finishes throughout. me & life safety under separate permit. | $90,000 |
| Aug 17, 2011 | Completed final sign-off Sep 2011 | 33 New Montgomery St | Ward Alan Emery Construction Inc. | office ti on the 11th fl, suite# 1150. demo of office partitions, constr. of new office partitions, doors, mep modification under separate permitDetails
office ti on the 11th fl, suite# 1150. demo of office partitions, constr. of new office partitions, doors, mep modification under separate permit | $57,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 3 Embarcadero Center | Ward Alan Emery Construction Inc. | 16th floor-demo select partitions, power data, millwork, finishes, doors & frames. construction of select new non structural partitions, doors, frames, millwork, finishes, power data & light fixtures. unoccupied space, mechanical, electrical, life safety under seperate permitDetails
16th floor-demo select partitions, power data, millwork, finishes, doors & frames. construction of select new non structural partitions, doors, frames, millwork, finishes, power data & light fixtures. unoccupied space, mechanical, electrical, life safety under seperate permit | $75,000 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 601 California St | Teamwrkx Inc. | project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permitDetails
project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permit | $120,000 |
| Jun 1, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 3rd floor-relocate & add fire sprinkler heads per tenant improvements. (relocate 6 & add 25).Details
3rd floor-relocate & add fire sprinkler heads per tenant improvements. (relocate 6 & add 25). | $7,000 |
| Apr 8, 2009 | Completed final sign-off May 2010 | 211 Main St | Bcci Construction Company | pre-fabricated guard kiosk with data & outlets.Details
pre-fabricated guard kiosk with data & outlets. | $40,000 |