Block 3737, lot 001
405 Howard St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
162 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2012 | Expired or cancelled expired Mar 2014 | 405 Howard St | Gci, Inc | installation of a dry cooler unit on an extg deck adjacent to extg tenant space on 6th floor.Details
installation of a dry cooler unit on an extg deck adjacent to extg tenant space on 6th floor. | $100,000 |
| Nov 4, 2011 | Completed final sign-off Nov 2011 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 3rd floor (bldg 2) fire alram t.i. - 2 dual monitor modeles, 2 control relays, 2 smoke detectors, 1 strobe, 5 speaker/strobes, 4 speakers.Details
3rd floor (bldg 2) fire alram t.i. - 2 dual monitor modeles, 2 control relays, 2 smoke detectors, 1 strobe, 5 speaker/strobes, 4 speakers. | $10,000 |
| May 12, 2011 | Completed final sign-off Aug 2011 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 3rd floor-fire alarm t.i-5 new audible/visual notification appliancesDetails
3rd floor-fire alarm t.i-5 new audible/visual notification appliances | $4,732 |
| May 10, 2011 | Completed final sign-off Jul 2011 | 405 Howard St | Mc Millan Electric | 6th floor-install 1 control relay, 1 door holder, 1 interposing relay, 10 speaker strobes, 4 ceiling mount speakersDetails
6th floor-install 1 control relay, 1 door holder, 1 interposing relay, 10 speaker strobes, 4 ceiling mount speakers | $7,500 |
| May 3, 2011 | Completed final sign-off Jun 2011 | 405 Howard St | Dpr Construction | 3rd floor suite 375 -minor modifications to (e) 1619 sq ft tenant space-install new millwork & glass partition, reverse swing of door in (e) restrooms, install new under floor air distribution & new sink for new break room. electrical work under seperate permitDetails
3rd floor suite 375 -minor modifications to (e) 1619 sq ft tenant space-install new millwork & glass partition, reverse swing of door in (e) restrooms, install new under floor air distribution & new sink for new break room. electrical work under seperate permit | $45,268 |
| Feb 25, 2011 | Completed final sign-off Dec 2011 | 405 Howard St | Intelligent Technologies & Services Inc | provide detection and controls for 6th floor equpment room. dual pre-action/novel - 1230 system (pre-action/novel system is provided and permitted by arb under separate permit 201012076238)Details
provide detection and controls for 6th floor equpment room. dual pre-action/novel - 1230 system (pre-action/novel system is provided and permitted by arb under separate permit 201012076238) | $5,734 |
| Jan 6, 2011 | Completed final sign-off Sep 2011 | 405 Howard St | Diversified Fire Products | fire alarm t.i.:1 new booster panel for strobes,8 ceiling mounted strobes,34 ceiling mounted speaker/strobes,23 ceiling mounted speakers, 8 monitor modules,1 synch module,3 control relays,2 smoke detectors.Details
fire alarm t.i.:1 new booster panel for strobes,8 ceiling mounted strobes,34 ceiling mounted speaker/strobes,23 ceiling mounted speakers, 8 monitor modules,1 synch module,3 control relays,2 smoke detectors. | $12,000 |
| Nov 1, 2010 | Never finaled issued Nov 2010, no final | 405 Howard St | streetspaceDetails
streetspace | ||
| Oct 20, 2010 | Completed final sign-off Sep 2011 | 405 Howard St | Gci, Inc | office ti on 6th floor. construction of a corridor extension on the north and south sides of the north core and the construction of a new tenant demising wall to accomodate for future tenant.Details
office ti on 6th floor. construction of a corridor extension on the north and south sides of the north core and the construction of a new tenant demising wall to accomodate for future tenant. | $23,000 |
| Oct 5, 2010 | Completed final sign-off Sep 2011 | 405 Howard St | Gci, Inc | tenant improvements- new offices and support facilities; modifications to the existing mep systemsDetails
tenant improvements- new offices and support facilities; modifications to the existing mep systems | $900,000 |
| Aug 19, 2010 | Completed final sign-off Apr 2011 | 405 Howard St | Mc Millan Electric | 5th floor-install 2 power supply, install 3 speaker/strobe setsDetails
5th floor-install 2 power supply, install 3 speaker/strobe sets | $3,500 |
| Apr 14, 2010 | Completed final sign-off Jun 2010 | 405 Howard St | Aaa Restaurant Fire Control/Dba Aaa Fire | on the ground floor - furnish & install one (1) ansul r-102 fire suppression system in the main kitchen area. fire alarm under separate permit.Details
on the ground floor - furnish & install one (1) ansul r-102 fire suppression system in the main kitchen area. fire alarm under separate permit. | $3,500 |
| Mar 18, 2010 | Completed final sign-off Aug 2010 | 405 Howard St | Paradigm General Contractors | 5th floor t.i. , add partial wall @ 545 @ multipurpose room, wall & door @ 555 conf. rm; add rated wall @ 551 to create room #556 which is added glass & door ; add wall & door @ 550 to create storage & window @ 544, add partial wall & closet door @ 503.Details
5th floor t.i. , add partial wall @ 545 @ multipurpose room, wall & door @ 555 conf. rm; add rated wall @ 551 to create room #556 which is added glass & door ; add wall & door @ 550 to create storage & window @ 544, add partial wall & closet door @ 503. | $10,415 |
| Mar 17, 2010 | Never finaled issued Jul 2010, no final | 405 Howard St | change of occupancy of part of main 1st floor lobby from accesory to a-3. a "max occupancy" sign will be installed.Details
change of occupancy of part of main 1st floor lobby from accesory to a-3. a "max occupancy" sign will be installed. | $100 | |
| Mar 4, 2010 | Completed final sign-off Jun 2010 | 405 Howard St | Mc Millan Electric | 1st floor/bldg #2-install 2 single input module, 1 control relay, 3 booster power supply, & 3 speaker/strobe setsDetails
1st floor/bldg #2-install 2 single input module, 1 control relay, 3 booster power supply, & 3 speaker/strobe sets | $7,500 |
| Jan 7, 2010 | Completed final sign-off Apr 2011 | 405 Howard St | Novo Construction Inc | 5th floor -tenant improvement demising wall, interior office,partition wall, glass entrances. mep, fire sprinklers and fire alarm under separate permit.Details
5th floor -tenant improvement demising wall, interior office,partition wall, glass entrances. mep, fire sprinklers and fire alarm under separate permit. | $84,000 |
| Sep 14, 2009 | Completed final sign-off Oct 2009 | 405 Howard St | Gci, Inc | ground floor. install new electrical fixtures in new idf closet to existing tenant space. ref. t.i application 200908315868. for t.i. work.Details
ground floor. install new electrical fixtures in new idf closet to existing tenant space. ref. t.i application 200908315868. for t.i. work. | $6,378 |
| Sep 8, 2009 | Never finaled issued Sep 2009, no final | 405 Howard St | Gci, Inc | hvac for ti to add 1 hvac unit, heat pump. please refer to 200908315868Details
hvac for ti to add 1 hvac unit, heat pump. please refer to 200908315868 | $10,300 |
| Aug 31, 2009 | Completed final sign-off Oct 2009 | 405 Howard St | Gci, Inc | gr. floor - one new height partitions and door for 1df closet. mechanical, elect. life safety and sprinkler will be under separate permit.Details
gr. floor - one new height partitions and door for 1df closet. mechanical, elect. life safety and sprinkler will be under separate permit. | $95,000 |
| Apr 29, 2009 | Completed final sign-off Jul 2009 | 405 Howard St | Diversified Fire Products | fire alarm modification, add 4 duct detectors, 6 control relays, 2 monitoring modules, 1 speaker/strobe, 1 strobe only to existing systemDetails
fire alarm modification, add 4 duct detectors, 6 control relays, 2 monitoring modules, 1 speaker/strobe, 1 strobe only to existing system | $11,687 |
| Mar 17, 2009 | Completed final sign-off Jul 2009 | 405 Howard St | Dpr Construction Inc | minor non-structural modifications to existing 2nd. floor tenant space. new partitions and reception desk.Details
minor non-structural modifications to existing 2nd. floor tenant space. new partitions and reception desk. | $1,600,000 |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | Dpr Construction Inc | renew pa# 2006/08/15/9563 to obtain final inspection which renew pa# 2002/12/30/4298, pa# 2003/02/14/7500 & pa# 2003/01/20/6293.Details
renew pa# 2006/08/15/9563 to obtain final inspection which renew pa# 2002/12/30/4298, pa# 2003/02/14/7500 & pa# 2003/01/20/6293. | |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | Dpr Construction Inc | renew pa# 2006/08/15/9559 to obtain final inspection which renew pa# 2003/01/09/4903, pa# 2002/12/20/3991 & pa# 2003/04/25/3116.Details
renew pa# 2006/08/15/9559 to obtain final inspection which renew pa# 2003/01/09/4903, pa# 2002/12/20/3991 & pa# 2003/04/25/3116. | |
| Dec 5, 2008 | Completed final sign-off Dec 2008 | 405 Howard St | Dpr Construction Inc | renew pa# 2006/08/15/9562 to obtain final inspection which renew pa# 2003/02/10/7027, pa# 2003/02/10/7028 & pa# 2002/12/20/3995.Details
renew pa# 2006/08/15/9562 to obtain final inspection which renew pa# 2003/02/10/7027, pa# 2003/02/10/7028 & pa# 2002/12/20/3995. | |
| Sep 11, 2008 | Completed final sign-off Oct 2008 | 405 Howard St | Diversified Fire Products | fire alarm t.i. for 1/f tenant, new resources bank, 5 control relays, 5 duct detectors, 1 power supply, 3 strobes, 6 speaker/strobes.Details
fire alarm t.i. for 1/f tenant, new resources bank, 5 control relays, 5 duct detectors, 1 power supply, 3 strobes, 6 speaker/strobes. | $16,656 |
| Aug 21, 2008 | Expired or cancelled cancelled Jan 2026 | 405 Howard St | t.i. at 1st fl: tenant new resouses bank, fire alarm : 5 control relays, 5 duct detectors, 1 power suppy, 3 strobes, 6 speaker/strobes.Details
t.i. at 1st fl: tenant new resouses bank, fire alarm : 5 control relays, 5 duct detectors, 1 power suppy, 3 strobes, 6 speaker/strobes. | $16,656 | |
| Jul 9, 2008 | Completed final sign-off Oct 2008 | 405 Howard St | Gci, Inc | 1st fl: electrical and mechanical work for vacant tenant space combined with another adjacent tenant space. reconfigure lighting and ductwork. ref arch app 200806164561Details
1st fl: electrical and mechanical work for vacant tenant space combined with another adjacent tenant space. reconfigure lighting and ductwork. ref arch app 200806164561 | $263,000 |
| May 9, 2008 | Never finaled issued May 2008, no final | 405 Howard St | Diversified Fire Products | fire alarm i.i. for orrick cooling tower, 10 th floor 1 control relay, 1 duct detectorDetails
fire alarm i.i. for orrick cooling tower, 10 th floor 1 control relay, 1 duct detector | $8,746 |
| Apr 29, 2008 | Completed final sign-off Jul 2008 | 405 Howard St | Diversified Fire Products | 4th floor-fire alarm notification upgrade for barclays, ste #420-4 speaker/strobesDetails
4th floor-fire alarm notification upgrade for barclays, ste #420-4 speaker/strobes | $9,644 |
| Mar 7, 2008 | Completed final sign-off May 2008 | 405 Howard St | Gci, Inc | electrical and mechanical upgrades to 4/f office space to install new ductwork fans and diffusers and lighting fixturesDetails
electrical and mechanical upgrades to 4/f office space to install new ductwork fans and diffusers and lighting fixtures | $45,785 |
| Mar 6, 2008 | Completed final sign-off Jul 2008 | 405 Howard St | 4th floor: tenant improvement of 5,044 sq ft of existing office space - new private offices and open office area new lighting. fire alarm & sprinkler under separate permit.Details
4th floor: tenant improvement of 5,044 sq ft of existing office space - new private offices and open office area new lighting. fire alarm & sprinkler under separate permit. | $600,000 | |
| Mar 5, 2008 | Completed final sign-off May 2008 | 405 Howard St | Diversified Fire Products | 4th floor-fire alarm t.i. for tenant: orrick-addition of 1 amplifier, 9 speakers strobes, 25 speakers, 1 strobe.Details
4th floor-fire alarm t.i. for tenant: orrick-addition of 1 amplifier, 9 speakers strobes, 25 speakers, 1 strobe. | $14,623 |
| Mar 5, 2008 | Completed final sign-off May 2008 | 405 Howard St | Diversified Fire Products | 4th floor-fire alarm t.i. for tenant: ashforth pacific of california-addition of 2 speakers strobesDetails
4th floor-fire alarm t.i. for tenant: ashforth pacific of california-addition of 2 speakers strobes | $6,535 |
| Jan 24, 2008 | Never finaled issued Jan 2008, no final | 405 Howard St | Dpr Construction Inc | renew pa#200212203991 for final inspection.Details
renew pa#200212203991 for final inspection. | |
| Aug 23, 2007 | Never finaled issued Aug 2007, no final | 405 Howard St | Wcp Svcs, Dba: Venture Builders | renewal for final inspection #200408242361 & #200408252567Details
renewal for final inspection #200408242361 & #200408252567 | |
| Jul 24, 2007 | Never finaled issued Jul 2007, no final | 405 Howard St | Diversified Fire Products | fire alarm t.i. for cna insurance, 6th floor, add 1 sprinkler/strobe.Details
fire alarm t.i. for cna insurance, 6th floor, add 1 sprinkler/strobe. | $5,478 |
| Jun 29, 2007 | Never finaled issued Jun 2007, no final | 405 Howard St | Gci, Inc | 1st floor & basement-fire alarms/life safety for commercial retail space in office complex located in older part of buildingDetails
1st floor & basement-fire alarms/life safety for commercial retail space in office complex located in older part of building | $28,000 |
| Jun 28, 2007 | Completed final sign-off Jul 2007 | 405 Howard St | Swinerton Builders | remove requirement for not of butt weld rep attached letter dated 06/06/07 on pa 200406247298Details
remove requirement for not of butt weld rep attached letter dated 06/06/07 on pa 200406247298 | |
| Jun 7, 2007 | Completed final sign-off Aug 2007 | 405 Howard St | Field Construction Inc. | oti-3 6th floor electricalDetails
oti-3 6th floor electrical | $5,000 |
| Apr 24, 2007 | Never finaled issued May 2007, no final | 405 Howard St | minor revision to fire alarm permit 200701181970 for 4th floor.Details
minor revision to fire alarm permit 200701181970 for 4th floor. | $2,500 | |
| Apr 24, 2007 | Never finaled issued May 2007, no final | 405 Howard St | Decker Electric Co Inc Electrical Contra | minor revisions to fire alarm permit 200701181971 for 2nd floorDetails
minor revisions to fire alarm permit 200701181971 for 2nd floor | $5,000 |
| Apr 24, 2007 | Never finaled issued May 2007, no final | 405 Howard St | Decker Electric Co Inc Electrical Contra | monor revisions to fire alarm permit 200701181969 for parking level p1 and 1st floorDetails
monor revisions to fire alarm permit 200701181969 for parking level p1 and 1st floor | $1,000 |
| Mar 22, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Allied Fire Protection | 2nd floor-revision #1 to pa# 200703156299.Details
2nd floor-revision #1 to pa# 200703156299. | |
| Mar 19, 2007 | Completed final sign-off Jul 2007 | 405 Howard St | Swinerton Builders | renew pa# 200605242369 for final.Details
renew pa# 200605242369 for final. | |
| Mar 15, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Allied Fire Protection | add 20 ceiling sprinklers on 1" drops off of existing sprinkler system.Details
add 20 ceiling sprinklers on 1" drops off of existing sprinkler system. | $6,000 |
| Feb 2, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Fuel Oil System | install 2-1200 gallon storage tanks, 2 pump sets & 2 remote fill panels.Details
install 2-1200 gallon storage tanks, 2 pump sets & 2 remote fill panels. | $65,000 |
| Jan 23, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Allied Fire Protection | fire sprinkler t.i. work on level 4, s.e. quadrant & new corridor @ elevator; t.i. work on level 2 excluding kitchen, skylite & ne corner;sprinkler t.i. work @ around flr generator room; t.i. work @ elel room ups, fuel oil,& dry cooler rooms on parking level;new preaction system on flr 2 & parking.Details
fire sprinkler t.i. work on level 4, s.e. quadrant & new corridor @ elevator; t.i. work on level 2 excluding kitchen, skylite & ne corner;sprinkler t.i. work @ around flr generator room; t.i. work @ elel room ups, fuel oil,& dry cooler rooms on parking level;new preaction system on flr 2 & parking. | $190,000 |
| Jan 18, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Company Lp | expand (e) fire alarm system for new work on 1st floor & p1 (basement) level.Details
expand (e) fire alarm system for new work on 1st floor & p1 (basement) level. | $12,000 |
| Jan 18, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Company Lp | expand (e) fire alarm on partial 4th floor for new tenant.Details
expand (e) fire alarm on partial 4th floor for new tenant. | $23,000 |
| Jan 18, 2007 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Company Lp | expand (e) fire alarm system on 2nd floor for new tenant.Details
expand (e) fire alarm system on 2nd floor for new tenant. | $61,000 |
| Dec 20, 2006 | Never finaled issued Dec 2006, no final | 405 Howard St | street space permitDetails
street space permit | ||
| Dec 19, 2006 | Completed final sign-off Jan 2007 | 405 Howard St | fire alarm ti: for peets doffee: addition of signals in ti space, one storbe and 4 speakersDetails
fire alarm ti: for peets doffee: addition of signals in ti space, one storbe and 4 speakers | $9,874 | |
| Dec 11, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | new 4x 12 slab opening for new mechanical shaft . permit of slab demolition onlyDetails
new 4x 12 slab opening for new mechanical shaft . permit of slab demolition only | $16,000 | |
| Dec 8, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | interior non structuraldemolitoin on ground floor onlyDetails
interior non structuraldemolitoin on ground floor only | $11,000 | |
| Nov 3, 2006 | Completed final sign-off Jan 2007 | 405 Howard St | revision to approved pa# 2006/08/02/8352. work is addition of 3.5" light weight concrete to make interior floor level with exterior plaza. no other work under this permit. (ada compliance per approved pa# 2006/08/02/8352)Details
revision to approved pa# 2006/08/02/8352. work is addition of 3.5" light weight concrete to make interior floor level with exterior plaza. no other work under this permit. (ada compliance per approved pa# 2006/08/02/8352) | $15,000 | |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 405 Howard St | Geo M Robinson & Co | alteration to existing fire sprinkler system for peet's coffee & tea on 1st level. ssp=11Details
alteration to existing fire sprinkler system for peet's coffee & tea on 1st level. ssp=11 | $2,900 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Co, Lp | new fuel oil & generator to serve barclays tenant spaces on 2nd & 4th floors. installation of generator & fuel oil system only. no other work under this permit.Details
new fuel oil & generator to serve barclays tenant spaces on 2nd & 4th floors. installation of generator & fuel oil system only. no other work under this permit. | $245,000 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Co, Lp | oti-2, barclays global investors, 2nd floor, el, me.Details
oti-2, barclays global investors, 2nd floor, el, me. | $100,000 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Co, Lp | oti-1, 2nd floor, el, me, ls, sp. 1st time t.i.Details
oti-1, 2nd floor, el, me, ls, sp. 1st time t.i. | $260,000 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Co, Lp | oti-1, 4th floor, el, me, ls, sp. new open office area & new partitions.Details
oti-1, 4th floor, el, me, ls, sp. new open office area & new partitions. | $74,000 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | Plant Construction Co, Lp | oti-2, 4th floor, el, me.Details
oti-2, 4th floor, el, me. | $62,000 |
| Oct 17, 2006 | Completed final sign-off Oct 2006 | 405 Howard St | Gci, Inc | oti-4 3rd floor spDetails
oti-4 3rd floor sp | $2,300 |
| Oct 17, 2006 | Completed final sign-off Oct 2006 | 405 Howard St | Gci, Inc | oti-3 3rd floor lsDetails
oti-3 3rd floor ls | $18,000 |
| Oct 10, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Cupertino Electric Inc. | 2nd floor - adding onto fire sprinkler system - updating life safety system -(flow & tamper).Details
2nd floor - adding onto fire sprinkler system - updating life safety system -(flow & tamper). | $3,500 |
| Oct 3, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Diversified Fire Products | oti-3 (revision pa 200608159520) 1st fl l/sDetails
oti-3 (revision pa 200608159520) 1st fl l/s | |
| Aug 23, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | Hathaway Dinwiddie Co. | oti 2-revision, 6th floor, meDetails
oti 2-revision, 6th floor, me | $50 |
| Aug 18, 2006 | Completed final sign-off Sep 2006 | 405 Howard St | Gci, Inc | oti-2 r1 3/f el. revision to oti-2 electrical only, change of lighting.Details
oti-2 r1 3/f el. revision to oti-2 electrical only, change of lighting. | |
| Aug 17, 2006 | Completed final sign-off Sep 2006 | 405 Howard St | Gci, Inc | oti-4 3/f spDetails
oti-4 3/f sp | $2,700 |
| Aug 17, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Gci, Inc | oti-3 1/f spDetails
oti-3 1/f sp | $6,700 |
| Aug 15, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | Dpr Construction Inc | 6th floor-renewal of pa# 2003/02/10/7027 2003/02/10/7028 2002/12/20/3995 for final inspection.Details
6th floor-renewal of pa# 2003/02/10/7027 2003/02/10/7028 2002/12/20/3995 for final inspection. | |
| Aug 15, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | Dpr Construction Inc | 6th floor-renewal of pa# 200301094903, 200212203991, 200304253116 for final inspection.Details
6th floor-renewal of pa# 200301094903, 200212203991, 200304253116 for final inspection. | |
| Aug 15, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | Dpr Construction Inc | 6th floor-renewal of pa# 200212304298, 200302147500, 200301206293 for final inspection.Details
6th floor-renewal of pa# 200212304298, 200302147500, 200301206293 for final inspection. | |
| Aug 4, 2006 | Completed final sign-off Dec 2006 | 405 Howard St | Bcci Construction Company | oti-2, revision. 4th floor, me. revision to pa# 2006/06/28/5272.Details
oti-2, revision. 4th floor, me. revision to pa# 2006/06/28/5272. | |
| Aug 3, 2006 | Completed final sign-off Dec 2006 | 405 Howard St | Bcci Construction Company | oti-3, 4th floor, ls (bldng. 2)Details
oti-3, 4th floor, ls (bldng. 2) | $3,500 |
| Aug 2, 2006 | Completed final sign-off Jan 2007 | 405 Howard St | tenant improvement for coffee shsop. work includes (n) walals, finishes, equipment, lighting, ducting and casework. no fire protection. no signage and no structural work under this permit. first titme tenantDetails
tenant improvement for coffee shsop. work includes (n) walals, finishes, equipment, lighting, ducting and casework. no fire protection. no signage and no structural work under this permit. first titme tenant | $450,000 | |
| Jul 10, 2006 | Completed final sign-off Oct 2006 | 405 Howard St | Gci, Inc | oti-2, 3rd floor, el, me.Details
oti-2, 3rd floor, el, me. | $81,000 |
| Jul 10, 2006 | Completed final sign-off Oct 2006 | 405 Howard St | Gci, Inc | oti-1 3rd floor el, me, l/s, spDetails
oti-1 3rd floor el, me, l/s, sp | $87,000 |
| Jun 28, 2006 | Completed final sign-off Dec 2006 | 405 Howard St | Bcci Construction Company | oti-2, 4th floor, el, me. oti-1 pa# 2006/06/22/4824.Details
oti-2, 4th floor, el, me. oti-1 pa# 2006/06/22/4824. | $16,000 |
| Jun 27, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | oti-2, 1st floor, el, me.Details
oti-2, 1st floor, el, me. | $200,000 | |
| Jun 22, 2006 | Completed final sign-off Dec 2006 | 405 Howard St | Bcci Construction Company | oti-1 4th floor architecturalDetails
oti-1 4th floor architectural | $60,000 |
| Jun 2, 2006 | Completed final sign-off Sep 2006 | 405 Howard St | Intelligent Technologies & Services Inc | renew permit #200403178914 for final inspection.Details
renew permit #200403178914 for final inspection. | |
| Jun 1, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Bcci Construction Company | oti-3 4th floor lsDetails
oti-3 4th floor ls | $11,000 |
| May 24, 2006 | Completed final sign-off Sep 2006 | 405 Howard St | Swinerton Builders | renew expired pa#200406176728, 200404302702, 200404070701, 200406297623 for final inspection.Details
renew expired pa#200406176728, 200404302702, 200404070701, 200406297623 for final inspection. | |
| May 24, 2006 | Completed final sign-off Oct 2006 | 405 Howard St | Swinerton Builders | renew expired pa# 2003073610843, 200307310848, 200310288795 for final inspection.Details
renew expired pa# 2003073610843, 200307310848, 200310288795 for final inspection. | |
| May 24, 2006 | Expired or cancelled expired Jul 2007 | 405 Howard St | Swinerton Builders | renew expired pa#200312232922, 200403189009, 200406247298 for final inspection.Details
renew expired pa#200312232922, 200403189009, 200406247298 for final inspection. | |
| May 18, 2006 | Never finaled issued Sep 2006, no final | 405 Howard St | Gci, Inc | oti-2, 1st floor, el, me. mechanical, electrical & plumbing (partial oti) this is a first time tenant use. refer to oti-1 appl#200605121491Details
oti-2, 1st floor, el, me. mechanical, electrical & plumbing (partial oti) this is a first time tenant use. refer to oti-1 appl#200605121491 | $50,000 |
| May 12, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Gci, Inc | oti-i at glf, walls, doors.Details
oti-i at glf, walls, doors. | $225,000 |
| May 12, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Gci, Inc | oti-1, 1st fl, el, me, ls, sp. t.i. to partial 1/f creation of demising wall to seperate office space from potential retail space. add corridor & upgrade to existing restrooms.Details
oti-1, 1st fl, el, me, ls, sp. t.i. to partial 1/f creation of demising wall to seperate office space from potential retail space. add corridor & upgrade to existing restrooms. | $75,000 |
| May 11, 2006 | Completed final sign-off Sep 2006 | 405 Howard St | relocate reception desk. replace elevator lobby doors (rated)Details
relocate reception desk. replace elevator lobby doors (rated) | $12,000 | |
| Apr 27, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Bcci Construction Company | oti-2, 4th floor, el, me, ls.Details
oti-2, 4th floor, el, me, ls. | $450,000 |
| Apr 4, 2006 | Completed final sign-off Jun 2006 | 405 Howard St | Hathaway Dinwiddie Co. | fire alarm work associated with pa# 200601091737, relocation of 6 strobes on the 6th floor.Details
fire alarm work associated with pa# 200601091737, relocation of 6 strobes on the 6th floor. | $5,000 |
| Mar 30, 2006 | Completed final sign-off Jun 2006 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system, 6 new sprinklers, 5 relocated sprinklers.Details
existing fire sprinkler system, 6 new sprinklers, 5 relocated sprinklers. | $1,200 |
| Mar 9, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | Hathaway Dinwiddie Co. | oti-2 rev. 6th floor el.Details
oti-2 rev. 6th floor el. | $32,000 |
| Mar 7, 2006 | Completed final sign-off Jun 2006 | 405 Howard St | revision to oti-1 6th floor. revision to appl#200601091737 new location of private office,change in dimensions of private offices & pantry,change in finishes.change in lighting layout & fixture type.Details
revision to oti-1 6th floor. revision to appl#200601091737 new location of private office,change in dimensions of private offices & pantry,change in finishes.change in lighting layout & fixture type. | $12,000 | |
| Jan 12, 2006 | Expired or cancelled expired Apr 2008 | 405 Howard St | scope of work for this project:install panic hardware for path of egress a3/a2.1,establish occupant load: floors 8 & 10. strobe installation to be submitted under seperate permit.Details
scope of work for this project:install panic hardware for path of egress a3/a2.1,establish occupant load: floors 8 & 10. strobe installation to be submitted under seperate permit. | $10,000 | |
| Jan 9, 2006 | Expired or cancelled expired Aug 2008 | 405 Howard St | oti-1 6th /fl-el,me,ls, sp.Details
oti-1 6th /fl-el,me,ls, sp. | $135,000 | |
| Jan 9, 2006 | Expired or cancelled expired Jan 2009 | 405 Howard St | oti-2 6th floor, el,meDetails
oti-2 6th floor, el,me | $50,000 | |
| Dec 29, 2005 | Completed final sign-off Sep 2006 | 405 Howard St | Decker Electric Co Inc Electrical Contra | add (4) smok d. (4) door h. (1) spr/strobe. 1st floor lobbyDetails
add (4) smok d. (4) door h. (1) spr/strobe. 1st floor lobby | $6,000 |
| Nov 16, 2005 | Completed final sign-off Apr 2006 | 405 Howard St | revision to apprvd pa#200310288795. revised existing plan on 1st floor.Details
revision to apprvd pa#200310288795. revised existing plan on 1st floor. | ||
| Nov 15, 2005 | Completed final sign-off Apr 2006 | 405 Howard St | install 10 granite nblocksw/staniles steel fins at plazaDetails
install 10 granite nblocksw/staniles steel fins at plaza | $18,000 | |
| Sep 28, 2005 | Completed final sign-off Nov 2006 | 405 Howard St | remove selected shotcrete and replace with windows to match existing conditions.Details
remove selected shotcrete and replace with windows to match existing conditions. | $150,000 | |
| Aug 4, 2005 | Completed final sign-off Jan 2006 | 405 Howard St | Bcci Construction Company | this permit is to show the location of fire hose cabinets as requested by sffd for floor 3Details
this permit is to show the location of fire hose cabinets as requested by sffd for floor 3 | |
| Aug 3, 2005 | Completed final sign-off Mar 2006 | 405 Howard St | Bcci Construction Company | this permit is for the sffd to establish occupant look at the (e) atrim area.Details
this permit is for the sffd to establish occupant look at the (e) atrim area. | |
| Jul 22, 2005 | Completed final sign-off Jan 2006 | 405 Howard St | Bcci Construction Company | oti-3, 3rd floor, ls, sp.Details
oti-3, 3rd floor, ls, sp. | $109,000 |
| May 11, 2005 | Completed final sign-off Apr 2006 | 405 Howard St | Bcci Construction Company | structural work associated with oti-1, pa# 2005/04/28/1039. this work comprised framing for ramp &Details
structural work associated with oti-1, pa# 2005/04/28/1039. this work comprised framing for ramp & | $40,000 |
| Apr 27, 2005 | Completed final sign-off Apr 2006 | 405 Howard St | Bcci Construction Company | oti-1-el, me, ls, sp (3rd fl)Details
oti-1-el, me, ls, sp (3rd fl) | $1,750,000 |
| Apr 27, 2005 | Completed final sign-off Jan 2006 | 405 Howard St | Bcci Construction Company | oti-2, 3rd/fl, el,me.Details
oti-2, 3rd/fl, el,me. | $950,000 |
| Feb 28, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Wcp Svcs, Dba: Venture Builders | ot1-2 1st floor el spDetails
ot1-2 1st floor el sp | $11,000 |
| Feb 3, 2005 | Expired or cancelled cancelled Nov 2024 | 405 Howard St | renew for final 200109279329Details
renew for final 200109279329 | ||
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renew for final 200109087859Details
renew for final 200109087859 | |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renew for final 200209136385Details
renew for final 200209136385 | |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renew appl#200208194290 for final inspectionDetails
renew appl#200208194290 for final inspection | |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renew appl#200202280260 for final inspectionDetails
renew appl#200202280260 for final inspection | |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renew appl#200009271638 & 200002232499 for final inspectionDetails
renew appl#200009271638 & 200002232499 for final inspection | |
| Feb 3, 2005 | Completed final sign-off Apr 2005 | 405 Howard St | Webcor Construction Lp | renew for final 200109279329Details
renew for final 200109279329 | |
| Feb 2, 2005 | Completed final sign-off Mar 2005 | 405 Howard St | Webcor Construction Lp | renewal for final 200002172133Details
renewal for final 200002172133 | |
| Oct 20, 2004 | Never finaled issued Oct 2004, no final | 405 Howard St | street spaceDetails
street space | ||
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 405 Howard St | Critchfield Mechanical Inc | add air into elevator lobby with 2 floor slot diffusers/add 1 fire smoke damperDetails
add air into elevator lobby with 2 floor slot diffusers/add 1 fire smoke damper | $4,000 |
| Sep 29, 2004 | Completed final sign-off Mar 2005 | 405 Howard St | Wcp Svcs, Dba: Venture Builders | oti-1, 1st floor, el, me, ls, spDetails
oti-1, 1st floor, el, me, ls, sp | $65,000 |
| Aug 25, 2004 | Expired or cancelled expired Jan 2007 | 405 Howard St | oti-2 (4th floor) el/meDetails
oti-2 (4th floor) el/me | $100,000 | |
| Aug 25, 2004 | Expired or cancelled expired Jan 2007 | 405 Howard St | oti-1 (4th floor) el, me, ls. spDetails
oti-1 (4th floor) el, me, ls. sp | $200,000 | |
| Jul 8, 2004 | Never finaled issued Jul 2004, no final | 405 Howard St | street spaceDetails
street space | ||
| Jun 29, 2004 | Expired or cancelled expired Sep 2006 | 405 Howard St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of (1) automatic smog hog fire suppression system on 8th floorDetails
installation of (1) automatic smog hog fire suppression system on 8th floor | $3,575 |
| Jun 28, 2004 | Completed final sign-off Jul 2004 | 405 Howard St | Dpw Inc. | as built sprinkler planning permt#200307184834 no work under this permit.Details
as built sprinkler planning permt#200307184834 no work under this permit. | |
| Jun 24, 2004 | Expired or cancelled expired Aug 2006 | 405 Howard St | Webcor Construction Lp | to erect electrical signDetails
to erect electrical sign | $40,000 |
| Jun 17, 2004 | Expired or cancelled expired Sep 2006 | 405 Howard St | Swinerton Builders | fire alarm upgrade to existing fire alarm system-floors-1,7,8,9,10.Details
fire alarm upgrade to existing fire alarm system-floors-1,7,8,9,10. | $200,000 |
| Apr 30, 2004 | Expired or cancelled expired Sep 2006 | 405 Howard St | Ayoob & Peery Plumbing Co Inc | fire sprinkler heads add & relocated (1st , 7,8,9, & 10 floor) . pre-action system at 7th flDetails
fire sprinkler heads add & relocated (1st , 7,8,9, & 10 floor) . pre-action system at 7th fl | $98,500 |
| Apr 7, 2004 | Expired or cancelled expired Sep 2006 | 405 Howard St | Aaa Restaurant Fire Control/Dba Aaa Fire | install (1) automatic, fire suppression system @ sting hood & duck on the 8th floorDetails
install (1) automatic, fire suppression system @ sting hood & duck on the 8th floor | $2,900 |
| Mar 18, 2004 | Expired or cancelled expired Jul 2007 | 405 Howard St | new communcating stairfrom floors 8 to 9 enclosed in a two hour seperationDetails
new communcating stairfrom floors 8 to 9 enclosed in a two hour seperation | $30,000 | |
| Mar 17, 2004 | Expired or cancelled expired Sep 2006 | 405 Howard St | Intelligent Technologies & Services Inc | install new hfc-227 ea (fm200)/pre-action system on 7/f network rm no increase in office spaceDetails
install new hfc-227 ea (fm200)/pre-action system on 7/f network rm no increase in office space | $6,000 |
| Dec 23, 2003 | Expired or cancelled expired Jul 2007 | 405 Howard St | interior demo for tenant improvement (pa 20031028879s)-multiple flr openings check fro shafts on intDetails
interior demo for tenant improvement (pa 20031028879s)-multiple flr openings check fro shafts on int | $15,000 | |
| Oct 28, 2003 | Expired or cancelled expired Oct 2006 | 405 Howard St | Swinerton Builders | tenant improvements (law offices) on flr 1 (partial)7,8,9,10 incl gen offices,conference,com'l kitchDetails
tenant improvements (law offices) on flr 1 (partial)7,8,9,10 incl gen offices,conference,com'l kitch | $15,500,000 |
| Aug 1, 2003 | Completed final sign-off Jul 2004 | 405 Howard St | Metropolitan Electrical Construction | 5/f t.i.- new life safety system, 2 smoke detectors, 29 speaker/strobes, 8 strobes, 1 duct detectorDetails
5/f t.i.- new life safety system, 2 smoke detectors, 29 speaker/strobes, 8 strobes, 1 duct detector | $25,000 |
| Jul 31, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | revision to oti-1 app 200305094198, 5th floor, add one new wallDetails
revision to oti-1 app 200305094198, 5th floor, add one new wall | $5,000 | |
| Jul 31, 2003 | Expired or cancelled expired Oct 2006 | 405 Howard St | Swinerton Builders | oti-1 9th floor, el, me, ls, spDetails
oti-1 9th floor, el, me, ls, sp | $40,000 |
| Jul 31, 2003 | Expired or cancelled expired Oct 2006 | 405 Howard St | Swinerton Builders | oti-2 9th floorDetails
oti-2 9th floor | $20,000 |
| Jul 18, 2003 | Completed final sign-off Jul 2004 | 405 Howard St | Dpw Inc. | add (136) new sprinkler head and plug-off (25) for new walls & ceilings for new t.i work on 5th flDetails
add (136) new sprinkler head and plug-off (25) for new walls & ceilings for new t.i work on 5th fl | $15,000 |
| Jun 4, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | Dynalectric Company | oti-3 5th fl lsDetails
oti-3 5th fl ls | $55,000 |
| May 9, 2003 | Completed final sign-off Jul 2004 | 405 Howard St | oti-2 5th floor, el, meDetails
oti-2 5th floor, el, me | $300,000 | |
| May 9, 2003 | Completed final sign-off Sep 2004 | 405 Howard St | oti-1 5th floor, el, me, ls, spDetails
oti-1 5th floor, el, me, ls, sp | $162,000 | |
| Apr 25, 2003 | Never finaled issued Apr 2003, no final | 405 Howard St | Cupertino Electric Inc. | adding card readers-door release and smoke detectors-addition/rev to org app 200302107027Details
adding card readers-door release and smoke detectors-addition/rev to org app 200302107027 | $5,000 |
| Feb 14, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | Intelligent Technologies & Services Inc | installation of hfc 227ea fm200 in 6th floor server roomDetails
installation of hfc 227ea fm200 in 6th floor server room | $5,000 |
| Feb 10, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | Cupertino Electric Inc. | fire alarm devices for tenant build out on 6/fDetails
fire alarm devices for tenant build out on 6/f | $40,000 |
| Feb 10, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | Cupertino Electric Inc. | fire alarm build out of corridor and elevator lobbies on 6th floorDetails
fire alarm build out of corridor and elevator lobbies on 6th floor | $25,000 |
| Jan 30, 2003 | Expired or cancelled expired Aug 2008 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 6/fl- provide tenant fire protection work, sprinkler system, total 46 headsDetails
6/fl- provide tenant fire protection work, sprinkler system, total 46 heads | $34,000 |
| Jan 9, 2003 | Never finaled issued Jan 2003, no final | 405 Howard St | ti for elevator lobby &new corridor on 6/fl only.Details
ti for elevator lobby &new corridor on 6/fl only. | $34,000 | |
| Dec 30, 2002 | Expired or cancelled expired Aug 2008 | 405 Howard St | mechanical 6/f equipment only no duct work the following work under separate bldg permit 1) ductworkDetails
mechanical 6/f equipment only no duct work the following work under separate bldg permit 1) ductwork | $470,000 | |
| Dec 20, 2002 | Expired or cancelled expired Aug 2008 | 405 Howard St | provide electrical on the 6th floorDetails
provide electrical on the 6th floor | $330,000 | |
| Dec 20, 2002 | Never finaled issued Dec 2002, no final | 405 Howard St | tenant build out for 6/f interior finishes partitions flooring cabinetry and acoustical ceiling gridDetails
tenant build out for 6/f interior finishes partitions flooring cabinetry and acoustical ceiling grid | $400,000 | |
| Nov 22, 2002 | Expired or cancelled withdrawn Jan 2003 | 405 Howard St | build out med on partial 6th fl. restoration furniture tobe submittted under separated permitDetails
build out med on partial 6th fl. restoration furniture tobe submittted under separated permit | $2,860,000 | |
| Sep 13, 2002 | Expired or cancelled expired Mar 2005 | 405 Howard St | reduce scope of work on 200002172133s for mechanical and electricalDetails
reduce scope of work on 200002172133s for mechanical and electrical | ||
| Aug 19, 2002 | Expired or cancelled expired Mar 2005 | 405 Howard St | 3 new canopies-1 canopy on howard st side & 2 canopies on 1st street side incl support glazingDetails
3 new canopies-1 canopy on howard st side & 2 canopies on 1st street side incl support glazing | $75,000 | |
| May 21, 2002 | Never finaled issued Sep 2002, no final | 405 Howard St | reduce the scope of work as provided on app #2000021712133s in order to obtain temporary permit occuDetails
reduce the scope of work as provided on app #2000021712133s in order to obtain temporary permit occu | ||
| Mar 8, 2002 | Never finaled issued May 2002, no final | 405 Howard St | provide emergency generator and fuel tank per planDetails
provide emergency generator and fuel tank per plan | $50,000 | |
| Feb 28, 2002 | Expired or cancelled expired Mar 2005 | 405 Howard St | revision to pa200002172133s3, to provide stair detailDetails
revision to pa200002172133s3, to provide stair detail | ||
| Sep 27, 2001 | Expired or cancelled expired Apr 2005 | 405 Howard St | revision to app #200002172133 design-build exterior skin shop per plansDetails
revision to app #200002172133 design-build exterior skin shop per plans | ||
| Sep 8, 2001 | Expired or cancelled expired Mar 2005 | 405 Howard St | provide fire sprinklers per plansDetails
provide fire sprinklers per plans | ||
| Sep 27, 2000 | Expired or cancelled expired Mar 2005 | 405 Howard St | install tower craneDetails
install tower crane | $45,000 | |
| Jul 10, 2000 | Expired or cancelled expired Nov 2000 | 401 Howard St | street spaceDetails
street space | ||
| Mar 16, 2000 | Completed final sign-off Mar 2005 | 401 Howard St | to demolishDetails
to demolish | ||
| Feb 23, 2000 | Expired or cancelled expired Mar 2005 | 405 Howard St | provide temporary shoringDetails
provide temporary shoring | $20,000 | |
| Feb 17, 2000 | Completed final sign-off Mar 2005 | 405 Howard St | to erect officeDetails
to erect office | $14,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gci, Inc (19), Bcci Construction Company (12), Diversified Fire Products (9), Swinerton Builders (9), Dpr Construction Inc (8), Webcor Construction Lp (8), Plant Construction Co, Lp (5), Cupertino Electric Inc. (4), Intelligent Technologies & Services Inc (4), Aaa Restaurant Fire Control/Dba Aaa Fire (3), Allied Fire Protection (3), Decker Electric Co Inc Electrical Contra (3), Hathaway Dinwiddie Co. (3), Mc Millan Electric (3), Plant Construction Company Lp (3), Wcp Svcs, Dba: Venture Builders (3), Anderson, Rowe & Buckley, Inc. (2), Dpw Inc. (2), Red Hawk Fire & Security Ca Llc (2), Ayoob & Peery Plumbing Co Inc, Critchfield Mechanical Inc, Dpr Construction, Dynalectric Company, Field Construction Inc., Fuel Oil System, Geo M Robinson & Co, Metropolitan Electrical Construction, Novo Construction Inc, Paradigm General Contractors
- Architects
- Erik Suebekrop (8), Darry T. Roberson (2), Studio Arch. (2), David Auch, Dfp Dfp, Ed Rivera, Julie Heidbreder, Keith Hooks, Michael Wilson, Stephen Glatt, Studio J Architecture, William Loftis
- Engineers
- Kristina Martin (2), Peter Mchugh (2), Susanna M. See (2), Diversified Fire Protection, Julie Heidbreder, Mechanical Design Mechanical Design, Nisiakian Engineers
- Attorneys
- Kristina Martin
- Authorized agent-otherss
- Tiffany Redding
- Lessees
- M Melissa Duffy
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.