Dpr Construction Inc
- Based in
- Redwood City
- On San Francisco permits
- Jan 2000 to Dec 2019
- Last 24 months
- 0 permits filed
450 permits since 2000: 332 completed, 21 never finaled, 97 expired or cancelled.
Of the 21 never-finaled permits, 3 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 450.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2019 | Completed final sign-off Aug 2020 | 1 Market St | steaurt tower: partial t.i. to 7th floor: office suite, 10,379 sq. ft. includes, open office, breakroom (for employee use only) and conference rooms.Details
steaurt tower: partial t.i. to 7th floor: office suite, 10,379 sq. ft. includes, open office, breakroom (for employee use only) and conference rooms. | $1,750,000 |
| Dec 17, 2019 | Completed final sign-off Nov 2020 | 455 Market St | 23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or areaDetails
23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area | $1,034,959 |
| Dec 10, 2019 | Completed final sign-off Aug 2020 | 1 Market St | partial floor demo to 7th floor steurt for upcoming tenant improvementDetails
partial floor demo to 7th floor steurt for upcoming tenant improvement | $100,000 |
| Oct 24, 2019 | Expired or cancelled cancelled Jan 2026 | 135 Townsend St | provide supply ducts and registers for the fitness space on level 4. provide 2 exhaust fans for the shower rooms on level 4 and 5. ref app#201909171806. n/a for maherDetails
provide supply ducts and registers for the fitness space on level 4. provide 2 exhaust fans for the shower rooms on level 4 and 5. ref app#201909171806. n/a for maher | $75,000 |
| Oct 18, 2019 | Never finaled issued Dec 2019, no final | 200 Paul Av | ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm.Details
ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm. | $500,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | #f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maherDetails
#f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher | $500,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 1250 Tennessee St | interior non-structural demotion including partitions mep. are to remain vacant until all accessibility featureDetails
interior non-structural demotion including partitions mep. are to remain vacant until all accessibility feature | $200,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | 2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformersDetails
2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformers | $22,750,000 |
| Feb 22, 2019 | Expired or cancelled cancelled Jan 2026 | 156 02nd St | 1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgradeDetails
1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgrade | $1,437,541 |
| Mar 16, 2018 | Completed final sign-off Jun 2020 | 100 Hooper St | revision to 201410209377 s3. update fuel port fill location add detail of fuel kill post wall construction, correct egress schedule door width typo, and correct keynotes for ele. show upgraded panel schedule & include sign notes for generator per sffd comments on fuel oil generator addendum maher nDetails
revision to 201410209377 s3. update fuel port fill location add detail of fuel kill post wall construction, correct egress schedule door width typo, and correct keynotes for ele. show upgraded panel schedule & include sign notes for generator per sffd comments on fuel oil generator addendum maher n | |
| Mar 9, 2018 | Completed final sign-off May 2019 | 1 Market St | 6th fl - change elevator lobby doors, minor tiDetails
6th fl - change elevator lobby doors, minor ti | $30,000 |
| Nov 6, 2017 | Completed final sign-off Oct 2018 | 150 Hooper St | all floors: evacuation signage for 150 hooper fire permit only. n/a for maherDetails
all floors: evacuation signage for 150 hooper fire permit only. n/a for maher | $2,000 |
| Nov 6, 2017 | Completed final sign-off Mar 2020 | 100 Hooper St | evacuation signage for 100 hooper fire permit only. n/a for maherDetails
evacuation signage for 100 hooper fire permit only. n/a for maher | $2,000 |
| May 23, 2017 | Never finaled issued May 2017, no final | 100 Hooper St | street spaceDetails
street space | |
| Aug 9, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher naDetails
revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher na | |
| Aug 9, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher naDetails
revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher naDetails
revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher naDetails
revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 3, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | 4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Aug 3, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | 8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 188 The Embarcadero | 6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 188 The Embarcadero | work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to extg equipment. floor 1: add mechanical box to extg column and provide 2 hour partition at extg mech shaft. ** maher: n/a **Details
work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to extg equipment. floor 1: add mechanical box to extg column and provide 2 hour partition at extg mech shaft. ** maher: n/a ** | $3,400,000 |
| Mar 29, 2016 | Expired or cancelled expired Aug 2023 | 400 Paul Av | remodel (e) building with new offices, new ceilings, new interior walls.Details
remodel (e) building with new offices, new ceilings, new interior walls. | |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 188 The Embarcadero | interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals.Details
interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals. | $2,000,000 |
| May 12, 2015 | Completed final sign-off Feb 2017 | 188 The Embarcadero | alterations to (e) 8 story bldg. work includes new mep upgrades,roof screen & mech platform.2nd flr: work includes computer lab, idf & elec rm & bathrm upgrades.lower level work to remove 8 parking spaces for future mep upgrades.upgrade 9e)mech shfat @stair #1 &add(n)vent shaft @roof;maher n/aDetails
alterations to (e) 8 story bldg. work includes new mep upgrades,roof screen & mech platform.2nd flr: work includes computer lab, idf & elec rm & bathrm upgrades.lower level work to remove 8 parking spaces for future mep upgrades.upgrade 9e)mech shfat @stair #1 &add(n)vent shaft @roof;maher n/a | $3,356,000 |
| Apr 20, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | interior renovations to 3rd fl including arch, mep. demo completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required.Details
interior renovations to 3rd fl including arch, mep. demo completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required. | $1,500,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | flrs: 2,6 and 8: non-structural demo of partitions, doors, frames, millwork, ceiling tile & grid, lighting, finishes. there is no new construction; maher n/aDetails
flrs: 2,6 and 8: non-structural demo of partitions, doors, frames, millwork, ceiling tile & grid, lighting, finishes. there is no new construction; maher n/a | $210,000 |
| Nov 17, 2014 | Never finaled issued Oct 2015, no final | 400 Paul Av | to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not requiredDetails
to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not required | $300,000 |
| Nov 17, 2014 | Completed final sign-off Aug 2016 | 400 Paul Av | demolish one story manafacturing center. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
demolish one story manafacturing center. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $20,000 |
| May 15, 2014 | Completed final sign-off Sep 2016 | 1019 Stockton St | temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111914Details
temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111914 | $57,000 |
| May 15, 2014 | Completed final sign-off Sep 2016 | 50 Trenton St | temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111907Details
temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111907 | $57,000 |
| Oct 10, 2013 | Completed final sign-off Sep 2016 | 835 Jackson St | the tower crane will be used for the construction of the new chinese hospital. the cranes use will be for loading and unloading of material and equipment.Details
the tower crane will be used for the construction of the new chinese hospital. the cranes use will be for loading and unloading of material and equipment. | $450,000 |
| May 21, 2010 | Completed final sign-off Sep 2010 | 1500 Owens St | new walk & canopy along side of building with up lightingDetails
new walk & canopy along side of building with up lighting | $136,784 |
| May 18, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | exterior window replacement at ground flr.Details
exterior window replacement at ground flr. | $50,000 |
| Apr 30, 2010 | Completed final sign-off Aug 2010 | 1 Market St | owner's preparation of an (e) restaurant space for demo and some exterior/interior work full t.i. under future permit. interior demolition, exterior storefront relocation/replacement, new mechanical system. see ti pa# 2009.04.27.7112 for referenceDetails
owner's preparation of an (e) restaurant space for demo and some exterior/interior work full t.i. under future permit. interior demolition, exterior storefront relocation/replacement, new mechanical system. see ti pa# 2009.04.27.7112 for reference | $95,238 |
| Feb 23, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | rev. to pa# 2009.07.23.3307. revise structural steel lay out for roof top equipmentDetails
rev. to pa# 2009.07.23.3307. revise structural steel lay out for roof top equipment | |
| Feb 11, 2010 | Completed final sign-off Mar 2010 | 1 Market St | 2nd floor-room alteration with minimal electrical & plumbing, mechanical work within an (e) room requiring no new construction such as partitions, doors, flooring covering, ceiling system or wall finish. all are (e) & will remainDetails
2nd floor-room alteration with minimal electrical & plumbing, mechanical work within an (e) room requiring no new construction such as partitions, doors, flooring covering, ceiling system or wall finish. all are (e) & will remain | $30,395 |
| Feb 8, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | revision to pa# 2009-0723-3307-per field conditions, revise 2 hour rated construction to match (e) 1 hour rated constructionDetails
revision to pa# 2009-0723-3307-per field conditions, revise 2 hour rated construction to match (e) 1 hour rated construction | $17,500 |
| Feb 1, 2010 | Completed final sign-off Feb 2010 | 685 Market St | basement level-revision to pa# 2009-1222-3644-change rating of doors at rated wlal to 20 min., clarify max occupancy per fire marshall & signageDetails
basement level-revision to pa# 2009-1222-3644-change rating of doors at rated wlal to 20 min., clarify max occupancy per fire marshall & signage | $100 |
| Dec 22, 2009 | Completed final sign-off Feb 2010 | 685 Market St | interior t.i. in (e) tenant suite: basement area reduce size of (e) classroom, add seminar classroom and increase size of stationary storage room and reception will involve drywall work, painting, cabinet, fire alarm, fire sprinkler & hvac work. work in bathrooms.Details
interior t.i. in (e) tenant suite: basement area reduce size of (e) classroom, add seminar classroom and increase size of stationary storage room and reception will involve drywall work, painting, cabinet, fire alarm, fire sprinkler & hvac work. work in bathrooms. | $300,000 |
| Oct 19, 2009 | Never finaled issued Oct 2009, no final | 710 Market St | ref. pa# 2006.07.13.6416s3. omit 3 hr rated roll down shutters with fusible link and smoke detectors as shown in pa# 2006.07.13.6416s3 on sheets a2.12,a3.03, a8.21 and a8.22. including all references to fire shutter on detailsDetails
ref. pa# 2006.07.13.6416s3. omit 3 hr rated roll down shutters with fusible link and smoke detectors as shown in pa# 2006.07.13.6416s3 on sheets a2.12,a3.03, a8.21 and a8.22. including all references to fire shutter on details | |
| Aug 6, 2009 | Completed final sign-off Oct 2009 | 595 Market St | 28th, 29th & 30th floors revision to appl #200904277091 for added structural work. other minor revisions include relocation of mep, finishes & partition locations. replacing existing fire smoke dampers. occupant loads established.sffd permit required for assembly..Details
28th, 29th & 30th floors revision to appl #200904277091 for added structural work. other minor revisions include relocation of mep, finishes & partition locations. replacing existing fire smoke dampers. occupant loads established.sffd permit required for assembly.. | $300,000 |
| Aug 6, 2009 | Completed final sign-off Oct 2009 | 595 Market St | 29th & 30th floor - revision to appl #200903103719 to remove smoke curtain at inter-connecting stair.Details
29th & 30th floor - revision to appl #200903103719 to remove smoke curtain at inter-connecting stair. | $5,000 |
| Jul 31, 2009 | Completed final sign-off Oct 2009 | 595 Market St | 28th, 29th & 30th floors - fire & life safety system for t.i. permit appl. #2009/0427/7091.Details
28th, 29th & 30th floors - fire & life safety system for t.i. permit appl. #2009/0427/7091. | $50,000 |
| Jul 23, 2009 | Completed final sign-off Sep 2010 | 200 Paul Av | alteration of data and electric rooms on 4th fl of bldg "f". replace partial roof/top mechanical/electrical equipment with new structural supports, replace (1) generator in existing generator yard. fire alarm & sprinklers under separate permit.Details
alteration of data and electric rooms on 4th fl of bldg "f". replace partial roof/top mechanical/electrical equipment with new structural supports, replace (1) generator in existing generator yard. fire alarm & sprinklers under separate permit. | $10,000,000 |
| Jul 1, 2009 | Expired or cancelled expired Oct 2024 | 1500 Owens St | new non combustible shed roof with open sides at roof levelDetails
new non combustible shed roof with open sides at roof level | $21,000 |
| Jun 5, 2009 | Completed final sign-off Nov 2011 | 450 Sansome St | convert existing side entrance to be a service entrance with delivery lift to complete work and obtain final inspection for work under pa 200710034450Details
convert existing side entrance to be a service entrance with delivery lift to complete work and obtain final inspection for work under pa 200710034450 | $50,000 |
| Jun 5, 2009 | Completed final sign-off Feb 2011 | 710 Market St | to obtain final inspection for work approved under pa #200710296720. all work is complete.Details
to obtain final inspection for work approved under pa #200710296720. all work is complete. | |
| Apr 27, 2009 | Never finaled issued Apr 2011, no final | 1 Market St | remodel of 2 office tower lobbies, (e) atrium & concourse, demo exterior decorative metal grilles, new exterior doors to match e storefront, remodel of existing and addition of new retail spaces, new mechanical system for retail tenant improvement. all work at ground floor.Details
remodel of 2 office tower lobbies, (e) atrium & concourse, demo exterior decorative metal grilles, new exterior doors to match e storefront, remodel of existing and addition of new retail spaces, new mechanical system for retail tenant improvement. all work at ground floor. | $13,125,000 |
| Apr 27, 2009 | Completed final sign-off Oct 2009 | 595 Market St | t.i at 28th, 29th 30th floor: mechanical, electrical, plumbing, structural & life safety, upgrade existing toilet rooms and add additional toilet rooms on 30th fl.Details
t.i at 28th, 29th 30th floor: mechanical, electrical, plumbing, structural & life safety, upgrade existing toilet rooms and add additional toilet rooms on 30th fl. | $5,000,000 |
| Apr 8, 2009 | Completed final sign-off May 2009 | 1 Market St | 2nd floor - revision to 200803036055, change in occupancy classification from b to a3 for gallery in existing office space. add door hardware & occupancy load signage @ a-3 gallery.Details
2nd floor - revision to 200803036055, change in occupancy classification from b to a3 for gallery in existing office space. add door hardware & occupancy load signage @ a-3 gallery. | |
| Mar 24, 2009 | Never finaled issued Mar 2009, no final | 1550 Owens St | to obtain final inspection for work approved under pa#200804210226. all work has been completed.Details
to obtain final inspection for work approved under pa#200804210226. all work has been completed. | |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 1500 Owens St | to obtain final inspection for work approved under pa#200807176969. all work has been completed.Details
to obtain final inspection for work approved under pa#200807176969. all work has been completed. | |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 1500 Owens St | to obtain final inspection for work approved under pa#200712100084. all work has been completed.Details
to obtain final inspection for work approved under pa#200712100084. all work has been completed. | |
| Mar 24, 2009 | Never finaled issued Mar 2009, no final | 1550 Owens St | to obtain final inspection for work approved under pa#200710014150. all work has been completed.Details
to obtain final inspection for work approved under pa#200710014150. all work has been completed. | |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 1500 Owens St | to obtain final inspection for work approved under pa#200807086156. all work has been completed.Details
to obtain final inspection for work approved under pa#200807086156. all work has been completed. | |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 1550 Owens St | to obtain final inspection for work approved under pa#200712180728. all work has been completed.Details
to obtain final inspection for work approved under pa#200712180728. all work has been completed. | |
| Mar 18, 2009 | Completed final sign-off Mar 2010 | 1 Stockton St | barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor.Details
barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor. | $20,000 |
| Mar 17, 2009 | Completed final sign-off Jul 2009 | 405 Howard St | minor non-structural modifications to existing 2nd. floor tenant space. new partitions and reception desk.Details
minor non-structural modifications to existing 2nd. floor tenant space. new partitions and reception desk. | $1,600,000 |
| Mar 11, 2009 | Completed final sign-off Feb 2011 | 710 Market St | revision to pa# 2006-0713-6416/s6-relocation of sprinkler valves assembly from vestibule to stairs in star #3.Details
revision to pa# 2006-0713-6416/s6-relocation of sprinkler valves assembly from vestibule to stairs in star #3. | $15,000 |
| Mar 10, 2009 | Completed final sign-off Oct 2009 | 595 Market St | ab17 soft demo- non structural walls & ceiling, floors 28,29 and 30.Details
ab17 soft demo- non structural walls & ceiling, floors 28,29 and 30. | $50,000 |
| Mar 10, 2009 | Completed final sign-off Oct 2009 | 595 Market St | 29th & 30th floors-new interconnecting stairs to be added between floors 29th & 30th including structural workDetails
29th & 30th floors-new interconnecting stairs to be added between floors 29th & 30th including structural work | $338,562 |
| Jan 6, 2009 | Completed final sign-off May 2009 | 10 United Nations Pz | 5th floor tenant improvement of an (e) low-rise office bldg of about 10,500 usable sq.ft. the tenant is an adult educational school w/classrooms & office space for facility. additional accessible toilet facilities are being provided. sprinkler/life safety will be submitted under separate permit.Details
5th floor tenant improvement of an (e) low-rise office bldg of about 10,500 usable sq.ft. the tenant is an adult educational school w/classrooms & office space for facility. additional accessible toilet facilities are being provided. sprinkler/life safety will be submitted under separate permit. | $450,000 |
| Dec 30, 2008 | Completed final sign-off Feb 2011 | 710 Market St | installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3Details
installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3 | $75,000 |
| Dec 29, 2008 | Completed final sign-off May 2009 | 10 United Nations Pz | demolition of (e) interior partitions, ceilings and plumbing in a vacant tenant space on the 1st floor. work will be done under ab-017Details
demolition of (e) interior partitions, ceilings and plumbing in a vacant tenant space on the 1st floor. work will be done under ab-017 | $50,000 |
| Dec 29, 2008 | Expired or cancelled expired Apr 2021 | 10 United Nations Pz | 1st floor-modification of (e) dumpster room. moving door to (e) sprinkler riser. no exterior workDetails
1st floor-modification of (e) dumpster room. moving door to (e) sprinkler riser. no exterior work | $5,000 |
| Dec 16, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338.Details
structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338. | $600,000 |
| Dec 8, 2008 | Expired or cancelled expired Jun 2014 | 1 Market St | lobby- demolition of interior finishes, partitions, mechanical and electrical equipment in preparation for remodel to be issued under separate permit. per provision ab.017 accessibilty compliance will be documented in subsequent application for re building vacant space.Details
lobby- demolition of interior finishes, partitions, mechanical and electrical equipment in preparation for remodel to be issued under separate permit. per provision ab.017 accessibilty compliance will be documented in subsequent application for re building vacant space. | $500,000 |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | renew pa# 2006/08/15/9563 to obtain final inspection which renew pa# 2002/12/30/4298, pa# 2003/02/14/7500 & pa# 2003/01/20/6293.Details
renew pa# 2006/08/15/9563 to obtain final inspection which renew pa# 2002/12/30/4298, pa# 2003/02/14/7500 & pa# 2003/01/20/6293. | |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | renew pa# 2006/08/15/9559 to obtain final inspection which renew pa# 2003/01/09/4903, pa# 2002/12/20/3991 & pa# 2003/04/25/3116.Details
renew pa# 2006/08/15/9559 to obtain final inspection which renew pa# 2003/01/09/4903, pa# 2002/12/20/3991 & pa# 2003/04/25/3116. | |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | renew pa# 2006/08/15/9562 to obtain final inspection which renew pa# 2003/02/10/7027, pa# 2003/02/10/7028 & pa# 2002/12/20/3995.Details
renew pa# 2006/08/15/9562 to obtain final inspection which renew pa# 2003/02/10/7027, pa# 2003/02/10/7028 & pa# 2002/12/20/3995. | |
| Nov 19, 2008 | Never finaled issued Nov 2008, no final | 601 16th St | request to add address for a temporary construction trailer which will be removed by year 2013 (no foundation - movable)Details
request to add address for a temporary construction trailer which will be removed by year 2013 (no foundation - movable) | |
| Nov 12, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows.Details
renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows. | $7,500,000 |
| Sep 30, 2008 | Completed final sign-off May 2009 | 10 United Nations Pz | tenant improvment 6th floor of e low rise office building. tenant is an adult educational school (b occupancy) with classrooms and instructional food facilities. project will provide acessible toilet facilities. all classroom occupants above 12th grade. life safety sep permit.Details
tenant improvment 6th floor of e low rise office building. tenant is an adult educational school (b occupancy) with classrooms and instructional food facilities. project will provide acessible toilet facilities. all classroom occupants above 12th grade. life safety sep permit. | $1,200,000 |
| Sep 4, 2008 | Completed final sign-off Sep 2008 | 50 Osgood Pl | 3rd floor-tenant improvement-patching walls, demo doorway and infill, add window, add telephone lines, data lines and light swithcesDetails
3rd floor-tenant improvement-patching walls, demo doorway and infill, add window, add telephone lines, data lines and light swithces | $24,864 |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 235 Montgomery St | drywall and glazing to create deicated office in existing office building 5th floorDetails
drywall and glazing to create deicated office in existing office building 5th floor | $28,000 |
| Aug 25, 2008 | Completed final sign-off Nov 2009 | 455 Mission Bay Blvd South | renew pa# 2007/01/09/1303 for final inspection only.Details
renew pa# 2007/01/09/1303 for final inspection only. | |
| Jun 24, 2008 | Completed final sign-off Sep 2008 | 720 Market St | 5th floor: tenant improvement. demo interior partitions, construct new interior partitions. remodel bathrooms for ada accessibility requirements. add new lighting and repair ceiling.Details
5th floor: tenant improvement. demo interior partitions, construct new interior partitions. remodel bathrooms for ada accessibility requirements. add new lighting and repair ceiling. | $90,000 |
| Jun 6, 2008 | Completed final sign-off Dec 2008 | 501 02nd St | 7th floor-removal of temporary dry wall partitions. relocate 4 electrical outlets, paint and carpetDetails
7th floor-removal of temporary dry wall partitions. relocate 4 electrical outlets, paint and carpet | $35,000 |
| May 22, 2008 | Completed final sign-off May 2008 | 450 Sansome St | renew appl#200707136709 for final inspection.Details
renew appl#200707136709 for final inspection. | |
| May 22, 2008 | Completed final sign-off May 2008 | 450 Sansome St | renew appl#200710054671, 200705171532, 200708099296 for final inspection.Details
renew appl#200710054671, 200705171532, 200708099296 for final inspection. | |
| Apr 24, 2008 | Completed final sign-off Dec 2008 | 1275 Market St | renovation of plaza to include landscape, waterproofing, minor electric for lighting, irrigation.Details
renovation of plaza to include landscape, waterproofing, minor electric for lighting, irrigation. | $1,000,000 |
| Apr 24, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | add and relocate ductwork for existing hvac on 6th floorDetails
add and relocate ductwork for existing hvac on 6th floor | $9,000 |
| Apr 22, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | demo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr)Details
demo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr) | $40,550 |
| Apr 2, 2008 | Completed final sign-off Oct 2008 | 1 Market St | new structural steel support for operable wall (skyfold door). ref arch #200803036055Details
new structural steel support for operable wall (skyfold door). ref arch #200803036055 | $8,000 |
| Apr 2, 2008 | Completed final sign-off Oct 2008 | 1 Market St | new elec distribution for lighting, mech equip,convenience power, copiers, printers, av equipment. mech, new hvac sistribution, new vav boxes, fsds and heate pumps. new structural steel support for operable wall (skyfold door) to be under separate permit. ref app 200803036055Details
new elec distribution for lighting, mech equip,convenience power, copiers, printers, av equipment. mech, new hvac sistribution, new vav boxes, fsds and heate pumps. new structural steel support for operable wall (skyfold door) to be under separate permit. ref app 200803036055 | $1,043 |
| Apr 1, 2008 | Completed final sign-off Jun 2008 | 10 United Nations Pz | 2nd floor-convert (e) fixed seat classroom into a video studio classroom. divide another classroom to create a video control room and storage room. electrical lights & hvac if any, under separate building permit.Details
2nd floor-convert (e) fixed seat classroom into a video studio classroom. divide another classroom to create a video control room and storage room. electrical lights & hvac if any, under separate building permit. | $35,000 |
| Mar 31, 2008 | Never finaled issued Apr 2008, no final | 120 Howard St | demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.Details
demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used. | $12,000 |
| Mar 26, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.Details
t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit. | $250,000 |
| Mar 10, 2008 | Completed final sign-off Feb 2011 | 710 Market St | tower crane drawings to site permit application 200607136416.Details
tower crane drawings to site permit application 200607136416. | |
| Mar 5, 2008 | Completed final sign-off Apr 2008 | 45 Fremont St | 29th floor-remove 2 strobes and 1 speaker, add 2 speaker/strobes, 3 smoke detectors, 2 duct smoke detectors, 1 control module and 6 monitor modulesDetails
29th floor-remove 2 strobes and 1 speaker, add 2 speaker/strobes, 3 smoke detectors, 2 duct smoke detectors, 1 control module and 6 monitor modules | $2,500 |
| Mar 3, 2008 | Completed final sign-off Oct 2008 | 1 Market St | 2nd floor-interior office construction & gallery space. new finishes, electrical, fire sprinkler, hvac & plumbing to be under seperate permit submission, project is seeking leed platinum certification.Details
2nd floor-interior office construction & gallery space. new finishes, electrical, fire sprinkler, hvac & plumbing to be under seperate permit submission, project is seeking leed platinum certification. | $2,200,000 |
| Jan 25, 2008 | Completed final sign-off May 2008 | 450 Sansome St | revision to pa# 2005/08/03/9280 to relocate handrails adjacent to handicap lift. revise ada drinking fountainDetails
revision to pa# 2005/08/03/9280 to relocate handrails adjacent to handicap lift. revise ada drinking fountain | $2,000 |
| Jan 25, 2008 | Completed final sign-off Apr 2008 | 300 Clay St | alteration to mechanical ststem to accomondate ti office layout on the 13th floor. ref. pa# 2007/11/27/8940. demo some duct lines and relocate them to fit new office layout. install 4 new exhaust fans with associated ducts.Details
alteration to mechanical ststem to accomondate ti office layout on the 13th floor. ref. pa# 2007/11/27/8940. demo some duct lines and relocate them to fit new office layout. install 4 new exhaust fans with associated ducts. | $25,000 |
| Jan 24, 2008 | Never finaled issued Jan 2008, no final | 405 Howard St | renew pa#200212203991 for final inspection.Details
renew pa#200212203991 for final inspection. | |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 300 Clay St | 13th floor: revision to appl #200711278940 to reduce scope of work. tenant to remove (2) doors and consider previous work as part of overall tenant space. revision is clouded and indicated by delta 1.Details
13th floor: revision to appl #200711278940 to reduce scope of work. tenant to remove (2) doors and consider previous work as part of overall tenant space. revision is clouded and indicated by delta 1. |