Permit GraphShortlistSan Francisco building permits since 2000

Block 0240, lot 007

580 California St

City’s use
Commercial Office
Built
1984
Stories
23
Building
357,700 sq ft
Lot
16,125 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 20, 2026In progress
issued Nov 2026
580 California StSkyline Constructionmechanical work for tenant improvement at suite 1300. ref. arch 202608196811
Details
Permit
202610209668
Permit issued
Nov 3, 2026

mechanical work for tenant improvement at suite 1300. ref. arch 202608196811

Open the permit page

$25,000
Oct 20, 2026In progress
issued Oct 2026
580 California StSkyline Constructionsuite 1500: mechanical work for t.i. ref #202608267180.
Details
Permit
202610209664
Permit issued
Oct 27, 2026

suite 1500: mechanical work for t.i. ref #202608267180.

Open the permit page

$25,000
Oct 1, 2026In progress
issued Oct 2026
580 California StSkyline Constructionelectrical and plumbing work for tenant improvement at suite 1500. ref 202608261500
Details
Permit
202610018876
Permit issued
Oct 23, 2026

electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500

Open the permit page

$165,000
Sep 30, 2026In progress
issued Oct 2026
580 California StSkyline Constructionsuite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811
Details
Permit
202609308822
Permit issued
Oct 8, 2026

suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811

Open the permit page

$120,000
Aug 26, 2026In progress
issued Sep 2026
580 California StSkyline Construction15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits.
Details
Permit
202608267180
Permit issued
Sep 9, 2026

15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits.

Open the permit page

$3,034,458
Aug 19, 2026In progress
issued Aug 2026
580 California StSkyline Construction13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures
Details
Permit
202608196811
Permit issued
Aug 31, 2026

13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures

Open the permit page

$966,322
Feb 12, 2026Completed
final sign-off Feb 2026
580 California StTri-Signal Integration Inc.19/f suite 1925: addition of 1 ceiling mounted strobe in suite 1925 due to tenant improvement. balance of system shall remain as is. ref t.i permit 202511149707
Details
Permit
202602125872
Permit issued
Feb 18, 2026
Final sign-off
Feb 25, 2026

19/f suite 1925: addition of 1 ceiling mounted strobe in suite 1925 due to tenant improvement. balance of system shall remain as is. ref t.i permit 202511149707

Open the permit page

$11,987
Jan 15, 2026Completed
final sign-off Feb 2026
580 California St19/f: fire sprinkler permit: add 1 pendent f/s on the 19/f. ref t.i. pa 202511149707.
Details
Permit
202601153891
Permit issued
Feb 5, 2026
Final sign-off
Feb 20, 2026

19/f: fire sprinkler permit: add 1 pendent f/s on the 19/f. ref t.i. pa 202511149707.

Open the permit page

$1,000
Nov 14, 2025Completed
final sign-off May 2026
580 California StSkyline Construction19/fl- interior demo and construction of non structural elements including but not necessarly limited to interior partitions doors, outlets, lighting, mep plans fire alarm and sprinkler plans will be submitted as separte permits. scope of work does not affect fixtures count, load or occupancy
Details
Permit
202511149707
Permit issued
Feb 4, 2026
Final sign-off
May 4, 2026

19/fl- interior demo and construction of non structural elements including but not necessarly limited to interior partitions doors, outlets, lighting, mep plans fire alarm and sprinkler plans will be submitted as separte permits. scope of work does not affect fixtures count, load or occupancy

Open the permit page

$246,119
Aug 5, 2025Completed
final sign-off Sep 2025
580 California StSkyline Construction20th fl, ste 2000 mechanical and electricl work for ti ref pa 202505086068
Details
Permit
202508052354
Permit issued
Aug 21, 2025
Final sign-off
Sep 25, 2025

20th fl, ste 2000 mechanical and electricl work for ti ref pa 202505086068

Open the permit page

$120,000
Jul 23, 2025Completed
final sign-off Aug 2025
580 California StTri-Signal Integration Inc.20/f: add 2 notification appliances in room# 2001 and 2002 and relocate 1 speaker in room 2020. realign existing devices and appliances as needed to match new ceiling grid. ti ref# 202505086068
Details
Permit
202507231397
Permit issued
Jul 23, 2025
Final sign-off
Aug 28, 2025

20/f: add 2 notification appliances in room# 2001 and 2002 and relocate 1 speaker in room 2020. realign existing devices and appliances as needed to match new ceiling grid. ti ref# 202505086068

Open the permit page

$12,987
Jul 16, 2025Completed
final sign-off Jul 2025
580 California StTri-Signal Integration Inc.14/f: remove existing and install new notification appliances in suite 1400 mpr due to tenant improvement. the balance of the system will remain "as is".
Details
Permit
202507160890
Permit issued
Jul 16, 2025
Final sign-off
Jul 31, 2025

14/f: remove existing and install new notification appliances in suite 1400 mpr due to tenant improvement. the balance of the system will remain "as is".

Open the permit page

$10,987
Jul 2, 2025Completed
final sign-off Jul 2025
580 California StAyoob & Peery Plumbing Co Inc20th floor: add 3 relocate 12 fire sprinkler per t.i. job #25-646 ref pa #202505086068
Details
Permit
202507020003
Permit issued
Jul 2, 2025
Final sign-off
Jul 15, 2025

20th floor: add 3 relocate 12 fire sprinkler per t.i. job #25-646 ref pa #202505086068

Open the permit page

$9,317
Jul 1, 2025In progress
filed Jul 2025, not yet issued
580 California StAyoob & Peery Plumbing Co Inc20th floor. add 3 relocate. 12 fire sprinkler per ti. ref# 202505086068.
Details
Permit
202507019915

20th floor. add 3 relocate. 12 fire sprinkler per ti. ref# 202505086068.

Open the permit page

$9,317
Jun 25, 2025In progress
issued Jun 2025
580 California StAnderson, Rowe & Buckley, Inc.suite # 1400: t.i. /alteration project of existing office space. mechanical modification to accommodate architectural changes includes: new ductwork and grillers, reconfiguration of existing ductwork, and air distribution, ddc controls and air balance. ti arch. #202505065906. mechanical only.
Details
Permit
202506259449
Permit issued
Jun 25, 2025

suite # 1400: t.i. /alteration project of existing office space. mechanical modification to accommodate architectural changes includes: new ductwork and grillers, reconfiguration of existing ductwork, and air distribution, ddc controls and air balance. ti arch. #202505065906. mechanical only.

Open the permit page

$30,000
Jun 24, 2025In progress
issued Jul 2025
580 California StGolden Gate Fire Protection Inc14th floor. relocate 6 pendents on the 14th floor. ref#: t.i. 202505065906
Details
Permit
202506249333
Permit issued
Jul 1, 2025

14th floor. relocate 6 pendents on the 14th floor. ref#: t.i. 202505065906

Open the permit page

$1,500
Jun 18, 2025Completed
final sign-off Sep 2025
580 California StCapitol Electric Constsuite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906
Details
Permit
202506189018
Permit issued
Jun 18, 2025
Final sign-off
Sep 17, 2025

suite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906

Open the permit page

$28,530
May 8, 2025Completed
final sign-off Sep 2025
580 California StSkyline Construction20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit.
Details
Permit
202505086068
Permit issued
Jun 11, 2025
Final sign-off
Sep 25, 2025

20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit.

Open the permit page

$600,000
May 6, 2025Completed
final sign-off Sep 2025
580 California StSkyline Constructionste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred.
Details
Permit
202505065906
Permit issued
May 27, 2025
Final sign-off
Sep 24, 2025

ste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred.

Open the permit page

$300,000
Apr 30, 2025Completed
final sign-off Jul 2025
580 California StSkyline Construction8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673
Details
Permit
202504305527
Permit issued
Jun 10, 2025
Final sign-off
Jul 22, 2025

8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673

Open the permit page

$12,000
Apr 23, 2025Completed
final sign-off May 2025
580 California StGolden Gate Fire Protection Increlocate 4 pendent sprinklers on the 8th fl ref 202503061673
Details
Permit
202504235057
Permit issued
Apr 24, 2025
Final sign-off
May 15, 2025

relocate 4 pendent sprinklers on the 8th fl ref 202503061673

Open the permit page

$1,000
Mar 6, 2025Completed
final sign-off Jul 2025
580 California StSkyline Construction8th/fl: tenant improvement, demo of structural partitions, ceilings, light fixtures, and flooring in break area only . new paint, ceilings, flooring, and light fixtures in break area only. * mep deferred if required
Details
Permit
202503061673
Permit issued
Apr 15, 2025
Final sign-off
Jul 22, 2025

8th/fl: tenant improvement, demo of structural partitions, ceilings, light fixtures, and flooring in break area only . new paint, ceilings, flooring, and light fixtures in break area only. * mep deferred if required

Open the permit page

$71,394
Nov 20, 2024Completed
final sign-off Dec 2024
580 California StAnderson, Rowe & Buckley, Inc.14th floor; existing fire sprinkler system. tenant improvement, relocate 5 and remove 1 fire sprinkler. ref#: 202410032248. arb#: 24255
Details
Permit
202411205349
Permit issued
Nov 20, 2024
Final sign-off
Dec 11, 2024

14th floor; existing fire sprinkler system. tenant improvement, relocate 5 and remove 1 fire sprinkler. ref#: 202410032248. arb#: 24255

Open the permit page

$1,250
Oct 3, 2024Completed
final sign-off Jan 2025
580 California StSkyline Construction14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldg
Details
Permit
202410032248
Permit issued
Nov 18, 2024
Final sign-off
Jan 15, 2025

14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldg

Open the permit page

$110,000
Sep 30, 2024Completed
final sign-off Jan 2025
580 California StSkyline Construction22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobby
Details
Permit
202409301934
Permit issued
Oct 1, 2024
Final sign-off
Jan 22, 2025

22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobby

Open the permit page

Sep 25, 2024Completed
final sign-off Dec 2024
580 California StRainbow Waterproofing & Restorremove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removed
Details
Permit
202409251565
Permit issued
Sep 26, 2024
Final sign-off
Dec 11, 2024

remove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removed

Open the permit page

$18,110
Mar 20, 2024Completed
final sign-off Apr 2024
580 California StTri-Signal Integration Inc.remove devices and applicanes to bring 18th fl back to core and shell ref pa# 202402226349
Details
Permit
202403208223
Permit issued
Mar 26, 2024
Final sign-off
Apr 11, 2024

remove devices and applicanes to bring 18th fl back to core and shell ref pa# 202402226349

Open the permit page

$14,897
Feb 22, 2024Completed
final sign-off May 2024
580 California StSkyline Construction18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep pa
Details
Permit
202402226349
Permit issued
Mar 6, 2024
Final sign-off
May 14, 2024

18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep pa

Open the permit page

$100,000
Feb 14, 2024Completed
final sign-off Apr 2024
580 California StGolden Gate Fire Protection Increlocate 95 upright sprinklers on 18th/f to accomodate demo
Details
Permit
202402145885
Permit issued
Feb 14, 2024
Final sign-off
Apr 10, 2024

relocate 95 upright sprinklers on 18th/f to accomodate demo

Open the permit page

$52,250
Jan 25, 2024In progress
issued Jan 2024
580 California StUrban Graphics Inc22/f: evacuation plans (x3).
Details
Permit
202401254604
Permit issued
Jan 25, 2024

22/f: evacuation plans (x3).

Open the permit page

$2,000
Dec 15, 2023Completed
final sign-off Jun 2024
580 California StSkyline Construction22/f: revision to permit 202309207029. change of offices room size by shifting partitions.
Details
Permit
202312152614
Permit issued
Jan 30, 2024
Final sign-off
Jun 4, 2024

22/f: revision to permit 202309207029. change of offices room size by shifting partitions.

Open the permit page

$50,000
Nov 21, 2023In progress
issued Dec 2023
580 California StTri-Signal Integration Inc.19/f: delete 2 (e) speakers and 2 (e) strobes for restroom and replace w/ combination 2 speakers strobes due to ti, ref pa# 202305177943 & 202306089570.
Details
Permit
202311211256
Permit issued
Dec 19, 2023

19/f: delete 2 (e) speakers and 2 (e) strobes for restroom and replace w/ combination 2 speakers strobes due to ti, ref pa# 202305177943 & 202306089570.

Open the permit page

$8,199
Nov 14, 2023Expired or cancelled
cancelled Oct 2024
580 California StTri-Signal Integration Inc.installation of a new remote call station on 22nd fl elevator lobby due to tenant improvement to connect to existing stairwell communication.
Details
Permit
202311140757
Permit issued
Mar 28, 2024

installation of a new remote call station on 22nd fl elevator lobby due to tenant improvement to connect to existing stairwell communication.

Open the permit page

$2,000
Nov 7, 2023Completed
final sign-off Jan 2024
580 California StGolden Gate Fire Protection Incfire sprinklers; as built to 2023-0927-7490; relocate 32 pendents on the 22nd fl
Details
Permit
202311070316
Permit issued
Nov 7, 2023
Final sign-off
Jan 16, 2024

fire sprinklers; as built to 2023-0927-7490; relocate 32 pendents on the 22nd fl

Open the permit page

$1,000
Nov 1, 2023Completed
final sign-off Jun 2024
580 California StSkyline Constructionmechanical, electrical, plumbing system for 22nd fl t.i. ref to 202309207029
Details
Permit
202311019977
Permit issued
Nov 15, 2023
Final sign-off
Jun 4, 2024

mechanical, electrical, plumbing system for 22nd fl t.i. ref to 202309207029

Open the permit page

$500,000
Oct 24, 2023Completed
final sign-off Apr 2024
580 California StTri-Signal Integration Inc.22/f: add notification devices to the existing fire alarm system due to tenant improvement. the balance to remain as is. ref. pa 202309076117
Details
Permit
202310249317
Permit issued
Nov 13, 2023
Final sign-off
Apr 25, 2024

22/f: add notification devices to the existing fire alarm system due to tenant improvement. the balance to remain as is. ref. pa 202309076117

Open the permit page

$28,789
Oct 18, 2023Completed
final sign-off Jun 2024
580 California StTri-Signal Integration Inc.installation of an rc-2a remote controller, relay and monitor modules on ground fl electrical room done to tenant improvement. ref # 202207289468.
Details
Permit
202310188864
Permit issued
Nov 14, 2023
Final sign-off
Jun 26, 2024

installation of an rc-2a remote controller, relay and monitor modules on ground fl electrical room done to tenant improvement. ref # 202207289468.

Open the permit page

$19,897
Sep 27, 2023Completed
final sign-off Apr 2024
580 California StGolden Gate Fire Protection Inc22/f: fire sprinkler; relocate 67 concealed pendents and 4 uprights. ref pa# 202309076117.
Details
Permit
202309277490
Permit issued
Oct 6, 2023
Final sign-off
Apr 25, 2024

22/f: fire sprinkler; relocate 67 concealed pendents and 4 uprights. ref pa# 202309076117.

Open the permit page

$44,020
Sep 20, 2023Completed
final sign-off Jun 2024
580 California StSkyline Constructionmodification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom.
Details
Permit
202309207029
Permit issued
Oct 12, 2023
Final sign-off
Jun 26, 2024

modification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom.

Open the permit page

$2,457,066
Sep 19, 2023Completed
final sign-off Jan 2024
580 California StNovo Construction Incadministrative permit to remove mechanical as a deferred submittal to pa# 202305177943.
Details
Permit
202309196918
Permit issued
Sep 22, 2023
Final sign-off
Jan 9, 2024

administrative permit to remove mechanical as a deferred submittal to pa# 202305177943.

Open the permit page

Sep 15, 2023Completed
final sign-off Apr 2024
580 California StSkyline Constructionstructural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570
Details
Permit
202309156713
Permit issued
Oct 11, 2023
Final sign-off
Apr 16, 2024

structural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570

Open the permit page

$5,000
Sep 11, 2023Completed
final sign-off Jan 2025
580 California StNovo Construction Inc23rd fl - mech & elect work for ti ref pa 2023-0725-2883
Details
Permit
202309116315
Permit issued
Sep 13, 2023
Final sign-off
Jan 16, 2025

23rd fl - mech & elect work for ti ref pa 2023-0725-2883

Open the permit page

$15,000
Sep 7, 2023Completed
final sign-off Jun 2024
580 California StSkyline Construction22/f: interior demo of existing office partitions. no exterior work to be done.
Details
Permit
202309076117
Permit issued
Sep 28, 2023
Final sign-off
Jun 4, 2024

22/f: interior demo of existing office partitions. no exterior work to be done.

Open the permit page

$100,000
Sep 5, 2023Completed
final sign-off Jul 2024
580 California StTri-Signal Integration Inc.installation of a new remote call station on 23rd fl; elevator lobby to be connected to existing communication system
Details
Permit
202309055901
Permit issued
Sep 12, 2023
Final sign-off
Jul 18, 2024

installation of a new remote call station on 23rd fl; elevator lobby to be connected to existing communication system

Open the permit page

$9,879
Aug 10, 2023Completed
final sign-off Oct 2023
580 California StIntelligent Technologies & Services Incprovide & install apre-action detection & control system within 19th fl idf room 1912. this work includes a conventional panel, area smoke detection and audible. ref pa202306089570.
Details
Permit
202308104145
Permit issued
Aug 10, 2023
Final sign-off
Oct 23, 2023

provide & install apre-action detection & control system within 19th fl idf room 1912. this work includes a conventional panel, area smoke detection and audible. ref pa202306089570.

Open the permit page

$21,840
Aug 7, 2023Never finaled
issued Aug 2023, no final
580 California StPioneer Fire Inc.13/f - ste 1335: relocate 23 pendents, add 2 pendents and remove 2 pendents
Details
Permit
202308073863
Permit issued
Aug 8, 2023

13/f - ste 1335: relocate 23 pendents, add 2 pendents and remove 2 pendents

Open the permit page

$5,400
Aug 3, 2023Completed
final sign-off Oct 2023
580 California StTri-Signal Integration Inc.delete existing devices and appliances and install new on the 19th fl due to tenant iprovements.
Details
Permit
202308033606
Permit issued
Aug 3, 2023
Final sign-off
Oct 23, 2023

delete existing devices and appliances and install new on the 19th fl due to tenant iprovements.

Open the permit page

$18,789
Aug 3, 2023Completed
final sign-off Oct 2023
580 California StGolden Gate Fire Protection Incfire sprinkler t.i.; relocate 4 uprights, relocate 57 pendents, and relocate 18 conceled pendents on 19th fl. ref t.i. pa# 202306089570.
Details
Permit
202308033672
Permit issued
Aug 7, 2023
Final sign-off
Oct 23, 2023

fire sprinkler t.i.; relocate 4 uprights, relocate 57 pendents, and relocate 18 conceled pendents on 19th fl. ref t.i. pa# 202306089570.

Open the permit page

$48,980
Aug 3, 2023Completed
final sign-off Aug 2023
580 California StSan Francisco Commercial Builders Increvision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system.
Details
Permit
202308033674
Permit issued
Aug 3, 2023
Final sign-off
Aug 11, 2023

revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system.

Open the permit page

Jul 27, 2023Completed
final sign-off Oct 2023
580 California StTri-Signal Integration Inc.fire alarm: delete existing devices and appliances and install new in suite 1335 due to tenant improvement
Details
Permit
202307273080
Permit issued
Jul 27, 2023
Final sign-off
Oct 30, 2023

fire alarm: delete existing devices and appliances and install new in suite 1335 due to tenant improvement

Open the permit page

$17,987
Jul 25, 2023Completed
final sign-off Jul 2024
580 California Stsuite 2300: constr of new office, power, ceiling, & small slope @ (e) conference room/reception w/new floor core & finishes. mep, l/s & sprinkler system under separate permit. addition of card reader/push button in accordance w/1010.2.12.1
Details
Permit
202307252883
Permit issued
Jul 31, 2023
Final sign-off
Jul 18, 2024

suite 2300: constr of new office, power, ceiling, & small slope @ (e) conference room/reception w/new floor core & finishes. mep, l/s & sprinkler system under separate permit. addition of card reader/push button in accordance w/1010.2.12.1

Open the permit page

$219,682
Jun 29, 2023Completed
final sign-off Apr 2024
580 California StSkyline Construction19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570
Details
Permit
202306291127
Permit issued
Jul 10, 2023
Final sign-off
Apr 16, 2024

19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570

Open the permit page

$25,000
Jun 8, 2023Completed
final sign-off Apr 2024
580 California StSkyline Construction19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a.
Details
Permit
202306089570
Permit issued
Jul 10, 2023
Final sign-off
Apr 16, 2024

19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a.

Open the permit page

$450,000
May 17, 2023Completed
final sign-off Jan 2024
580 California StNovo Construction Inc19/f: full fixture, finish and ada upgrades to common area restrooms. mep, f/l/s and sprinklers under separate permit.
Details
Permit
202305177943
Permit issued
Jul 13, 2023
Final sign-off
Jan 9, 2024

19/f: full fixture, finish and ada upgrades to common area restrooms. mep, f/l/s and sprinklers under separate permit.

Open the permit page

$100,000
May 8, 2023Completed
final sign-off Aug 2023
580 California StNovo Construction Incadministrative permit to remove deferred mechanical requirement from permit app 202205134260. elec, plumb, life safety and sprinklers still under separate permits.
Details
Permit
202305087280
Permit issued
May 31, 2023
Final sign-off
Aug 1, 2023

administrative permit to remove deferred mechanical requirement from permit app 202205134260. elec, plumb, life safety and sprinklers still under separate permits.

Open the permit page

May 5, 2023Completed
final sign-off Apr 2024
580 California StNovo Construction Inc13/f: electrical title 24 compliances for t.i. restrooms. ref pa 202205134260.
Details
Permit
202305057214
Permit issued
May 8, 2023
Final sign-off
Apr 15, 2024

13/f: electrical title 24 compliances for t.i. restrooms. ref pa 202205134260.

Open the permit page

$10,000
Apr 25, 2023Expired or cancelled
cancelled Jan 2026
580 California Strequest for technical infeasibility at restrooms with riser main conflict at accessible stall. accessibility is being provided to the maximum extent possible - floors 5,9, 10, 17, 18, 19, 20 & 23
Details
Permit
202304256393

request for technical infeasibility at restrooms with riser main conflict at accessible stall. accessibility is being provided to the maximum extent possible - floors 5,9, 10, 17, 18, 19, 20 & 23

Open the permit page

Apr 6, 2023Completed
final sign-off Apr 2024
580 California StNovo Construction Inc13/f ste# 1335: demo of non-structural walls,doors,finishes,ceilings,lighting,mechanical,electrical outlets and switches. refer to mep drawings, scope of work does not affect fixture quantities, occupant load or path of travel. no exterior bldg, site, landscape use or parking changes proposed.
Details
Permit
202304065177
Permit issued
Jul 13, 2023
Final sign-off
Apr 4, 2024

13/f ste# 1335: demo of non-structural walls,doors,finishes,ceilings,lighting,mechanical,electrical outlets and switches. refer to mep drawings, scope of work does not affect fixture quantities, occupant load or path of travel. no exterior bldg, site, landscape use or parking changes proposed.

Open the permit page

$100,000
Mar 7, 2023Never finaled
issued Mar 2023, no final
580 California StEmcor Services/Mesa Energy Systems Increvision to pa# 202301260769, to include anchorage calcs & details to pad.
Details
Permit
202303073133
Permit issued
Mar 7, 2023

revision to pa# 202301260769, to include anchorage calcs & details to pad.

Open the permit page

Feb 8, 2023Completed
final sign-off Aug 2023
580 California StSan Francisco Commercial Builders Incupgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal.
Details
Permit
202302081593
Permit issued
Apr 5, 2023
Final sign-off
Aug 11, 2023

upgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal.

Open the permit page

$80,000
Jan 26, 2023Completed
final sign-off Sep 2023
580 California StEmcor Services/Mesa Energy Systems Incinstall (n) house keeping concrete pad and install new heat exchange
Details
Permit
202301260769
Permit issued
Feb 15, 2023
Final sign-off
Sep 15, 2023

install (n) house keeping concrete pad and install new heat exchange

Open the permit page

$458,151
Jan 13, 2023Completed
final sign-off Apr 2023
580 California StNovo Construction Inc13th fl, ste 1350 - electrical work for ti ref pa 2022-0929-3426
Details
Permit
202301130175
Permit issued
Feb 2, 2023
Final sign-off
Apr 18, 2023

13th fl, ste 1350 - electrical work for ti ref pa 2022-0929-3426

Open the permit page

$12,000
Nov 7, 2022Completed
final sign-off Dec 2022
580 California StGolden Gate Fire Protection Incfire spinklers; relocate 42 upright sprinklers on the 13th floor.
Details
Permit
202211075977
Permit issued
Nov 7, 2022
Final sign-off
Dec 16, 2022

fire spinklers; relocate 42 upright sprinklers on the 13th floor.

Open the permit page

$22,050
Oct 3, 2022Completed
final sign-off Feb 2023
580 California StNovo Construction Inc13th fl: floor consists of limited demo of non -structural partitions and associated power data, ceiling items and finishes througout space is currently unoccupied per ab-017 occupancy (e) paths travel restrooms to be undr sep permit mep is deffered
Details
Permit
202210033599
Permit issued
Nov 8, 2022
Final sign-off
Feb 28, 2023

13th fl: floor consists of limited demo of non -structural partitions and associated power data, ceiling items and finishes througout space is currently unoccupied per ab-017 occupancy (e) paths travel restrooms to be undr sep permit mep is deffered

Open the permit page

$18,000
Sep 29, 2022Completed
final sign-off Feb 2023
580 California StNovo Construction Incsuite 1350 mgmt off - scope of work consists of limited demo of non-structural partitions & associated power data, downlights & finishes throughout. limited construction of (n) conference room which includes (n) partitions, finishes, power & lighting. mep & life safety deferred.
Details
Permit
202209293426
Permit issued
Oct 4, 2022
Final sign-off
Feb 28, 2023

suite 1350 mgmt off - scope of work consists of limited demo of non-structural partitions & associated power data, downlights & finishes throughout. limited construction of (n) conference room which includes (n) partitions, finishes, power & lighting. mep & life safety deferred.

Open the permit page

$100,000
Aug 29, 2022Completed
final sign-off Jan 2023
580 California StTri-Signal Integration Inc.17/f: fire alarm mod due to t.i. : remove (e) appiances/devices and add notification appliance. ref t.i. pa202206287215.
Details
Permit
202208291436
Permit issued
Aug 29, 2022
Final sign-off
Jan 27, 2023

17/f: fire alarm mod due to t.i. : remove (e) appiances/devices and add notification appliance. ref t.i. pa202206287215.

Open the permit page

$13,789
Aug 11, 2022Completed
final sign-off Sep 2022
580 California StAnderson, Rowe & Buckley, Inc.fire sprinkler only relocate 33 pendents, add pendents and plug off 2 heads for wcas 17th fl
Details
Permit
202208110311
Permit issued
Aug 11, 2022
Final sign-off
Sep 16, 2022

fire sprinkler only relocate 33 pendents, add pendents and plug off 2 heads for wcas 17th fl

Open the permit page

$17,500
Aug 9, 2022Completed
final sign-off Mar 2023
580 California StPeacock Constructionmechanical and electrical engineered drawings for base permit 202206287215
Details
Permit
202208090158
Permit issued
Aug 10, 2022
Final sign-off
Mar 15, 2023

mechanical and electrical engineered drawings for base permit 202206287215

Open the permit page

$90,000
Jul 28, 2022Completed
final sign-off Jun 2023
580 California StTri-Signal Integration Inc.replace all devices in stairwell communication system in existing locations
Details
Permit
202207289468
Permit issued
Jul 28, 2022
Final sign-off
Jun 30, 2023

replace all devices in stairwell communication system in existing locations

Open the permit page

$76,789
Jul 28, 2022Completed
final sign-off Aug 2022
580 California StTri-Signal Integration Inc.revision to 202112073831 for t.i. 8th & 10th fl: install (2) proper supplies, (12) smoke detectors, (7) pull stations, (9) strobes, relocate (4) strobes, add (20) speakers. pull stations were existing
Details
Permit
202207289467
Permit issued
Aug 2, 2022
Final sign-off
Aug 12, 2022

revision to 202112073831 for t.i. 8th & 10th fl: install (2) proper supplies, (12) smoke detectors, (7) pull stations, (9) strobes, relocate (4) strobes, add (20) speakers. pull stations were existing

Open the permit page

$20,000
Jun 28, 2022Completed
final sign-off Feb 2023
580 California StPeacock Construction17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)
Details
Permit
202206287215
Permit issued
Jul 1, 2022
Final sign-off
Feb 13, 2023

17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)

Open the permit page

$902,002
May 13, 2022Completed
final sign-off Aug 2023
580 California StNovo Construction Incfixture and finishes upgradeof common area restrooms, no structural work mep under sep permit
Details
Permit
202205134260
Permit issued
Aug 22, 2022
Final sign-off
Aug 1, 2023

fixture and finishes upgradeof common area restrooms, no structural work mep under sep permit

Open the permit page

$200,000
Mar 28, 2022Completed
final sign-off Oct 2022
580 California StSan Francisco Commercial Builders Inc23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.
Details
Permit
202203280981
Permit issued
Jun 16, 2022
Final sign-off
Oct 21, 2022

23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.

Open the permit page

$190,000
Mar 21, 2022Never finaled
issued Mar 2022, no final
580 California StGigabyte Graphics Inc. Dba Fastsigns9th & 10th fl: install six 1/8" thick non-glare acrylic evacuation signs. 15.5" x 23.5" to interior.
Details
Permit
202203210409
Permit issued
Mar 21, 2022

9th & 10th fl: install six 1/8" thick non-glare acrylic evacuation signs. 15.5" x 23.5" to interior.

Open the permit page

$1,000
Dec 7, 2021Never finaled
issued Feb 2022, no final
580 California StTri-Signal Integration Inc.replace limited number of field devices due to age; as is; not an upgrade; intent is not to bring to current code
Details
Permit
202112073827
Permit issued
Feb 2, 2022

replace limited number of field devices due to age; as is; not an upgrade; intent is not to bring to current code

Open the permit page

$100,000
Dec 7, 2021Never finaled
issued Dec 2021, no final
580 California StTri-Signal Integration Inc.t.i for 9th and 10th flrs to install 2 power supplies, 12 smoke detectors, 7 pull stations, 9 strobes, relocate 4 strobes and add 20 speakers. pull stations existing
Details
Permit
202112073831
Permit issued
Dec 7, 2021

t.i for 9th and 10th flrs to install 2 power supplies, 12 smoke detectors, 7 pull stations, 9 strobes, relocate 4 strobes and add 20 speakers. pull stations existing

Open the permit page

$20,000
Nov 23, 2021Never finaled
issued Nov 2021, no final
580 California StGolden Gate Fire Protection Incfire sprinklers, relocate 33 pendent sprinklers & relocate 18 upright on the 9th fl. relocate 33 pendent sprinklers & 67 uprights on the 10th fl. t.i. ref #202101283514 (9th fl) & #202101273474 (10ht fl)
Details
Permit
202111232977
Permit issued
Nov 23, 2021

fire sprinklers, relocate 33 pendent sprinklers & relocate 18 upright on the 9th fl. relocate 33 pendent sprinklers & 67 uprights on the 10th fl. t.i. ref #202101283514 (9th fl) & #202101273474 (10ht fl)

Open the permit page

$30,200
Sep 22, 2021Completed
final sign-off Oct 2021
580 California StTri-Signal Integration Inc.relocate 1 strobe & remove 1 strobe
Details
Permit
202109228898
Permit issued
Sep 22, 2021
Final sign-off
Oct 20, 2021

relocate 1 strobe & remove 1 strobe

Open the permit page

$9,500
Jun 9, 2021Completed
final sign-off Nov 2021
580 California StPeacock Constructionste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting.
Details
Permit
202106092013
Permit issued
Jul 7, 2021
Final sign-off
Nov 8, 2021

ste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting.

Open the permit page

$96,690
Jan 28, 2021Completed
final sign-off Nov 2022
580 California StNovo Construction Inc9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a.
Details
Permit
202101283514
Permit issued
Sep 1, 2021
Final sign-off
Nov 10, 2022

9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a.

Open the permit page

$1,725,959
Jan 27, 2021Completed
final sign-off Feb 2023
580 California St10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a.
Details
Permit
202101273474
Permit issued
Sep 7, 2021
Final sign-off
Feb 9, 2023

10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a.

Open the permit page

$2,002,819
Feb 13, 2020Never finaled
issued Feb 2020, no final
580 California StTri-Signal Integration Inc.ref pa# 201912200226; frie alram system dodifications add (1) speaker/strobe to (e) system
Details
Permit
202002134416
Permit issued
Feb 13, 2020

ref pa# 201912200226; frie alram system dodifications add (1) speaker/strobe to (e) system

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
580 California Ststreet space
Details
Permit
M1193467
Permit issued
Feb 12, 2020

street space

Open the permit page

Feb 11, 2020Completed
final sign-off Oct 2020
580 California StPeacock Constructiont24 mechanical for work under 201912200226
Details
Permit
202002114123
Permit issued
Feb 11, 2020
Final sign-off
Oct 14, 2020

t24 mechanical for work under 201912200226

Open the permit page

Jan 17, 2020Completed
final sign-off Apr 2020
580 California StGolden Gate Fire Protection Incref pa# 201912200226; fire sprinklers relocate 9 pendent sprinklers on the 11th fl. n/a maher
Details
Permit
202001172147
Permit issued
Jan 17, 2020
Final sign-off
Apr 30, 2020

ref pa# 201912200226; fire sprinklers relocate 9 pendent sprinklers on the 11th fl. n/a maher

Open the permit page

$4,500
Jan 10, 2020Never finaled
issued Jan 2020, no final
580 California Ststreet space
Details
Permit
M1183807
Permit issued
Jan 10, 2020

street space

Open the permit page

Dec 30, 2019Completed
final sign-off May 2020
580 California StPeacock Construction5th floor: t-24 electrical for work under app#201905312116
Details
Permit
201912300907
Permit issued
Dec 30, 2019
Final sign-off
May 8, 2020

5th floor: t-24 electrical for work under app#201905312116

Open the permit page

Dec 30, 2019Completed
final sign-off May 2020
580 California StPeacock Construction19th floor: t-24 electrical for work under app#201910073676
Details
Permit
201912300908
Permit issued
Dec 30, 2019
Final sign-off
May 1, 2020

19th floor: t-24 electrical for work under app#201910073676

Open the permit page

Dec 30, 2019Never finaled
issued Dec 2019, no final
580 California StPeacock Construction10th floor: t-24 electrical for work under app#201909161723
Details
Permit
201912300906
Permit issued
Dec 30, 2019

10th floor: t-24 electrical for work under app#201909161723

Open the permit page

Dec 30, 2019Completed
final sign-off Mar 2020
580 California StPeacock Construction9th floor: t-24 electrical for work under app#201909261721
Details
Permit
201912300905
Permit issued
Dec 30, 2019
Final sign-off
Mar 12, 2020

9th floor: t-24 electrical for work under app#201909261721

Open the permit page

Dec 20, 2019Completed
final sign-off Oct 2020
580 California StPeacock Construction11th flr - tenant improvement: demo and new non-structural partitions, electrical, light fixtures, and finishes. life safety and sprinklers under separate permit.
Details
Permit
201912200226
Permit issued
Dec 30, 2019
Final sign-off
Oct 13, 2020

11th flr - tenant improvement: demo and new non-structural partitions, electrical, light fixtures, and finishes. life safety and sprinklers under separate permit.

Open the permit page

$148,000
Dec 17, 2019Never finaled
issued Dec 2019, no final
580 California Ststreet space
Details
Permit
M1176387
Permit issued
Dec 17, 2019

street space

Open the permit page

Dec 10, 2019Completed
final sign-off May 2020
580 California StPeacock Constructiont-24 mechanical for work under 201910033676
Details
Permit
201912109176
Permit issued
Dec 17, 2019
Final sign-off
May 1, 2020

t-24 mechanical for work under 201910033676

Open the permit page

$2,500
Dec 10, 2019Never finaled
issued Dec 2019, no final
580 California Ststreet space only
Details
Permit
M1173927
Permit issued
Dec 10, 2019

street space only

Open the permit page

Dec 10, 2019Completed
final sign-off Mar 2020
580 California StPeacock Constructionfl 9th & 10th - t24 mechanical for work under 201909161721 and 201909161723
Details
Permit
201912109175
Permit issued
Dec 17, 2019
Final sign-off
Mar 12, 2020

fl 9th & 10th - t24 mechanical for work under 201909161721 and 201909161723

Open the permit page

$1,500
Nov 27, 2019Completed
final sign-off Apr 2020
580 California StGolden Gate Fire Protection Incfire sprinkler only relocate 02 pendents for suite 1925 19th flr maher not req
Details
Permit
201911278323
Permit issued
Nov 27, 2019
Final sign-off
Apr 9, 2020

fire sprinkler only relocate 02 pendents for suite 1925 19th flr maher not req

Open the permit page

$1,200
Nov 22, 2019Completed
final sign-off Feb 2020
580 California StTri-Signal Integration Inc.5th fl: ref pa# 201909111277; no devices added
Details
Permit
201911227954
Permit issued
Nov 26, 2019
Final sign-off
Feb 1, 2020

5th fl: ref pa# 201909111277; no devices added

Open the permit page

Nov 22, 2019Never finaled
issued Nov 2019, no final
580 California StTri-Signal Integration Inc.19th fl: ref pa# 201910073676; fa ti includes relocate (2) strobes, connected to (e) nac circuit
Details
Permit
201911227953
Permit issued
Nov 26, 2019

19th fl: ref pa# 201910073676; fa ti includes relocate (2) strobes, connected to (e) nac circuit

Open the permit page

$1,000
Nov 18, 2019Completed
final sign-off Feb 2020
580 California StGolden Gate Fire Protection Inc9th & 10th flr fire sprinklers. relocate (10 pendent sprinklers on the 9th & 10th fl. restrooms ref pa# 201909161721 (9th fl) & 201909161723 (10th fl)
Details
Permit
201911187504
Permit issued
Nov 18, 2019
Final sign-off
Feb 1, 2020

9th & 10th flr fire sprinklers. relocate (10 pendent sprinklers on the 9th & 10th fl. restrooms ref pa# 201909161721 (9th fl) & 201909161723 (10th fl)

Open the permit page

$5,000
Nov 5, 2019Never finaled
issued Nov 2019, no final
580 California Ststreet space only
Details
Permit
M1162207
Permit issued
Nov 5, 2019

street space only

Open the permit page

Oct 15, 2019Completed
final sign-off May 2020
580 California StPeacock Constructiont-24 mechanical for work under pa# 201905312116
Details
Permit
201910154518
Permit issued
Oct 16, 2019
Final sign-off
May 8, 2020

t-24 mechanical for work under pa# 201905312116

Open the permit page

Oct 7, 2019Completed
final sign-off May 2020
580 California StPeacock Constructionsuite 1925: interior tenant improvement: removal of non-structural partitions, new finishes, lighting & open office. mep, fire life safety & sprinkler under separate permit. maher na
Details
Permit
201910073676
Permit issued
Oct 30, 2019
Final sign-off
May 1, 2020

suite 1925: interior tenant improvement: removal of non-structural partitions, new finishes, lighting & open office. mep, fire life safety & sprinkler under separate permit. maher na

Open the permit page

$168,000
Oct 3, 2019Never finaled
issued Oct 2019, no final
580 California Ststreet space
Details
Permit
M1147407
Permit issued
Oct 3, 2019

street space

Open the permit page

Sep 18, 2019Completed
final sign-off Oct 2019
580 California StGolden Gate Fire Protection Incfire sprinkler - relocate 92 upright sprinklers on the 9th fl (demo).
Details
Permit
201909181931
Permit issued
Sep 18, 2019
Final sign-off
Oct 7, 2019

fire sprinkler - relocate 92 upright sprinklers on the 9th fl (demo).

Open the permit page

$46,000
Sep 16, 2019Completed
final sign-off Mar 2020
580 California StPeacock Constructionproject consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.
Details
Permit
201909161723
Permit issued
Oct 23, 2019
Final sign-off
Mar 12, 2020

project consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.

Open the permit page

$200,000
Sep 16, 2019Completed
final sign-off Mar 2020
580 California StPeacock Constructionproject consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.
Details
Permit
201909161721
Permit issued
Oct 23, 2019
Final sign-off
Mar 12, 2020

project consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.

Open the permit page

$200,000
Sep 11, 2019Completed
final sign-off Feb 2020
580 California StTri-Signal Integration Inc.fire alarm ti includes add 1 smoke det, 2 relay modules, 13 speakr strobes, 4 strobe, 1 sync module 1 control relay to e fire alarm system. ref pa 201907095384
Details
Permit
201909111277
Permit issued
Sep 17, 2019
Final sign-off
Feb 7, 2020

fire alarm ti includes add 1 smoke det, 2 relay modules, 13 speakr strobes, 4 strobe, 1 sync module 1 control relay to e fire alarm system. ref pa 201907095384

Open the permit page

$12,000
Sep 10, 2019Completed
final sign-off Oct 2019
580 California StGolden Gate Fire Protection Incfire sprinklers relocate 50 uprights, 18 pendents & 32 concealed pendents on the 5th flr, ref ti 201905312116
Details
Permit
201909101135
Permit issued
Sep 10, 2019
Final sign-off
Oct 18, 2019

fire sprinklers relocate 50 uprights, 18 pendents & 32 concealed pendents on the 5th flr, ref ti 201905312116

Open the permit page

$50,000
Jul 26, 2019Completed
final sign-off Sep 2019
580 California StRichlen Construction17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permit
Details
Permit
201907267041
Permit issued
Aug 6, 2019
Final sign-off
Sep 26, 2019

17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permit

Open the permit page

$104,936
Jul 18, 2019Completed
final sign-off Nov 2019
580 California StPeacock Constructiondemolition of extg non structural partitions, doors, glazing, finishes. ceiling system, light fixture, devices, cabinets, tele/data, and elecrical fire life safety and sprinklers to remain.
Details
Permit
201907186263
Permit issued
Aug 12, 2019
Final sign-off
Nov 20, 2019

demolition of extg non structural partitions, doors, glazing, finishes. ceiling system, light fixture, devices, cabinets, tele/data, and elecrical fire life safety and sprinklers to remain.

Open the permit page

$137,000
Jul 9, 2019Completed
final sign-off May 2020
580 California StPeacock Constructiontenant improvement to vacant suite. demo and new non structural partitions, elec light fixtures and finishes. mep included; fire life safety as reference
Details
Permit
201907095384
Permit issued
Aug 12, 2019
Final sign-off
May 8, 2020

tenant improvement to vacant suite. demo and new non structural partitions, elec light fixtures and finishes. mep included; fire life safety as reference

Open the permit page

$1,320,000
Jul 9, 2019Expired or cancelled
cancelled Jan 2026
580 California Sttenant improvement to vacant suite. demo and new non structural partitions, elec, light fixtures and finishes. fire life safety, mep included
Details
Permit
201907095383

tenant improvement to vacant suite. demo and new non structural partitions, elec, light fixtures and finishes. fire life safety, mep included

Open the permit page

$1,320,000
Jul 9, 2019Never finaled
issued Jul 2019, no final
580 California StEmcor Services/Mesa Energy Systems Increplace outside air fan with new cell fan wall
Details
Permit
201907095369
Permit issued
Jul 17, 2019

replace outside air fan with new cell fan wall

Open the permit page

$105,000
May 31, 2019Completed
final sign-off May 2020
580 California StPeacock Construction5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permit
Details
Permit
201905312116
Permit issued
Aug 23, 2019
Final sign-off
May 8, 2020

5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permit

Open the permit page

$200,000
Apr 3, 2019Completed
final sign-off Oct 2020
580 California StPeacock Constructionbarrier removal, adding automatic door operator actuator at starbucks entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05
Details
Permit
201904037034
Permit issued
Sep 2, 2020
Final sign-off
Oct 5, 2020

barrier removal, adding automatic door operator actuator at starbucks entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05

Open the permit page

$30,000
Apr 3, 2019Completed
final sign-off Oct 2020
580 California StPeacock Constructionbarrier removal, adding automatic door operator actuator at secondary entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05
Details
Permit
201904037035
Permit issued
Sep 2, 2020
Final sign-off
Oct 6, 2020

barrier removal, adding automatic door operator actuator at secondary entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05

Open the permit page

$30,000
Apr 3, 2019Completed
final sign-off Oct 2020
580 California StPeacock Constructionbarrier removal, adding automatic door operator actuator at ladle & leaf entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05
Details
Permit
201904037025
Permit issued
Sep 2, 2020
Final sign-off
Oct 6, 2020

barrier removal, adding automatic door operator actuator at ladle & leaf entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05

Open the permit page

$30,000
Apr 3, 2019Completed
final sign-off Oct 2020
580 California StPeacock Constructionbarrier removal, adding automatic door operator actuator at main entry per accessible business entry program ordinance 51-16. all work to comply with da-04 & da-05
Details
Permit
201904037033
Permit issued
Sep 2, 2020
Final sign-off
Oct 5, 2020

barrier removal, adding automatic door operator actuator at main entry per accessible business entry program ordinance 51-16. all work to comply with da-04 & da-05

Open the permit page

$30,000
Nov 14, 2018Completed
final sign-off Jan 2019
580 California St20th flr. fire sprinklers, relocate 2 pendent sprinkler, ref t.i pa 201810102735
Details
Permit
201811145850
Permit issued
Nov 14, 2018
Final sign-off
Jan 30, 2019

20th flr. fire sprinklers, relocate 2 pendent sprinkler, ref t.i pa 201810102735

Open the permit page

$1,000
Nov 5, 2018Completed
final sign-off Mar 2019
580 California StMcclure Electric Incsuite 2050: title 24 only, lighting. ref 201810102735
Details
Permit
201811054928
Permit issued
Nov 5, 2018
Final sign-off
Mar 5, 2019

suite 2050: title 24 only, lighting. ref 201810102735

Open the permit page

Oct 23, 2018Completed
final sign-off Feb 2019
580 California StTri-Signal Integration Inc.relocate 1 strobe, remove 1 strobe. ref#201807023555.
Details
Permit
201810233840
Permit issued
Oct 23, 2018
Final sign-off
Feb 15, 2019

relocate 1 strobe, remove 1 strobe. ref#201807023555.

Open the permit page

$1,500
Oct 19, 2018Never finaled
issued Oct 2018, no final
580 California StTri-Signal Integration Inc.as-builts, ref 201810021940
Details
Permit
201810193670
Permit issued
Oct 19, 2018

as-builts, ref 201810021940

Open the permit page

Oct 10, 2018Completed
final sign-off Feb 2019
580 California StMarchetti Groupsuite 2050 -add recption counter suspended ceiling grid system at (e) breakroom/kitchenetter open office space mill work mep deferred
Details
Permit
201810102735
Permit issued
Oct 16, 2018
Final sign-off
Feb 14, 2019

suite 2050 -add recption counter suspended ceiling grid system at (e) breakroom/kitchenetter open office space mill work mep deferred

Open the permit page

$90,000
Oct 2, 2018Completed
final sign-off Oct 2018
580 California StTri-Signal Integration Inc.fa ti includes: add 1 relay module, relocate 3 strobes, 1 speaker ref#201806273154 n/a for maher.
Details
Permit
201810021940
Permit issued
Oct 2, 2018
Final sign-off
Oct 26, 2018

fa ti includes: add 1 relay module, relocate 3 strobes, 1 speaker ref#201806273154 n/a for maher.

Open the permit page

$1,500
Sep 14, 2018Completed
final sign-off Oct 2018
580 California StSkender Construction Llc18th fl - evacuation maps. ref pa 2018-0627-3154
Details
Permit
201809140203
Permit issued
Sep 14, 2018
Final sign-off
Oct 26, 2018

18th fl - evacuation maps. ref pa 2018-0627-3154

Open the permit page

$1,000
Sep 13, 2018Completed
final sign-off Dec 2018
580 California StRichlen Construction4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662
Details
Permit
201809130003
Permit issued
Sep 17, 2018
Final sign-off
Dec 5, 2018

4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662

Open the permit page

$12,000
Sep 11, 2018Completed
final sign-off Nov 2018
580 California StWaterproofing Associatesreroofing.
Details
Permit
201809119632
Permit issued
Sep 11, 2018
Final sign-off
Nov 8, 2018

reroofing.

Open the permit page

$588,459
Jul 31, 2018Completed
final sign-off Oct 2018
580 California StTri-Signal Integration Inc.20th floor - add 1 speaker, relocate 5 strobes maher na
Details
Permit
201807315959
Permit issued
Jul 31, 2018
Final sign-off
Oct 1, 2018

20th floor - add 1 speaker, relocate 5 strobes maher na

Open the permit page

$2,000
Jul 25, 2018Completed
final sign-off Sep 2018
580 California St18th flr. fire sprinklers. 17 relocated pendents, 1 added. ref ba# 201806273154
Details
Permit
201807255464
Permit issued
Jul 25, 2018
Final sign-off
Sep 6, 2018

18th flr. fire sprinklers. 17 relocated pendents, 1 added. ref ba# 201806273154

Open the permit page

$3,900
Jul 24, 2018Completed
final sign-off Aug 2018
580 California StGolden Gate Fire Protection Incfire sprinkler only. relocate 10 pendents for north point advisors for 20th floor. app #2018-07-02-3555. maher n/a
Details
Permit
201807245347
Permit issued
Jul 26, 2018
Final sign-off
Aug 13, 2018

fire sprinkler only. relocate 10 pendents for north point advisors for 20th floor. app #2018-07-02-3555. maher n/a

Open the permit page

$5,500
Jul 16, 2018Completed
final sign-off Oct 2018
580 California StRichlen Construction4th fl - ti on a full floor build out, demo existing walls & mnior construction of new walls, finishes, millwork and power/data work. design-build mep, sprinkler system & life safetey modification is under separate permit
Details
Permit
201807164662
Permit issued
Aug 23, 2018
Final sign-off
Oct 25, 2018

4th fl - ti on a full floor build out, demo existing walls & mnior construction of new walls, finishes, millwork and power/data work. design-build mep, sprinkler system & life safetey modification is under separate permit

Open the permit page

$123,000
Jul 2, 2018Completed
final sign-off Dec 2018
580 California StPeacock Construction20/f: limited modification and expansion of existing ti, to include selective partition demo, and modifications to ceiling grid, & tile, light fixture relocations. new office doors & frame, salvage & reuse exisitng materials of millwork and new finishes
Details
Permit
201807023555
Permit issued
Jul 11, 2018
Final sign-off
Dec 4, 2018

20/f: limited modification and expansion of existing ti, to include selective partition demo, and modifications to ceiling grid, & tile, light fixture relocations. new office doors & frame, salvage & reuse exisitng materials of millwork and new finishes

Open the permit page

$420,000
Jun 27, 2018Completed
final sign-off Oct 2018
580 California StSkender Construction Llc18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community room
Details
Permit
201806273154
Permit issued
Jul 20, 2018
Final sign-off
Oct 26, 2018

18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community room

Open the permit page

$500,000
Jun 21, 2018Completed
final sign-off Sep 2018
580 California StTri-Signal Integration Inc.fa ti includes: add (1) speaker/strobe (1) strobe and relocate (1) existing strobe. n/a maher
Details
Permit
201806212512
Permit issued
Jun 21, 2018
Final sign-off
Sep 4, 2018

fa ti includes: add (1) speaker/strobe (1) strobe and relocate (1) existing strobe. n/a maher

Open the permit page

$2,000
Jun 7, 2018Completed
final sign-off Jul 2018
580 California StPribuss Engineering Incfire sprinkler t.i. on 23rd fl. relocated sprinkers (6), added sprinklers (2), total (8) ($514.00). n/a maher
Details
Permit
201806071198
Permit issued
Jun 7, 2018
Final sign-off
Jul 16, 2018

fire sprinkler t.i. on 23rd fl. relocated sprinkers (6), added sprinklers (2), total (8) ($514.00). n/a maher

Open the permit page

$4,112
Apr 26, 2018Completed
final sign-off Jan 2019
580 California StPeacock Construction20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher na
Details
Permit
201804267457
Permit issued
Aug 27, 2018
Final sign-off
Jan 2, 2019

20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher na

Open the permit page

$14,000
Apr 26, 2018Completed
final sign-off Jan 2019
580 California StPeacock Construction19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher na
Details
Permit
201804267456
Permit issued
Aug 27, 2018
Final sign-off
Jan 2, 2019

19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher na

Open the permit page

$13,000
Mar 27, 2018Completed
final sign-off Sep 2018
580 California StFisher Development Incinterior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher na
Details
Permit
201803274746
Permit issued
Apr 23, 2018
Final sign-off
Sep 6, 2018

interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher na

Open the permit page

$250,000
Mar 22, 2018Completed
final sign-off Jan 2019
580 California Stinterior work to restrooms on the 18th fl. scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler under sep permit
Details
Permit
201803224315
Permit issued
Aug 27, 2018
Final sign-off
Jan 2, 2019

interior work to restrooms on the 18th fl. scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler under sep permit

Open the permit page

$175,000
Feb 15, 2018Completed
final sign-off Jan 2019
580 California StPeacock Constructioninterior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher na
Details
Permit
201802151373
Permit issued
Aug 27, 2018
Final sign-off
Jan 2, 2019

interior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher na

Open the permit page

$175,000
Feb 2, 2018Never finaled
issued Feb 2018, no final
580 California StC B F Inctitle 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a.
Details
Permit
201802020277
Permit issued
Feb 2, 2018

title 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a.

Open the permit page

$20,000
Nov 6, 2017Never finaled
issued Nov 2017, no final
580 California StA S F Electric Inc11th floor suite 1100 - new lights, controls title 24.. ref pa #201706270446. n/a maher ordinance
Details
Permit
201711063193
Permit issued
Nov 6, 2017

11th floor suite 1100 - new lights, controls title 24.. ref pa #201706270446. n/a maher ordinance

Open the permit page

$10,000
Sep 7, 2017Completed
final sign-off Nov 2017
580 California StTri-Signal Integration Inc.11th fl: suite 1100 conference room. add 1 speaker/strobe to existing fire alarm system ref pa 2017-0627-0446. maher na
Details
Permit
201709077141
Permit issued
Sep 7, 2017
Final sign-off
Nov 1, 2017

11th fl: suite 1100 conference room. add 1 speaker/strobe to existing fire alarm system ref pa 2017-0627-0446. maher na

Open the permit page

$1,500
Aug 31, 2017Completed
final sign-off Dec 2017
580 California Stfire sprinkler t.i. relocate 52, add 2 pendents, replace 50 pendents with upright sprinklers & add 8 uprights. t.i. pa#201706129080. n/a ordinance #155-13
Details
Permit
201708316593
Permit issued
Aug 31, 2017
Final sign-off
Dec 4, 2017

fire sprinkler t.i. relocate 52, add 2 pendents, replace 50 pendents with upright sprinklers & add 8 uprights. t.i. pa#201706129080. n/a ordinance #155-13

Open the permit page

$57,568
Aug 25, 2017Completed
final sign-off Oct 2017
580 California StTri-Signal Integration Inc.4/f - fire alarm ti includes: add ten(10) speaker/strobes and one (1) strobe to existing fire alarm system, relocate seven (7) speakers and fire strrobes. ref ti appl.# 2017-0627-0446.
Details
Permit
201708255870
Permit issued
Aug 25, 2017
Final sign-off
Oct 10, 2017

4/f - fire alarm ti includes: add ten(10) speaker/strobes and one (1) strobe to existing fire alarm system, relocate seven (7) speakers and fire strrobes. ref ti appl.# 2017-0627-0446.

Open the permit page

$7,000
Aug 17, 2017Completed
final sign-off Oct 2017
580 California StRichlen Constructionrev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall.
Details
Permit
201708175110
Permit issued
Aug 17, 2017
Final sign-off
Oct 25, 2017

rev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall.

Open the permit page

Aug 3, 2017Completed
final sign-off Oct 2017
580 California StRichlen Construction#1700- construction of new office and demise on (e) office, relocate (2) light fixtures, install new ada compliant water fountain. paint throughout. space is currently unoccupied. life safety, sprinkler and mep under seperate permits. n/a ordinance #155-13
Details
Permit
201708033770
Permit issued
Aug 11, 2017
Final sign-off
Oct 25, 2017

#1700- construction of new office and demise on (e) office, relocate (2) light fixtures, install new ada compliant water fountain. paint throughout. space is currently unoccupied. life safety, sprinkler and mep under seperate permits. n/a ordinance #155-13

Open the permit page

$36,800
Jun 27, 2017Completed
final sign-off Dec 2017
580 California StSan Francisco Commercial Builders Inc11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit.
Details
Permit
201706270446
Permit issued
Jul 14, 2017
Final sign-off
Dec 8, 2017

11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit.

Open the permit page

$48,000
Jun 23, 2017Completed
final sign-off Jul 2017
580 California StTri-Signal Integration Inc.as built for previously approved fa permit 201705025372, to include 4 new duct detectors for >2000 cfm fans per pa 201701318262 (ameps).
Details
Permit
201706230162
Permit issued
Jun 23, 2017
Final sign-off
Jul 10, 2017

as built for previously approved fa permit 201705025372, to include 4 new duct detectors for >2000 cfm fans per pa 201701318262 (ameps).

Open the permit page

Jun 12, 2017Never finaled
issued Jul 2017, no final
580 California StRichlen Construction4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not req
Details
Permit
201706129080
Permit issued
Jul 7, 2017

4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not req

Open the permit page

$800,000
May 2, 2017Completed
final sign-off Jul 2017
580 California StTri-Signal Integration Inc.1st floor - fire alarm ti includes 7 new strobes to circuit "b2", add 1 new speaker to circuit "c", relocate 1 speaker on circuit "c", remove 2 strobes from circuite b4 & remove circuit "b4". maher na
Details
Permit
201705025372
Permit issued
May 2, 2017
Final sign-off
Jul 7, 2017

1st floor - fire alarm ti includes 7 new strobes to circuit "b2", add 1 new speaker to circuit "c", relocate 1 speaker on circuit "c", remove 2 strobes from circuite b4 & remove circuit "b4". maher na

Open the permit page

$5,000
Apr 26, 2017Completed
final sign-off Jun 2017
580 California StAyoob & Peery Plumbing Co Inc1/f #150- add (3), relocate (23) & remove (2) fire sprinklers per t.i. ref. t.i. pa#201701318262. n/a ordinance #155-13
Details
Permit
201704264903
Permit issued
Apr 26, 2017
Final sign-off
Jun 19, 2017

1/f #150- add (3), relocate (23) & remove (2) fire sprinklers per t.i. ref. t.i. pa#201701318262. n/a ordinance #155-13

Open the permit page

$13,650
Apr 25, 2017Completed
final sign-off Jul 2017
580 California StSuperior Electrical Advertising Incinstall (1) illuminated interior window sign "starbucks".
Details
Permit
201704254832
Permit issued
May 17, 2017
Final sign-off
Jul 7, 2017

install (1) illuminated interior window sign "starbucks".

Open the permit page

$2,000
Apr 25, 2017Completed
final sign-off Jul 2017
580 California StSuperior Electrical Advertising Incinstall (2) illuminated wall signs onto existing cabinets "starbucks".
Details
Permit
201704254828
Permit issued
May 17, 2017
Final sign-off
Jul 7, 2017

install (2) illuminated wall signs onto existing cabinets "starbucks".

Open the permit page

$6,000
Mar 24, 2017Never finaled
issued Mar 2017, no final
580 California StAnderson, Rowe & Buckley, Inc.as built per fire inspector: add 9 heads ref pa 2017-0126-8005
Details
Permit
201703242239
Permit issued
Mar 24, 2017

as built per fire inspector: add 9 heads ref pa 2017-0126-8005

Open the permit page

Jan 31, 2017Completed
final sign-off Jul 2017
580 California StT C B Builders Incsuite # 150: commercial tenant improvement to an extg vacant unit includes mechanical, electrical and plumbing. signage and spriklers under seperate pemit. n/a for maher.
Details
Permit
201701318262
Permit issued
Mar 9, 2017
Final sign-off
Jul 7, 2017

suite # 150: commercial tenant improvement to an extg vacant unit includes mechanical, electrical and plumbing. signage and spriklers under seperate pemit. n/a for maher.

Open the permit page

$215,938
Jan 26, 2017Completed
final sign-off May 2017
580 California StAnderson, Rowe & Buckley, Inc.fire sprinler system ti 93 relocated & 16 added sprinklers and 12 plugged sprinklers. ref pa 2016-1214-4935. maher na
Details
Permit
201701268005
Permit issued
Jan 26, 2017
Final sign-off
May 15, 2017

fire sprinler system ti 93 relocated & 16 added sprinklers and 12 plugged sprinklers. ref pa 2016-1214-4935. maher na

Open the permit page

$54,000
Jan 18, 2017Completed
final sign-off May 2017
580 California StTri-Signal Integration Inc.7th floor: fire alarm t.i. includes add 7 speakers and 19 strobes to extg fire alarm system, relocate 9 extg speakers and 2 strobes. remove 1 smoke detectors, and 8 strobes. ref app#201612144935. n/a for maher.
Details
Permit
201701187327
Permit issued
Jan 18, 2017
Final sign-off
May 9, 2017

7th floor: fire alarm t.i. includes add 7 speakers and 19 strobes to extg fire alarm system, relocate 9 extg speakers and 2 strobes. remove 1 smoke detectors, and 8 strobes. ref app#201612144935. n/a for maher.

Open the permit page

$13,950
Jan 18, 2017Never finaled
issued Jan 2017, no final
580 California StTri-Signal Integration Inc.1st floor: fire alarm t.i. includes add 1 relay modules to extg fire alarm. n/a for maher. ref app#201608104653
Details
Permit
201701187326
Permit issued
Jan 18, 2017

1st floor: fire alarm t.i. includes add 1 relay modules to extg fire alarm. n/a for maher. ref app#201608104653

Open the permit page

$1,500
Jan 4, 2017Completed
final sign-off Jun 2017
580 California StRichlen Constructionsuite 150: revision to app#201606139764. install base bldg mep equipment for future tenant. add new transformer circuit breaker, nw conduit ring/string, add fan, 2 panel boards with meters, new exhaust fan, 2 new heat pump,& new cold water meter. n/a for maher.
Details
Permit
201701046471
Permit issued
Jan 4, 2017
Final sign-off
Jun 23, 2017

suite 150: revision to app#201606139764. install base bldg mep equipment for future tenant. add new transformer circuit breaker, nw conduit ring/string, add fan, 2 panel boards with meters, new exhaust fan, 2 new heat pump,& new cold water meter. n/a for maher.

Open the permit page

$250,000
Dec 14, 2016Completed
final sign-off Jul 2017
580 California StRichlen Construction7th flr: ti - including demo of walls and (e) ceiling system, new walls, electrical and ceiling finishes & life safety maher na
Details
Permit
201612144935
Permit issued
Dec 16, 2016
Final sign-off
Jul 27, 2017

7th flr: ti - including demo of walls and (e) ceiling system, new walls, electrical and ceiling finishes & life safety maher na

Open the permit page

$1,300,000
Dec 12, 2016Completed
final sign-off Jul 2018
580 California StRossi Builders Inc.revision to 201608104653. new destination dispatch/keypad consoles in elevator lobby. elec sep permit
Details
Permit
201612124725
Permit issued
May 3, 2017
Final sign-off
Jul 16, 2018

revision to 201608104653. new destination dispatch/keypad consoles in elevator lobby. elec sep permit

Open the permit page

$5,200
Dec 1, 2016Completed
final sign-off Jul 2018
580 California StRossi Builders Inc.lobby: minor renovation to extg bldg lobby. work consists of new reception desk, new screen walls, finishes, and relamping lights. electrical and fire on separate permit. no mechanical and plbmg. n/a for maher
Details
Permit
201612013949
Permit issued
May 3, 2017
Final sign-off
Jul 16, 2018

lobby: minor renovation to extg bldg lobby. work consists of new reception desk, new screen walls, finishes, and relamping lights. electrical and fire on separate permit. no mechanical and plbmg. n/a for maher

Open the permit page

$1,290,000
Nov 30, 2016Completed
final sign-off Dec 2016
580 California StPribuss Engineering Incfire sprinkler as built for 2016-0830-6332. n/a for maher
Details
Permit
201611303810
Permit issued
Nov 30, 2016
Final sign-off
Dec 14, 2016

fire sprinkler as built for 2016-0830-6332. n/a for maher

Open the permit page

Nov 17, 2016Completed
final sign-off Dec 2016
580 California StPribuss Engineering Inc1st floor fire sprinkler - ste. 175 - t.i . under pa #201606139764 - relocates 14, adds 4 totoal = 18. n/a maher ordinance
Details
Permit
201611172962
Permit issued
Nov 21, 2016
Final sign-off
Dec 21, 2016

1st floor fire sprinkler - ste. 175 - t.i . under pa #201606139764 - relocates 14, adds 4 totoal = 18. n/a maher ordinance

Open the permit page

$9,263
Oct 31, 2016Completed
final sign-off Dec 2016
580 California StTri-Signal Integration Inc.2nd floor - add 7 speakers and 6 strobes; replace 10 speakers, 1 strobe, relocate 6 strobes; remove 1 smoke detector, 1 door holder, 3 speakers, 2 strobes. ref pa 2016-0613-9762 maher na
Details
Permit
201610311460
Permit issued
Oct 31, 2016
Final sign-off
Dec 5, 2016

2nd floor - add 7 speakers and 6 strobes; replace 10 speakers, 1 strobe, relocate 6 strobes; remove 1 smoke detector, 1 door holder, 3 speakers, 2 strobes. ref pa 2016-0613-9762 maher na

Open the permit page

$7,800
Oct 31, 2016Completed
final sign-off Dec 2016
580 California StTri-Signal Integration Inc.add 2 new weatherproof strobes; relocate 1 speaker and 2 strobes; remove 1 speaker and 3 strobes. ref pa 2016-08104674. maher na
Details
Permit
201610311457
Permit issued
Oct 31, 2016
Final sign-off
Dec 5, 2016

add 2 new weatherproof strobes; relocate 1 speaker and 2 strobes; remove 1 speaker and 3 strobes. ref pa 2016-08104674. maher na

Open the permit page

$2,000
Oct 31, 2016Completed
final sign-off Dec 2016
580 California StTri-Signal Integration Inc.add 3 speakers and 4 strobes; remove 1 pull station, 1 speaker. ref pa 2016-0810-4653. maher na
Details
Permit
201610311459
Permit issued
Oct 31, 2016
Final sign-off
Dec 5, 2016

add 3 speakers and 4 strobes; remove 1 pull station, 1 speaker. ref pa 2016-0810-4653. maher na

Open the permit page

$4,300
Sep 22, 2016Never finaled
issued Sep 2016, no final
580 California StTri-Signal Integration Inc.suite 1300 fire alarm ti add one speaker and one strobe. relocate 3 speakers and 7 strobes. ref pa 2016-0720-2862
Details
Permit
201609228514
Permit issued
Sep 22, 2016

suite 1300 fire alarm ti add one speaker and one strobe. relocate 3 speakers and 7 strobes. ref pa 2016-0720-2862

Open the permit page

$6,500
Aug 30, 2016Completed
final sign-off Dec 2016
580 California StPribuss Engineering Inc2nd floor: fire sprinkler t.i. under gc #2016-0613-9762. relocate 86, add 02, plug 02. nfpa-13. n/a for maher.
Details
Permit
201608306332
Permit issued
Sep 1, 2016
Final sign-off
Dec 14, 2016

2nd floor: fire sprinkler t.i. under gc #2016-0613-9762. relocate 86, add 02, plug 02. nfpa-13. n/a for maher.

Open the permit page

$45,524
Aug 18, 2016Completed
final sign-off Aug 2016
580 California StPribuss Engineering Incsuite 1300 fire sprinkler ti under 201607202862 relocate 4. n/a for maher.
Details
Permit
201608185379
Permit issued
Aug 23, 2016
Final sign-off
Aug 29, 2016

suite 1300 fire sprinkler ti under 201607202862 relocate 4. n/a for maher.

Open the permit page

$2,070
Aug 10, 2016Completed
final sign-off Dec 2016
580 California StPribuss Engineering Inc1st flr: ste 150: fire sprinkler t.i. ref. 201606139764, relocates 19 total 9,829.
Details
Permit
201608104674
Permit issued
Aug 10, 2016
Final sign-off
Dec 21, 2016

1st flr: ste 150: fire sprinkler t.i. ref. 201606139764, relocates 19 total 9,829.

Open the permit page

$9,829
Aug 10, 2016Completed
final sign-off Apr 2017
580 California StRichlen Construction#175- demolition of interior partitions, doors, frames, hardware & finishes. space is currently unoccupied. construction of new conference room, bike storage, pantry & office. new finishes throughout. sprinkler/life safety under separate permit. maher na
Details
Permit
201608104653
Permit issued
Aug 11, 2016
Final sign-off
Apr 27, 2017

#175- demolition of interior partitions, doors, frames, hardware & finishes. space is currently unoccupied. construction of new conference room, bike storage, pantry & office. new finishes throughout. sprinkler/life safety under separate permit. maher na

Open the permit page

$350,000
Jul 20, 2016Completed
final sign-off Nov 2016
580 California StRichlen Construction13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordina
Details
Permit
201607202862
Permit issued
Aug 1, 2016
Final sign-off
Nov 7, 2016

13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordina

Open the permit page

$232,000
Jun 13, 2016Completed
final sign-off Apr 2017
580 California StRichlen Constructionarch/mep for ste 150 demo interior partitions, doors, frames, hardware, power/data, and finishes; currently unoccupied. construction of demising partition at vestibule and new finishes throughout. demo & construction of restrooms and showers. fire sprinkler and alarms under separate permit. maher na
Details
Permit
201606139764
Permit issued
Jul 15, 2016
Final sign-off
Apr 27, 2017

arch/mep for ste 150 demo interior partitions, doors, frames, hardware, power/data, and finishes; currently unoccupied. construction of demising partition at vestibule and new finishes throughout. demo & construction of restrooms and showers. fire sprinkler and alarms under separate permit. maher na

Open the permit page

$140,640
Jun 13, 2016Completed
final sign-off Apr 2017
580 California StRichlen Constructionarch/mep full floor ste 200 demolition of select interior partitions and millwork. construction of new conferences and phone rooms. new millwork, power/data and finishes throughout. space is currently unoccupied. fire sprinklers and alarms under separate permit
Details
Permit
201606139762
Permit issued
Jul 15, 2016
Final sign-off
Apr 27, 2017

arch/mep full floor ste 200 demolition of select interior partitions and millwork. construction of new conferences and phone rooms. new millwork, power/data and finishes throughout. space is currently unoccupied. fire sprinklers and alarms under separate permit

Open the permit page

$803,040
May 20, 2016Never finaled
issued May 2016, no final
580 California Stfire sprinkler permit, demo (e) sprinkler head in elevator shaft and elevator machine room on 13/f & roof level. 19 deleted sprinkler heads. n/a ordinance #155-13
Details
Permit
201605208020
Permit issued
May 20, 2016

fire sprinkler permit, demo (e) sprinkler head in elevator shaft and elevator machine room on 13/f & roof level. 19 deleted sprinkler heads. n/a ordinance #155-13

Open the permit page

$5,243
Sep 22, 2015Never finaled
issued Sep 2015, no final
580 California Ststreet space
Details
Permit
M623987
Permit issued
Sep 22, 2015

street space

Open the permit page

Aug 25, 2015Expired or cancelled
cancelled Jan 2026
580 California Stfire sprinkler elevator modernization, remove heads at top of elevator shafts & in elevator machine room on 15th & 23rd floor. reference ab2.01 addendum "d".
Details
Permit
201508255233

fire sprinkler elevator modernization, remove heads at top of elevator shafts & in elevator machine room on 15th & 23rd floor. reference ab2.01 addendum "d".

Open the permit page

$2,500
Aug 20, 2015Never finaled
issued Aug 2015, no final
580 California Ststreet space
Details
Permit
M616607
Permit issued
Aug 20, 2015

street space

Open the permit page

Aug 20, 2015Never finaled
issued Aug 2015, no final
580 California StPioneer Fire Inc.21/f: relocate or add fire sprinklers to accommodate new buildout, gf per 2015-0708-0886. compliance with maher ordinance no 155-13 not required.
Details
Permit
201508204842
Permit issued
Aug 20, 2015

21/f: relocate or add fire sprinklers to accommodate new buildout, gf per 2015-0708-0886. compliance with maher ordinance no 155-13 not required.

Open the permit page

$3,900
Aug 6, 2015Completed
final sign-off Nov 2017
580 California StTri-Signal Integration Inc.fire alarm t.i., add 1 speaker and 1 strobe to existing fire system. maher not req
Details
Permit
201508063474
Permit issued
Aug 6, 2015
Final sign-off
Nov 1, 2017

fire alarm t.i., add 1 speaker and 1 strobe to existing fire system. maher not req

Open the permit page

$1,200
Jul 8, 2015Completed
final sign-off Nov 2015
580 California StRichlen Construction21st floor: new work consists of new ceiling ht partitions, doors, frames, and hardware. new millwork, new power/data, finishes throughout space is currently unoccupied. sprinkler/life safety under seperate permit. n/a for the maher.
Details
Permit
201507080886
Permit issued
Jul 17, 2015
Final sign-off
Nov 9, 2015

21st floor: new work consists of new ceiling ht partitions, doors, frames, and hardware. new millwork, new power/data, finishes throughout space is currently unoccupied. sprinkler/life safety under seperate permit. n/a for the maher.

Open the permit page

$500,000
Jul 8, 2015Never finaled
issued Jul 2015, no final
580 California Ststreet space
Details
Permit
M601127
Permit issued
Jul 8, 2015

street space

Open the permit page

May 22, 2015Never finaled
issued May 2015, no final
580 California StTri-Signal Integration Inc.14th & penthouse: fire alarm upgrade due to elevator upgrade: add 2 relay modules for flashing in elevators and removing heat detector is elevator machine rooms. maher na
Details
Permit
201505226969
Permit issued
May 22, 2015

14th & penthouse: fire alarm upgrade due to elevator upgrade: add 2 relay modules for flashing in elevators and removing heat detector is elevator machine rooms. maher na

Open the permit page

$1,400
Apr 13, 2015Completed
final sign-off Aug 2015
580 California StRichlen Constructionrenovation of beakrooms, new cabinets and appiances. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req
Details
Permit
201504133473
Permit issued
Apr 16, 2015
Final sign-off
Aug 11, 2015

renovation of beakrooms, new cabinets and appiances. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req

Open the permit page

$50,000
Apr 13, 2015Completed
final sign-off Aug 2015
580 California StRichlen Constructionrenovation of beakrooms, new cabinets and appiances. renovation of reception area. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req
Details
Permit
201504133472
Permit issued
Apr 16, 2015
Final sign-off
Aug 11, 2015

renovation of beakrooms, new cabinets and appiances. renovation of reception area. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req

Open the permit page

$80,000
Oct 1, 2014Completed
final sign-off Oct 2014
580 California StGolden Gate Fire Protection Inc13rd floor - relocate 7 pendent sprinkler. ref #2014.0815.3925. compliance with ord 155-13 na
Details
Permit
201410017752
Permit issued
Oct 1, 2014
Final sign-off
Oct 14, 2014

13rd floor - relocate 7 pendent sprinkler. ref #2014.0815.3925. compliance with ord 155-13 na

Open the permit page

$3,605
Sep 11, 2014Completed
final sign-off Oct 2014
580 California StTri-Signal Integration Inc.add 1 new strobe to existing nac circuit maher not req
Details
Permit
201409116035
Permit issued
Sep 11, 2014
Final sign-off
Oct 16, 2014

add 1 new strobe to existing nac circuit maher not req

Open the permit page

$1,200
Aug 15, 2014Completed
final sign-off Jan 2015
580 California StPeacock Construction13th floor ste 1330 - demolition & construction of interior non-load bearing partitions, doors, millwork & finishes. minor modifications to lighting /switching as required by this scope. any mech, elec, life safety/fire protection modifications under separate permit.
Details
Permit
201408153925
Permit issued
Aug 29, 2014
Final sign-off
Jan 9, 2015

13th floor ste 1330 - demolition & construction of interior non-load bearing partitions, doors, millwork & finishes. minor modifications to lighting /switching as required by this scope. any mech, elec, life safety/fire protection modifications under separate permit.

Open the permit page

$57,000
Jun 30, 2014Completed
final sign-off Aug 2014
580 California StSan Francisco Commercial Builders Inc#1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a.
Details
Permit
201406300087
Permit issued
Jul 16, 2014
Final sign-off
Aug 26, 2014

#1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a.

Open the permit page

$58,000
May 30, 2014Completed
final sign-off Jun 2014
580 California StAnderson, Rowe & Buckley, Inc.fire sprinkler t.i.: add 3 heads, relocate 111 heads, total heads 114. t.i. pa# 201404183582. n/a ordinance #155-13.
Details
Permit
201405307075
Permit issued
May 30, 2014
Final sign-off
Jun 26, 2014

fire sprinkler t.i.: add 3 heads, relocate 111 heads, total heads 114. t.i. pa# 201404183582. n/a ordinance #155-13.

Open the permit page

$58,872
May 9, 2014Completed
final sign-off Jul 2014
580 California StTri-Signal Integration Inc.(e) fire alarm ti, add: 1 speaker; 22 speaker strobes, 2 strobes, 1 smoke detector, 1 realy module, 1 control realy, 1 sync module to existing fire alarm system. ref pa# 201404183582. na for maher ordiance.
Details
Permit
201405095303
Permit issued
May 9, 2014
Final sign-off
Jul 14, 2014

(e) fire alarm ti, add: 1 speaker; 22 speaker strobes, 2 strobes, 1 smoke detector, 1 realy module, 1 control realy, 1 sync module to existing fire alarm system. ref pa# 201404183582. na for maher ordiance.

Open the permit page

$10,500
Apr 18, 2014Completed
final sign-off Jul 2014
580 California StDpr Construction5th floor: t.i. for office bldg. modification of non-structural partitions doors, cabinets and finishes. life safety , sprinkler work under deffered submittal. n/a for the maher ordinance #155-13 incl mep
Details
Permit
201404183582
Permit issued
Apr 28, 2014
Final sign-off
Jul 21, 2014

5th floor: t.i. for office bldg. modification of non-structural partitions doors, cabinets and finishes. life safety , sprinkler work under deffered submittal. n/a for the maher ordinance #155-13 incl mep

Open the permit page

$1,294,546
Apr 16, 2014Expired or cancelled
cancelled Sep 2023
580 California StTri-Signal Integration Inc.14th floor: as built for app#201402259224
Details
Permit
201404163409

14th floor: as built for app#201402259224

Open the permit page

Mar 31, 2014Completed
final sign-off Jun 2014
580 California StSkyline Constructionrevision to 201312103769. new scope of work is revision to occupancy loads and existing to document as built conditions - and remove requirement for place of assembly permit - no "a" occupancy in this tenant space. maher ordiance not required.
Details
Permit
201403312009
Permit issued
Apr 2, 2014
Final sign-off
Jun 3, 2014

revision to 201312103769. new scope of work is revision to occupancy loads and existing to document as built conditions - and remove requirement for place of assembly permit - no "a" occupancy in this tenant space. maher ordiance not required.

Open the permit page

Mar 26, 2014Completed
final sign-off Jun 2014
580 California StSkyline Constructionrev. to pa#201312103769 scope of work at elevator lobby: relocation of exit sign, relocate of emergency door release pull, expand fire pull station opening 4" in all directions, bring fire pull station/fire mains jack to fill compliance.
Details
Permit
201403261764
Permit issued
Apr 2, 2014
Final sign-off
Jun 3, 2014

rev. to pa#201312103769 scope of work at elevator lobby: relocation of exit sign, relocate of emergency door release pull, expand fire pull station opening 4" in all directions, bring fire pull station/fire mains jack to fill compliance.

Open the permit page

Mar 12, 2014Expired or cancelled
cancelled Jan 2026
580 California Strevise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13.
Details
Permit
201403120580

revise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13.

Open the permit page

Feb 25, 2014Completed
final sign-off Jun 2014
580 California StSkyline Constructionrevision to pa #2013/1210/3769 to provide structural calcs. and details for folding partitions.
Details
Permit
201402259299
Permit issued
Feb 27, 2014
Final sign-off
Jun 3, 2014

revision to pa #2013/1210/3769 to provide structural calcs. and details for folding partitions.

Open the permit page

$8,000
Feb 25, 2014Completed
final sign-off Apr 2014
580 California StTri-Signal Integration Inc.floor 14th suite 1420, add 2 speakers and 3 strobe lights to existing fire alarm system. complaince with ordinance #155-13 not required.
Details
Permit
201402259224
Permit issued
Feb 25, 2014
Final sign-off
Apr 22, 2014

floor 14th suite 1420, add 2 speakers and 3 strobe lights to existing fire alarm system. complaince with ordinance #155-13 not required.

Open the permit page

$3,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Tri-Signal Integration Inc. (42), Peacock Construction (27), Skyline Construction (25), Golden Gate Fire Protection Inc (15), Richlen Construction (15), Novo Construction Inc (11), Anderson, Rowe & Buckley, Inc. (6), Pribuss Engineering Inc (6), San Francisco Commercial Builders Inc (5), Ayoob & Peery Plumbing Co Inc (3), Emcor Services/Mesa Energy Systems Inc (3), Pioneer Fire Inc. (2), Rossi Builders Inc. (2), Skender Construction Llc (2), Superior Electrical Advertising Inc (2), A S F Electric Inc, C B F Inc, Capitol Electric Const, Dpr Construction, Fisher Development Inc, Gigabyte Graphics Inc. Dba Fastsigns, Intelligent Technologies & Services Inc, Marchetti Group, Mcclure Electric Inc, Rainbow Waterproofing & Restor, T C B Builders Inc, Urban Graphics Inc, Waterproofing Associates
Architects
Martha Breed (8), Scott E Clement (8), Leighton Lee (5), Sashikala Murthy (4), Christopher Preovolos (2), Claudette Bleijenberg (2), Joseph A. Remling (2), Revel Archi (2), Stanley H Lew (2), Suwanty Mulia (2), Adriana Daringa, Ajp Associates, Alma Rossy Jauregui, Carl Christiansen, Jin Park, John Kamus, Joyce Polhamus, Katherine Dwyer, Michael J Myers, Shawn Anderson, William Diefenbach
Engineers
Amit Wadhwa (3), Stephen Shafeer (3), Alexander Joseph Pacheco (2), Joshua Mcmahan (2), Levi Abarte (2), Rudolfo P Bustos Iii (2), Christopher Jordan Malabed, Craig Laws, Daniel Shearer, Edward Rivera, Edward Rivera, Guil Orihuela, Habtom Nugusse Tewelde, Jing Wei Huang, Lars Peter Mortensen, Laura Hendrickson, Mike Howe, Prabhjeet Grewal, Sashikala Murthy, Wiss, Janney, Elster Ass., Xuong Quach, Zin Min Aye
Authorized agents
Joyce Mizuhara (2)
Designers
Tri-Signal Integration Inc. (4), Moline Jason, Peter Mchugh, William Anthony Baker

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.