Block 3740, lot 033
211 Main St
- City’s use
- Commercial Office
- Built
- 1973
- Stories
- 17
- Units
- 1
- Rooms
- 38 bathrooms
- Building
- 417,226 sq ft
- Lot
- 31,258 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2021 | Completed final sign-off Jan 2022 | 211 Main St | Bilcor Inc | 9/f: fire life safety: as built to permit 202009033424 to reflect existing field conditions.Details
9/f: fire life safety: as built to permit 202009033424 to reflect existing field conditions. | |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 211 Main St | Bilcor Inc | to obtain final inspection for work approved under permit application 201801188946. all work is complete.Details
to obtain final inspection for work approved under permit application 201801188946. all work is complete. | $9,000 |
| Sep 7, 2021 | Completed final sign-off Nov 2021 | 211 Main St | Bilcor Inc | basement/ground floor: fire life safety: install 2 ceiling mount speaker strobes. relocate 1 wall mount speaker strobe.Details
basement/ground floor: fire life safety: install 2 ceiling mount speaker strobes. relocate 1 wall mount speaker strobe. | $1,320 |
| Jan 21, 2021 | Completed final sign-off Feb 2021 | 211 Main St | Bilcor Inc | fire life safety: as-built in reference to fa permit # 2020-1221-1481. remove from scope of work the installation of (2) control relays per inspector's request. both control relays are existing.Details
fire life safety: as-built in reference to fa permit # 2020-1221-1481. remove from scope of work the installation of (2) control relays per inspector's request. both control relays are existing. | $1,320 |
| Dec 21, 2020 | Completed final sign-off Aug 2021 | 211 Main St | Bilcor Inc | fire life safety: install (5) ceiling mount speaker strobes, (2) control relays. reference #: 2020-0926-5155Details
fire life safety: install (5) ceiling mount speaker strobes, (2) control relays. reference #: 2020-0926-5155 | $4,620 |
| Oct 30, 2020 | Never finaled filed Oct 2020, never issued | 211 Main St | addition of bike parking & enclosure in exterior breezeway. the breezeway is monitored by on site security 24 hrs/day. pot drawings from approved pa# 202007099861.Details
addition of bike parking & enclosure in exterior breezeway. the breezeway is monitored by on site security 24 hrs/day. pot drawings from approved pa# 202007099861. | $70,000 | |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 211 Main St | Dome Construction Corp | 16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a.Details
16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a. | $2,597,000 |
| Sep 26, 2020 | Completed final sign-off Dec 2020 | 211 Main St | Bilcor Inc | fire life safety: install (1) control panel, (2) power supplies, (1) expansion switch, (2) call stations, (2) monitor modules, (1) dual monitor module. ref bpa#202006028060Details
fire life safety: install (1) control panel, (2) power supplies, (1) expansion switch, (2) call stations, (2) monitor modules, (1) dual monitor module. ref bpa#202006028060 | $5,940 |
| Sep 20, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 9/f: add 7, relocate 43, plug 2 sprinklers to conform with the new wlal/ceiling layout of t.i. pa202006028060. maher n/a.Details
9/f: add 7, relocate 43, plug 2 sprinklers to conform with the new wlal/ceiling layout of t.i. pa202006028060. maher n/a. | $13,350 |
| Sep 3, 2020 | Completed final sign-off Jan 2022 | 211 Main St | Bilcor Inc | fire life safety: install 14 ceiling mount speaker strobes, 1 smoke detector with base, 2 duct detectors, 3 control relays. ref app#202006028060Details
fire life safety: install 14 ceiling mount speaker strobes, 1 smoke detector with base, 2 duct detectors, 3 control relays. ref app#202006028060 | $13,200 |
| Aug 29, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Bilcor Inc | fire life safety: install 2 wall mount speaker strobes and 2 wall mount weatherproof speaker strobes. ref ti# 202007099861Details
fire life safety: install 2 wall mount speaker strobes and 2 wall mount weatherproof speaker strobes. ref ti# 202007099861 | $2,640 |
| Aug 22, 2020 | Completed final sign-off Aug 2021 | 211 Main St | R L H Fire Protection Inc | 1st flr. fire sprinkler permit. relocate 3, add 1 and delete 3 sprinklers. ref t.i 202007099861.Details
1st flr. fire sprinkler permit. relocate 3, add 1 and delete 3 sprinklers. ref t.i 202007099861. | $1,500 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Deb Construction Llc | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with newDetails
new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| Jun 2, 2020 | Completed final sign-off Feb 2021 | 211 Main St | Dome Construction Corp | 9th flr: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9 g1.0.Details
9th flr: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9 g1.0. | $900,000 |
| Jan 30, 2020 | Completed final sign-off Aug 2020 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 6th fl: add 2 and relocate 17 sprinklers to conform with the new wall/ceiling layout of the tenant improvementDetails
6th fl: add 2 and relocate 17 sprinklers to conform with the new wall/ceiling layout of the tenant improvement | $4,875 |
| Jan 30, 2020 | Completed final sign-off Apr 2020 | 211 Main St | Bilcor Inc | fire alarm, 6th floor: ref# 2019-1218-9845: install 1 ceiling mount strobe, 14 wall mount strobe, 26 ceiling mount speaker strobe, 1 wall mount speaker strobe. replace 6 (e) smoke detectors, 3 (e) pull stations, install 1 control relay module.Details
fire alarm, 6th floor: ref# 2019-1218-9845: install 1 ceiling mount strobe, 14 wall mount strobe, 26 ceiling mount speaker strobe, 1 wall mount speaker strobe. replace 6 (e) smoke detectors, 3 (e) pull stations, install 1 control relay module. | $34,320 |
| Dec 18, 2019 | Completed final sign-off Feb 2021 | 211 Main St | Dome Construction Corp | 6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout.Details
6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout. | $1,200,000 |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 211 Main St | Bilcor Inc | 4th fl: as-built - install 1 control relay. ref pa #201908088220. ref ti #201905100305.Details
4th fl: as-built - install 1 control relay. ref pa #201908088220. ref ti #201905100305. | $660 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 211 Main St | Bilcor Inc | ref pa# 201905100305; instll 1 power supply 2 ceiling strobe, 10 ceiling speaker strobes, 1 control relay, 1 duct detector, remove and replace 6 smoke detectores, 5 wall strobes, 1 wall speaker strobe, 3 pull stations,Details
ref pa# 201905100305; instll 1 power supply 2 ceiling strobe, 10 ceiling speaker strobes, 1 control relay, 1 duct detector, remove and replace 6 smoke detectores, 5 wall strobes, 1 wall speaker strobe, 3 pull stations, | $21,780 |
| Jun 19, 2019 | Completed final sign-off Jul 2019 | 211 Main St | R L H Fire Protection Inc | 4th flr. fire sprinkler permit. relocate 15 and add 4 sprinklers. ref t.i 201905100305Details
4th flr. fire sprinkler permit. relocate 15 and add 4 sprinklers. ref t.i 201905100305 | $6,000 |
| May 10, 2019 | Completed final sign-off Oct 2019 | 211 Main St | Swinerton Builders | ti- new private offices, upgrades to (e) offices, conference rooms and break area. mep modifications and ada upgrades in restroomsDetails
ti- new private offices, upgrades to (e) offices, conference rooms and break area. mep modifications and ada upgrades in restrooms | $1,000,505 |
| Aug 1, 2018 | Completed final sign-off Aug 2018 | 211 Main St | Bilcor Inc | fire alarm tenant improvement. 5th fl - install 1 ceiling mount strobe, install 14 ceiling mount speaker strobes, install 12 wall mount strobe, install 1 wall mount speaker strobe, install 9 ceiling mount speaker, install 1 booster panel/power supply. ref pa 2018-0430-7769Details
fire alarm tenant improvement. 5th fl - install 1 ceiling mount strobe, install 14 ceiling mount speaker strobes, install 12 wall mount strobe, install 1 wall mount speaker strobe, install 9 ceiling mount speaker, install 1 booster panel/power supply. ref pa 2018-0430-7769 | $19,000 |
| Jul 11, 2018 | Completed final sign-off Nov 2018 | 211 Main St | Bilcor Inc | fire alarm ti install 1 wall mount speaker strobe. relocate 1 ceiling mount strobe. ref pa 2018-0523-9867Details
fire alarm ti install 1 wall mount speaker strobe. relocate 1 ceiling mount strobe. ref pa 2018-0523-9867 | $500 |
| May 31, 2018 | Completed final sign-off Oct 2018 | 211 Main St | Lewis M Merlo Inc | remove an 8'x8' section of a garage slab to permit drain pipe repair, repair slab, drain pipe repair under seperate permit maher naDetails
remove an 8'x8' section of a garage slab to permit drain pipe repair, repair slab, drain pipe repair under seperate permit maher na | $65,000 |
| May 23, 2018 | Never finaled issued May 2018, no final | 211 Main St | street space w/mtaDetails
street space w/mta | ||
| May 23, 2018 | Never finaled issued Jun 2018, no final | 211 Main St | Hathaway Dinwiddie Co. | tenant improvement to include demising wall, carpet, paint, new lights; fire alarm and sprinklers separateDetails
tenant improvement to include demising wall, carpet, paint, new lights; fire alarm and sprinklers separate | $50,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 211 Main St | street space w/mtaDetails
street space w/mta | ||
| May 16, 2018 | Completed final sign-off Jul 2018 | 211 Main St | R L H Fire Protection Inc | relocat 12 pendent sprinklers on the 5th fl. ref# 201804307769Details
relocat 12 pendent sprinklers on the 5th fl. ref# 201804307769 | $2,500 |
| Apr 30, 2018 | Completed final sign-off Nov 2018 | 211 Main St | Dome Construction Corp | 5th flr demo and renovation of office spaceDetails
5th flr demo and renovation of office space | $600,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2018 | 211 Main St | Bilcor Inc | install: 19 ceiling mount speaker/strobes, 20 wall mount strobes, 5 ceiling mount speakers, 2 booster panel/power supply, 2 ceiling mount strobes, 6 wall mount speaker/strobes ref 7th flr - 201801319979, ref 13th fkr - 201801319980 maher naDetails
install: 19 ceiling mount speaker/strobes, 20 wall mount strobes, 5 ceiling mount speakers, 2 booster panel/power supply, 2 ceiling mount strobes, 6 wall mount speaker/strobes ref 7th flr - 201801319979, ref 13th fkr - 201801319980 maher na | $27,000 |
| Apr 18, 2018 | Completed final sign-off May 2018 | 211 Main St | Bilcor Inc | 8/f & 12/f: as-built to reference #201712126267. install (22) ceiling mount speakersDetails
8/f & 12/f: as-built to reference #201712126267. install (22) ceiling mount speakers | $10,000 |
| Feb 20, 2018 | Completed final sign-off May 2018 | 211 Main St | R L H Fire Protection Inc | fire sprinkler, relocate 30, add 5, delete 1 pendant sprinker 7th fl. ti 201801319979; n/a maherDetails
fire sprinkler, relocate 30, add 5, delete 1 pendant sprinker 7th fl. ti 201801319979; n/a maher | $9,000 |
| Feb 14, 2018 | Completed final sign-off Jun 2018 | 211 Main St | R L H Fire Protection Inc | fire sprinkler permit. relocate 32, add 2 , detelet 5 pendent sprinklers on 13th fl ref 201801319980Details
fire sprinkler permit. relocate 32, add 2 , detelet 5 pendent sprinklers on 13th fl ref 201801319980 | $6,000 |
| Jan 31, 2018 | Never finaled issued Jan 2018, no final | 211 Main St | street space permtDetails
street space permt | ||
| Jan 31, 2018 | Completed final sign-off Jul 2018 | 211 Main St | Hathaway Dinwiddie Co. | 13th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher naDetails
13th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na | $480,000 |
| Jan 31, 2018 | Completed final sign-off Jul 2018 | 211 Main St | Hathaway Dinwiddie Co. | 7th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher naDetails
7th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na | $480,000 |
| Jan 18, 2018 | Completed final sign-off Nov 2021 | 211 Main St | Bilcor Inc | upgrade 3 audio panels, components consist of 3 digial audio distribution boards, 6 digital amplifier, 3 power supply, 6 26 amp batteries. maher n/aDetails
upgrade 3 audio panels, components consist of 3 digial audio distribution boards, 6 digital amplifier, 3 power supply, 6 26 amp batteries. maher n/a | $9,000 |
| Dec 12, 2017 | Completed final sign-off May 2018 | 211 Main St | Bilcor Inc | 8th & 12th flrs: fire alarm full floor ti: install- 2 ceiling mount strobes, 18 ceiling mount speaker/strobes, 20 wall mount strobes, 7 wall mount speaker/strobes ref pas# 8th flr - 201710020051, 12th flr - 201710020052 maher naDetails
8th & 12th flrs: fire alarm full floor ti: install- 2 ceiling mount strobes, 18 ceiling mount speaker/strobes, 20 wall mount strobes, 7 wall mount speaker/strobes ref pas# 8th flr - 201710020051, 12th flr - 201710020052 maher na | $23,500 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 211 Main St | R L H Fire Protection Inc | fire sprinkler relocate 37, add 5, delete 8 pendent sprinklers 8th flDetails
fire sprinkler relocate 37, add 5, delete 8 pendent sprinklers 8th fl | $10,500 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 211 Main St | R L H Fire Protection Inc | fire sprinkler relocate 34, add 3, delete 8 pendent sprinklers 12th fl. ti 201710020052Details
fire sprinkler relocate 34, add 3, delete 8 pendent sprinklers 12th fl. ti 201710020052 | $9,000 |
| Oct 2, 2017 | Completed final sign-off Jul 2018 | 211 Main St | Hathaway Dinwiddie Co. | 8/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms.Details
8/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms. | $100,000 |
| Oct 2, 2017 | Completed final sign-off Jul 2018 | 211 Main St | Hathaway Dinwiddie Co. | 12/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms.Details
12/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms. | $100,000 |
| Sep 21, 2017 | Completed final sign-off Jul 2018 | 211 Main St | The Lawson Roofing Co Inc. | reroofing. n/a for maher.Details
reroofing. n/a for maher. | $225,000 |
| Sep 11, 2017 | Completed final sign-off Jun 2018 | 211 Main St | Bilcor Inc | fire alarm t.i. - as built to reference pa # 2017-0905-6900. theatrical lighting no longer in use.Details
fire alarm t.i. - as built to reference pa # 2017-0905-6900. theatrical lighting no longer in use. | |
| Sep 5, 2017 | Completed final sign-off Sep 2017 | 211 Main St | Bilcor Inc | fire alarm tenant improvement, remove 4 ceiling mount speakrs, 8 wall mount speaker strobes, 1 control relay module ref 201706220159Details
fire alarm tenant improvement, remove 4 ceiling mount speakrs, 8 wall mount speaker strobes, 1 control relay module ref 201706220159 | $4,500 |
| Aug 7, 2017 | Completed final sign-off Sep 2017 | 211 Main St | Pribuss Engineering Inc | fire sprinkler, relocate 52, add 25, total 77Details
fire sprinkler, relocate 52, add 25, total 77 | $38,799 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 211 Main St | Swinerton Builders | tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinanceDetails
tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinance | $1,200,000 |
| Jun 21, 2017 | Completed final sign-off Sep 2017 | 211 Main St | Bilcor Inc | on 14th & 15th floors- fire alarm ti - install 4 ceiling mount strobes, install 18 wall mount strobes, install 6 wall mount speaker strobes, install 10 ceiling mount speakers, install 2 booster panel/power supply. ref pa 2017-0417-4089 (15th fl) and 2017-0417-4086 (14th fl). n/a maherDetails
on 14th & 15th floors- fire alarm ti - install 4 ceiling mount strobes, install 18 wall mount strobes, install 6 wall mount speaker strobes, install 10 ceiling mount speakers, install 2 booster panel/power supply. ref pa 2017-0417-4089 (15th fl) and 2017-0417-4086 (14th fl). n/a maher | $20,000 |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 211 Main St | Hathaway Dinwiddie Co. | 15th fl: revision to #2017-0417-4089. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher naDetails
15th fl: revision to #2017-0417-4089. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher na | |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 211 Main St | Hathaway Dinwiddie Co. | 14th fl: revision to #2017-0417-4086. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher naDetails
14th fl: revision to #2017-0417-4086. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher na | |
| May 30, 2017 | Completed final sign-off Sep 2017 | 211 Main St | R L H Fire Protection Inc | 15th flr: fire sprinkler - relocate 29 add 3 and delete 9 pendent sprinklers. ti 201704174089 maher naDetails
15th flr: fire sprinkler - relocate 29 add 3 and delete 9 pendent sprinklers. ti 201704174089 maher na | $7,500 |
| May 30, 2017 | Completed final sign-off Sep 2017 | 211 Main St | R L H Fire Protection Inc | 14th flr: fire sprinkler - relocate 29 add 3 and delete 7 pendent sprinklers. ti 201704174086 maher naDetails
14th flr: fire sprinkler - relocate 29 add 3 and delete 7 pendent sprinklers. ti 201704174086 maher na | $7,500 |
| Apr 17, 2017 | Never finaled issued Apr 2017, no final | 211 Main St | Hathaway Dinwiddie Co. | 15th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a maher ordinanceDetails
15th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a maher ordinance | $50,000 |
| Apr 17, 2017 | Never finaled issued Apr 2017, no final | 211 Main St | Hathaway Dinwiddie Co. | 14th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a maher ordinanceDetails
14th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a maher ordinance | $50,000 |
| Feb 9, 2017 | Completed final sign-off Mar 2017 | 211 Main St | Bilcor Inc | 10 & 11/f: fire larm ti remove and replace 16 wall mount strobes, 7 wall mount strobes, 5 ceiling mount strobes, 18 ceiling mount speaker strobes 201612205400, 201612215529. maher ord 155-13 naDetails
10 & 11/f: fire larm ti remove and replace 16 wall mount strobes, 7 wall mount strobes, 5 ceiling mount strobes, 18 ceiling mount speaker strobes 201612205400, 201612215529. maher ord 155-13 na | $18,400 |
| Jan 17, 2017 | Completed final sign-off Mar 2017 | 211 Main St | Golden Gate Fire Protection Inc | fire sprinkler only - 10th fl: relocate 26 pendents, add 2 (28 heads) 11th fl: relocate 24 penedents, add 26 heads. maher not reqDetails
fire sprinkler only - 10th fl: relocate 26 pendents, add 2 (28 heads) 11th fl: relocate 24 penedents, add 26 heads. maher not req | $16,200 |
| Dec 21, 2016 | Completed final sign-off Oct 2017 | 211 Main St | Dome Construction Corp | 11/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/aDetails
11/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a | $853,491 |
| Dec 20, 2016 | Completed final sign-off Oct 2017 | 211 Main St | Dome Construction Corp | 10/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/aDetails
10/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a | $853,491 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 211 Main St | Ayoob & Peery Plumbing Co Inc | ti 2nd floor: 8 adds, 92 relocates, 17 removed. of the 92 relocations, 9 will be disconnected from pre-action system and converted to light hazard office space. 3rd floor: 18 adds, 46 relocates, 8 remove. maher na ref permit # 201512175336 (2nd floor) and #201512175337 (3rd floor)Details
ti 2nd floor: 8 adds, 92 relocates, 17 removed. of the 92 relocations, 9 will be disconnected from pre-action system and converted to light hazard office space. 3rd floor: 18 adds, 46 relocates, 8 remove. maher na ref permit # 201512175336 (2nd floor) and #201512175337 (3rd floor) | $85,280 |
| Mar 3, 2016 | Completed final sign-off Oct 2016 | 211 Main St | Tri-Signal Integration Inc. | add 10 speakers & 13 strobes to an (e) fire alarm system; relocated 2 speakers & 12 strobes, remove 10 smoke detectors. maher na ref 2/f: pa201512175337; 3/f:201512175336.Details
add 10 speakers & 13 strobes to an (e) fire alarm system; relocated 2 speakers & 12 strobes, remove 10 smoke detectors. maher na ref 2/f: pa201512175337; 3/f:201512175336. | $6,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 211 Main St | 18th floor - two (n) vfd's to be installed fo rchilled water pumps. n/a maher ordinanceDetails
18th floor - two (n) vfd's to be installed fo rchilled water pumps. n/a maher ordinance | $16,000 | |
| Dec 17, 2015 | Completed final sign-off Nov 2016 | 211 Main St | Swinerton Builders | 3rd floor: buildout of new offices millwork and finishes. no structural work to be performed. n/a for maher. sprinklers/alarms deferred.Details
3rd floor: buildout of new offices millwork and finishes. no structural work to be performed. n/a for maher. sprinklers/alarms deferred. | $1,482,884 |
| Dec 17, 2015 | Completed final sign-off Nov 2016 | 211 Main St | Swinerton Builders | 2nd floor: buildout of new offices millwork and finishes including mep. no structural work to be performed. n/a for maherDetails
2nd floor: buildout of new offices millwork and finishes including mep. no structural work to be performed. n/a for maher | $2,965,768 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 211 Main St | Bilcor Inc | 1st floor program system to add disable function for smoke detector zone. no t.i related. customer adding feature to the system.Details
1st floor program system to add disable function for smoke detector zone. no t.i related. customer adding feature to the system. | $500 |
| Dec 10, 2015 | Completed final sign-off Aug 2016 | 211 Main St | Swinerton Builders | 2nd floor - demolition of offices & affected ceiling tile & grid & l2nd ighting per ab-017. n/a maher ordinanceDetails
2nd floor - demolition of offices & affected ceiling tile & grid & l2nd ighting per ab-017. n/a maher ordinance | $30,000 |
| Dec 10, 2015 | Completed final sign-off Aug 2016 | 211 Main St | Swinerton Builders | 3rd floor - demolition of offices & affected ceiling tile & grid & lighting per ab-017. n/a maher ordinanceDetails
3rd floor - demolition of offices & affected ceiling tile & grid & lighting per ab-017. n/a maher ordinance | $30,000 |
| Dec 5, 2014 | Completed final sign-off Dec 2014 | 211 Main St | Bilcor Inc | 5th flr: fire alarm tenant improvement. replace and relocate 2 wall mount strobes. replace and relocate 1 wall mount speaker-strobe. replace and replace 4 wall mount strobes. replace and replace 1 wall mount speaker-strobe; maher n/aDetails
5th flr: fire alarm tenant improvement. replace and relocate 2 wall mount strobes. replace and relocate 1 wall mount speaker-strobe. replace and replace 4 wall mount strobes. replace and replace 1 wall mount speaker-strobe; maher n/a | $3,200 |
| Oct 28, 2014 | Completed final sign-off Mar 2015 | 211 Main St | Bilcor Inc | ground floor: fire alarm t.i. emergency replace fire alarm control unit. ul certififcation number fc35418229. 100 pewrcent functional required plaus 10 percent existing devices.t.i. app#201305227597. n/a for the maher.Details
ground floor: fire alarm t.i. emergency replace fire alarm control unit. ul certififcation number fc35418229. 100 pewrcent functional required plaus 10 percent existing devices.t.i. app#201305227597. n/a for the maher. | $400 |
| Oct 17, 2014 | Completed final sign-off Nov 2014 | 211 Main St | Pribuss Engineering Inc | fire sprinkler ti : relocate 8Details
fire sprinkler ti : relocate 8 | $4,117 |
| Aug 14, 2014 | Completed final sign-off May 2015 | 211 Main St | Bcci Construction Company | 5th fl:minor demo of office fronts, breakroom millwork and ceiling/lighting at various locations as indicated. new work will include new glass fronts, new breakroom millwork, minor power/signal upgrades and finishes. minor mep work.n/a for maher ordinance #155-13Details
5th fl:minor demo of office fronts, breakroom millwork and ceiling/lighting at various locations as indicated. new work will include new glass fronts, new breakroom millwork, minor power/signal upgrades and finishes. minor mep work.n/a for maher ordinance #155-13 | $140,902 |
| Sep 16, 2013 | Completed final sign-off Nov 2013 | 211 Main St | C B F Inc | 1st floor: relocation of existing (6) strobes and (1) speakers. new duct detectors and relay modules at new heat pumps.new smoke deteector and relcay at a new fire smoke damperDetails
1st floor: relocation of existing (6) strobes and (1) speakers. new duct detectors and relay modules at new heat pumps.new smoke deteector and relcay at a new fire smoke damper | $5,000 |
| Aug 8, 2013 | Completed final sign-off Sep 2013 | 211 Main St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 28 fire sprinkler. relocate 1 total 29x514.62=14924.00 deleted =3 (ti app#201305227597)Details
fire sprinkler t.i. relocate 28 fire sprinkler. relocate 1 total 29x514.62=14924.00 deleted =3 (ti app#201305227597) | $14,924 |
| Jul 11, 2013 | Completed final sign-off Jan 2014 | 211 Main St | install 2 wall sign murals, illuminated signDetails
install 2 wall sign murals, illuminated sign | $7,000 | |
| Jul 11, 2013 | Completed final sign-off Jan 2014 | 211 Main St | install sign a new illuminated letter setDetails
install sign a new illuminated letter set | $6,000 | |
| Jul 11, 2013 | Completed final sign-off Jan 2014 | 211 Main St | Arrow Sign Company | install 2 illuminated cubes, no copyDetails
install 2 illuminated cubes, no copy | $4,400 |
| Jul 11, 2013 | Completed final sign-off Dec 2013 | 211 Main St | Arrow Sign Company | reface existing projection sign.Details
reface existing projection sign. | $1,500 |
| Jul 11, 2013 | Never finaled issued Aug 2013, no final | 211 Main St | Arrow Sign Company | install 1 projecting illuminated sign.Details
install 1 projecting illuminated sign. | $2,500 |
| Jul 11, 2013 | Never finaled issued Aug 2013, no final | 211 Main St | Arrow Sign Company | install 1 illuminated ground sign.Details
install 1 illuminated ground sign. | $4,000 |
| May 22, 2013 | Completed final sign-off Feb 2014 | 211 Main St | Swinerton Builders | 1st floor-office t.i includes new non structural partitions & finshes. scope of work includes architectural, electrical, non structural upgrades. no work at exterior of building. no modification to the (e) egress system. add 1 new ada restroomDetails
1st floor-office t.i includes new non structural partitions & finshes. scope of work includes architectural, electrical, non structural upgrades. no work at exterior of building. no modification to the (e) egress system. add 1 new ada restroom | $435,000 |
| Mar 7, 2013 | Completed final sign-off Feb 2014 | 211 Main St | Swinerton Builders | 55'-0 lineal feet of new storefront on floor 1. scope of work pursuant to ab-017Details
55'-0 lineal feet of new storefront on floor 1. scope of work pursuant to ab-017 | $361,511 |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 211 Main St | C B F Inc | instal 2 ceiling mount speaker strobes, install 2 smoke detectors with bases, relocate and install 2 new strobes, connect new strobes to existing circuits, tie speakrers to existing speaker loopDetails
instal 2 ceiling mount speaker strobes, install 2 smoke detectors with bases, relocate and install 2 new strobes, connect new strobes to existing circuits, tie speakrers to existing speaker loop | $3,000 |
| Nov 27, 2012 | Completed final sign-off Dec 2012 | 211 Main St | Anderson, Rowe & Buckley, Inc. | 9th floor, t.i. pa# 2012-10-10-09-1561. (e) fire sprinkler system, 8 relocated sprinklers, 7 added sprinklers.Details
9th floor, t.i. pa# 2012-10-10-09-1561. (e) fire sprinkler system, 8 relocated sprinklers, 7 added sprinklers. | $7,500 |
| Oct 9, 2012 | Expired or cancelled expired Oct 2014 | 211 Main St | Swinerton Builders | approx. 2667 sq. ft. gross on floor 9 office tenant improvement incl. non structural partitions and finish upgrades. the scope of work incluldes archi. mech. and electrical. reconfig. of rooms 901-910. no work on exterior. life safety sep. permits.Details
approx. 2667 sq. ft. gross on floor 9 office tenant improvement incl. non structural partitions and finish upgrades. the scope of work incluldes archi. mech. and electrical. reconfig. of rooms 901-910. no work on exterior. life safety sep. permits. | $90,000 |
| Aug 22, 2012 | Completed final sign-off Sep 2012 | 211 Main St | C B F Inc | fire alarm ti-16th fl, install 1 strobe, 1 speaker, relocate 1 strobe & 1 relay. 17th fl, install 4 strobes, 3 speakers, relocate 5 strobes & 4 speakers.Details
fire alarm ti-16th fl, install 1 strobe, 1 speaker, relocate 1 strobe & 1 relay. 17th fl, install 4 strobes, 3 speakers, relocate 5 strobes & 4 speakers. | $5,500 |
| Aug 10, 2012 | Never finaled issued Aug 2012, no final | 211 Main St | Ayoob & Peery Plumbing Co Inc | relocate 8 and add 1 sprinkler heads on 17th floor t.i.Details
relocate 8 and add 1 sprinkler heads on 17th floor t.i. | $4,626 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 211 Main St | C B F Inc | 17th floor-life safety system modifications-relocate 1 (e) wall module strobeDetails
17th floor-life safety system modifications-relocate 1 (e) wall module strobe | $350 |
| May 25, 2012 | Completed final sign-off Jan 2013 | 211 Main St | Swinerton Builders | tenant improvement of (e) interior space on 16th. flr.(single tenant) no structural work. relocation of mechanical diffusers, (n) partitions, relocated lights & ceilings. under separate permit fire life safety.Details
tenant improvement of (e) interior space on 16th. flr.(single tenant) no structural work. relocation of mechanical diffusers, (n) partitions, relocated lights & ceilings. under separate permit fire life safety. | $55,000 |
| May 25, 2012 | Completed final sign-off Jan 2013 | 211 Main St | Swinerton Builders | tenant improvement of (e) interior space on 17th. flr.(single tenant). no structural work. relocation of mechanical diffusers & add lights, (n) partitions & lights, finishes & ceiling. under separate permit; fire/life safety.Details
tenant improvement of (e) interior space on 17th. flr.(single tenant). no structural work. relocation of mechanical diffusers & add lights, (n) partitions & lights, finishes & ceiling. under separate permit; fire/life safety. | $1,000,000 |
| Mar 14, 2012 | Completed final sign-off Sep 2012 | 211 Main St | Anderson, Rowe & Buckley, Inc. | 17th floor t.i.- existing fire sprinkler system, add 1 sprinkler.Details
17th floor t.i.- existing fire sprinkler system, add 1 sprinkler. | $500 |
| Feb 7, 2012 | Completed final sign-off Nov 2012 | 211 Main St | Swinerton Builders | 17th floor tenant improvement of (e) interior space. (single tenant floor). no sturctural work, relocation mechanical diffusers, new partitions, finishes & ceiling includes minor electrical work. fire/life safety under separate permit.Details
17th floor tenant improvement of (e) interior space. (single tenant floor). no sturctural work, relocation mechanical diffusers, new partitions, finishes & ceiling includes minor electrical work. fire/life safety under separate permit. | $119,000 |
| Nov 28, 2011 | Completed final sign-off Jan 2012 | 211 Main St | C B F Inc | 4th floor-life safety system modifications-remove & relocate 18 new strobes, install 3 new ceiling strobes, remove & relocate 3 new speaker strobes. install 3 new speakersDetails
4th floor-life safety system modifications-remove & relocate 18 new strobes, install 3 new ceiling strobes, remove & relocate 3 new speaker strobes. install 3 new speakers | $7,000 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 211 Main St | Swinerton Builders | 4th floor revision to pa #201108223001 - ada upgrades mens & womens room ada stalls.Details
4th floor revision to pa #201108223001 - ada upgrades mens & womens room ada stalls. | $3,782 |
| Oct 14, 2011 | Completed final sign-off Nov 2011 | 211 Main St | Anderson, Rowe & Buckley, Inc. | 4th floor tenant improvement to existing fire sprinkler system, 4 removed sprinklers, 6 added sprinklers, 20 relcoated sprinklers.Details
4th floor tenant improvement to existing fire sprinkler system, 4 removed sprinklers, 6 added sprinklers, 20 relcoated sprinklers. | $13,000 |
| Oct 7, 2011 | Expired or cancelled withdrawn Nov 2011 | 211 Main St | 17th floor-tenant improvement of existing interior space on 17th floor by existig tenant. no structural work, relocate mechanical grilles, new partitions, finsishes, ceiling. includes minor elec work.under sep permit: fire life safetyDetails
17th floor-tenant improvement of existing interior space on 17th floor by existig tenant. no structural work, relocate mechanical grilles, new partitions, finsishes, ceiling. includes minor elec work.under sep permit: fire life safety | $25,000 | |
| Oct 6, 2011 | Completed final sign-off Dec 2011 | 211 Main St | Swinerton Builders | revision to appl #201108233001 - removed 3 offices & 1 large office from orig. scope.Details
revision to appl #201108233001 - removed 3 offices & 1 large office from orig. scope. | |
| Sep 20, 2011 | Completed final sign-off Apr 2013 | 211 Main St | Coast Sign Incorporated | to obtain final inspection for work approved under pa#200906059856. all work is complete.Details
to obtain final inspection for work approved under pa#200906059856. all work is complete. | |
| Sep 9, 2011 | Completed final sign-off Sep 2011 | 211 Main St | C B F Inc | life safety system modifications on the 18th fl boiler room. 2 detector base, 2 heat detectors, 1 speaker strobe and 1 wall speakerDetails
life safety system modifications on the 18th fl boiler room. 2 detector base, 2 heat detectors, 1 speaker strobe and 1 wall speaker | $1,800 |
| Sep 8, 2011 | Completed final sign-off Nov 2015 | 211 Main St | Cisco Fire Sprinklers, Inc. | add 7 new ssu, relocate 3 for new wall added in boiler room 18th floor - all sprinklers added to existing system main & lines except 1 new branch line being installed. existing earthquake bracing to remain.Details
add 7 new ssu, relocate 3 for new wall added in boiler room 18th floor - all sprinklers added to existing system main & lines except 1 new branch line being installed. existing earthquake bracing to remain. | $3,000 |
| Aug 23, 2011 | Completed final sign-off Dec 2011 | 211 Main St | Swinerton Builders | break room and elevator lobby renovation with office addition including interior non load bearing partitions,doors,glazed office fronts, acuoustic tile ceilings, drywall ceilings and lighting. with associated mep. & communication. fire life safety to be under seperate permit.no structural work.Details
break room and elevator lobby renovation with office addition including interior non load bearing partitions,doors,glazed office fronts, acuoustic tile ceilings, drywall ceilings and lighting. with associated mep. & communication. fire life safety to be under seperate permit.no structural work. | $800,000 |
| Jul 8, 2011 | Completed final sign-off Dec 2011 | 211 Main St | C B F Inc | penthouse-install new connection to boilers, provide power outlets for convenience & providing new lighting in the boiler roomDetails
penthouse-install new connection to boilers, provide power outlets for convenience & providing new lighting in the boiler room | $30,000 |
| Jun 23, 2011 | Completed final sign-off Jan 2012 | 211 Main St | Matrix Hg Inc | in penthouse - remove (2) existing boilers & replace with (4) smaller boilers. ref pa #2010.12.23.7290.Details
in penthouse - remove (2) existing boilers & replace with (4) smaller boilers. ref pa #2010.12.23.7290. | $180,000 |
| Jun 9, 2011 | Completed final sign-off Jul 2011 | 211 Main St | Anderson, Rowe & Buckley, Inc. | t.i. extg fire sprinkler system 2 relocated sprinklers and 1 sprinklers at basement garage level.Details
t.i. extg fire sprinkler system 2 relocated sprinklers and 1 sprinklers at basement garage level. | $1,500 |
| Apr 13, 2011 | Completed final sign-off Aug 2011 | 211 Main St | Bcci Construction Company | t.i.: one new office walls, door, ceiling, finishes in basement. sprinklers and life safety under separate permit. no structural work to be performed.Details
t.i.: one new office walls, door, ceiling, finishes in basement. sprinklers and life safety under separate permit. no structural work to be performed. | $20,000 |
| Feb 4, 2011 | Completed final sign-off Mar 2011 | 211 Main St | C B F Inc | as builts revision 201010052309. change in smoke detectors installedDetails
as builts revision 201010052309. change in smoke detectors installed | |
| Dec 23, 2010 | Completed final sign-off Sep 2011 | 211 Main St | Bcci Construction Company | constructing a new rated enclosure for (e) boilers as well as a rated seperation wall & door assembly. mep & sprinkler upgrades are on seperate permitDetails
constructing a new rated enclosure for (e) boilers as well as a rated seperation wall & door assembly. mep & sprinkler upgrades are on seperate permit | $10,000 |
| Oct 5, 2010 | Completed final sign-off Sep 2011 | 211 Main St | C B F Inc | 9th floor-life safety modifications-adding 2 smoke detectors, 1 relay module, 1 door holder, 1 door holder mounted in headerDetails
9th floor-life safety modifications-adding 2 smoke detectors, 1 relay module, 1 door holder, 1 door holder mounted in header | $800 |
| Sep 2, 2010 | Completed final sign-off Sep 2011 | 211 Main St | C B F Inc | 1st floor-life safety system modifications-211 main st, garage level-1st floor-shuttle elevator. installation of elevator recall equipment. 3 smoke detectors and 3 relay modules.Details
1st floor-life safety system modifications-211 main st, garage level-1st floor-shuttle elevator. installation of elevator recall equipment. 3 smoke detectors and 3 relay modules. | $5,000 |
| Aug 23, 2010 | Never finaled issued Aug 2010, no final | 211 Main St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per ti. 6th fl: 8 relocate, 4 removes. 10th fl: 8 reloacte, 4 removedDetails
relocate fire sprinkler heads per ti. 6th fl: 8 relocate, 4 removes. 10th fl: 8 reloacte, 4 removed | $7,200 |
| Jul 27, 2010 | Completed final sign-off Mar 2011 | 211 Main St | Bcci Construction Company | repair 25' expansion joist on buidling property at the podium walkway.Details
repair 25' expansion joist on buidling property at the podium walkway. | $12,000 |
| Jun 21, 2010 | Completed final sign-off Nov 2022 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 9th floor -relocate fire sprinkler per tenant improvements- 29 relocateDetails
9th floor -relocate fire sprinkler per tenant improvements- 29 relocate | $8,500 |
| May 5, 2010 | Completed final sign-off Aug 2011 | 211 Main St | Bcci Construction Company | tenant improvment on the 6th floor including new non load bearing partition doors, glazing, ceilings and associated mechanical and electrical work. ls and sprinkler under separate permitDetails
tenant improvment on the 6th floor including new non load bearing partition doors, glazing, ceilings and associated mechanical and electrical work. ls and sprinkler under separate permit | $300,000 |
| May 5, 2010 | Completed final sign-off Sep 2011 | 211 Main St | Bcci Construction Company | tenant improvement on the 10th floor including new non load bearing partitions, doors, glazing, ceilings and associated mechanicaland electrical. ls and fire sprinklers under sep permitDetails
tenant improvement on the 10th floor including new non load bearing partitions, doors, glazing, ceilings and associated mechanicaland electrical. ls and fire sprinklers under sep permit | $300,000 |
| Apr 27, 2010 | Completed final sign-off Feb 2012 | 211 Main St | Coast Sign Incorporated | install 1-electrical message board sign for "charles schwab": at corner of main & howard sts.Details
install 1-electrical message board sign for "charles schwab": at corner of main & howard sts. | $5,000 |
| Mar 26, 2010 | Completed final sign-off Jun 2011 | 211 Main St | Bcci Construction Company | 9th floor-new finishes throughout hr office & new ceiling work in common areas. no new structural work to be performed. includes associate mechanical & electricalDetails
9th floor-new finishes throughout hr office & new ceiling work in common areas. no new structural work to be performed. includes associate mechanical & electrical | $300,000 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 211 Main St | Bcci Construction Company | ground floor. construct new interior atm machine room. work includes drywall, doors, celing work, lighting and finishes. sprinkler drawings under separate permit. field verify that existing 1-hour wall is maintained.Details
ground floor. construct new interior atm machine room. work includes drywall, doors, celing work, lighting and finishes. sprinkler drawings under separate permit. field verify that existing 1-hour wall is maintained. | $30,000 |
| Jan 6, 2010 | Never finaled issued Jan 2010, no final | 211 Main St | C B F Inc | life safety system notifacation at floors 17 and 18. 17th fl 9 new devicesDetails
life safety system notifacation at floors 17 and 18. 17th fl 9 new devices | $3,500 |
| Dec 22, 2009 | Completed final sign-off May 2010 | 211 Main St | Anderson, Rowe & Buckley, Inc. | 17th floor-tenant improvements to the (e) fire sprinkler system-added 5, relocated 20Details
17th floor-tenant improvements to the (e) fire sprinkler system-added 5, relocated 20 | $5,000 |
| Dec 9, 2009 | Completed final sign-off Aug 2010 | 211 Main St | Bcci Construction Company | 17th & 18th floors-demolition & remodel of (e) restrooms, pantry & office areas.life safety & sprinklers under separate permit.Details
17th & 18th floors-demolition & remodel of (e) restrooms, pantry & office areas.life safety & sprinklers under separate permit. | $660,000 |
| Nov 19, 2009 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | to obtain final inspection for work approved under app#200807187030.all work is complete.Details
to obtain final inspection for work approved under app#200807187030.all work is complete. | |
| Oct 22, 2009 | Completed final sign-off Jan 2010 | 211 Main St | C B F Inc | 7th floor life safety system modifications - new syncable devices repalcing at (e) locatio. new remote power supply for strobe devices, relocate (5) existing ceilig speakers & (1) wall strobe, install (4) new wall strobes.Details
7th floor life safety system modifications - new syncable devices repalcing at (e) locatio. new remote power supply for strobe devices, relocate (5) existing ceilig speakers & (1) wall strobe, install (4) new wall strobes. | $8,000 |
| Oct 22, 2009 | Completed final sign-off Jan 2010 | 211 Main St | C B F Inc | 8th floor life safety system modifications - new syncable devices -replacing at existing locations, ne wremote power supply for strobe devices. relocate (4) exisitng ceiling speakers & (2) existig wall strobes. install (3) new wall strobes.Details
8th floor life safety system modifications - new syncable devices -replacing at existing locations, ne wremote power supply for strobe devices. relocate (4) exisitng ceiling speakers & (2) existig wall strobes. install (3) new wall strobes. | $9,000 |
| Oct 15, 2009 | Completed final sign-off Jan 2010 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 7th & 8th floors-relocate fire sprinkler heads per tenant improvement-7th floor: 23 relocates, 8th floor: 25 relocatesDetails
7th & 8th floors-relocate fire sprinkler heads per tenant improvement-7th floor: 23 relocates, 8th floor: 25 relocates | $7,200 |
| Sep 22, 2009 | Never finaled issued Sep 2009, no final | 211 Main St | R L H Fire Protection Inc | 9th floor t.i. upgrade on the (e) fire sprinkler system of charles schwab, relocate 3 heads, add 1 head, total 4 heads.Details
9th floor t.i. upgrade on the (e) fire sprinkler system of charles schwab, relocate 3 heads, add 1 head, total 4 heads. | $800 |
| Sep 3, 2009 | Completed final sign-off Jan 2010 | 211 Main St | Bcci Construction Company | 7th fl - tenant improvment on the 7th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associated mechanical/elec. ls/alarm sep permitDetails
7th fl - tenant improvment on the 7th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associated mechanical/elec. ls/alarm sep permit | $350,000 |
| Sep 3, 2009 | Completed final sign-off Jan 2010 | 211 Main St | Bcci Construction Company | 8th fl - tenant improvment on the 8th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associated mechanical/elec. ls/alarm sep permitDetails
8th fl - tenant improvment on the 8th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associated mechanical/elec. ls/alarm sep permit | $350,000 |
| Aug 4, 2009 | Expired or cancelled cancelled Aug 2021 | 211 Main St | Bcci Construction Company | application to revise existing room occupant load on first floor refer to permit # 2008/1022/4835. see plans for ammount of occupant load in auditorium sffd permit requiredDetails
application to revise existing room occupant load on first floor refer to permit # 2008/1022/4835. see plans for ammount of occupant load in auditorium sffd permit required | |
| Jul 29, 2009 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | upgrade of finishes removal of 2 partitions and construction of new partitions. no new sqft or structural work to be performed tenant improvement of corridors 2 confrence rooms and seating area and associated mechanical and electrical work. all work on 9th floor.Details
upgrade of finishes removal of 2 partitions and construction of new partitions. no new sqft or structural work to be performed tenant improvement of corridors 2 confrence rooms and seating area and associated mechanical and electrical work. all work on 9th floor. | $305,600 |
| Jul 1, 2009 | Completed final sign-off Aug 2009 | 211 Main St | C B F Inc | life safety system modifications, 3rd fl, new speakers and strobesDetails
life safety system modifications, 3rd fl, new speakers and strobes | $7,000 |
| Jun 23, 2009 | Completed final sign-off Dec 2009 | 211 Main St | Bcci Construction Company | 17th floor-revision to pa# 2008-0718-7032-reflect field changes to conference room & associated mechanical & electrical workDetails
17th floor-revision to pa# 2008-0718-7032-reflect field changes to conference room & associated mechanical & electrical work | $56,500 |
| Jun 23, 2009 | Completed final sign-off May 2010 | 211 Main St | Bcci Construction Company | revision to application 200904085825. add concrete slab and procuring special inspection.Details
revision to application 200904085825. add concrete slab and procuring special inspection. | |
| Jun 10, 2009 | Completed final sign-off Sep 2009 | 211 Main St | C B F Inc | fire alarm modifications at 1st floor main lobbyDetails
fire alarm modifications at 1st floor main lobby | $6,000 |
| Jun 5, 2009 | Expired or cancelled expired Feb 2012 | 211 Main St | Coast Sign Incorporated | erect a ground, electric, double faced sign.Details
erect a ground, electric, double faced sign. | $3,000 |
| Jun 3, 2009 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | revision to application 200807187030. add pavers to the roof under the overhang as a finish. this area is not accessible except for maintenance.Details
revision to application 200807187030. add pavers to the roof under the overhang as a finish. this area is not accessible except for maintenance. | $51,600 |
| Jun 1, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Ayoob & Peery Plumbing Co Inc | 3rd floor-relocate & add fire sprinkler heads per tenant improvements. (relocate 6 & add 25).Details
3rd floor-relocate & add fire sprinkler heads per tenant improvements. (relocate 6 & add 25). | $7,000 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 211 Main St | C B F Inc | 6th floor-install 1 new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 3 new ceiling speakers, remove 1 (e) ceiling speaker, remove 2 (e) wall strobes, install 1 new relay module to unlock security doorsDetails
6th floor-install 1 new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 3 new ceiling speakers, remove 1 (e) ceiling speaker, remove 2 (e) wall strobes, install 1 new relay module to unlock security doors | $5,000 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 211 Main St | C B F Inc | 5th floor-install new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 4 new ceiling speakers, install 2 new strobes, remove 3 (e) ceiling strobes, remove 5 (e) wall strobes.Details
5th floor-install new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 4 new ceiling speakers, install 2 new strobes, remove 3 (e) ceiling strobes, remove 5 (e) wall strobes. | $5,000 |
| May 20, 2009 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | 18th fl - revision to application 200807187030, adding concrete pavers.Details
18th fl - revision to application 200807187030, adding concrete pavers. | $1,800 |
| May 1, 2009 | Expired or cancelled cancelled Aug 2021 | 211 Main St | Bcci Construction Company | application to verify assembly occupancy on the 1st floor. reference application 200810224835. requested by fire inspector.Details
application to verify assembly occupancy on the 1st floor. reference application 200810224835. requested by fire inspector. | |
| Apr 29, 2009 | Completed final sign-off Sep 2009 | 211 Main St | R L H Fire Protection Inc | t.i. upgrade on existing fire sprinkler system. relcoate 3 heads. (charles schwab lobby).Details
t.i. upgrade on existing fire sprinkler system. relcoate 3 heads. (charles schwab lobby). | $600 |
| Apr 28, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 3rd floor-new acoustical partition walls & door assemblies, corresponding electrical, hvac & new finishes.Details
3rd floor-new acoustical partition walls & door assemblies, corresponding electrical, hvac & new finishes. | $150,000 |
| Apr 23, 2009 | Completed final sign-off Oct 2009 | 211 Main St | R L H Fire Protection Inc | 6th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 16 heads & add 1 heads, total 17 headsDetails
6th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 16 heads & add 1 heads, total 17 heads | $3,825 |
| Apr 23, 2009 | Completed final sign-off Oct 2009 | 211 Main St | R L H Fire Protection Inc | 5th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 19 heads & add 3 heads, total 22 headsDetails
5th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 19 heads & add 3 heads, total 22 heads | $4,275 |
| Apr 17, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | revision to permit #2009/0224/2683 including revised power and data for furniture systems.Details
revision to permit #2009/0224/2683 including revised power and data for furniture systems. | $500 |
| Apr 17, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | revised to pa#2009/0107/9679 including revised furniture layout, power & data and new & relocated exit signs.Details
revised to pa#2009/0107/9679 including revised furniture layout, power & data and new & relocated exit signs. | $1,500 |
| Apr 17, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | revision to permit#2009/0302/3162 to change panel schedule.Details
revision to permit#2009/0302/3162 to change panel schedule. | $500 |
| Apr 16, 2009 | Completed final sign-off May 2009 | 211 Main St | C B F Inc | life safety/fire alarm modifications, 211 main street, 1st floor employee branch. install approx 7 new devices.Details
life safety/fire alarm modifications, 211 main street, 1st floor employee branch. install approx 7 new devices. | $4,200 |
| Apr 16, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | revision to pa#2009/0123/0740. add (2) vav boxes, change lighting layout, add (1) exit sign.Details
revision to pa#2009/0123/0740. add (2) vav boxes, change lighting layout, add (1) exit sign. | $6,600 |
| Apr 16, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | revision to approved pa#2009/0107/9680: new enclosure of portion of open office on east side with office front glazing.Details
revision to approved pa#2009/0107/9680: new enclosure of portion of open office on east side with office front glazing. | $5,500 |
| Apr 13, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | revision to application 200903023164, including changes to mechanical & electrical plans.Details
revision to application 200903023164, including changes to mechanical & electrical plans. | $15,000 |
| Apr 13, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | revision to application 200902242681, including demolition of white boards & addition of new furniture systems.Details
revision to application 200902242681, including demolition of white boards & addition of new furniture systems. | $200,000 |
| Apr 8, 2009 | Completed final sign-off May 2010 | 211 Main St | Bcci Construction Company | pre-fabricated guard kiosk with data & outlets.Details
pre-fabricated guard kiosk with data & outlets. | $40,000 |
| Apr 3, 2009 | Completed final sign-off May 2009 | 211 Main St | R L H Fire Protection Inc | 1st floor - t.i. upgrade on the extg fire sprinkler system for charles schwab's employee branch on the 1st floor. relocate 6 pendents for proper coverage.Details
1st floor - t.i. upgrade on the extg fire sprinkler system for charles schwab's employee branch on the 1st floor. relocate 6 pendents for proper coverage. | $1,200 |
| Mar 30, 2009 | Completed final sign-off Aug 2009 | 211 Main St | C B F Inc | life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.at 11th floorDetails
life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.at 11th floor | $2,500 |
| Mar 30, 2009 | Completed final sign-off Aug 2009 | 211 Main St | C B F Inc | 14th - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.Details
14th - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| Mar 30, 2009 | Never finaled issued Mar 2009, no final | 211 Main St | C B F Inc | 15th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.Details
15th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| Mar 30, 2009 | Completed final sign-off Aug 2009 | 211 Main St | C B F Inc | 10th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.Details
10th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| Mar 30, 2009 | Completed final sign-off Aug 2009 | 211 Main St | C B F Inc | 12th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.Details
12th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| Mar 30, 2009 | Completed final sign-off Sep 2009 | 211 Main St | C B F Inc | 13th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.Details
13th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| Mar 26, 2009 | Completed final sign-off Sep 2009 | 211 Main St | Bcci Construction Company | partial remodel of basement and first floor elevator lobbies including minor demolition. new non-load bearing partitions ceilings, finishes, new millwork, mechanical and electrical as required. life safety & sprinklers under separate permit.Details
partial remodel of basement and first floor elevator lobbies including minor demolition. new non-load bearing partitions ceilings, finishes, new millwork, mechanical and electrical as required. life safety & sprinklers under separate permit. | $550,000 |
| Mar 2, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | mechanical & electrical work. ref appl. 200902242681- 5th floor, including relocation of outlets, adjusting cfm (1) new vav box, new power & signal outlets, relocation of (e) lighting , fixtures & installation of new lighting & controls. life safety under separate permit.Details
mechanical & electrical work. ref appl. 200902242681- 5th floor, including relocation of outlets, adjusting cfm (1) new vav box, new power & signal outlets, relocation of (e) lighting , fixtures & installation of new lighting & controls. life safety under separate permit. | $48,900 |
| Mar 2, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | mechanical & electrical work. ref appl. 200902242683- 6th floor, including relocation of outlets, adjustin cfm (1) new vanbox, new power & signal outlets, relocation of (e) lighting , fixtures & installation of new lighting & controls. life safety under separate permit.Details
mechanical & electrical work. ref appl. 200902242683- 6th floor, including relocation of outlets, adjustin cfm (1) new vanbox, new power & signal outlets, relocation of (e) lighting , fixtures & installation of new lighting & controls. life safety under separate permit. | $48,900 |
| Feb 24, 2009 | Completed final sign-off Jan 2010 | 211 Main St | Bcci Construction Company | (n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoustic tile ceilings & lighting associated mech, elec, telecom & fire/life safety to be performed under separate permit. no structural work to be performed.Details
(n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoustic tile ceilings & lighting associated mech, elec, telecom & fire/life safety to be performed under separate permit. no structural work to be performed. | $200,000 |
| Feb 24, 2009 | Completed final sign-off Oct 2009 | 211 Main St | Bcci Construction Company | (n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoutical tile ceiling & lighting associated mech, elec, telecom & fire/life safety to be performed under separate permit. no structural work to be performed.Details
(n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoutical tile ceiling & lighting associated mech, elec, telecom & fire/life safety to be performed under separate permit. no structural work to be performed. | $200,000 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | R L H Fire Protection Inc | ti upgrade on the e fire sprinkler sytem for charles schwab 11th fl. relocate 8 heads add 1, total 9 heads.Details
ti upgrade on the e fire sprinkler sytem for charles schwab 11th fl. relocate 8 heads add 1, total 9 heads. | $1,800 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | R L H Fire Protection Inc | ti upgrade on the e fire sprinkler system for charles schwab on the 10th fl. relocate 8 heads, add 1, total 9.Details
ti upgrade on the e fire sprinkler system for charles schwab on the 10th fl. relocate 8 heads, add 1, total 9. | $1,800 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | R L H Fire Protection Inc | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 15th. flr. relocate (8) heads and add (1); total (9) heads.Details
t/i: upgrade on the (e) fire sprinkler system; for charles schwab 15th. flr. relocate (8) heads and add (1); total (9) heads. | $1,800 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | R L H Fire Protection Inc | ti upgrade on the e fire sprinkler system, for charles schwab 12 th fl. relcoate 8 heads, add 1, toltal 9 headsDetails
ti upgrade on the e fire sprinkler system, for charles schwab 12 th fl. relcoate 8 heads, add 1, toltal 9 heads | $1,800 |
| Feb 23, 2009 | Completed final sign-off Sep 2009 | 211 Main St | R L H Fire Protection Inc | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 13th. flr. relocate (8) heads and add (1) head, total (9) heads.Details
t/i: upgrade on the (e) fire sprinkler system; for charles schwab 13th. flr. relocate (8) heads and add (1) head, total (9) heads. | $1,800 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | R L H Fire Protection Inc | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 14th. flr. relocate (8) heads and add (1) head; total (9) heads.Details
t/i: upgrade on the (e) fire sprinkler system; for charles schwab 14th. flr. relocate (8) heads and add (1) head; total (9) heads. | $1,800 |
| Feb 12, 2009 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | ti @ 1st: (n) interior construction of offices including interior non-load bearing partitions, doors & glazed office fronts. associated mech., elec., telecomunications & fire life safety to be perfomed under separate permit. no structructual work to be performed.Details
ti @ 1st: (n) interior construction of offices including interior non-load bearing partitions, doors & glazed office fronts. associated mech., elec., telecomunications & fire life safety to be perfomed under separate permit. no structructual work to be performed. | $87,000 |
| Feb 12, 2009 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | 1st floor mechanical & electrical work associated with approved pa #200902121931 tenant improvement including minor demolition, new power & signal outlets & relocation of existing & installation of new lighting fixtures.Details
1st floor mechanical & electrical work associated with approved pa #200902121931 tenant improvement including minor demolition, new power & signal outlets & relocation of existing & installation of new lighting fixtures. | $22,500 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 211 Main St | demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan.Details
demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan. | $70,000 | |
| Jan 27, 2009 | Completed final sign-off Jun 2009 | 211 Main St | The Lawson Roofing Co Inc. | reroofing.Details
reroofing. | $232,000 |
| Jan 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | mechanical and electrical work associated with approved app 200901079679 including relocation of air outlets, adjusting cfm, 1 vav box, relocation and installation of lighting fixtures and controls. life safety under separate permitDetails
mechanical and electrical work associated with approved app 200901079679 including relocation of air outlets, adjusting cfm, 1 vav box, relocation and installation of lighting fixtures and controls. life safety under separate permit | $110,500 |
| Jan 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 10th floor-mechanical & electrical work associated with approved pa# 2009-0107-9681 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of new lighting fixtures & controls. ls under seperate permitDetails
10th floor-mechanical & electrical work associated with approved pa# 2009-0107-9681 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of new lighting fixtures & controls. ls under seperate permit | $88,425 |
| Jan 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 11th floor-mechanical & electrical work associated with approved pa# 2009-0107-9680 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of lighting fixtures & controls. ls under seperate permitDetails
11th floor-mechanical & electrical work associated with approved pa# 2009-0107-9680 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of lighting fixtures & controls. ls under seperate permit | $107,050 |
| Jan 22, 2009 | Completed final sign-off Sep 2009 | 211 Main St | Bcci Construction Company | 13th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjusting cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures and controls ls under separate permit.Details
13th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjusting cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures and controls ls under separate permit. | $110,500 |
| Jan 22, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 14th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjustin cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures and controls ls under separate permit.Details
14th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjustin cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures and controls ls under separate permit. | $110,050 |
| Jan 21, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | mechanical, electrical associated with approved pa# 200901079678 including relocation of air outlets adjusting cfm, one vav box, minor demo, relocation & installation of lights & controls is under seperate permitDetails
mechanical, electrical associated with approved pa# 200901079678 including relocation of air outlets adjusting cfm, one vav box, minor demo, relocation & installation of lights & controls is under seperate permit | $110,500 |
| Jan 15, 2009 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | mechanical & electrical work. ref. appl. 200812108173 to include hvac, new exhaust fan, diffusers, vav boxes & lighting.Details
mechanical & electrical work. ref. appl. 200812108173 to include hvac, new exhaust fan, diffusers, vav boxes & lighting. | $62,000 |
| Jan 14, 2009 | Completed final sign-off May 2009 | 211 Main St | C B F Inc | addition/revision to l/s system. ref. #200809020556.211 main st 1st floor auditoriam.Details
addition/revision to l/s system. ref. #200809020556.211 main st 1st floor auditoriam. | $9,000 |
| Jan 14, 2009 | Completed final sign-off Nov 2009 | 211 Main St | C B F Inc | life safty system modifications. expand extg fire alarm system due to tenant replacement 18th floor at 211 main stDetails
life safty system modifications. expand extg fire alarm system due to tenant replacement 18th floor at 211 main st | $8,000 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 10th/fl interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, tele communications, and fire life safety to be performed under separate permit, no struc work.Details
10th/fl interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, tele communications, and fire life safety to be performed under separate permit, no struc work. | $200,000 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 14th floor. new interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & fire life safety to be performed under separate permit, no structural work.Details
14th floor. new interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & fire life safety to be performed under separate permit, no structural work. | $200,000 |
| Jan 7, 2009 | Completed final sign-off Sep 2009 | 211 Main St | Bcci Construction Company | 13th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, telecommunications and fire life safety to be performed under separate permit, no struc work.Details
13th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, telecommunications and fire life safety to be performed under separate permit, no struc work. | $200,000 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 11th/fl. interior const of offices including interior non-load bearing partitions,doors, glazed store fronts, acoustic tile ceilings & associated mech, elec, telecommications, and fire life safety to be performed under separate permit, no struc work.Details
11th/fl. interior const of offices including interior non-load bearing partitions,doors, glazed store fronts, acoustic tile ceilings & associated mech, elec, telecommications, and fire life safety to be performed under separate permit, no struc work. | $200,000 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 12th floor. new interior construction of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mechanical, electrical tele commumications & fire life safety to be performed under separate permit, no structural work.Details
12th floor. new interior construction of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mechanical, electrical tele commumications & fire life safety to be performed under separate permit, no structural work. | $200,000 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 15th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elec, telecommoncations and fire life safety to be performed under separate permit, no struc work.Details
15th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elec, telecommoncations and fire life safety to be performed under separate permit, no struc work. | $200,000 |
| Dec 30, 2008 | Completed final sign-off May 2009 | 211 Main St | R L H Fire Protection Inc | t.i. upgrade the (e) fire sprinkler system, relocate 52 heads, add 18 heads, delete 17 heads. total 70 heads.Details
t.i. upgrade the (e) fire sprinkler system, relocate 52 heads, add 18 heads, delete 17 heads. total 70 heads. | $15,750 |
| Dec 30, 2008 | Completed final sign-off Apr 2009 | 211 Main St | R L H Fire Protection Inc | revision to pa #200808118880. sprinkler work. relocate 57, add 13, delete 10 sprinkler heads.Details
revision to pa #200808118880. sprinkler work. relocate 57, add 13, delete 10 sprinkler heads. | $1,000 |
| Dec 19, 2008 | Completed final sign-off Dec 2009 | 211 Main St | C B F Inc | life safety system modifications, expand existing fire alarm system due to tenant improvementsDetails
life safety system modifications, expand existing fire alarm system due to tenant improvements | $30,000 |
| Dec 19, 2008 | Completed final sign-off May 2009 | 211 Main St | C B F Inc | life safety modifications, expand fire alarm system due to tenant improvementDetails
life safety modifications, expand fire alarm system due to tenant improvement | $30,000 |
| Dec 15, 2008 | Never finaled issued Sep 2011, no final | 211 Main St | Thyssenkrupp Elevator Corp. | install destination based elevator controlDetails
install destination based elevator control | $25,000 |
| Dec 10, 2008 | Completed final sign-off Nov 2009 | 211 Main St | Bcci Construction Company | 18th fl, partial remodel of floor tenant improvement including demolition, new non load bearing window wall, partitions, ceilings, finishes, new skylight and electrical. life safety under separate permitDetails
18th fl, partial remodel of floor tenant improvement including demolition, new non load bearing window wall, partitions, ceilings, finishes, new skylight and electrical. life safety under separate permit | $265,000 |
| Nov 20, 2008 | Completed final sign-off Dec 2009 | 211 Main St | Bcci Construction Company | revision to app #200807187032. add new door at 1704. relocate door at 1705. demo 4 foot wall at 1704. no exterior work.Details
revision to app #200807187032. add new door at 1704. relocate door at 1705. demo 4 foot wall at 1704. no exterior work. | $7,000 |
| Nov 19, 2008 | Completed final sign-off Apr 2010 | 211 Main St | R L H Fire Protection Inc | 18th floor ti upgrade on the (e) fire sprinkler system for the 18th flr of charles schwab. relocate 25hd; add 5hd; delete 6hd. total 30hdDetails
18th floor ti upgrade on the (e) fire sprinkler system for the 18th flr of charles schwab. relocate 25hd; add 5hd; delete 6hd. total 30hd | $6,000 |
| Nov 12, 2008 | Completed final sign-off May 2009 | 211 Main St | Bcci Construction Company | interior demo, new drywall, ceiling work, doors, vav box, 1 fire damper, supply and return airDetails
interior demo, new drywall, ceiling work, doors, vav box, 1 fire damper, supply and return air | $1,000,000 |
| Oct 22, 2008 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | ground flr lecture hall without fixed seating and revision to (e) pa# 2008-0701-5781-accessory back of house service and relocate stage. m.e.p. and structural upgrade of restrooms, structural work to be performedDetails
ground flr lecture hall without fixed seating and revision to (e) pa# 2008-0701-5781-accessory back of house service and relocate stage. m.e.p. and structural upgrade of restrooms, structural work to be performed | $114,000 |
| Oct 2, 2008 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | exterior window replacement from single pane to double pane, relocation of exterior entry from howard st to main st.Details
exterior window replacement from single pane to double pane, relocation of exterior entry from howard st to main st. | $40,000 |
| Oct 2, 2008 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | revision to pa #200807015781, demolition of mezzanine & revision of structural beam from w 36" to 24" @ colum line e between 3 & 2.Details
revision to pa #200807015781, demolition of mezzanine & revision of structural beam from w 36" to 24" @ colum line e between 3 & 2. | $30,000 |