Teresa Emery
- Listed as
- architect, designer, engineer
- Firm
- Forge Architecture
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Dec 2022
231 permits since 2000 (architect on 225 permits, engineer on 5 permits, designer on 1 permit): 181 completed, 33 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 231.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2022 | Completed final sign-off Mar 2024 | 303 02nd St | Gci, Inc | to convert (4)(e) parking stalls into (1) van accessible ev charging stall & (1) standard ev charging stall. new type-3 ev chargers provided at each stall per sf ordinance 244-19Details
to convert (4)(e) parking stalls into (1) van accessible ev charging stall & (1) standard ev charging stall. new type-3 ev chargers provided at each stall per sf ordinance 244-19 | $350,000 |
| Dec 15, 2022 | Expired or cancelled cancelled Jan 2026 | 519 Powell St | new ti improvement on the mezzanine flr, construction of non-structural partitions, millworks, finishes, ceiling, mep, lighting fixtures and restroomsDetails
new ti improvement on the mezzanine flr, construction of non-structural partitions, millworks, finishes, ceiling, mep, lighting fixtures and restrooms | $750,000 | |
| Dec 13, 2022 | Expired or cancelled cancelled Jan 2026 | 303 02nd St | 4th/flr: restroom upgrades: includes removal of all existing finishes, wallpaper & corner guards, particle walls & prep for new finish. remove plumbing fixtures, equipments, accessories, toilet partitions. provide new finishes, plumbing fixtures, equipments, accessories & toilet partitions.Details
4th/flr: restroom upgrades: includes removal of all existing finishes, wallpaper & corner guards, particle walls & prep for new finish. remove plumbing fixtures, equipments, accessories, toilet partitions. provide new finishes, plumbing fixtures, equipments, accessories & toilet partitions. | $400,000 | |
| Dec 13, 2022 | Completed final sign-off Aug 2023 | 100 California St | Skyline Construction | 6/f suite 600: demolition of non-structural partitions and millwork. new construction of non-structural partitions, operable folding partition, new breakroom for employees only.Details
6/f suite 600: demolition of non-structural partitions and millwork. new construction of non-structural partitions, operable folding partition, new breakroom for employees only. | $487,000 |
| Dec 8, 2022 | Expired or cancelled withdrawn May 2023 | 44 02nd St | this permit is for change of use, in connection with planning dept. case no 2022-003210cua.Details
this permit is for change of use, in connection with planning dept. case no 2022-003210cua. | ||
| Dec 8, 2022 | Expired or cancelled withdrawn Oct 2023 | 360 03rd St | suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.Details
suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes. | $900,000 | |
| Dec 7, 2022 | Completed final sign-off Jul 2023 | 360 03rd St | Gci, Inc | 1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms.Details
1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms. | $350,000 |
| Dec 2, 2022 | Completed final sign-off Jul 2023 | 44 02nd St | Gci, Inc | comply with accessible business program: main entry door upgrade, work includes removal of existing interior and exterior push buttons and ex isting door operator. remove components to be replaced with ada compliant push button pedestals and door operator abe 202209144307Details
comply with accessible business program: main entry door upgrade, work includes removal of existing interior and exterior push buttons and ex isting door operator. remove components to be replaced with ada compliant push button pedestals and door operator abe 202209144307 | $10,000 |
| Nov 30, 2022 | Completed final sign-off Oct 2023 | 1 Market St | Skyline Construction | 39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms.Details
39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms. | $2,160,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2023 | 44 02nd St | Hp Build | change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included.Details
change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included. | |
| Oct 6, 2022 | Completed final sign-off Apr 2023 | 55 02nd St | M C S Construction Services | 19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes.Details
19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes. | $125,000 |
| Oct 4, 2022 | Completed final sign-off Apr 2023 | 303 02nd St | Field Construction Inc. | demolition of non structural paritions, ceiling, lighting, millwork and finsihes. new construction of non structural partitoins, ceiling, lighting, elec, finishes.Details
demolition of non structural paritions, ceiling, lighting, millwork and finsihes. new construction of non structural partitoins, ceiling, lighting, elec, finishes. | $220,000 |
| Sep 21, 2022 | Completed final sign-off Mar 2023 | 601 Montgomery St | High Level Construction Co | commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbingDetails
commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbing | $405,570 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 100 Hooper St | Gci, Inc | g/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep.Details
g/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep. | $100,000 |
| Sep 19, 2022 | Completed final sign-off Feb 2023 | 170 Maiden Ln | Gci, Inc | barrier removal at the primary office entry and interior accessible path of travel. new power door operators and replacement of floor designation signage at elevator door jambs. abe 201810312342.Details
barrier removal at the primary office entry and interior accessible path of travel. new power door operators and replacement of floor designation signage at elevator door jambs. abe 201810312342. | $12,000 |
| Sep 14, 2022 | Completed final sign-off Apr 2023 | 601 Montgomery St | Commercial Interior Builders Inc | 8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbingDetails
8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing | $206,537 |
| Sep 6, 2022 | Never finaled issued Sep 2022, no final | 740 Market St | Anning-Johnson Company | demo interior @ ground fl & roof top eqiuipment only of non structural partitions, ceiling, finishes & associated mep.Details
demo interior @ ground fl & roof top eqiuipment only of non structural partitions, ceiling, finishes & associated mep. | $90,000 |
| Aug 19, 2022 | Completed final sign-off Sep 2022 | 303 02nd St | Skyline Construction | 5/f:revision to pa# 202201146043. scope of work includes to provide framing partitions behind toilet in women ada stall per dbi inspector comments.Details
5/f:revision to pa# 202201146043. scope of work includes to provide framing partitions behind toilet in women ada stall per dbi inspector comments. | $6,000 |
| Aug 11, 2022 | Completed final sign-off Jun 2023 | 1 Market St | Field Construction Inc. | suite 1050: rev to pa202203079332 - layout changes. no structural work.Details
suite 1050: rev to pa202203079332 - layout changes. no structural work. | |
| Jul 22, 2022 | Completed final sign-off Apr 2023 | 560 Mission St | Gci, Inc | 19/f: accessibility upgtrades in the (e) restrooms, new finishes, ceiling and lighting fixtures. new door frames and hardware at (e0 elevator lobby and coridors in the tenant suite.Details
19/f: accessibility upgtrades in the (e) restrooms, new finishes, ceiling and lighting fixtures. new door frames and hardware at (e0 elevator lobby and coridors in the tenant suite. | $300,000 |
| Jul 11, 2022 | Completed final sign-off Oct 2022 | 220 Montgomery St | San Francisco Commercial Builders Inc | suite 300-a: demising suite 300-a into (2) separate suites w/addition of demising partitions/doors, 3/f accessible restroom upgrades in accordance w/disabled access 20% ruleDetails
suite 300-a: demising suite 300-a into (2) separate suites w/addition of demising partitions/doors, 3/f accessible restroom upgrades in accordance w/disabled access 20% rule | $61,440 |
| Jul 6, 2022 | Expired or cancelled cancelled Jan 2026 | 220 Montgomery St | Plant Construction Co, Lp | revision to bpa#202110120297: repair (e) inteiror rated corridor wall utilizing engineering judgement developed by fire protection engineer (coffman engs)Details
revision to bpa#202110120297: repair (e) inteiror rated corridor wall utilizing engineering judgement developed by fire protection engineer (coffman engs) | |
| Jun 29, 2022 | Completed final sign-off Oct 2024 | 69 Green St | Novo Construction Inc | speculative office space at (e) commercial building. proposed work includes reconfiguration of (e) lobby stairs and exterior windows at front facade, a roof deck.Details
speculative office space at (e) commercial building. proposed work includes reconfiguration of (e) lobby stairs and exterior windows at front facade, a roof deck. | $500,000 |
| Jun 21, 2022 | Completed final sign-off Dec 2023 | 69 Green St | Novo Construction Inc | the prj consists of speculative office space @ an (e) commercial office bldg. proposed work includes new restrooms, finishes, ceiling, and lighting throughout.Details
the prj consists of speculative office space @ an (e) commercial office bldg. proposed work includes new restrooms, finishes, ceiling, and lighting throughout. | $400,000 |
| Jun 14, 2022 | Completed final sign-off May 2023 | 1 Market St | Gci, Inc | demolition of the communicating stiar and intemediary landing between 39th floor and 40th floor.Details
demolition of the communicating stiar and intemediary landing between 39th floor and 40th floor. | $145,000 |
| Jun 10, 2022 | Completed final sign-off Mar 2023 | 560 Mission St | Gci, Inc | 19th flr: includes the construction of non structural partitions, millwork, finishes, celing tiles and grids, light fixtures and acessibilty upgrades at restrooms.Details
19th flr: includes the construction of non structural partitions, millwork, finishes, celing tiles and grids, light fixtures and acessibilty upgrades at restrooms. | $2,750,000 |
| May 18, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | M C S Construction Services | 10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a.Details
10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a. | |
| May 6, 2022 | Completed final sign-off Dec 2023 | 69 Green St | Novo Construction Inc | demo of non-structural partitions, ceiling, finishes and associated mech, plumbing & electrical of vacant spaceDetails
demo of non-structural partitions, ceiling, finishes and associated mech, plumbing & electrical of vacant space | $50,000 |
| Mar 18, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | M C S Construction Services | 10th fl: demo of non-structural partitions, ceilings, lighting & finishes. new construction of non-structural partition, ceiling, lighting, electrical, millwork, and finishes.Details
10th fl: demo of non-structural partitions, ceilings, lighting & finishes. new construction of non-structural partition, ceiling, lighting, electrical, millwork, and finishes. | $1,300,000 |
| Mar 10, 2022 | Completed final sign-off Sep 2022 | 303 02nd St | Skyline Construction | 4/f suite n401 & n450: demolition of non-structural partitions, ceiling, lighting, millwork and finishes. new construction of non-structural partitions, ceiling, lighting, millwork and finishes.mep will be deferred submittal.Details
4/f suite n401 & n450: demolition of non-structural partitions, ceiling, lighting, millwork and finishes. new construction of non-structural partitions, ceiling, lighting, millwork and finishes.mep will be deferred submittal. | $1,000,000 |
| Mar 7, 2022 | Completed final sign-off Jun 2023 | 1 Market St | Field Construction Inc. | 10th fl: demolition of (e) non-structural partitions, doors & frames, gyp board ceiling, lighting, millwork & finishes. construction of (n) non-structural partitions, act ceiling, lighting, millwork & finishes.Details
10th fl: demolition of (e) non-structural partitions, doors & frames, gyp board ceiling, lighting, millwork & finishes. construction of (n) non-structural partitions, act ceiling, lighting, millwork & finishes. | $600,000 |
| Feb 17, 2022 | Completed final sign-off Apr 2023 | 301 Toland St | C & J Contracting Inc | provide and install 1 new exhaust fan.Details
provide and install 1 new exhaust fan. | $4,500 |
| Feb 15, 2022 | Completed final sign-off Jul 2022 | 345 Brannan St | Gci, Inc | revision to pa# 202101213031. scope of work includes replacing an (e) window with a louver.Details
revision to pa# 202101213031. scope of work includes replacing an (e) window with a louver. | $5,000 |
| Feb 2, 2022 | Completed final sign-off Jul 2022 | 360 03rd St | demolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall.Details
demolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall. | $68,000 | |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 575 Market St | Field Construction Inc. | 10/f: adding 2-way communication system and card readers at elevator lobby and freight elevator lobby.Details
10/f: adding 2-way communication system and card readers at elevator lobby and freight elevator lobby. | $2,640 |
| Jan 14, 2022 | Completed final sign-off Sep 2022 | 303 02nd St | Skyline Construction | suite n550, tenant improvement demo of non structural partition, ceiling, lighting, millwork+finishes, new construction of non-structural partition, ceiling , lighting, millwork and finishes.Details
suite n550, tenant improvement demo of non structural partition, ceiling, lighting, millwork+finishes, new construction of non-structural partition, ceiling , lighting, millwork and finishes. | $250,000 |
| Dec 9, 2021 | Completed final sign-off Aug 2022 | 345 Brannan St | Gci, Inc | 1st floor: revision to pa#202101213031. scope of work includes the revision of the storage space to be built out as a new single occupancy restroom.Details
1st floor: revision to pa#202101213031. scope of work includes the revision of the storage space to be built out as a new single occupancy restroom. | $40,000 |
| Dec 9, 2021 | Completed final sign-off Jun 2022 | 454 Shotwell St | C C I Commercial Construction & Improv | installation of access hatch at elevator shaft.Details
installation of access hatch at elevator shaft. | $2,000 |
| Nov 30, 2021 | Completed final sign-off Mar 2022 | 1 Market St | Field Construction Inc. | 5th floor:demo of non-structural partitions,ceiling,lighting,finishes & associated mechanical,plumbing & electrical per ab-017 space will remain unoccupied.sprinkler demo permit under #2021/1122/2851.Details
5th floor:demo of non-structural partitions,ceiling,lighting,finishes & associated mechanical,plumbing & electrical per ab-017 space will remain unoccupied.sprinkler demo permit under #2021/1122/2851. | $280,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 100 Hooper St | Gci, Inc | suite #15: revision to room #809 - extg storage to private office. ref app#202108196721Details
suite #15: revision to room #809 - extg storage to private office. ref app#202108196721 | |
| Oct 28, 2021 | Completed final sign-off Sep 2022 | 201 03rd St | Gci, Inc | installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as requiredDetails
installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as required | $40,000 |
| Oct 13, 2021 | Completed final sign-off Dec 2021 | 85 02nd St | Field Construction Inc. | ground floor t.i: demolition of one non-structural partial height partition, doors and sitelite. new construction of one non structural partition, reinstall salvaged doors and frames, minor lighting and electrical work. all interior ti.Details
ground floor t.i: demolition of one non-structural partial height partition, doors and sitelite. new construction of one non structural partition, reinstall salvaged doors and frames, minor lighting and electrical work. all interior ti. | $168,000 |
| Oct 12, 2021 | Completed final sign-off Jul 2022 | 220 Montgomery St | Plant Construction Co, Lp | revision to 202106283354: scope of work included reduction in the basement storage and modified routing for mech & plumbing to 3rd fl roof. original permit included t.i. on basement flDetails
revision to 202106283354: scope of work included reduction in the basement storage and modified routing for mech & plumbing to 3rd fl roof. original permit included t.i. on basement fl | |
| Sep 23, 2021 | Completed final sign-off Feb 2023 | 301 Toland St | C & J Contracting Inc | new structural/non-structural interior partitions, tenant demising wall, ceilings, lighting, plumbing, finishes. exterior improvement for accessibility scope of work under separate permit. revision to bpa#202012030199Details
new structural/non-structural interior partitions, tenant demising wall, ceilings, lighting, plumbing, finishes. exterior improvement for accessibility scope of work under separate permit. revision to bpa#202012030199 | $460,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2023 | 301 Toland St | C & J Contracting Inc | new exterior openings and accessible access at an existing warehouse. revision to pa# 202011058335Details
new exterior openings and accessible access at an existing warehouse. revision to pa# 202011058335 | $320,000 |
| Sep 21, 2021 | Never finaled issued Oct 2022, no final | 345 Brannan St | rooftop: rev to pa200811045827 only for fire; assembly permit to establish occupancy in assembly space from b to a-3, occupancy at roof deck. rev. to 2021 0427 9443Details
rooftop: rev to pa200811045827 only for fire; assembly permit to establish occupancy in assembly space from b to a-3, occupancy at roof deck. rev. to 2021 0427 9443 | ||
| Aug 31, 2021 | Expired or cancelled cancelled Jan 2026 | 529 Powell St | revision to a previous barrier removal pa 2019-0401-6785 adding a guardrail attachment to the (e) handrail at the entryDetails
revision to a previous barrier removal pa 2019-0401-6785 adding a guardrail attachment to the (e) handrail at the entry | $5,000 | |
| Aug 19, 2021 | Completed final sign-off Jan 2022 | 100 Hooper St | Gci, Inc | suite 15 - 1st flr: new partition walls, new lighting & new feature screen wall. mep/fire alarm/sprinklers deferred permits. ref pa 202011138886 & 201906113160.Details
suite 15 - 1st flr: new partition walls, new lighting & new feature screen wall. mep/fire alarm/sprinklers deferred permits. ref pa 202011138886 & 201906113160. | $150,000 |
| Aug 13, 2021 | Expired or cancelled cancelled Jan 2026 | 500 Sutter St | revision to previous barrier removal pa 2019 1213 9557. adding a guardrail attachment to (e) handrail at the main entry.Details
revision to previous barrier removal pa 2019 1213 9557. adding a guardrail attachment to (e) handrail at the main entry. | $5,000 | |
| Aug 6, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | Gci, Inc | 10/f: demolition of non-structural partitions, celing, lighting, millwork and finishes. new construction of non-structural partitions, ceilings, lighting, electrical millwork & finishes.Details
10/f: demolition of non-structural partitions, celing, lighting, millwork and finishes. new construction of non-structural partitions, ceilings, lighting, electrical millwork & finishes. | $800,000 |
| Jul 23, 2021 | Never finaled issued Sep 2021, no final | 201 03rd St | Gci, Inc | 10th fl: demolition of non-structural partitions, partial ceiling, lighting & finishes. new construction of full height demising walls to create 2 new suites, upgrade in existing accessible restrooms & new accessible all gender restrooms. fire alarm/sprinklers under sep permits.Details
10th fl: demolition of non-structural partitions, partial ceiling, lighting & finishes. new construction of full height demising walls to create 2 new suites, upgrade in existing accessible restrooms & new accessible all gender restrooms. fire alarm/sprinklers under sep permits. | $648,000 |
| Jun 28, 2021 | Completed final sign-off Aug 2022 | 220 Montgomery St | Plant Construction Co, Lp | work includes:improvements on the basement floor: demo includes removal of non-structural ceilings, lighting & finishes. construction includes non -structural partitions ceilinfgs, lighting, finishes, & proving nw accessble showers, restrooms, & locker rooms. nw rated shafts to 3rd floor lightwell,Details
work includes:improvements on the basement floor: demo includes removal of non-structural ceilings, lighting & finishes. construction includes non -structural partitions ceilinfgs, lighting, finishes, & proving nw accessble showers, restrooms, & locker rooms. nw rated shafts to 3rd floor lightwell, | $1,471,776 |
| Jun 16, 2021 | Completed final sign-off Jun 2023 | 259 Post St | Gci, Inc | minor permit to alter application submitted for planning review for window washing davits & safety railing installation on roof level of (e) bldgDetails
minor permit to alter application submitted for planning review for window washing davits & safety railing installation on roof level of (e) bldg | $250,000 |
| May 17, 2021 | Expired or cancelled cancelled Jul 2024 | 301 Toland St | C & J Contracting Inc | all work on toland side of warehouse- renovation to enlarge existing office area in existing warehouse, including new structural and non structural partitions, ceiling, lighting, plumbing, and finishes on the first floor and new mezzanie.Details
all work on toland side of warehouse- renovation to enlarge existing office area in existing warehouse, including new structural and non structural partitions, ceiling, lighting, plumbing, and finishes on the first floor and new mezzanie. | $1,000,000 |
| May 17, 2021 | Completed final sign-off Jan 2022 | 100 Hooper St | Gci, Inc | demo of portion of (e) curtain wall. new roll up door at (e) breezeway. ref pa 2020-1209-0608Details
demo of portion of (e) curtain wall. new roll up door at (e) breezeway. ref pa 2020-1209-0608 | $125,000 |
| May 3, 2021 | Never finaled issued Jun 2021, no final | 121 Spear St | Marchetti Group | removal & replacement of sections of 1st floor slab. interior location.Details
removal & replacement of sections of 1st floor slab. interior location. | $15,000 |
| Apr 30, 2021 | Never finaled issued May 2021, no final | 1355 Market St | Bcci Construction Company | suite 200 - 2/f: rev to pa202101192923:; revision to demo and construciton at reakroom and offices, lighting, power and sign, finsihes and millwork.Details
suite 200 - 2/f: rev to pa202101192923:; revision to demo and construciton at reakroom and offices, lighting, power and sign, finsihes and millwork. | $75,000 |
| Apr 22, 2021 | Expired or cancelled cancelled Jan 2026 | 301 Toland St | C & J Contracting Inc | renovation of an existing warehouse including new exterior openings, and new accessible entry.Details
renovation of an existing warehouse including new exterior openings, and new accessible entry. | $350,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2022 | 640 Cesar Chavez St | Truebeck Construction | demo of non structural elements of building interior only per ab-017Details
demo of non structural elements of building interior only per ab-017 | $5,000 |
| Apr 7, 2021 | Never finaled issued May 2022, no final | 601 Montgomery St | demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glazeDetails
demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glaze | $675,923 | |
| Apr 6, 2021 | Completed final sign-off Nov 2021 | 99 Rhode Island St | Skyline Construction | removal of (e) ground floor roll up doors and warehouse swing door. installation of new ground floor glass roll up and fixed storefront window in (e) rough opening. removal of 11 (e) 3rd flr windows and replace with new enlarged window openings.Details
removal of (e) ground floor roll up doors and warehouse swing door. installation of new ground floor glass roll up and fixed storefront window in (e) rough opening. removal of 11 (e) 3rd flr windows and replace with new enlarged window openings. | $400,000 |
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.Details
7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep. | $338,903 |
| Apr 1, 2021 | Completed final sign-off Mar 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.Details
4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893. | $308,451 |
| Mar 2, 2021 | Never finaled filed Mar 2021, never issued | 369 Pine St | remove (e) exterior awing fabric and replace with new. (e) awning frame and structural to remain.Details
remove (e) exterior awing fabric and replace with new. (e) awning frame and structural to remain. | $15,000 | |
| Mar 1, 2021 | Completed final sign-off Jun 2021 | 99 Rhode Island St | Skyline Construction | soft demo only per ab-017. demolition of non-structural partitions ceilings, lighting, millworks, & any associated m.e.p., fire sprinklers, to be modified in accordance with requirement for open ceilings under separate submittal.Details
soft demo only per ab-017. demolition of non-structural partitions ceilings, lighting, millworks, & any associated m.e.p., fire sprinklers, to be modified in accordance with requirement for open ceilings under separate submittal. | $100,000 |
| Mar 1, 2021 | Completed final sign-off Oct 2022 | 1 Market St | Gci, Inc | 14th fl: demo of existing non-structural partitions, plumbing fixtures, finishes, ceilings & lighting. construction of new non-structural partitions, plumbing fixtures, finishes, ceilings & lightings.Details
14th fl: demo of existing non-structural partitions, plumbing fixtures, finishes, ceilings & lighting. construction of new non-structural partitions, plumbing fixtures, finishes, ceilings & lightings. | $90,000 |
| Feb 26, 2021 | Completed final sign-off Jun 2022 | 1 Market St | Gci, Inc | demolition of existing non-structural partitions, doors, frames, finishes ceilings, lightings, plumbing fixtures. construction of new non-structural partitions, finishes ceilings, lighting, plumbing fixtures. restroom accessibility upgrage.Details
demolition of existing non-structural partitions, doors, frames, finishes ceilings, lightings, plumbing fixtures. construction of new non-structural partitions, finishes ceilings, lighting, plumbing fixtures. restroom accessibility upgrage. | $464,000 |
| Feb 26, 2021 | Completed final sign-off Oct 2022 | 1 Market St | Gci, Inc | 12th fl: restroom remodel. demo of non-structural partitions,plumbing fixtures, finishes, ceilings and lighting, construction of new non-structural partitions, plumbing fixtures, finishes, ceilings and ligthing n/a maherDetails
12th fl: restroom remodel. demo of non-structural partitions,plumbing fixtures, finishes, ceilings and lighting, construction of new non-structural partitions, plumbing fixtures, finishes, ceilings and ligthing n/a maher | $90,000 |
| Feb 11, 2021 | Completed final sign-off Dec 2021 | 1 Market St | Skyline Construction | fl 3, 4, 11, 16: ti consisting of new gender neutral restroom. interior demo of non-structural elements. included but not limited to partitions, doors, finishes, ceilings, lighting & mep's. no exterior work. life safety under separate permit.Details
fl 3, 4, 11, 16: ti consisting of new gender neutral restroom. interior demo of non-structural elements. included but not limited to partitions, doors, finishes, ceilings, lighting & mep's. no exterior work. life safety under separate permit. | $800,000 |
| Feb 5, 2021 | Completed final sign-off May 2022 | 121 Spear St | Skyline Construction | levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls.Details
levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls. | $700,000 |
| Jan 21, 2021 | Completed final sign-off Aug 2022 | 345 Brannan St | 1st fl - scope includes a speculative tenant space, warm shell condition with drywall on existing unfinished walls, painting of walls & ceiling at new soffit, lighting, louver, plumbing stub out for future sinks, sub panel, power outlets and vrf unit. ref pa 2017-0906-6962Details
1st fl - scope includes a speculative tenant space, warm shell condition with drywall on existing unfinished walls, painting of walls & ceiling at new soffit, lighting, louver, plumbing stub out for future sinks, sub panel, power outlets and vrf unit. ref pa 2017-0906-6962 | $65,000 | |
| Jan 19, 2021 | Completed final sign-off Sep 2021 | 1355 Market St | Bcci Construction Company | 2nd fl - demo and construction of non-structural paritions, lighting, finishes and millwork. mep included. life safety deferred.Details
2nd fl - demo and construction of non-structural paritions, lighting, finishes and millwork. mep included. life safety deferred. | $700,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2022 | 100 Hooper St | Gci, Inc | suite 3. spec suite build-out incl construct of rated & non-rated partitions, conference rms, meeting rms, electr rm, breakrm and lighting. mezzanine pa 202009305592.Details
suite 3. spec suite build-out incl construct of rated & non-rated partitions, conference rms, meeting rms, electr rm, breakrm and lighting. mezzanine pa 202009305592. | $1,000,000 |
| Dec 3, 2020 | Completed final sign-off Feb 2023 | 301 Toland St | C & J Contracting Inc | construction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335.Details
construction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335. | $750,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.Details
4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit. | $310,155 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep.Details
4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep. | $289,203 |
| Nov 13, 2020 | Completed final sign-off Mar 2022 | 100 Hooper St | Gci, Inc | unit 8: spec suite build out including construction of rated and non-rated walls, conference & meeting rooms, electrical room, break room, & lighting. (e) mezz, lift & stairs approved under pa 201906113160.Details
unit 8: spec suite build out including construction of rated and non-rated walls, conference & meeting rooms, electrical room, break room, & lighting. (e) mezz, lift & stairs approved under pa 201906113160. | $1,000,000 |
| Nov 6, 2020 | Completed final sign-off Sep 2021 | 600 California St | Novo Construction Inc | waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter.Details
waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter. | $120,000 |
| Nov 5, 2020 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421.Details
13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421. | $100,000 |
| Nov 2, 2020 | Completed final sign-off Dec 2021 | 220 Montgomery St | R.M.R. Construction Company | existing ground floor lobby includes: demolition of (e) ceilings, light fixtures, wall surfaces & finishes, specialty interior glazim & non-compliant common area restroom items. construction of new fixtures & accessable restroom upgrades.Details
existing ground floor lobby includes: demolition of (e) ceilings, light fixtures, wall surfaces & finishes, specialty interior glazim & non-compliant common area restroom items. construction of new fixtures & accessable restroom upgrades. | $1,110,515 |
| Nov 2, 2020 | Completed final sign-off Dec 2021 | 220 Montgomery St | R.M.R. Construction Company | improvements to comply with accessible business entrance ord 51-16 program. scope of work includes modifying existing ramp, handrails, installation of actuator bars/power door operatators interior suite entry doors & upgrading hardware at exterior suite entry door.Details
improvements to comply with accessible business entrance ord 51-16 program. scope of work includes modifying existing ramp, handrails, installation of actuator bars/power door operatators interior suite entry doors & upgrading hardware at exterior suite entry door. | $37,100 |
| Oct 30, 2020 | Never finaled filed Oct 2020, never issued | 211 Main St | addition of bike parking & enclosure in exterior breezeway. the breezeway is monitored by on site security 24 hrs/day. pot drawings from approved pa# 202007099861.Details
addition of bike parking & enclosure in exterior breezeway. the breezeway is monitored by on site security 24 hrs/day. pot drawings from approved pa# 202007099861. | $70,000 | |
| Oct 22, 2020 | Completed final sign-off Sep 2021 | 1 Market St | Bcci Construction Company | 28/f: new lobby with operable partition, additional gender neutral restroom, updated restroom and breakroom area. maher n/a.Details
28/f: new lobby with operable partition, additional gender neutral restroom, updated restroom and breakroom area. maher n/a. | $550,000 |
| Oct 22, 2020 | Completed final sign-off Sep 2021 | 1 Market St | Bcci Construction Company | 27/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a.Details
27/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a. | $550,000 |
| Oct 22, 2020 | Completed final sign-off Sep 2021 | 1 Market St | Bcci Construction Company | 31/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a.Details
31/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a. | $550,000 |
| Oct 17, 2020 | Expired or cancelled cancelled Jan 2026 | 6000 03rd St | power service upgrade to existing warehouse including new electrical room with new exteriro access/egress door.Details
power service upgrade to existing warehouse including new electrical room with new exteriro access/egress door. | $200,000 | |
| Oct 17, 2020 | Completed final sign-off Apr 2023 | 301 Toland St | C & J Contracting Inc | demo (e) single-occupancy restrooms & power service upgrade to existing warehouse including new electrical room w/ new exterior access/egress door & stair.Details
demo (e) single-occupancy restrooms & power service upgrade to existing warehouse including new electrical room w/ new exterior access/egress door & stair. | $200,000 |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 100 Hooper St | Gci, Inc | suite #3: construction of mezzanine, accessible lift, stairs in existing core and shell building.Details
suite #3: construction of mezzanine, accessible lift, stairs in existing core and shell building. | $150,000 |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 211 Main St | Dome Construction Corp | 16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a.Details
16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a. | $2,597,000 |
| Sep 26, 2020 | Completed final sign-off Apr 2022 | 100 Hooper St | Gci, Inc | rev to 201908158968: suites 1, 2 & 6: rev to document 1-hr walls at adjacent spaces.Details
rev to 201908158968: suites 1, 2 & 6: rev to document 1-hr walls at adjacent spaces. | |
| Sep 26, 2020 | Completed final sign-off Jan 2021 | 333 Brannan St | Principal Builders Inc. | 1/f: installation of new turnstiles in lobby; restroom accessibilty upgrades. maher n/a.Details
1/f: installation of new turnstiles in lobby; restroom accessibilty upgrades. maher n/a. | $30,000 |
| Sep 24, 2020 | Completed final sign-off Mar 2022 | 1 Market St | Field Construction Inc. | plaza level: demolition of existing plumbing fixtures, finishes, lighting. construction of new non-structural partitions, plumbing fixtures, lighting and finishes. full accessibility upgrades under this scope of work.Details
plaza level: demolition of existing plumbing fixtures, finishes, lighting. construction of new non-structural partitions, plumbing fixtures, lighting and finishes. full accessibility upgrades under this scope of work. | $97,000 |
| Sep 23, 2020 | Never finaled issued Jan 2021, no final | 454 Shotwell St | C C I Commercial Construction & Improv | 452-454 shotwell st: demo of (e) ramp, and construction of new stair, rmap, elevator upgtrade and enw restrooms on 2/f.Details
452-454 shotwell st: demo of (e) ramp, and construction of new stair, rmap, elevator upgtrade and enw restrooms on 2/f. | $1,400,000 |
| Sep 12, 2020 | Completed final sign-off Jan 2021 | 303 02nd St | Bevilacqua & Sons | restroom upgrades on 3/f scope of work includes new stall partitions, reinstalling (e) plumbing fixtures & restroom accessories, or providing new as required. scope of work to be barrier removal only.Details
restroom upgrades on 3/f scope of work includes new stall partitions, reinstalling (e) plumbing fixtures & restroom accessories, or providing new as required. scope of work to be barrier removal only. | $75,000 |
| Sep 1, 2020 | Never finaled issued Nov 2020, no final | 601 Montgomery St | Vortex Industries Inc | to comply with the accessible business entrance program: install new power door operator at existing retail tenant entry, and lowering existing elevator support rail at accessible entry from garage.Details
to comply with the accessible business entrance program: install new power door operator at existing retail tenant entry, and lowering existing elevator support rail at accessible entry from garage. | $8,561 |
| Aug 10, 2020 | Completed final sign-off Jul 2022 | 454 Shotwell St | C C I Commercial Construction & Improv | demolition of extg storefront at 454 shotwell, fire escape and rollup door at facade. new construction of storefront, brick infill and windows.Details
demolition of extg storefront at 454 shotwell, fire escape and rollup door at facade. new construction of storefront, brick infill and windows. | $250,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Deb Construction Llc | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with newDetails
new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| Jul 9, 2020 | Expired or cancelled expired Jul 2026 | 106 West Portal Av | Alegis Construction Inc | replace 2 existing roof top units.Details
replace 2 existing roof top units. | $90,000 |
| Jun 2, 2020 | Completed final sign-off Feb 2021 | 211 Main St | Dome Construction Corp | 9th flr: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9 g1.0.Details
9th flr: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9 g1.0. | $900,000 |
| May 20, 2020 | Completed final sign-off Oct 2020 | 345 Brannan St | Principal Builders Inc. | 3/f: construction of non-structural partition and door, frame and hardware. maher n/a.Details
3/f: construction of non-structural partition and door, frame and hardware. maher n/a. | $25,000 |