Block 3713, lot 006
1 Market St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress | 1 Market St | Peacock Construction | deffered m.e.p. for bpa#202604079021 | $15,000 |
| Jul 22, 2026 | In progress | 1 Market St | Thomas Swan Sign Co Inc | install evacuation maps on floors 17 & 18 | $2,000 |
| Jul 10, 2026 | In progress | 1 Market St | 1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space | $1,491,000 | |
| May 12, 2026 | In progress | 1 Market St | 6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural. | $3,000,000 | |
| Apr 7, 2026 | In progress | 1 Market St | Peacock Construction | fl b7: interior renovation retail space w/ new non-structural partitions, storefront, ceiling, lighting, millwork & finishes. | $50,000 |
| Jan 13, 2026 | Completed | 1 Market St | Phase One Fire Life Safety Systems Inc | arch permit #2025-1126-0516: add 1 ceiling mounted speaker strobe in the mail storage room. one device will be added to (e) fire alarm system. | $6,131 |
| Dec 10, 2025 | In progress | 1 Market St | Bcci Construction Company | 10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures | $30,000 |
| Nov 26, 2025 | Completed | 1 Market St | United Systems Fire And Security Llc | as built ref 202510107159 scope providing addresses for initiating devices | |
| Nov 26, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 2nd fl: fire sprinkler as-built. relocates (2), delete (01), total (02). apn#202506189022 fp#202509125167 | |
| Nov 26, 2025 | Completed | 1 Market St | Bcci Construction Company | 3/f: empty office space to be converted into a mail room. new door with card reader added. | $15,000 |
| Oct 31, 2025 | In progress | 1 Market St | Cosco Fire Protection Inc. | revision to pa # 2025-0109-8015 : address ahj comments, add 3 abb relays to connect fire alarm system to scada for monitoring | $10,300 |
| Oct 27, 2025 | Completed | 1 Market St | Dpr Construction A | level 2 revision to pa # 2025-0618-9024. dph food service scope. | |
| Oct 10, 2025 | Completed | 1 Market St | Dpr Construction A | level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted. | |
| Oct 10, 2025 | In progress | 1 Market St | United Systems Fire And Security Llc | installation of new strobes and speaker/storbe per code. new fire alarm notification appliances to be connected to the existing remple power supplies and existing speaker circuits. instalaation of 2 contril relays for music shut down. installation of duct detector & control relay 2 new heat pumps. | $4,188 |
| Oct 10, 2025 | In progress | 1 Market St | United Systems Fire And Security Llc | level 4; installation of new strobes and speaker/strobes per code , new alarm notification appliances connected to the existing remote power supply and existing speaker circuits. ref#: 202506037804 | $16,293 |
| Sep 26, 2025 | In progress | 1 Market St | Dpr Construction A | 4/fl- ti demo (e) and install (n) partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures. | $387,128 |
| Sep 12, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 2th floor: existing fire sprinkler ti, building permit 202506189022, total relocated pendent 14; total added pendent 17, total 31 | $15,500 |
| Sep 12, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler ti: relocate 13, add 9, total : 22 | $7,634 |
| Sep 10, 2025 | Completed | 1 Market St | Dpr Construction A | level 2 - revision to pa 202506189024. minor reivisons to lighting. | |
| Aug 14, 2025 | In progress | 1 Market St | Dpr Construction A | l5: revision to pa# 202506209163. t.i. deleting facilities qu lab rooms from scope. new taining room, catering pantry, and breakd area. dph on seperate permit.no exterior work. demo and new partitions. | $2,229,805 |
| Aug 14, 2025 | In progress | 1 Market St | Dpr Construction A | l2: t.i. to demo and install new partitions, millwork, finishes, mep. new rent space, catering pantry, no exterior. dph on seperate permit. | $1,964,650 |
| Jun 20, 2025 | In progress | 1 Market St | Dpr Construction A | level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior. | $693,000 |
| Jun 18, 2025 | Completed | 1 Market St | Dpr Construction A | 2/fl-ref demo permit 202505237202- ti (n) partitions, finishes, millwork, bathrooms, no exterior work. | $2,060,000 |
| Jun 18, 2025 | Completed | 1 Market St | Dpr Construction A | 2/fl-revision 202505237202- reduction of soft demo area | |
| Jun 3, 2025 | Completed | 1 Market St | Dpr Construction A | l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work. | $105,000 |
| Jun 2, 2025 | In progress | 1 Market St | Anderson, Rowe & Buckley, Inc. | upturn 127 fire sprinkler heads for core and shell conditions. | $31,750 |
| May 23, 2025 | Completed | 1 Market St | Dpr Construction A | 4th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $18,000 |
| May 23, 2025 | Completed | 1 Market St | Dpr Construction A | level 2 soft demo only. no exterior, structural, ceiling demo. ab017. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $150,000 |
| May 23, 2025 | In progress | 1 Market St | Dpr Construction A | 5th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $40,000 |
| Apr 29, 2025 | In progress | 1 Market St | United Systems Fire And Security Llc | 7/f - as built plan for ref permit 202503212736. replacing (1) monitor module to (1) control relay for wshp unit cold water supply shut off valve shutdown. | |
| Apr 3, 2025 | In progress | 1 Market St | Siemens Industry, Inc. | fl/35a: fire alarm for the "wsgr" remodel on floor 35a done under pa#2024-1010-2710 and pa#2024-1216-6922, additions abe 8 smoke detectors, 1 module, 35 speakers/strobes, 8 strobes, and a strobe power supply,3 smoke detectors and duct detectors are also relocated. | $57,000 |
| Mar 24, 2025 | Completed | 1 Market St | R L H Fire Protection Inc | 12th/fl: fire sprinklers permit relocate 37 , add 7 and delete 9 sprinklers on the ti#2024-1223-7318. | $15,000 |
| Mar 21, 2025 | Completed | 1 Market St | United Systems Fire And Security Llc | 7th fl - provide (1) monitor module for new wshp unit cold water supply shut-off valve. ref pa 202412025921 | $5,131 |
| Jan 16, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 35th existing fire sprinkler system - ti 184 relocate, 3 added, & 2 removed fire sprinklers. ref pa 202410102710 | $46,000 |
| Jan 9, 2025 | In progress | 1 Market St | Cosco Fire Protection Inc. | rooms#: 362; replacing the existing clean agent monitoring system with a new monitoring system at room#: 362. fire alarm. | $38,360 |
| Jan 7, 2025 | Completed | 1 Market St | Dpr Construction A | 7/fl- ref 202412025921- to support approved arch permit to include (n) heat pump, lighting, plumbing for employee cafe | $250,000 |
| Dec 6, 2024 | Expired or cancelled | 1 Market St | spear tower - 2nd fl ti construction of soffit/ceiling. all new or revised mep, life safety work will be design build and submitted for permit separately (bldg fully sprinklered) | $15,000 | |
| Dec 2, 2024 | Completed | 1 Market St | Dpr Construction A | 7th floor: remove and replace finishes and equipment in commercial kitchen. mep def. | $210,000 |
| Nov 8, 2024 | Completed | 1 Market St | United Systems Fire And Security Llc | 11th fl - 4 new door holders to be provided for double doors at the c110 corridor door holders to be installed by other. provide 2 addressable smoke detectors. provide 1 relay module for door holders control | $8,004 |
| Nov 8, 2024 | Completed | 1 Market St | United Systems Fire And Security Llc | revised mechanical for 202407317623. pendant mounted smoke detectors to be installed for 5 new smoke dampers. provide 1 control relay for fsd shutdown. provide 1 control relay for supply fan 1 control relay for building exhaust fan located on the east side of the building. | $5,680 |
| Nov 7, 2024 | Completed | 1 Market St | Pioneer Fire Inc. | remove remaining fire hose racks (class ii)( from the 1st and 2nd basements. 2nd basement -remove 8 cabinets/racks, 1st basement -remove 4 cabinets /racks | |
| Oct 16, 2024 | Completed | 1 Market St | Source Planning And Construction Inc | basement lvl ref pa # 2024-0820-9023 mechanical demo of existing duct & install new fsd | $25,000 |
| Oct 10, 2024 | Completed | 1 Market St | Dpr Construction A | 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational | $3,760,780 |
| Aug 20, 2024 | Completed | 1 Market St | Source Planning And Construction Inc | revision to pa # 2024-0606-3882 basement level to incorporate powered mobility devices & required updates to meet fire code section 325. no plumbing or mechanical in scope. fire sprinkler, life safety & electrical under separate permit | $55,000 |
| Jul 31, 2024 | Completed | 1 Market St | United Systems Fire And Security Llc | installation of (4) ceiling mounted speaker/strobe. new fire alarm devices to be connected to existing speaker and strobe circuits. | $18,500 |
| Jun 6, 2024 | Completed | 1 Market St | Source Planning And Construction Inc | bike storage ti to include (n) 8' chain link fence and storage room for bikes and (n) finishes located in basement. no mep work | $250,000 |
| Apr 29, 2024 | Completed | 1 Market St | Bcci Construction Company | tenant improvement. include installing a new heat pump ref pa 202311160890 | |
| Mar 29, 2024 | Completed | 1 Market St | United Systems Fire And Security Llc | 5th fl. installation of new duct detector for heat pump and new high power control relaly for shutdown | $8,400 |
| Feb 14, 2024 | Completed | 1 Market St | Pribuss Engineering Inc | 1/f: reconfigure existing sprinklers and pipe at vault area and vault entryway for removal of the walls and vault on 1st flr. total sprinklers 2. ref pa# 202308083934 & 202307263012. | $1,028 |
| Jan 29, 2024 | In progress | 1 Market St | interior ti of existing restaurant. no exterior work proposed. modify existing interio bar area, equpment and furniture. new low height partitions, new plumbing and electrical connections at the new bar area, and associated ada path of travel improvements as required. | $75,000 | |
| Dec 14, 2023 | Completed | 1 Market St | Golden Gate Fire Protection Inc | add 1 pendent and add 1 upright on the 2nd fl. | $2,000 |
| Dec 12, 2023 | In progress | 1 Market St | Anderson, Rowe & Buckley, Inc. | new mechanical vav on 3rd and 4th floors, ductwork and diffusers | $20,000 |
| Nov 16, 2023 | In progress | 1 Market St | Anderson, Rowe & Buckley, Inc. | landmark bldg: new mechanical water source packaged heat pump, piping, duct and diffusers. | $20,000 |
| Oct 24, 2023 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 25/f: fire sprinklers, relocate 4 concelaed pendents in restrooms. ref t.i #202310068155 | $2,480 |
| Aug 23, 2023 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 16/f: fire sprinklers, relocate 91 pendents, 19 concelaed pendents and 1 upright, ref pa# 202305016775. | $68,820 |
| Jul 24, 2023 | Completed | 1 Market St | Gci, Inc | revision to 202201316997 e toilet rooms refresh new finishes, fixtures and accessories. note any new fixtures or accessories intalled in the same locations as existing and will comply with accessibiltiy clearances requirements | |
| Jul 24, 2023 | Completed | 1 Market St | Gci, Inc | revision to 202201266664 e toiolet rooms refresh new finishes, fixtures and accessories. note any new fixtures or acessories will be installed in the same location as ex and comply with accessibility clearances and requirements | |
| Jul 17, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | 12/f - suite 1280: fire only work for remodel on floor 12b. additions are 3 speaker/strobes and 3 strobes. ref permit 202304175806 | $4,746 |
| Jul 6, 2023 | Completed | 1 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 16 pendants & relocate 5 concealed pendents. ref ti pa 202304175806 | $13,020 |
| May 23, 2023 | Never finaled | 1 Market St | Maguire Inc Dba Lahue And Associates | 39/f: 4-evacuation signs fire only | $1,690 |
| May 18, 2023 | Completed | 1 Market St | Gci, Inc | suite 1225: mech - demo (e) duct, instll new vav/duct; install new ddc controls, air balance. electrical - lighting, ckt / controls, power & signal devices & wriing. ref t.i. pa 202304175806. | $125,000 |
| Apr 20, 2023 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - add 2 pendents and relocate 43 pendents for thoma bravo fitness circles (1st fl) | $26,500 |
| Apr 17, 2023 | Completed | 1 Market St | Gci, Inc | 12/f ste 1208 & 1225: t.i. on existing multi tenant space, work includes selective demo and construction of non-structural partitions, ceilings, finishes, structural work for anchorage of furniture, mep & fire life safety under separate permit. | $500,000 |
| Mar 21, 2023 | Completed | 1 Market St | Gci, Inc | floors 36, 40, 41, & 42: equivalent facilitation request. signage to direct individual to a room that provides acoustic privacy for phone calls as provided by previously approved phone booths. ref permits: 202111232986, 202201316997, 202201276745, 202201266664 | |
| Feb 24, 2023 | Never finaled | 1 Market St | Gci, Inc | 2nd fl - ti includes construction of non-structural glass partitions and unlocked doors. building is fully sprinklered (project's 200 sf); ref 2021-1220-4683 | $15,000 |
| Feb 14, 2023 | Completed | 1 Market St | Intelligent Technologies & Services Inc | 40/flr server room 4018: supply & install 1-complete pre-action detection & control system; sprinkler pa# 202210255111; arch pa# 202201266664 | $25,000 |
| Jan 30, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work for the "thomas bravo" remodel on floor 23a; additions are (6) smoke detectors, (1) modules, (40) speaker/strobes, (12) strobes, and the relocation of (6) smoke detectors, ref permit app# 202207057745. | $50,812 |
| Jan 30, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work for the "thomas bravo" remodel on floor 24a; additions are (6) smoke detectors, (2) modules, (37) speaker/strobes, (14) strobes, and the relocation of (6) smoke detectors, ref peermit app# 202207118174. | $49,771 |
| Jan 18, 2023 | Never finaled | 1 Market St | Gci, Inc | 40th fl - revision to pa 2022-0126-6664 install new fire smoke damper at new shaft penetration. connect all new fsds to a new dedicated emergency circuit to existing panel | |
| Jan 6, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | floor 12b - fire only work for the parnassus phase 1" . additions are 6 speaker/strobes and 1 strobe ref pa 2022-0908-2046 | $4,350 |
| Dec 22, 2022 | Never finaled | 1 Market St | Dorado Enterprises | modify exterior patio. no change in interior occuant load. new furntiure/umbrellas for the (e) patio area and new folding doors between the patio and dining area. the new total occupant load is shown in egress plan. ref approved t.i. under 202201135898. | $80,000 |
| Dec 15, 2022 | Completed | 1 Market St | Pioneer Fire Inc. | 17th fl: add (8) pendents, (11) uprights, convert (2) pendents to sidewall, (39) pendents to uprights, relocate (81) pendents, remove (14) pendents. gci 202211075982. | $17,100 |
| Dec 5, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | 2a/flr: fire only work for the "autodesk" conference area. additions are 1- speaker/strobe and 4 strobes, ref pa# 2022-0719-8781. | $2,835 |
| Nov 29, 2022 | Completed | 1 Market St | Golden Gate Fire Protection Inc | fire sprinklers: relocate (32) pendent sprinklers and add (2) pendents on the 12th fl. ref ti pa# 202209082046. | $17,850 |
| Nov 9, 2022 | Completed | 1 Market St | Gci, Inc | revision to pa 2022-0719-8781 to change scullery sink from ada to non ada | |
| Oct 18, 2022 | Completed | 1 Market St | Gci, Inc | 12th floor: mechanical 6 vav boxes, 1 exhaust fan, install duct work, insulationa, ddc controls, electrical power , lighting, signal ref#202209082046 | $150,000 |
| Sep 23, 2022 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. 23rd fl - relocate (172) add (8) heads, remove (4) total (180). 24th fl - relocate (170), add (3), remove (5) total (173). total of 353 hd. | $176,500 |
| Sep 8, 2022 | Completed | 1 Market St | Gci, Inc | suite 1225: t.i. on the 12/f to include selectrive demo and construction of non-structural partitoin, ceiling, finishes, mep, life safety under sep permit. | $700,000 |
| Sep 6, 2022 | Completed | 1 Market St | Pioneer Fire Inc. | 2/f: relocate 4 upright fire sprinklers, 1 pendent, add 2 upright fire sprinklers due to ti. pa 202207198781. | $1,400 |
| Aug 15, 2022 | Never finaled | 1 Market St | Siemens Industry, Inc. | fire only work for the "stk steakhouse" on the street level, additions are 7 speaker/strobes; ref permit app 202201135898 | $4,440 |
| Aug 9, 2022 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 9/f: fire sprinkler only. relocate (8) pendents & add (1) for visa @ 1 market street steuart tower. ref bpa#202206146265 | $4,500 |
| Aug 4, 2022 | Never finaled | 1 Market St | International Fire Equipment Co Incorpor | ul300 coverage for new kitchen equipment two (e) ul30 fire systems ref pa# 2022-0113-5898 | $10,000 |
| Jul 20, 2022 | Completed | 1 Market St | Skyline Construction | 23/flr mep for bpa 202207057745. | |
| Jul 19, 2022 | Completed | 1 Market St | Gci, Inc | t.i. 2nd/f- non structural partitions, ceilings, flooring & lighting fixtures. | $2,000,000 |
| Jul 19, 2022 | Completed | 1 Market St | Dpr Construction A | 9/f: deferred mechanical sheets for t.i. pa202206146265. | $35,000 |
| Jul 14, 2022 | Completed | 1 Market St | Intelligent Technologies & Services Inc | 41/f and 42/f: supply and install pre-action detection and control systems. (1) on 41st floor ups room # 4125 and (1) on 42 floor server room #4237 | $38,106 |
| Jun 30, 2022 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 1st fl - fire sprinkler only relocate 12 pendents & 58 uprights for the steakhouse. ref pa 2022-0113-5898 | $35,000 |
| Jun 28, 2022 | Completed | 1 Market St | Gci, Inc | 2nd fl - demo of some non structural partitions ceiling flooring etc in areas where existing ceiling is to be removed. existing sprinkler heads shall be turned up under separate permit 2022-0817-6554. all revised mep life safety work will be design build & submitted separately | $8,000 |
| Jun 17, 2022 | Completed | 1 Market St | Pioneer Fire Inc. | 2nd floor(spear tower): remove extg pendents in order to return suite to warm shell condition. | $6,450 |
| Jun 14, 2022 | Completed | 1 Market St | Gci, Inc | demolition of the communicating stiar and intemediary landing between 39th floor and 40th floor. | $145,000 |
| Jun 14, 2022 | Completed | 1 Market St | Dpr Construction A | 9th fl steuart tower: tenant improvement for lease ready. include selective demolition, new finishes, new non-bearing partitions, ceilings, accessible restroom, drinking fountain upgrades and employee breakroom. no change of occupancy, no change of use. | $250,000 |
| May 12, 2022 | Expired or cancelled | 1 Market St | Decker Electric Co Inc Electrical Contra | 11/f: provide title 24 electrical documents and electrical drawings for pa20211233005. | |
| May 5, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | floor 2a: fire only work for the autodesk qa lab. additions are 1 smoke detector, 1 duct detector, and 1 relay module. ref pa# 202111041852. | $2,720 |
| May 5, 2022 | Never finaled | 1 Market St | Anderson, Rowe & Buckley, Inc. | 23th & 24th fl: fire sprinklers only, demo plan. replace pendents for upright protection. 187 heads total. | $93,500 |
| Apr 7, 2022 | Completed | 1 Market St | United Systems Fire And Security Llc | 2nd fl, room 12004: installation of new duct detector for fan coil units, heat pump & fire smoke clamper in lab room 12004. 12 relays for control power shutdown. | $16,675 |
| Mar 8, 2022 | Never finaled | 1 Market St | United Systems Fire And Security Llc | add mew audible/visual notification devices for 3rd and 6th floor. change made to permit 202111243145. as built | |
| Jan 19, 2022 | Never finaled | 1 Market St | United Systems Fire And Security Llc | additionto existing fire alarm system. add 1 relay module for a/v shtudown on 7/f. add 1 realy module for a/v shutdown for 10/f | $9,500 |
| Jan 13, 2022 | Completed | 1 Market St | Dorado Enterprises | g/f: interior t.i. for new restaurant and (e) shell building. new fixtures, finishes, new (non-structural) partitions, (e) restrooom fixtures to remain, new finishes only. (e) kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac. | $500,000 |
| Dec 20, 2021 | Completed | 1 Market St | Dpr Construction | 2/f: t.i.: mens shower compartment door and locker area changing bench. all new or revised mep, lieft safety and sprinklers will design build and sumbmitted for permit separtely if needed. | $1,200 |
| Dec 3, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work to relocate 2 speaker/strobes for a demo only job to vacate the existing tenant space. no new devices added. ref permit 202110150558. | $635 |
| Dec 3, 2021 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | ref to pa# 202111162492. (e) fire sprinkler system. t.i. add 23 pendent (9 on 3rd flr, 14 on 6th flr) & relocate 1 sprinkler 6th flr. | $13,000 |
| Nov 29, 2021 | Never finaled | 1 Market St | Bcci Construction Company | 19th, 21st, 22nd floor - mechanical and electrical revision to previously approved permits ref. 2019-1219-0040, 202008071326, 201909242582, 201911127036, 2019-0924-2584 and 2019-1112-7044. | |
| Nov 24, 2021 | Never finaled | 1 Market St | United Systems Fire And Security Llc | 3rd & 6th/f: new audiable/visual notification for 3rd amd 6th fl restrooms full heihgts amd partition added in restrooms, add new strobes for accomondate. t.i. 202111162492 | $5,000 |
| Nov 23, 2021 | Completed | 1 Market St | Gci, Inc | revise approved permit 2021-0712-4191 with limited scope only to increase occupancy count;related accessibility, egress and lighting upgrades to the 2 (e) roof decks at the 11th fl; this project includes a change of use from b-office/a-2 dining accessory to office | $50,000 |
| Nov 22, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | replace all life safety system panels and initiating devices. all notification devices will remain as installed. no reference permit. | $985,000 |
| Nov 16, 2021 | Completed | 1 Market St | Gci, Inc | 3rd and 6th floor: replacement of extg restroom partitions in multi stall restroom on l3 and 6 with full height partitions. | $150,000 |
| Nov 15, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | floor 2a: fire only work to add 4 speaker/strobes and 3 strobes for the "autodesk" northwest area remodel. ref permit 202108045809. | $4,190 |
| Nov 4, 2021 | Completed | 1 Market St | Gci, Inc | 2nd fl ti of spear-steuart tower to create server room | $40,000 |
| Nov 4, 2021 | Completed | 1 Market St | Gci, Inc | ti on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure. | $120,000 |
| Nov 1, 2021 | Never finaled | 1 Market St | Siemens Industry, Inc. | fire only work for partial area remodel on floors 33a and 34a for wslk; 1 speaker/strobe and 2 strobes are added on 34a, and6 speakers are relocated between both fls. | $1,735 |
| Oct 25, 2021 | Never finaled | 1 Market St | Dorado Enterprises | interior demo: removal of floorings, light fixture, all furniture, tables, chairs to be removed 2x2 tiles to be removed and flooring materials, gyp board to be removed per ab-017. | $40,000 |
| Oct 15, 2021 | Completed | 1 Market St | Field Construction Inc. | demo only: interior demo of non-structuralk partitions, restroom, millwork, light fixtures and finishes. ab17 to remain vacant. ref# 2021-1015-0524 | $50,000 |
| Oct 14, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as built for 202105250990 fire alarm | |
| Oct 6, 2021 | Never finaled | 1 Market St | Dpr Construction | revision to pa 2020-0926-5068 admin permit to include sffd stamps for event & exhibit spaces | |
| Sep 29, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | 27a/f: fire only work for the " day2 area" remodel on floor 27a, addition are 1 speaker/ strobe, and 1 strobe, ref 2021 0714 4345 | $1,185 |
| Sep 27, 2021 | Never finaled | 1 Market St | Siemens Industry, Inc. | 3a/f: fire only work to add a smoke detector on the one market plaza side of the entry door to the landmark building. ref. pa 202010176783. | $635 |
| Sep 27, 2021 | Completed | 1 Market St | Shield Fire Protection, Inc. | bsm & 2nd fl: elevator modification - remove machine room sprinklers & top hoist way sprinklers. | $9,878 |
| Sep 21, 2021 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 2/f: t.i. - (e) fire sprinkler system, 7 relocated upright, 7 relocated pendents, 10 change outs, 2 relocated/changed out sprinklers, ref bpa#202108045809 | $13,000 |
| Sep 16, 2021 | In progress | 1 Market St | United Systems Fire And Security Llc | 3/f: add 1 smoke detector and 1 relay for door control. | $1,200 |
| Sep 8, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as builts for permit 202001091557 (no change from original per applicant) | |
| Sep 8, 2021 | Never finaled | 1 Market St | Gci, Inc | as builts- reception area & removal of 3 doors in response to fire use permit (100832) inspection for mk | |
| Aug 24, 2021 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 4/f: ref to pa# 202105251007. existing fire sprinkler system, t.i relocate 3 pendents & 1 upright sprinkler. | $2,000 |
| Aug 16, 2021 | Completed | 1 Market St | Level 10 Construction Lp | 11/f: revision to pa 201909262834. amendment to occupancy load of exterior roof decks to 49 occupancy each. clarifying hardware on doors es101 and es1103 as existing. identifying an existing curb in path of egress as "existing/non-compliant" field condition. | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as built per 202102255393. change to evacuation plan due to interconnecting stairs pa # 2020 0612 8640 | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | 7/f: as built for permit 202006188881 to update evacuation matrix changed due to pa 202006128640 | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as-built fire drawings for pa# 202006188876. evac matrix change due to pa# 202006128640 | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as built for pa 2021-0225-5416. evac matrix updated due to interconnecting stairs pa 202006128640 | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as built per app 202007019446. update evacuation plan due to inerconnecting stairs per app# 202006128640 | |
| Aug 13, 2021 | In progress | 1 Market St | United Systems Fire And Security Llc | as-built fire drawings for pa# 202006128640. | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | as builts for pa 2020-0701-9448. evac matrix updated due to interconnecting stairs. pa 202006128640. | |
| Aug 13, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | 10/f: as builts for pa# 202006188892. interconnecting stairs, change of evacuation plans pa# 202006128640. | |
| Aug 10, 2021 | Never finaled | 1 Market St | Gci, Inc | fire only administrative review for assembly occupant load stamp for approved drawings pa# 202012019912 & 201910033475 | |
| Aug 9, 2021 | Never finaled | 1 Market St | Bcci Construction Company | 27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345. | $40,000 |
| Aug 2, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | 3/f: the addition of 1 smoke and 1 relay for door holder control. maher n/a | $1,000 |
| Jul 14, 2021 | Completed | 1 Market St | Bcci Construction Company | 27th floor: added shower room partitioned from existing storage area. mep deferred | $157,075 |
| Jul 12, 2021 | Completed | 1 Market St | Level 10 Construction Lp | revise occupancy class of teaching kitchen, from assembly to classroom. no alteration or construction under this permit application. reference #201909262834 & 2021-0204-4100 (ansul) | |
| Jul 2, 2021 | Completed | 1 Market St | Ayoob & Peery Plumbing Co Inc | 3rd fl - add 3 sprinklers per ti; 6th fl - add 2 sprinklers per ti ref pa 2020-1201-9912. | $2,625 |
| Jun 16, 2021 | Never finaled | 1 Market St | Level 10 Construction Lp | fire only permit for place of assembly occupant load refer 2019-0904-0591 | |
| Jun 16, 2021 | Never finaled | 1 Market St | Level 10 Construction Lp | fire only permit for place of assembly occupant load refer 2019-0611-3065 | |
| Jun 16, 2021 | Never finaled | 1 Market St | Level 10 Construction Lp | fire only permit for place of assembly occupant load refer 2019-0611-3075 r1 | |
| Jun 15, 2021 | Never finaled | 1 Market St | Level 10 Construction Lp | fire only permit for place of assembly occupant load refer 2019-0904-0607 | |
| Jun 10, 2021 | Completed | 1 Market St | Gci, Inc | ref pa #202102205507 (12th fl) & 202103015598 (14th fl). electrical power, lighting a signal. maher n/a. | $180,000 |
| May 25, 2021 | Completed | 1 Market St | Dpr Construction | 4/f interior ti includes demo and new non structural partitions. | $126,000 |
| May 25, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | partial 6th floor fire t.i. 17 speaker strobes, 1 power supply, 3 duct detectors, 1 smoke detector, 5 relays and 1 synchronization module. | $3,200 |
| May 25, 2021 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - tenant improvements 7th - 2 sprinklers 8th - 2 sprinklers 9th - 2 sprinklers 10th - 2 sprinklers 11th - 2 sprinklers (relocate & change out sprinklers) | $5,000 |
| May 13, 2021 | Never finaled | 1 Market St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 1 pendent sprinkler on the 3rd fl. relocate 1 pendent sprinkler on the 4th fl. relocate 1 pendent sprinkler and add 1 upright on the 11th fl. delete 1 sprinkler, relocate 1 pendent sprinkler on the 16th fl. t.i> ref. # 2021-0121-3064 | $2,625 |
| Apr 26, 2021 | Never finaled | 1 Market St | United Systems Fire And Security Llc | the addition of 6 speaker strobes and 3 strobes to the 2nd, 4th & 5th floor restrooms. | $3,000 |
| Apr 15, 2021 | Completed | 1 Market St | Ayoob & Peery Plumbing Co Inc | 6th floor: add (7), relocate (33) and change out (9) sprinklers per t.i.; ref #: 2020-1201-9912 | $13,125 |
| Mar 31, 2021 | Never finaled | 1 Market St | Edison Fire Extinguisher Company Inc | installation of fire suppression system new ul300 system | $2,950 |
| Mar 23, 2021 | Completed | 1 Market St | Level 10 Construction Lp | 11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling addition of power for misc av equipment in and above ceiling | |
| Mar 4, 2021 | Completed | 1 Market St | Level 10 Construction Lp | level 7 & level 10: revision to 201906113076 for as built scope to replace cafe banquet seating to alcove to accommodate 2 new handwash sinks given covid 19. level 10: revision to pa 201906113065 for as built scope to replace banquet seating to accommodate 4 new handwash sinks for additional hygiene | $20,000 |
| Mar 2, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | 2/f - fire alarm system ti. addition of (2) smoke detectors, (15) duct detectors, (26) speaker-strobe, (2) strobes. ref ti 2020-0926-5068. | $25,000 |
| Feb 26, 2021 | Completed | 1 Market St | Gci, Inc | 12th fl: restroom remodel. demo of non-structural partitions,plumbing fixtures, finishes, ceilings and lighting, construction of new non-structural partitions, plumbing fixtures, finishes, ceilings and ligthing n/a maher | $90,000 |
| Feb 25, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | the additiona of 45 a/v, 13 duct delay, 1 smoke detector and 1 power supply. | |
| Feb 25, 2021 | Completed | 1 Market St | United Systems Fire And Security Llc | the addition of 8 nac, 3 smoke, 2 duct detectors and 1 power supply for the 11th floor. arch permit# 2019-0926-2834 | $3,500 |
| Feb 22, 2021 | Completed | 1 Market St | Gci, Inc | 16th fl: revision to pa# 202009234805 to convert storage room to 2 private offices. | |
| Feb 18, 2021 | Completed | 1 Market St | Bcci Construction Company | 31st floor: structural only permit to show the support framing for an operable partition. ref app#202010227185 | $20,000 |
| Feb 18, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | fire-only work for partial-area remodels on floors 27a and 28 for "morgan lewis"; additions are 3 speaker/strobes and 2 strobes. ref permit app # 2020-1022-7182 (fl27) and 2020-1022-7184 (fl28). | $3,000 |
| Feb 4, 2021 | Never finaled | 1 Market St | Terranova Construction | ref # 2019-0815-8895; sffd required asbuilts for the 4th flr. | |
| Feb 4, 2021 | Never finaled | 1 Market St | Ace Fire Equipment&Serv. | install ansul system in new/renovated(?) cafe | $5,000 |
| Jan 21, 2021 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | apn; tenant improvements - existing fire sprinkler syst. 14 change out uprights; 30 relocated pendents; 2 relocated uprights; 1 changed out pendent; 5 added uprights; 4 added pendents; 14 deleted spkrs. | |
| Jan 21, 2021 | Never finaled | 1 Market St | Dpr Construction | 2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes. | $200,000 |
| Jan 15, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | fire alarm work for the "morgan lewis" east area remodel on floor 31a; additions are 1 duct detector, 1 speaker/strobe. 1 strobe, and the relocation of 2 detectors, and 1 strobe. ref. permit app # 2020-1022-7185 | $2,770 |
| Jan 15, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | fire alarm work to replace speakers and strobes with 2 speaker/strobes for the restroom remodel at the southwest area of the lobby level; ref. permit app # 2020-0924-4942 | $1,270 |
| Jan 14, 2021 | Completed | 1 Market St | Siemens Industry, Inc. | fire alarm work to add 1 speaker/strobe for retail space "k" on the lobby level; ref permit app # 201809119738 | $635 |
| Dec 11, 2020 | Completed | 1 Market St | Bcci Construction Company | 5/f: demo only permit for decomission work in (e) building. demo per ab-017 | $50,000 |
| Dec 10, 2020 | Completed | 1 Market St | Field Construction Inc. | two way communication. reference 2019-1217-9815 | |
| Dec 9, 2020 | Completed | 1 Market St | Ayoob & Peery Plumbing Co Inc | 18th floor: add and install two hundred and sixty two (262) sprinklers and new mains, lines, and fittings to conform with the new wall/ceiling layout of the tenant improvement. ref # 2019-12-19-0043 | $140,000 |
| Dec 8, 2020 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 8th fl. ref 2020-0220-4903. existing fire sprinkler system - tenant improvements. visitor crate as-built - add 4 pendents. | $2,100 |
| Dec 8, 2020 | Completed | 1 Market St | United Systems Fire And Security Llc | 2-way com for the 3rd, 6-11th floors (volintay) | $21,000 |
| Dec 8, 2020 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | apn 2020-02-20-4905. existing fire sprinkler system - tenant improvements. visitor crate as-built = +4 pendent spkrs | $2,100 |
| Dec 8, 2020 | Completed | 1 Market St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 8 pendents; for parnassus on the 16th floor. | $4,000 |
| Dec 8, 2020 | Completed | 1 Market St | Siemens Industry, Inc. | life safety work for the "harri williams" remodel on floor 11b; additions are 8 smoke detectors, 1 strobe power supply, 31 speaker/strobes, and 10 strobes. ref. permit app # 2019 1217 9815 | $31,600 |
| Dec 8, 2020 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 2019-1217-9815. existing fire sprinkler system - tenant improvements. 18 changed out uprights, 4 relocated uprights, 8 added uprights, 8 relocated pendents, 4 added pendents (40 total sprinklers). | $21,000 |
| Nov 24, 2020 | Completed | 1 Market St | United Systems Fire And Security Llc | new 2-way comm. system, see plans. | $4,500 |
| Nov 4, 2020 | Completed | 1 Market St | G4s Secure Integration Llc | 11th fl. install a card access system that includes (6) card access readers, (2) intercoms, (1) master station for the intercoms, and an emergency exit button. ref # 2020-1210-0791, 2019-1217-9815 | $25,000 |
| Oct 30, 2020 | Never finaled | 1 Market St | Edison Fire Extinguisher Company Inc | install ul300 pcu fire suppression system. | $2,300 |
| Oct 22, 2020 | Completed | 1 Market St | Bcci Construction Company | 28/f: new lobby with operable partition, additional gender neutral restroom, updated restroom and breakroom area. maher n/a. | $550,000 |
| Oct 22, 2020 | Completed | 1 Market St | Bcci Construction Company | 27/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a. | $550,000 |
| Oct 22, 2020 | Completed | 1 Market St | Bcci Construction Company | 31/f: updated break room millwork. 2 single occupany restrooms, updates to (e) restrooms, paint and carpet. mep included. maher n/a. | $550,000 |
| Oct 17, 2020 | Expired or cancelled | 1 Market St | Level 10 Construction Lp | annex. convert (e) opening on l3 into communicating opeing plus minor cosmetic work, new communicating opening to comply w/ ab10; note: l3 landmark annex & l3 spear tower both are occupied by google. | $90,500 |
| Oct 17, 2020 | Completed | 1 Market St | Gci, Inc | spear tower. create new door opening on l3 for a convenience opening between spear tower & landmark annex plus minor cosmetic work; note: l3 landmark l3 spear tower both are occupied by google | $85,000 |
| Oct 14, 2020 | Never finaled | 1 Market St | Dpr Construction | ste 200, 2/f: structural modifications for t.i under pa # 202009265068. scope includes structural support for moveable partition in main event space. support for roll down fire door. | $10,000 |
| Sep 26, 2020 | Completed | 1 Market St | Dpr Construction | ste 200: interior tenant improvement includeds remodel of elevator lobby,reception area, gallery, meeting rooms & catering staging pantry. | $2,557,000 |
| Sep 26, 2020 | Completed | 1 Market St | Dpr Construction | #200: interior non-structural demo. work includes non-structural partitions, finishes, electrical, plumbing, & mechanical equipment. | $10,000 |
| Sep 26, 2020 | Never finaled | 1 Market St | Gci, Inc | construction of housekeeping pad for new replacement chiller in lower basement (route to ming ge for reviewing building and structural) | $7,500 |
| Sep 25, 2020 | Expired or cancelled | 1 Market St | Dpr Construction | suite 200. tenant improvement of an existing type a3 occupancy. includes remodel of existing elevator lobby, reception area, gallery, meeting rooms, and catering staging pantry. a new event space is being added. fire sprinkler to be submitted under separate permit. | $2,557,000 |
| Sep 16, 2020 | Completed | 1 Market St | Level 10 Construction Lp | 10th fl cafe. mep only permit; grease exhaust, makeup air, new grease interuptor and water heating, new pwoer distrib and lighting/controls, deferred mep for issued pa #201906113065. | $2,500,000 |
| Sep 10, 2020 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | ti - improvements existing fire sprinkler system 2 change out uprights, 2 change out pendents, 30 added pendents and 11 deleted sprinklers | $6,800 |
| Aug 31, 2020 | Never finaled | 1 Market St | Gci, Inc | replace existing chiller in kind | $500,000 |
| Aug 31, 2020 | Completed | 1 Market St | Golden Gate Fire Protection Inc | ground floor: fires sprinkler, relocate 8 fire sprinkler concealed pendents in spear tower lobby. ref bpa#202001242724 | $4,000 |
| Aug 27, 2020 | Completed | 1 Market St | Edison Fire Extinguisher Company Inc | 3/f: ul300 fire suppression installation | $9,000 |
| Aug 20, 2020 | Completed | 1 Market St | Bcci Construction Company | 5/f. revision to pa#201909101107 | |
| Aug 18, 2020 | Completed | 1 Market St | R L H Fire Protection Inc | 27th floor: fire sprinkler additional work shown in clouded area. revision delta #2. 3 offices added to extg scope of work. ref app #201910316040 & fire app#201912028418 | $1,100 |
| Aug 12, 2020 | Completed | 1 Market St | 4th floor:revision to bpa#201906103013.remove card readers & text note"door not locked",audible alarm to sound without card swipe @ door 108b. added requirements met for access-controlled elevator lobby @ legend a3.04.**maher n/a** | ||
| Aug 7, 2020 | Completed | 1 Market St | Bcci Construction Company | 19th floor: mep submittal to support approved architectural set. supplemental cooking via vrf condensing unit systems. ref#2019/1219/0043. | $100,000 |
| Aug 7, 2020 | Completed | 1 Market St | Bcci Construction Company | 18th floor: mep submittal to support approved arch set. supplemental cooling via vrf condensing unit systems. ref app#201912190043. | $100,000 |
| Jul 10, 2020 | Completed | 1 Market St | Principal Builders Inc. | 27th floor: revision to app#201910316040 and 201912270796 for 27th floor deferred mep | $10,000 |
| Jul 1, 2020 | Completed | 1 Market St | United Systems Fire And Security Llc | 9th fl fire alarm system ti for existing bldg. ref pa #201909040591 | $31,489 |
| Jul 1, 2020 | Completed | 1 Market St | United Systems Fire And Security Llc | 8th fl fire alarm system ti for existing bldg. ref pa #201909040607 | $31,192 |