Skyline Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2026
- Last 24 months
- 261 permits filed
3,607 permits since 2000: 2,615 completed, 127 in progress, 494 never finaled, 371 expired or cancelled.
Of the 494 never-finaled permits, 41 are 3 to 5 years old, 233 are 5 to 10 years old, 220 are over 10 years old. 8 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 3,607.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 555 California St | evacuation maps for 31st flr. ref#: 202603238106 | $1,500 |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 645 Harrison St | deferred structural permit to pa# 202608206930 for equipment anchorage.Details
deferred structural permit to pa# 202608206930 for equipment anchorage. | |
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 300 Mission St | 16th and 17th floors: health department permit only to review existing break rooms. ref pa #202512302939Details
16th and 17th floors: health department permit only to review existing break rooms. ref pa #202512302939 | |
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 343 Sansome St | ste 505 - finishes, counters, etc. new construction to consist of finishes. non-structural partitions, interior doors, electrical, counters, and paint. mech, elec, fire life safety and sprinkler plans to be deferred permits. no change to fixture quantities, occupant load or path of travel. noDetails
ste 505 - finishes, counters, etc. new construction to consist of finishes. non-structural partitions, interior doors, electrical, counters, and paint. mech, elec, fire life safety and sprinkler plans to be deferred permits. no change to fixture quantities, occupant load or path of travel. no | $120,000 |
| Oct 22, 2026 | In progress issued Nov 2026 | 1 Sansome St | 23/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep includedDetails
23/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included | $4,100,000 |
| Oct 22, 2026 | In progress issued Nov 2026 | 1 Sansome St | 21/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep includedDetails
21/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included | $4,100,000 |
| Oct 20, 2026 | In progress issued Nov 2026 | 580 California St | mechanical work for tenant improvement at suite 1300. ref. arch 202608196811Details
mechanical work for tenant improvement at suite 1300. ref. arch 202608196811 | $25,000 |
| Oct 20, 2026 | In progress issued Nov 2026 | 1 Sansome St | 40th fl: revision to 202512182127 to remove previously identified structural strengthening.Details
40th fl: revision to 202512182127 to remove previously identified structural strengthening. | |
| Oct 20, 2026 | In progress issued Oct 2026 | 580 California St | suite 1500: mechanical work for t.i. ref #202608267180.Details
suite 1500: mechanical work for t.i. ref #202608267180. | $25,000 |
| Oct 16, 2026 | Completed final sign-off Oct 2026 | 405 Howard St | to obtain final inspection for work approved under pa# 202505146466. all work is complete.Details
to obtain final inspection for work approved under pa# 202505146466. all work is complete. | |
| Oct 14, 2026 | In progress issued Oct 2026 | 1 Sansome St | 38/f: revision to pa#202602045247. add dedicated heat pump system to private office. installation of new hvac equipment.Details
38/f: revision to pa#202602045247. add dedicated heat pump system to private office. installation of new hvac equipment. | |
| Oct 8, 2026 | In progress issued Oct 2026 | 55 Spear St | levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layoutDetails
levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layout | |
| Oct 7, 2026 | In progress issued Oct 2026 | 55 Spear St | 28th ti non structural partitions, ceilings, lighting and associated mepDetails
28th ti non structural partitions, ceilings, lighting and associated mep | $1,800,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 4 Embarcadero Center | 19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishesDetails
19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes | $73,320 |
| Oct 1, 2026 | In progress issued Oct 2026 | 580 California St | electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500Details
electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500 | $165,000 |
| Sep 30, 2026 | In progress issued Oct 2026 | 580 California St | suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811Details
suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811 | $120,000 |
| Sep 29, 2026 | In progress issued Oct 2026 | 600 Montgomery St | 33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area.Details
33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area. | $47,583 |
| Sep 28, 2026 | In progress issued Oct 2026 | 220 Montgomery St | mechanical and electrical work for t.i. on the 9th floor; ref#: 202609037667.Details
mechanical and electrical work for t.i. on the 9th floor; ref#: 202609037667. | $65,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 220 Montgomery St | 9/f #975: commercial interior ti for (e) office tenant space. work includes new non-structural partitions, doors, glazing, interior finishes, ceiling & lighting fixtures, casework, power/data coordination, & accessibility upgrades.Details
9/f #975: commercial interior ti for (e) office tenant space. work includes new non-structural partitions, doors, glazing, interior finishes, ceiling & lighting fixtures, casework, power/data coordination, & accessibility upgrades. | $1,200,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 425 Market St | 14th floor: new t.i. includes construction of non-structural partitions, ceillings, doors, glazing, light fixtures, casework, and pover/signal.Details
14th floor: new t.i. includes construction of non-structural partitions, ceillings, doors, glazing, light fixtures, casework, and pover/signal. | $6,100,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | 8/fl- ti to include paint, finishes, and (n) phone boothsDetails
8/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 31, 2026 | In progress issued Oct 2026 | 55 Spear St | 29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish.Details
29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish. | $3,646,268 |
| Aug 31, 2026 | In progress issued Sep 2026 | 301 Toland St | repair of existing stuctural roof trusses.Details
repair of existing stuctural roof trusses. | $175,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | 10/fl- ti to include paint, finishes, and (n) phone boothsDetails
10/fl- ti to include paint, finishes, and (n) phone booths | $150,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | 9/fl- ti to include paint, finishes, and (n) phone boothsDetails
9/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 27, 2026 | In progress issued Oct 2026 | 300 Clay St | level 9: interior ti includes limited soft demo, buildi out includng new millwork and mepDetails
level 9: interior ti includes limited soft demo, buildi out includng new millwork and mep | $125,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 1 Sansome St | 29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly.Details
29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly. | |
| Aug 26, 2026 | In progress issued Sep 2026 | 580 California St | 15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits.Details
15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits. | $3,034,458 |
| Aug 24, 2026 | In progress issued Aug 2026 | 555 California St | deferred structural calculations & details for new handrail at stair previously approved pa#202603238106.Details
deferred structural calculations & details for new handrail at stair previously approved pa#202603238106. | |
| Aug 20, 2026 | In progress issued Sep 2026 | 645 Harrison St | limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation.Details
limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation. | $107,970 |
| Aug 19, 2026 | In progress issued Aug 2026 | 580 California St | 13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixturesDetails
13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures | $966,322 |
| Aug 17, 2026 | In progress issued Oct 2026 | 731 Market St | ste 200, tenant improvement to include selective demolition on non-structural partitions, ceilings, lighting and finishes. construction of non-structural partitions, ceiling, lighting, millwork finishes and mepDetails
ste 200, tenant improvement to include selective demolition on non-structural partitions, ceilings, lighting and finishes. construction of non-structural partitions, ceiling, lighting, millwork finishes and mep | $1,225,000 |
| Aug 12, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door.Details
floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door. | |
| Aug 12, 2026 | In progress issued Aug 2026 | 45 Fremont St | 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred.Details
17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred. | $127,000 |
| Aug 11, 2026 | In progress issued Sep 2026 | 525 Market St | 3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work.Details
3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work. | $10,000 |
| Aug 5, 2026 | In progress issued Nov 2026 | 220 Montgomery St | 6th floor: administrative permit to remove defferred mechanical requirement from architectural permit #202512151758. no mechanical scope involvedDetails
6th floor: administrative permit to remove defferred mechanical requirement from architectural permit #202512151758. no mechanical scope involved | |
| Jul 27, 2026 | Completed final sign-off Oct 2026 | 222 02nd St | mechanical work for t.i. on the 22nd flr. ref#: 202606163276Details
mechanical work for t.i. on the 22nd flr. ref#: 202606163276 | $18,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 101 California St | 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring.Details
46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. | $45,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 55 Spear St | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landingDetails
l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 595 Market St | ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgradesDetails
ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades | $1,000,000 |
| Jul 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397Details
29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397 | |
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 450 Pacific Av | occupant load review for intermitent use of lobby as assembly in support of sffd operational permit.Details
occupant load review for intermitent use of lobby as assembly in support of sffd operational permit. | |
| Jun 26, 2026 | In progress issued Jul 2026 | 345 California St | 10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955Details
10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955 | $300,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 343 Sansome St | mechanical work for tenant improvement on the 5th fl ref 202604230007Details
mechanical work for tenant improvement on the 5th fl ref 202604230007 | $5,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | 3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $3,100,000 |
| Jun 25, 2026 | Completed final sign-off Oct 2026 | 680 Folsom St | 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work includedDetails
8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included | $120,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 55 Spear St | 29th floor: interior non-structural demolition on the 29th floor. ab017Details
29th floor: interior non-structural demolition on the 29th floor. ab017 | $45,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | 21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,999 |
| Jun 18, 2026 | Completed final sign-off Oct 2026 | 101 California St | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbingDetails
33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| Jun 16, 2026 | Completed final sign-off Oct 2026 | 222 02nd St | 22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures.Details
22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $20,500 |
| Jun 16, 2026 | Completed final sign-off Oct 2026 | 222 02nd St | 21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures.Details
21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $32,600 |
| Jun 10, 2026 | In progress issued Jul 2026 | 345 California St | 10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittalDetails
10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal | $2,000,000 |
| Jun 4, 2026 | Completed final sign-off Nov 2026 | 650 California St | mechanical and electrical work for tenant improvement on 12th floor. ref. 202605111057Details
mechanical and electrical work for tenant improvement on 12th floor. ref. 202605111057 | $175,000 |
| Jun 4, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | l28: deferred mep for pa #202512172064Details
l28: deferred mep for pa #202512172064 | $1,215,216 |
| Jun 4, 2026 | Completed final sign-off Oct 2026 | 114 Sansome St | revision to bpa: 202603137536 - update occupancy load calculations. (7th fl)Details
revision to bpa: 202603137536 - update occupancy load calculations. (7th fl) | |
| Jun 1, 2026 | In progress issued Jul 2026 | 101 California St | floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.Details
floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. | $38,000 |
| May 29, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | 40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition detailsDetails
40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition details | |
| May 28, 2026 | In progress issued Jun 2026 | 525 Market St | commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishesDetails
commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishes | $350,000 |
| May 28, 2026 | In progress issued Jul 2026 | 343 Sansome St | 5th floor: electrical work for tenant improvement. ref arch. 202604230007Details
5th floor: electrical work for tenant improvement. ref arch. 202604230007 | $20,000 |
| May 27, 2026 | In progress issued Aug 2026 | 345 California St | 6/f & 7/f: installation office phone booth anchorage & structural details included.Details
6/f & 7/f: installation office phone booth anchorage & structural details included. | $66,000 |
| May 26, 2026 | Completed final sign-off Nov 2026 | 444 De Haro St | 1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scopeDetails
1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scope | $134,000 |
| May 22, 2026 | Completed final sign-off Jul 2026 | 160 Spear St | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18.Details
17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| May 21, 2026 | Completed final sign-off Sep 2026 | 650 California St | revision to pa#202512111537 ti revision of nono-stuct ceiling & lighting design. new const. to include non-structural ceiling & lighting, finishes and new ventless fireplace. all work interior only on 22/f: deferred mep and new ventless fireplace.Details
revision to pa#202512111537 ti revision of nono-stuct ceiling & lighting design. new const. to include non-structural ceiling & lighting, finishes and new ventless fireplace. all work interior only on 22/f: deferred mep and new ventless fireplace. | |
| May 19, 2026 | In progress issued May 2026 | 345 California St | 5th fl: mechanical revision to pa#202603046904, 202509024401 and 202509024365 to add fsd-14 upgrade bulletin 2.05, fsd matrix, add sequence of operations. add updated smoke control narrative/preapp minutes. smoke control panel.Details
5th fl: mechanical revision to pa#202603046904, 202509024401 and 202509024365 to add fsd-14 upgrade bulletin 2.05, fsd matrix, add sequence of operations. add updated smoke control narrative/preapp minutes. smoke control panel. | |
| May 18, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit.Details
level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit. | |
| May 18, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | 38/f: revision to pa# 202512101393 includes updates to finishes, equipment and enviormental health notes. includes additional lockers, ceiling and soffit modifications.Details
38/f: revision to pa# 202512101393 includes updates to finishes, equipment and enviormental health notes. includes additional lockers, ceiling and soffit modifications. | |
| May 11, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths.Details
floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths. | $400,000 |
| May 11, 2026 | Completed final sign-off Nov 2026 | 650 California St | 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.Details
12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. | $1,630,160 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details.Details
26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details. | |
| Apr 30, 2026 | In progress issued Jul 2026 | 301 Howard St | 3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater.Details
3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater. | $1,200,000 |
| Apr 29, 2026 | Completed final sign-off Nov 2026 | 221 Main St | ste 770: 2 new phone booths in existing office. new outlets for phone boothsDetails
ste 770: 2 new phone booths in existing office. new outlets for phone booths | $10,000 |
| Apr 29, 2026 | In progress issued Nov 2026 | 50 California St | construction of new roof terrace over (e) roof above 2/f.Details
construction of new roof terrace over (e) roof above 2/f. | $1,000,000 |
| Apr 29, 2026 | In progress issued Sep 2026 | 50 California St | 2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge.Details
2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge. | $3,790,509 |
| Apr 29, 2026 | In progress issued Jul 2026 | 301 Howard St | 4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permitDetails
4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permit | $1,200,000 |
| Apr 28, 2026 | In progress issued Aug 2026 | 301 Toland St | work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular liftDetails
work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular lift | $300,000 |
| Apr 23, 2026 | In progress issued Jul 2026 | 55 Spear St | level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work.Details
level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work. | $8,250,000 |
| Apr 23, 2026 | In progress issued May 2026 | 343 Sansome St | expansion of tenant suite 500 to combine with existing tenant suite 520. demolition of existimg mpm structural partitions, ceilings, doors, glazing millwork, lighting fixtures and finishes. construction of non structural partitions, ceilings, doors, glazing millwork and finishesDetails
expansion of tenant suite 500 to combine with existing tenant suite 520. demolition of existimg mpm structural partitions, ceilings, doors, glazing millwork, lighting fixtures and finishes. construction of non structural partitions, ceilings, doors, glazing millwork and finishes | $150,000 |
| Apr 23, 2026 | In progress issued Jun 2026 | 55 Spear St | 30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural workDetails
30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural work | $9,052,500 |
| Apr 22, 2026 | In progress issued May 2026 | 345 California St | administrative permit to document aasembly loads reference bpa: 202509024365Details
administrative permit to document aasembly loads reference bpa: 202509024365 | |
| Apr 22, 2026 | In progress issued May 2026 | 600 Montgomery St | revision to 202510167484: update partition w/o door at exit hallway (2) 1508. revise man's restroom layout to add a furring wall, relocate the door location to the restroom & increase the ada stall to accomdate site conditionDetails
revision to 202510167484: update partition w/o door at exit hallway (2) 1508. revise man's restroom layout to add a furring wall, relocate the door location to the restroom & increase the ada stall to accomdate site condition | |
| Apr 16, 2026 | Completed final sign-off May 2026 | 1 Bush St | to obtain final inspection for work approved under pa#: 202501218675. all work is completeDetails
to obtain final inspection for work approved under pa#: 202501218675. all work is complete | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications.Details
revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications. | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modificationsDetails
33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modifications | |
| Apr 13, 2026 | In progress issued Apr 2026 | 555 California St | 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office spaceDetails
30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space | $1,250,000 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.Details
31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. | $2,750,000 |
| Apr 7, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | 28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation...Details
28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation... | |
| Apr 6, 2026 | Completed final sign-off Nov 2026 | 650 California St | 22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537Details
22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537 | $290,000 |
| Apr 2, 2026 | In progress issued Jun 2026 | 345 California St | deferred mep for 27th floor office ti under permit 202512182090.Details
deferred mep for 27th floor office ti under permit 202512182090. | $295,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 55 Spear St | floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17Details
floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17 | $382,005 |
| Apr 1, 2026 | In progress issued May 2026 | 345 California St | 4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permitDetails
4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permit | $175,000 |
| Mar 31, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | level 40: defered mep for bpa#202512172045Details
level 40: defered mep for bpa#202512172045 | $633,816 |
| Mar 31, 2026 | Completed final sign-off Oct 2026 | 1 Sansome St | 29th/f: deferred mep for t.i. 202512101397Details
29th/f: deferred mep for t.i. 202512101397 | $1,157,328 |
| Mar 23, 2026 | In progress issued Apr 2026 | 555 California St | 31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall finishesDetails
31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall finishes | $8,285,917 |
| Mar 23, 2026 | In progress issued Apr 2026 | 405 Howard St | rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246)Details
rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246) | |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 3 Embarcadero Center | 16th fl mechanical and electrical work for ti ref pa 202601214196Details
16th fl mechanical and electrical work for ti ref pa 202601214196 | $140,000 |
| Mar 13, 2026 | Completed final sign-off Oct 2026 | 114 Sansome St | office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.Details
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system. | $1,400,000 |
| Mar 10, 2026 | In progress issued May 2026 | 301 Howard St | interior demo only permit for level 3 and 4. tenant improvement seperate permit.Details
interior demo only permit for level 3 and 4. tenant improvement seperate permit. | $100,000 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 24-25/f: deferred mep for pa# 202512172034.Details
24-25/f: deferred mep for pa# 202512172034. | $2,314,656 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 26/f: deferred mep for pa# 202512172035.Details
26/f: deferred mep for pa# 202512172035. | $1,157,328 |
| Mar 5, 2026 | Completed final sign-off Nov 2026 | 600 Montgomery St | 44th/f: full floor tenant improvement for office tenant. new non-load bearing partitions and doors, relatec ceiling, wall and floor finishes, as well as mep work.Details
44th/f: full floor tenant improvement for office tenant. new non-load bearing partitions and doors, relatec ceiling, wall and floor finishes, as well as mep work. | $1,000,000 |