Block 0227, lot 005
527 Montgomery St
- City’s use
- Commercial Office
- Lot
- 788 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
128 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress issued Jun 2026 | 505 Montgomery St | ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millworks, mech & elec outlets, switches. full restroom accessibility upgradeDetails
ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millworks, mech & elec outlets, switches. full restroom accessibility upgrade | $150,000 | |
| Apr 28, 2026 | In progress issued Jun 2026 | 505 Montgomery St | level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, millwork, fixtures and finishes. project shall be compliant with sf ab-017Details
level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, millwork, fixtures and finishes. project shall be compliant with sf ab-017 | $100,000 | |
| Mar 17, 2026 | In progress issued May 2026 | 505 Montgomery St | basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping)Details
basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping) | $20,000 | |
| Oct 30, 2025 | In progress issued Nov 2025 | 505 Montgomery St | level 6: defered mep for pa#202508294230Details
level 6: defered mep for pa#202508294230 | $58,176 | |
| Aug 29, 2025 | In progress issued Oct 2025 | 505 Montgomery St | t.i: removal and construction of non -structural partitions, salvage and relocation of door assembly and new finishes. relocated power outlets and new lightening. 6th floorDetails
t.i: removal and construction of non -structural partitions, salvage and relocation of door assembly and new finishes. relocated power outlets and new lightening. 6th floor | $150,000 | |
| Nov 7, 2024 | Expired or cancelled withdrawn Jun 2025 | 505 Montgomery St | 13th/f: new card reader & rex device installation at specfied locationDetails
13th/f: new card reader & rex device installation at specfied location | $6,000 | |
| Sep 25, 2024 | In progress issued Sep 2024 | 505 Montgomery St | C B F Inc | 13/fl-(n) power and signal devices title 24Details
13/fl-(n) power and signal devices title 24 | |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 505 Montgomery St | Convergint Technologies Llc | 6/f: fire alarm modificaation commercial ti 6th fl. 16 new speaker strobes, 14 new speakers. ref 202306301339.Details
6/f: fire alarm modificaation commercial ti 6th fl. 16 new speaker strobes, 14 new speakers. ref 202306301339. | $5,000 |
| Jul 7, 2023 | Completed final sign-off Mar 2024 | 505 Montgomery St | Convergint Technologies Llc | voluntary replacement of fire alarm control panels and smoke detector devices as follows: 1 facp, 3 remote nodes, 287 smoke detectors, 34 duct smoke detectors, 2 rmeodel annunicator. maher n/a.Details
voluntary replacement of fire alarm control panels and smoke detector devices as follows: 1 facp, 3 remote nodes, 287 smoke detectors, 34 duct smoke detectors, 2 rmeodel annunicator. maher n/a. | $48,000 |
| Jun 30, 2023 | Completed final sign-off Feb 2024 | 505 Montgomery St | Principal Builders Inc. | 6th fl: t.i. for suite 600 & 610: non structural partitions, doors, lighting, fixture & finishes, mep deferredDetails
6th fl: t.i. for suite 600 & 610: non structural partitions, doors, lighting, fixture & finishes, mep deferred | $364,768 |
| Jun 30, 2023 | Completed final sign-off Feb 2024 | 505 Montgomery St | Principal Builders Inc. | 12th fl restroom upgrade mep deferredDetails
12th fl restroom upgrade mep deferred | $125,000 |
| Apr 4, 2023 | Never finaled issued May 2023, no final | 505 Montgomery St | Sign Of Light | instll (3) non-electric single face wall signs (bmo)Details
instll (3) non-electric single face wall signs (bmo) | $7,500 |
| Apr 4, 2023 | Completed final sign-off Jun 2023 | 505 Montgomery St | Thomas Swan Sign Co Inc | installation of evac maps 7th flDetails
installation of evac maps 7th fl | $2,000 |
| Mar 3, 2023 | Completed final sign-off Mar 2023 | 505 Montgomery St | Convergint Technologies Llc | 12/f: f/a modification, t.i., relocate/add new modification devices to conform to new floor plan. ref bpa#202211216947Details
12/f: f/a modification, t.i., relocate/add new modification devices to conform to new floor plan. ref bpa#202211216947 | $7,000 |
| Feb 24, 2023 | Completed final sign-off May 2023 | 505 Montgomery St | Convergint Technologies Llc | 7/f: f/a t.i., new notification to conform w/new floor plan, new smoke detector in i.t. room. ref bpa#202208180781Details
7/f: f/a t.i., new notification to conform w/new floor plan, new smoke detector in i.t. room. ref bpa#202208180781 | $10,000 |
| Feb 7, 2023 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | mep for bpa# 20220818-0781Details
mep for bpa# 20220818-0781 | $397,521 |
| Dec 15, 2022 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | 7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroomDetails
7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroom | |
| Sep 30, 2022 | Completed final sign-off May 2025 | 505 Montgomery St | Ayoob & Peery Plumbing Co Inc | 7/f: add 26, relocate 82 fire sprinklers per t.i. 202208180781.Details
7/f: add 26, relocate 82 fire sprinklers per t.i. 202208180781. | $32,050 |
| Sep 19, 2022 | Completed final sign-off Jul 2025 | 505 Montgomery St | Convergint Technologies Llc | 4/f: t.i. provide new notification devices to conform w/new floor planDetails
4/f: t.i. provide new notification devices to conform w/new floor plan | $10,000 |
| Aug 18, 2022 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | 7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately.Details
7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately. | $848,172 |
| May 6, 2022 | Completed final sign-off Aug 2022 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | 7th floor: fire sprinkler only. demo only. replace pendents heads to upright; when extg ceiling 15 removed; total 78 headsDetails
7th floor: fire sprinkler only. demo only. replace pendents heads to upright; when extg ceiling 15 removed; total 78 heads | $39,000 |
| Oct 29, 2021 | Completed final sign-off Jan 2022 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler demo. upturn fire sprinkler heads upright heads: 57Details
fire sprinkler demo. upturn fire sprinkler heads upright heads: 57 | $19,950 |
| Oct 4, 2021 | Completed final sign-off Dec 2021 | 505 Montgomery St | Bach Construction, Inc. | 5th fl: deferred electrical to pa# 202105251023. installation of power/data devices installation of 2019 title 24 compliant lighting controlsDetails
5th fl: deferred electrical to pa# 202105251023. installation of power/data devices installation of 2019 title 24 compliant lighting controls | |
| Aug 31, 2021 | Completed final sign-off Sep 2021 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | 14/f: add 2 fire sprinklers, relocate 14, remove 1 sprinkler. ref t.i. pa202108136421.Details
14/f: add 2 fire sprinklers, relocate 14, remove 1 sprinkler. ref t.i. pa202108136421. | $3,400 |
| Aug 13, 2021 | Completed final sign-off Mar 2022 | 505 Montgomery St | Principal Builders Inc. | suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen.Details
suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen. | |
| Jul 27, 2021 | Completed final sign-off Feb 2022 | 505 Montgomery St | Golden Gate Sign Company Inc. | 13/f: install 5 evacuation plan maps for fire review only.Details
13/f: install 5 evacuation plan maps for fire review only. | $2,000 |
| Jul 15, 2021 | Completed final sign-off Sep 2021 | 505 Montgomery St | Convergint Technologies Llc | fire alarm system for office ti 202105251023. 7 new speaker strobes, 1 new strobeDetails
fire alarm system for office ti 202105251023. 7 new speaker strobes, 1 new strobe | $15,000 |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 505 Montgomery St | Bach Construction, Inc. | 5th floor: deferred mep submittal ref bpa#2021-0525-1023.demo & install new duct & hvac system.Details
5th floor: deferred mep submittal ref bpa#2021-0525-1023.demo & install new duct & hvac system. | |
| Jul 1, 2021 | Completed final sign-off Mar 2022 | 505 Montgomery St | Principal Builders Inc. | demo of (e) non structural interior partitions, doors, frames, hardware. and contruction (n) interior partitions, doors, frames, hardwares, millwork, ceilings, lightings & finishes. ref to t.i. 2019 0221 3523Details
demo of (e) non structural interior partitions, doors, frames, hardware. and contruction (n) interior partitions, doors, frames, hardwares, millwork, ceilings, lightings & finishes. ref to t.i. 2019 0221 3523 | $533,000 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 505 Montgomery St | Bach Construction, Inc. | suite 550 t.i. install non structural gyp board office partitions w/ sidelite,door frames, hardware, electrical,millwork,finishes, light fixtures & acoustical ceiling system where indicated - mep deferred.Details
suite 550 t.i. install non structural gyp board office partitions w/ sidelite,door frames, hardware, electrical,millwork,finishes, light fixtures & acoustical ceiling system where indicated - mep deferred. | $731,753 |
| Mar 19, 2021 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes.Details
13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes. | $110,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 505 Montgomery St | Convergint Technologies Llc | fire alarm t.i. provide (4) control relays for security, a/v shutdown add (12) speaker/strobes to existing circuit add (9) speakers to existing circuitDetails
fire alarm t.i. provide (4) control relays for security, a/v shutdown add (12) speaker/strobes to existing circuit add (9) speakers to existing circuit | $9,000 |
| Feb 18, 2021 | Completed final sign-off Jun 2021 | 505 Montgomery St | Ayoob & Peery Plumbing Co Inc | replace existing electric fire pump, controller with like in kind.Details
replace existing electric fire pump, controller with like in kind. | $95,000 |
| Dec 10, 2020 | Completed final sign-off Aug 2021 | 505 Montgomery St | Peacock Construction | #620: electrical,lighting, power & signal. deferred mep. ref pa# 201909272902Details
#620: electrical,lighting, power & signal. deferred mep. ref pa# 201909272902 | |
| Nov 20, 2020 | Completed final sign-off Mar 2021 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | tenant improvements - demo permit. exising fire sprinkler system. 87 relocated sprinklers.Details
tenant improvements - demo permit. exising fire sprinkler system. 87 relocated sprinklers. | $44,000 |
| Nov 13, 2020 | Completed final sign-off Aug 2021 | 505 Montgomery St | Clune Construction Company L P | 13/f: tenant improvement - construction includes non-structural partitions, millwork, and finishes. mep, f/a and sprinklers will be under separate permitDetails
13/f: tenant improvement - construction includes non-structural partitions, millwork, and finishes. mep, f/a and sprinklers will be under separate permit | $1,132,800 |
| Nov 5, 2020 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421.Details
13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421. | $100,000 |
| Oct 28, 2020 | Never finaled issued Feb 2021, no final | 505 Montgomery St | Performance Air Service Inc | 11/f: remove 1 (e) 1.5 ton water source heat pump and replace with 1 (n) carrier 1.5 ton water source heat pump. direct replacement, reconnect water, drain, duct and electrion.Details
11/f: remove 1 (e) 1.5 ton water source heat pump and replace with 1 (n) carrier 1.5 ton water source heat pump. direct replacement, reconnect water, drain, duct and electrion. | $12,500 |
| Oct 13, 2020 | Completed final sign-off Apr 2021 | 505 Montgomery St | Principal Builders Inc. | interior t.i. of restrooms at floors 14,15,16,17,18,19,20. work includes: demo and construction of partitions, millwork, finishes, electrical and plumbing fixtures.Details
interior t.i. of restrooms at floors 14,15,16,17,18,19,20. work includes: demo and construction of partitions, millwork, finishes, electrical and plumbing fixtures. | $341,930 |
| Sep 21, 2020 | Completed final sign-off Dec 2020 | 505 Montgomery St | Convergint Technologies Llc | 23rd fl: no new fire alarm equipment - testing with secutiry card access system only. existing control relay. ref electrical pa# ew202007148971.Details
23rd fl: no new fire alarm equipment - testing with secutiry card access system only. existing control relay. ref electrical pa# ew202007148971. | $1,200 |
| Jul 17, 2020 | Never finaled filed Jul 2020, never issued | 505 Montgomery St | street spaceDetails
street space | ||
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 505 Montgomery St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 505 Montgomery St | street spaceDetails
street space | ||
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 505 Montgomery St | Convergint Technologies Llc | fire alarm ti add 2 new speakers to suite 620 connect to existing speaker circuitDetails
fire alarm ti add 2 new speakers to suite 620 connect to existing speaker circuit | $5,000 |
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 505 Montgomery St | street spaceDetails
street space | ||
| Nov 21, 2019 | Never finaled issued Nov 2019, no final | 505 Montgomery St | street spaceDetails
street space | ||
| Sep 27, 2019 | Completed final sign-off Aug 2021 | 505 Montgomery St | Peacock Construction | ti suite 620 on 6th fl: demo cabinets, partitions and finishes, new millwork, elec/data receptacles, light fixtures. existing ceiling system, devices and light fixtures to remain. mep & electrical under sep. permit. sprinkler under sep permit. ref 201608306372.Details
ti suite 620 on 6th fl: demo cabinets, partitions and finishes, new millwork, elec/data receptacles, light fixtures. existing ceiling system, devices and light fixtures to remain. mep & electrical under sep. permit. sprinkler under sep permit. ref 201608306372. | $100,000 |
| Sep 10, 2019 | Completed final sign-off Sep 2020 | 505 Montgomery St | Rainbow Waterproofing & Restor | remoeve 1-2 ft of sidewalk adjacent to building to install waterproofing system where building walls meets structural slab. reinstall sidewalk to match existing. remove reinstall fire exit doors. remove fire proofing to install waterporoofing on steel beams, reinstall spray on fire proofing mahernotDetails
remoeve 1-2 ft of sidewalk adjacent to building to install waterproofing system where building walls meets structural slab. reinstall sidewalk to match existing. remove reinstall fire exit doors. remove fire proofing to install waterporoofing on steel beams, reinstall spray on fire proofing mahernot | $457,355 |
| May 1, 2019 | Completed final sign-off Oct 2019 | 505 Montgomery St | Ayoob & Peery Plumbing Co Inc | replace existing diesel fire pump, controller, and pressure relief valveDetails
replace existing diesel fire pump, controller, and pressure relief valve | $10,000 |
| Apr 30, 2019 | Never finaled issued Apr 2019, no final | 505 Montgomery St | A S F Electric Inc | title 24 electrical, ref pa 201902223610.Details
title 24 electrical, ref pa 201902223610. | $1,000 |
| Apr 18, 2019 | Completed final sign-off May 2019 | 505 Montgomery St | Convergint Technologies Llc | fire alarm ti 5th fl ref 201902223610 including 11 speaker strobesDetails
fire alarm ti 5th fl ref 201902223610 including 11 speaker strobes | $5,000 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 505 Montgomery St | Convergint Technologies Llc | 12th flr fire alarm to 8 speakers 9 speaker/strobes ref 201902223610Details
12th flr fire alarm to 8 speakers 9 speaker/strobes ref 201902223610 | $5,000 |
| Mar 14, 2019 | Completed final sign-off May 2019 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | 5/f:existing fire sprinkler system - ti. 2 added, 52 relocated, 19 removed, change out 47.. ar&b 18.124. ref arch #201902213523.Details
5/f:existing fire sprinkler system - ti. 2 added, 52 relocated, 19 removed, change out 47.. ar&b 18.124. ref arch #201902213523. | $30,000 |
| Feb 22, 2019 | Completed final sign-off Jun 2019 | 505 Montgomery St | Bach Construction, Inc. | suite 1250: t.i incl demo interior, paritions, doors, sidelights. replace light fixtures w/led, t24 fixtures. (n) non-structural partitions, door assemblies, cabs, recepts & finishes. mep, fls & sprinklers under sep permit.Details
suite 1250: t.i incl demo interior, paritions, doors, sidelights. replace light fixtures w/led, t24 fixtures. (n) non-structural partitions, door assemblies, cabs, recepts & finishes. mep, fls & sprinklers under sep permit. | $180,000 |
| Feb 21, 2019 | Completed final sign-off Jul 2019 | 505 Montgomery St | Richlen Construction | unoccupied spec suite 500 ab-017" partitions w/sidelites, non-structural partitions, electrical, millwork, finishes, light fixtures & accoustical ceiling ystem, elevator lobby finishes, seating, gyp.bd ceiling & light fixtures, new sinks,faucets, t0ilets, urinals,countertops, partitions, lights, mepDetails
unoccupied spec suite 500 ab-017" partitions w/sidelites, non-structural partitions, electrical, millwork, finishes, light fixtures & accoustical ceiling ystem, elevator lobby finishes, seating, gyp.bd ceiling & light fixtures, new sinks,faucets, t0ilets, urinals,countertops, partitions, lights, mep | $731,753 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 505 Montgomery St | Convergint Technologies Llc | fire alarm ti 5th fl ref 201811286832 including 5 speaker strobes, 3 smoke detectorsDetails
fire alarm ti 5th fl ref 201811286832 including 5 speaker strobes, 3 smoke detectors | $5,000 |
| Nov 28, 2018 | Completed final sign-off Jul 2019 | 505 Montgomery St | Richlen Construction | demo of non-structual portition ceiling, floor finishes to warm shell condition. suite to remain unoccupied until tenant improvement permited to be filed ab-017. new lights. all work on 5th floor. spinklers separate permit for upright heads-Details
demo of non-structual portition ceiling, floor finishes to warm shell condition. suite to remain unoccupied until tenant improvement permited to be filed ab-017. new lights. all work on 5th floor. spinklers separate permit for upright heads- | $500,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2018 | 505 Montgomery St | Convergint Technologies Llc | fire alarm ti on 12th floor ref 201806262942 including 3 speakers, 2 speaker/strobes maher naDetails
fire alarm ti on 12th floor ref 201806262942 including 3 speakers, 2 speaker/strobes maher na | $5,000 |
| Aug 7, 2018 | Completed final sign-off Dec 2018 | 505 Montgomery St | Peacock Construction | 12th fl - title 24 electrical for work under pa 2018-0626-2942Details
12th fl - title 24 electrical for work under pa 2018-0626-2942 | $14,000 |
| Jul 24, 2018 | Completed final sign-off May 2025 | 505 Montgomery St | Anderson, Rowe & Buckley, Inc. | 12/f: existing sprinkler system t.i. add 2 sprinkler, relocate 2 sprinkler. maher n/a.Details
12/f: existing sprinkler system t.i. add 2 sprinkler, relocate 2 sprinkler. maher n/a. | $2,000 |
| Oct 10, 2017 | Completed final sign-off Oct 2017 | 505 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit add 1 pendent sprinkler on the 6th fl ti 201707172018. n/a for maher.Details
fire sprinkler permit add 1 pendent sprinkler on the 6th fl ti 201707172018. n/a for maher. | $1,000 |
| Jul 17, 2017 | Completed final sign-off Oct 2017 | 505 Montgomery St | Bach Construction, Inc. | #600 6/f- demo partial (e) ceiling, 2 lights & flooring/finishes. new scope new rated 20 min entry door & side light assembly ceiling, light fixtures & rated full height gyp. board partition, new non structural partitions, side lights and finishes. mep/fire deferred submittal. n/a ordinance #155-1Details
#600 6/f- demo partial (e) ceiling, 2 lights & flooring/finishes. new scope new rated 20 min entry door & side light assembly ceiling, light fixtures & rated full height gyp. board partition, new non structural partitions, side lights and finishes. mep/fire deferred submittal. n/a ordinance #155-1 | $115,000 |
| May 23, 2017 | Completed final sign-off Jul 2017 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | 3rd floor - fire alarm ti - add 1 control relay for security door release & 1 smoke detector. maher naDetails
3rd floor - fire alarm ti - add 1 control relay for security door release & 1 smoke detector. maher na | $1,200 |
| Mar 23, 2017 | Completed final sign-off Jun 2017 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | 6th/8th/9th flr: fire alarm ti - add 6 ceiling speaker strobes. 6 control relays for av shutdown and 1 relay for security access. relocated six, remove 4 existing. ref 201609147675 maher naDetails
6th/8th/9th flr: fire alarm ti - add 6 ceiling speaker strobes. 6 control relays for av shutdown and 1 relay for security access. relocated six, remove 4 existing. ref 201609147675 maher na | $7,000 |
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 505 Montgomery St | Bach Construction, Inc. | 23/f- t.i., new doors, hardware, card readers and ceiling height gyp. board partition. n/a ordinance #155-13Details
23/f- t.i., new doors, hardware, card readers and ceiling height gyp. board partition. n/a ordinance #155-13 | $50,000 |
| Oct 12, 2016 | Completed final sign-off Mar 2017 | 505 Montgomery St | Pribuss Engineering Inc | flrs: 6/8/9: fire sprinkler t.i. under pa#201609147675; relocate 41 sprinklers. maher n/aDetails
flrs: 6/8/9: fire sprinkler t.i. under pa#201609147675; relocate 41 sprinklers. maher n/a | $21,210 |
| Sep 14, 2016 | Completed final sign-off Jun 2017 | 505 Montgomery St | Bcci Construction Company | 6/f, 8/f, 9/f- t.i. including minor demolition and new non-structural partitions, bathroom upgrades, new lighting & finishes and associated mechanical & electrical work. fire, life safety under seperate permit. n/a ordinance #155-13Details
6/f, 8/f, 9/f- t.i. including minor demolition and new non-structural partitions, bathroom upgrades, new lighting & finishes and associated mechanical & electrical work. fire, life safety under seperate permit. n/a ordinance #155-13 | $1,399,750 |
| Aug 30, 2016 | Completed final sign-off Jun 2017 | 505 Montgomery St | Peacock Construction | 6th floor - remove & replace upgrades, barrier removal, remvoe exisitng fixtures & finishes & provide new fixtures & finishes, new led light fixtures.Details
6th floor - remove & replace upgrades, barrier removal, remvoe exisitng fixtures & finishes & provide new fixtures & finishes, new led light fixtures. | $50,000 |
| Jul 21, 2015 | Completed final sign-off Mar 2016 | 505 Montgomery St | Swinerton Builders | new floor and wall finishes, new partitions, and finishes. includes connection to and extension of base building utiliies and services. electrical, mech, plumbing. no change to abase building washrooms, janitor closets, no change to base building plumbingDetails
new floor and wall finishes, new partitions, and finishes. includes connection to and extension of base building utiliies and services. electrical, mech, plumbing. no change to abase building washrooms, janitor closets, no change to base building plumbing | $325,000 |
| Jul 21, 2015 | Completed final sign-off Dec 2016 | 505 Montgomery St | Swinerton Builders | work includes new floor and finishes, new partitions3 and finishes. work also includes connection & extension of the base building utilities and services.Details
work includes new floor and finishes, new partitions3 and finishes. work also includes connection & extension of the base building utilities and services. | $325,000 |
| Apr 27, 2015 | Never finaled issued Jun 2015, no final | 505 Montgomery St | Thyssenkrupp Elevator Corp. | floors 1, 3 thru 12 : upgrade three elevators w/ destination dispatch low rise 1-12 elevators. n/a maher ordinanceDetails
floors 1, 3 thru 12 : upgrade three elevators w/ destination dispatch low rise 1-12 elevators. n/a maher ordinance | $50,000 |
| Dec 1, 2014 | Completed final sign-off Jan 2015 | 505 Montgomery St | Bilcor Inc | 24th flr: fire alarm tenant improvement, install 3 ceiling mount speaker-strobes, t.i. 201406279859; maher n/aDetails
24th flr: fire alarm tenant improvement, install 3 ceiling mount speaker-strobes, t.i. 201406279859; maher n/a | $1,200 |
| Sep 15, 2014 | Completed final sign-off Aug 2025 | 505 Montgomery St | Rossi Builders Inc. | revision to 201405024807. remove partition elevation keys to provide assited listening devices in all conference rooms per 118-219, n/a ordinance #155-13.Details
revision to 201405024807. remove partition elevation keys to provide assited listening devices in all conference rooms per 118-219, n/a ordinance #155-13. | |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 505 Montgomery St | Airco Mechanical Inc | remove & replace the air handing systems outside air & return air dampers have been removed & replaced under the emcs (energy management control system) retrofit.n/a for the maher ordinance #155-13Details
remove & replace the air handing systems outside air & return air dampers have been removed & replaced under the emcs (energy management control system) retrofit.n/a for the maher ordinance #155-13 | $60,000 |
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 505 Montgomery St | Golden Gate Fire Protection Inc | sprinkler t.i. on 23rd floor: relocate 10 pendents, add 5, delete 3Details
sprinkler t.i. on 23rd floor: relocate 10 pendents, add 5, delete 3 | $6,180 |
| Oct 3, 2012 | Completed final sign-off Oct 2013 | 505 Montgomery St | Novo Construction Inc | revision to 201009090492. to add 2 new card readers at stairwells at 4th floor only. floors 15th, 16th, 17th, 18th, 19th, 20th showing all existing card readers. ref. arch 201009090492.Details
revision to 201009090492. to add 2 new card readers at stairwells at 4th floor only. floors 15th, 16th, 17th, 18th, 19th, 20th showing all existing card readers. ref. arch 201009090492. | |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 505 Montgomery St | street space permit.Details
street space permit. | ||
| Aug 10, 2012 | Completed final sign-off Aug 2012 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | 3rd floor suite 300 fire alarm t.i. adding 8-speakers to existing f/a systemDetails
3rd floor suite 300 fire alarm t.i. adding 8-speakers to existing f/a system | $7,500 |
| Aug 9, 2012 | Completed final sign-off Nov 2012 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti- added 1 strobe and reset candella on otherDetails
fire alarm ti- added 1 strobe and reset candella on other | $2,500 |
| Feb 15, 2012 | Completed final sign-off Mar 2012 | 505 Montgomery St | Gci, Inc | 23rd floor: light and power work on the 23rd floor. ref arch. 201202093881Details
23rd floor: light and power work on the 23rd floor. ref arch. 201202093881 | $50,000 |
| Feb 9, 2012 | Completed final sign-off Mar 2012 | 505 Montgomery St | Gci, Inc | interior demo, new partitions in elevator lobby. new ceiling grid and lighting in unoccupied tenant space per ab-017. mep under separate permitDetails
interior demo, new partitions in elevator lobby. new ceiling grid and lighting in unoccupied tenant space per ab-017. mep under separate permit | $60,000 |
| Jan 11, 2012 | Completed final sign-off Feb 2012 | 505 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate & remove fire sprinkler heads per tenant improvement. 1 add, 65 relocate and 7 removeDetails
relocate & remove fire sprinkler heads per tenant improvement. 1 add, 65 relocate and 7 remove | $33,924 |
| Sep 9, 2011 | Completed final sign-off Oct 2013 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. @ 505 montgomery 18th floor 1 mcr control relay 20 ceiling speaker/strobes, 4 ct2 monitoring modules , 48 ceiling speakers 2 cr control relays , 4 smoke detectors.Details
fire alarm t.i. @ 505 montgomery 18th floor 1 mcr control relay 20 ceiling speaker/strobes, 4 ct2 monitoring modules , 48 ceiling speakers 2 cr control relays , 4 smoke detectors. | $43,092 |
| Sep 9, 2011 | Completed final sign-off Oct 2011 | 505 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. @ 505 montgomery 10th & 11th floor 56 wall strobes & 15 ceiling speakers.Details
fire alarm t.i. @ 505 montgomery 10th & 11th floor 56 wall strobes & 15 ceiling speakers. | $39,857 |
| May 12, 2011 | Never finaled issued May 2011, no final | 505 Montgomery St | street spaceDetails
street space | ||
| Jan 6, 2011 | Completed final sign-off Oct 2013 | 505 Montgomery St | Diversified Fire Products | 15th floor - fire alarm t.i.:1 control relay, 2 dual monitor modules,1 smoke detector,2 ceiling mounted strobes,16 ceiling mounted speaker/strobes,42 ceiling mounted speakers.Details
15th floor - fire alarm t.i.:1 control relay, 2 dual monitor modules,1 smoke detector,2 ceiling mounted strobes,16 ceiling mounted speaker/strobes,42 ceiling mounted speakers. | $5,100 |
| Jan 6, 2011 | Completed final sign-off Oct 2013 | 505 Montgomery St | Diversified Fire Products | fire alarm t.i.:4 dual monitor modules,4 control, relays,6 smoke detectors, 1 ceiling mounted strobes,2 wp wall strobes, 26 ceiling speaker/strobes,3 wp wall speaker/strobes,11 ceiling speakers.Details
fire alarm t.i.:4 dual monitor modules,4 control, relays,6 smoke detectors, 1 ceiling mounted strobes,2 wp wall strobes, 26 ceiling speaker/strobes,3 wp wall speaker/strobes,11 ceiling speakers. | $8,526 |
| Oct 20, 2010 | Completed final sign-off Apr 2012 | 505 Montgomery St | Thyssenkrupp Elevator Corp. | upgrade from conventional elevator all technology to destination dispatch per ab-090; floors 1,4,12 though 24, only.Details
upgrade from conventional elevator all technology to destination dispatch per ab-090; floors 1,4,12 though 24, only. | $90,640 |
| Sep 9, 2010 | Completed final sign-off Oct 2013 | 505 Montgomery St | Novo Construction Inc | select demolition of walls and ceilings. new construction for tenant improvement of floor 4. partial build out on floor 14-20. new load bearings partitions, ceilings and finishes. fire sprinkler and life safety, emergency generator, evacuation signage under separate permits.Details
select demolition of walls and ceilings. new construction for tenant improvement of floor 4. partial build out on floor 14-20. new load bearings partitions, ceilings and finishes. fire sprinkler and life safety, emergency generator, evacuation signage under separate permits. | $8,500,000 |
| Mar 31, 2010 | Never finaled issued Mar 2010, no final | 505 Montgomery St | street space & mta parkingDetails
street space & mta parking | ||
| Dec 2, 2009 | Completed final sign-off Jan 2010 | 505 Montgomery St | Bcci Construction Company | revision to appl #200909257644 room 615 walls to remain in original wall types.Details
revision to appl #200909257644 room 615 walls to remain in original wall types. | $500 |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 505 Montgomery St | Bcci Construction Company | 6th floor. revision to application 200911020354. to delete installation of fsd's.Details
6th floor. revision to application 200911020354. to delete installation of fsd's. | |
| Nov 2, 2009 | Completed final sign-off Jan 2010 | 505 Montgomery St | Bcci Construction Company | 6th floor. mechanical & lighting work including ductwork, difusers, 1 heat pump, 1 new vav box & 2 fire smoke dampers, new lighting, power & signal work.Details
6th floor. mechanical & lighting work including ductwork, difusers, 1 heat pump, 1 new vav box & 2 fire smoke dampers, new lighting, power & signal work. | $150,000 |
| Oct 15, 2009 | Expired or cancelled cancelled Jan 2026 | 505 Montgomery St | corridor extension to existing permit #2009/0915/6870.Details
corridor extension to existing permit #2009/0915/6870. | $2,000 | |
| Sep 15, 2009 | Completed final sign-off Feb 2010 | 505 Montgomery St | Bach Construction, Inc. | 6th floor - finish improvements to existing elevator lobby,tenant corridor & restroom. mechanical & electrical under separate permit.Details
6th floor - finish improvements to existing elevator lobby,tenant corridor & restroom. mechanical & electrical under separate permit. | $117,000 |
| Jan 6, 2009 | Completed final sign-off Feb 2009 | 505 Montgomery St | Field Construction Inc. | 20th floor tenant improvements. demolish doors and partitions of 2 document rooms. construct new partitions and door assembley for 1 new telepresence room. m e p fire sprinkler as seperate permit.Details
20th floor tenant improvements. demolish doors and partitions of 2 document rooms. construct new partitions and door assembley for 1 new telepresence room. m e p fire sprinkler as seperate permit. | $188,530 |
| Sep 3, 2008 | Never finaled issued Sep 2008, no final | 505 Montgomery St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Aug 21, 2008 | Never finaled issued Aug 2008, no final | 505 Montgomery St | Diversified Fire Products | at 2nd, 4th & 14th fl: t.i. for fire alarm additions per highrise inspection. 1 smoke, 4 strobes.Details
at 2nd, 4th & 14th fl: t.i. for fire alarm additions per highrise inspection. 1 smoke, 4 strobes. | $10,298 |
| Jul 8, 2008 | Completed final sign-off Sep 2008 | 505 Montgomery St | Bcci Construction Company | tenant improvement at 5th fl, remove partitions & doors, provide new gyp bd partitions, provide new elect receptacles. no change to mech and fire life safety.Details
tenant improvement at 5th fl, remove partitions & doors, provide new gyp bd partitions, provide new elect receptacles. no change to mech and fire life safety. | $35,000 |
| Jul 2, 2008 | Completed final sign-off Nov 2008 | 505 Montgomery St | Peacock Construction Inc | mechanical, install 1 new vav box and replace existing supply and return grillsDetails
mechanical, install 1 new vav box and replace existing supply and return grills | $24,000 |
| May 2, 2008 | Completed final sign-off Apr 2009 | 505 Montgomery St | Ayoob & Peery Plumbing Co Inc | 23rd floor - relocate and remove fire sprinkler heads per tenant improvments. 5 relocates, 1 removed.Details
23rd floor - relocate and remove fire sprinkler heads per tenant improvments. 5 relocates, 1 removed. | $1,200 |
| Apr 29, 2008 | Never finaled issued Apr 2008, no final | 505 Montgomery St | Field Construction Inc. | revision to application 200802295951 , new wall at tenant corridor to match with existing adjacent wall type which is non-rated.Details
revision to application 200802295951 , new wall at tenant corridor to match with existing adjacent wall type which is non-rated. | |
| Apr 10, 2008 | Completed final sign-off Jul 2009 | 505 Montgomery St | Diversified Fire Products | fire alarm t.i. 12th floor, ada upgrade 3 strobes, 5 speakers/strobes.Details
fire alarm t.i. 12th floor, ada upgrade 3 strobes, 5 speakers/strobes. | $9,615 |
| Apr 4, 2008 | Completed final sign-off Nov 2008 | 505 Montgomery St | Peacock Construction Inc | ti on the 23rd floor. add glass partitions in ex. officeDetails
ti on the 23rd floor. add glass partitions in ex. office | $60,000 |
| Feb 29, 2008 | Completed final sign-off Sep 2008 | 505 Montgomery St | Field Construction Inc. | tenant improvement on 12th floor, in suite #1200. upgrade existing partitions, and install new partitions, new finish.Details
tenant improvement on 12th floor, in suite #1200. upgrade existing partitions, and install new partitions, new finish. | $40,000 |
| Jul 27, 2007 | Completed final sign-off Oct 2007 | 505 Montgomery St | Merrcon Inc. | work consists of removal of low work station partitions & removal of 2 ceiling high walls to create more open space, patch,paint & carpet.no changes in existing. no changes to existing ceiling plan.lighting,hvac & sprinklers will remain the same.life safety upgrades will be submitted seperately.Details
work consists of removal of low work station partitions & removal of 2 ceiling high walls to create more open space, patch,paint & carpet.no changes in existing. no changes to existing ceiling plan.lighting,hvac & sprinklers will remain the same.life safety upgrades will be submitted seperately. | $85,000 |
| Feb 15, 2007 | Completed final sign-off Mar 2007 | 505 Montgomery St | Merrcon Inc. | oti-2 3rd/ fl, el, me.Details
oti-2 3rd/ fl, el, me. | $36,162 |
| Feb 13, 2007 | Completed final sign-off Mar 2007 | 505 Montgomery St | A S F Electric Inc | latham & watkins, 3rd floor: fire alarm upgrade, 7 speakers, 9 strobesDetails
latham & watkins, 3rd floor: fire alarm upgrade, 7 speakers, 9 strobes | $4,800 |
| Feb 2, 2007 | Completed final sign-off Mar 2007 | 505 Montgomery St | latham & watkins, 3rd floor: oti-1 3rd floor el ,e, l/s, spDetails
latham & watkins, 3rd floor: oti-1 3rd floor el ,e, l/s, sp | $65,000 | |
| Mar 18, 2004 | Expired or cancelled expired Jul 2008 | 505 Montgomery St | Dpr Construction Inc | demolition and removal from site of exist constructionDetails
demolition and removal from site of exist construction | $40,000 |
| May 7, 2003 | Completed final sign-off Aug 2003 | 505 Montgomery St | Decker Electric Co Inc Electrical Contra | life safety divices- 19 speakers, 17 strobes, 5 smokes at 15th floor.Details
life safety divices- 19 speakers, 17 strobes, 5 smokes at 15th floor. | $17,000 |
| Mar 25, 2003 | Completed final sign-off Aug 2003 | 505 Montgomery St | Dpr Construction Inc | oti-1 15th fl, el, me, ls, sp.Details
oti-1 15th fl, el, me, ls, sp. | $200,000 |
| Mar 5, 2003 | Completed final sign-off Apr 2003 | 505 Montgomery St | Field Construction Inc. | oti-3 7th fl. ls,spDetails
oti-3 7th fl. ls,sp | $14,000 |
| Dec 23, 2002 | Completed final sign-off Jun 2003 | 505 Montgomery St | Field Construction Inc. | infill of e stair opening w/ concrete,fill and metal deck oti-1 200212/18/3791 for remodel, this isDetails
infill of e stair opening w/ concrete,fill and metal deck oti-1 200212/18/3791 for remodel, this is | $15,000 |
| Dec 18, 2002 | Completed final sign-off Apr 2003 | 505 Montgomery St | Field Construction Inc. | oti-1 7th fl, el, me, ls, spDetails
oti-1 7th fl, el, me, ls, sp | $234,000 |
| May 23, 2002 | Completed final sign-off Oct 2002 | 505 Montgomery St | oti-2, 5th flr, el, meDetails
oti-2, 5th flr, el, me | $60,000 | |
| May 20, 2002 | Expired or cancelled expired Jan 2004 | 505 Montgomery St | oti-1 5th flr el, me ls,spDetails
oti-1 5th flr el, me ls,sp | $200,000 | |
| Apr 12, 2001 | Completed final sign-off Jul 2001 | 505 Montgomery St | Bcci Construction Company | renew appl#200003093938 for final inspectionDetails
renew appl#200003093938 for final inspection | |
| Jan 16, 2001 | Completed final sign-off May 2001 | 505 Montgomery St | Gci, Inc | oti-2 3rd floor, el & me & spDetails
oti-2 3rd floor, el & me & sp | $12,000 |
| Dec 15, 2000 | Completed final sign-off Apr 2001 | 505 Montgomery St | Bcci Construction Company | fire alarm shop drawings for work on 24th floorDetails
fire alarm shop drawings for work on 24th floor | $12,000 |
| Dec 15, 2000 | Completed final sign-off Apr 2001 | 505 Montgomery St | Bcci Construction Company | oti-2 24th fl, elDetails
oti-2 24th fl, el | $150,000 |
| Dec 11, 2000 | Completed final sign-off May 2001 | 505 Montgomery St | Gci, Inc | oti-1 34d floor el,me,lsDetails
oti-1 34d floor el,me,ls | $80,000 |
| Nov 8, 2000 | Expired or cancelled expired Jun 2004 | 505 Montgomery St | Bcci Construction Company | for alarm shop drawing & submittal for work on the 4th floorDetails
for alarm shop drawing & submittal for work on the 4th floor | $12,000 |
| Sep 27, 2000 | Expired or cancelled expired Jun 2004 | 505 Montgomery St | Bcci Construction Company | oti-1 4th floor, el, me, ls, spDetails
oti-1 4th floor, el, me, ls, sp | $600,000 |
| Aug 4, 2000 | Completed final sign-off Feb 2001 | 505 Montgomery St | 3rd fl tenant improvement approved under 2000/06/23/3485 for fire protect,light,mech t-24 compDetails
3rd fl tenant improvement approved under 2000/06/23/3485 for fire protect,light,mech t-24 comp | $30,000 | |
| Apr 25, 2000 | Completed final sign-off Feb 2001 | 505 Montgomery St | oti-2 me, sp 3rd floorDetails
oti-2 me, sp 3rd floor | $49,500 | |
| Mar 9, 2000 | Completed final sign-off Jul 2001 | 505 Montgomery St | Bcci Construction Company | in and fill of dumbwater hole thru concrete slab at 24/fDetails
in and fill of dumbwater hole thru concrete slab at 24/f | $4,000 |
| Feb 16, 2000 | Completed final sign-off Mar 2000 | 505 Montgomery St | Cic Associates, Inc | oti-1 el, me, sp 17th floorDetails
oti-1 el, me, sp 17th floor | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.