Studio J Architecture
- Listed as
- architect
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2006 to Aug 2016
6 permits since 2000 (architect on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2016 | Completed final sign-off Jan 2017 | 3774 23rd St | new bedroom on 1st floor, relocate hvac & water heaterDetails
new bedroom on 1st floor, relocate hvac & water heater | $20,000 | |
| May 7, 2013 | Completed final sign-off Aug 2013 | 4 Embarcadero Center | Field Construction Inc. | 25th floor selective renovation including partial demo of one partition, additoin of one partition, relocation of existing door, addition of power & data, patch & repair of walls, floors & ceilings.Details
25th floor selective renovation including partial demo of one partition, additoin of one partition, relocation of existing door, addition of power & data, patch & repair of walls, floors & ceilings. | $33,000 |
| Oct 7, 2008 | Never finaled issued Oct 2008, no final | 1 Market St | Hathaway Dinwiddie Co. | t. i. at 11th fl: non-structural demo & new partitions, interior finishes, mechanical & electrical, no plumbing work. fire alarm & sprinklers under separate permit. new fire/smoke dampers....Details
t. i. at 11th fl: non-structural demo & new partitions, interior finishes, mechanical & electrical, no plumbing work. fire alarm & sprinklers under separate permit. new fire/smoke dampers.... | $300,000 |
| Dec 31, 2007 | Completed final sign-off Feb 2008 | 1 Market St | Hathaway Dinwiddie Co. | 3rd fl, spear tower - revision to p/a #200712201010. rename entry suite from reception area to secretarial due to fact "morgan lewis" law firm reception occurs on 28th floor. change discussed with inspector tam chiu. clarify building story count 43 not 10 as stated in p/a #2007.12.20.1010.Details
3rd fl, spear tower - revision to p/a #200712201010. rename entry suite from reception area to secretarial due to fact "morgan lewis" law firm reception occurs on 28th floor. change discussed with inspector tam chiu. clarify building story count 43 not 10 as stated in p/a #2007.12.20.1010. | |
| Apr 18, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | Bcci Construction Company | oti-1, 4th floor, el, me, ls, sp t.i. for office use.Details
oti-1, 4th floor, el, me, ls, sp t.i. for office use. | $1,300,000 |
| Jan 12, 2006 | Expired or cancelled expired Apr 2008 | 405 Howard St | scope of work for this project:install panic hardware for path of egress a3/a2.1,establish occupant load: floors 8 & 10. strobe installation to be submitted under seperate permit.Details
scope of work for this project:install panic hardware for path of egress a3/a2.1,establish occupant load: floors 8 & 10. strobe installation to be submitted under seperate permit. | $10,000 |