Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress issued Nov 2026 | 580 California St | Skyline Construction | mechanical work for tenant improvement at suite 1300. ref. arch 202608196811Details
mechanical work for tenant improvement at suite 1300. ref. arch 202608196811 | $25,000 |
| Oct 20, 2026 | In progress issued Oct 2026 | 580 California St | Skyline Construction | suite 1500: mechanical work for t.i. ref #202608267180.Details
suite 1500: mechanical work for t.i. ref #202608267180. | $25,000 |
| Oct 1, 2026 | In progress issued Oct 2026 | 580 California St | Skyline Construction | electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500Details
electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500 | $165,000 |
| Sep 30, 2026 | In progress issued Oct 2026 | 580 California St | Skyline Construction | suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811Details
suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811 | $120,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 580 California St | Skyline Construction | 15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits.Details
15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits. | $3,034,458 |
| Aug 19, 2026 | In progress issued Aug 2026 | 580 California St | Skyline Construction | 13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixturesDetails
13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures | $966,322 |
| Feb 12, 2026 | Completed final sign-off Feb 2026 | 580 California St | Tri-Signal Integration Inc. | 19/f suite 1925: addition of 1 ceiling mounted strobe in suite 1925 due to tenant improvement. balance of system shall remain as is. ref t.i permit 202511149707Details
19/f suite 1925: addition of 1 ceiling mounted strobe in suite 1925 due to tenant improvement. balance of system shall remain as is. ref t.i permit 202511149707 | $11,987 |
| Jan 15, 2026 | Completed final sign-off Feb 2026 | 580 California St | 19/f: fire sprinkler permit: add 1 pendent f/s on the 19/f. ref t.i. pa 202511149707.Details
19/f: fire sprinkler permit: add 1 pendent f/s on the 19/f. ref t.i. pa 202511149707. | $1,000 | |
| Nov 14, 2025 | Completed final sign-off May 2026 | 580 California St | Skyline Construction | 19/fl- interior demo and construction of non structural elements including but not necessarly limited to interior partitions doors, outlets, lighting, mep plans fire alarm and sprinkler plans will be submitted as separte permits. scope of work does not affect fixtures count, load or occupancyDetails
19/fl- interior demo and construction of non structural elements including but not necessarly limited to interior partitions doors, outlets, lighting, mep plans fire alarm and sprinkler plans will be submitted as separte permits. scope of work does not affect fixtures count, load or occupancy | $246,119 |
| Aug 5, 2025 | Completed final sign-off Sep 2025 | 580 California St | Skyline Construction | 20th fl, ste 2000 mechanical and electricl work for ti ref pa 202505086068Details
20th fl, ste 2000 mechanical and electricl work for ti ref pa 202505086068 | $120,000 |
| Jul 23, 2025 | Completed final sign-off Aug 2025 | 580 California St | Tri-Signal Integration Inc. | 20/f: add 2 notification appliances in room# 2001 and 2002 and relocate 1 speaker in room 2020. realign existing devices and appliances as needed to match new ceiling grid. ti ref# 202505086068Details
20/f: add 2 notification appliances in room# 2001 and 2002 and relocate 1 speaker in room 2020. realign existing devices and appliances as needed to match new ceiling grid. ti ref# 202505086068 | $12,987 |
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 580 California St | Tri-Signal Integration Inc. | 14/f: remove existing and install new notification appliances in suite 1400 mpr due to tenant improvement. the balance of the system will remain "as is".Details
14/f: remove existing and install new notification appliances in suite 1400 mpr due to tenant improvement. the balance of the system will remain "as is". | $10,987 |
| Jul 2, 2025 | Completed final sign-off Jul 2025 | 580 California St | Ayoob & Peery Plumbing Co Inc | 20th floor: add 3 relocate 12 fire sprinkler per t.i. job #25-646 ref pa #202505086068Details
20th floor: add 3 relocate 12 fire sprinkler per t.i. job #25-646 ref pa #202505086068 | $9,317 |
| Jul 1, 2025 | In progress filed Jul 2025, not yet issued | 580 California St | Ayoob & Peery Plumbing Co Inc | 20th floor. add 3 relocate. 12 fire sprinkler per ti. ref# 202505086068.Details
20th floor. add 3 relocate. 12 fire sprinkler per ti. ref# 202505086068. | $9,317 |
| Jun 25, 2025 | In progress issued Jun 2025 | 580 California St | Anderson, Rowe & Buckley, Inc. | suite # 1400: t.i. /alteration project of existing office space. mechanical modification to accommodate architectural changes includes: new ductwork and grillers, reconfiguration of existing ductwork, and air distribution, ddc controls and air balance. ti arch. #202505065906. mechanical only.Details
suite # 1400: t.i. /alteration project of existing office space. mechanical modification to accommodate architectural changes includes: new ductwork and grillers, reconfiguration of existing ductwork, and air distribution, ddc controls and air balance. ti arch. #202505065906. mechanical only. | $30,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 580 California St | Golden Gate Fire Protection Inc | 14th floor. relocate 6 pendents on the 14th floor. ref#: t.i. 202505065906Details
14th floor. relocate 6 pendents on the 14th floor. ref#: t.i. 202505065906 | $1,500 |
| Jun 18, 2025 | Completed final sign-off Sep 2025 | 580 California St | Capitol Electric Const | suite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906Details
suite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906 | $28,530 |
| May 8, 2025 | Completed final sign-off Sep 2025 | 580 California St | Skyline Construction | 20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit.Details
20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit. | $600,000 |
| May 6, 2025 | Completed final sign-off Sep 2025 | 580 California St | Skyline Construction | ste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred.Details
ste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred. | $300,000 |
| Apr 30, 2025 | Completed final sign-off Jul 2025 | 580 California St | Skyline Construction | 8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673Details
8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673 | $12,000 |
| Apr 23, 2025 | Completed final sign-off May 2025 | 580 California St | Golden Gate Fire Protection Inc | relocate 4 pendent sprinklers on the 8th fl ref 202503061673Details
relocate 4 pendent sprinklers on the 8th fl ref 202503061673 | $1,000 |
| Mar 6, 2025 | Completed final sign-off Jul 2025 | 580 California St | Skyline Construction | 8th/fl: tenant improvement, demo of structural partitions, ceilings, light fixtures, and flooring in break area only . new paint, ceilings, flooring, and light fixtures in break area only. * mep deferred if requiredDetails
8th/fl: tenant improvement, demo of structural partitions, ceilings, light fixtures, and flooring in break area only . new paint, ceilings, flooring, and light fixtures in break area only. * mep deferred if required | $71,394 |
| Nov 20, 2024 | Completed final sign-off Dec 2024 | 580 California St | Anderson, Rowe & Buckley, Inc. | 14th floor; existing fire sprinkler system. tenant improvement, relocate 5 and remove 1 fire sprinkler. ref#: 202410032248. arb#: 24255Details
14th floor; existing fire sprinkler system. tenant improvement, relocate 5 and remove 1 fire sprinkler. ref#: 202410032248. arb#: 24255 | $1,250 |
| Oct 3, 2024 | Completed final sign-off Jan 2025 | 580 California St | Skyline Construction | 14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldgDetails
14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldg | $110,000 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 580 California St | Skyline Construction | 22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobbyDetails
22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobby | |
| Sep 25, 2024 | Completed final sign-off Dec 2024 | 580 California St | Rainbow Waterproofing & Restor | remove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removedDetails
remove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removed | $18,110 |
| Mar 20, 2024 | Completed final sign-off Apr 2024 | 580 California St | Tri-Signal Integration Inc. | remove devices and applicanes to bring 18th fl back to core and shell ref pa# 202402226349Details
remove devices and applicanes to bring 18th fl back to core and shell ref pa# 202402226349 | $14,897 |
| Feb 22, 2024 | Completed final sign-off May 2024 | 580 California St | Skyline Construction | 18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep paDetails
18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep pa | $100,000 |
| Feb 14, 2024 | Completed final sign-off Apr 2024 | 580 California St | Golden Gate Fire Protection Inc | relocate 95 upright sprinklers on 18th/f to accomodate demoDetails
relocate 95 upright sprinklers on 18th/f to accomodate demo | $52,250 |
| Jan 25, 2024 | In progress issued Jan 2024 | 580 California St | Urban Graphics Inc | 22/f: evacuation plans (x3). | $2,000 |
| Dec 15, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | 22/f: revision to permit 202309207029. change of offices room size by shifting partitions.Details
22/f: revision to permit 202309207029. change of offices room size by shifting partitions. | $50,000 |
| Nov 21, 2023 | In progress issued Dec 2023 | 580 California St | Tri-Signal Integration Inc. | 19/f: delete 2 (e) speakers and 2 (e) strobes for restroom and replace w/ combination 2 speakers strobes due to ti, ref pa# 202305177943 & 202306089570.Details
19/f: delete 2 (e) speakers and 2 (e) strobes for restroom and replace w/ combination 2 speakers strobes due to ti, ref pa# 202305177943 & 202306089570. | $8,199 |
| Nov 14, 2023 | Expired or cancelled cancelled Oct 2024 | 580 California St | Tri-Signal Integration Inc. | installation of a new remote call station on 22nd fl elevator lobby due to tenant improvement to connect to existing stairwell communication.Details
installation of a new remote call station on 22nd fl elevator lobby due to tenant improvement to connect to existing stairwell communication. | $2,000 |
| Nov 7, 2023 | Completed final sign-off Jan 2024 | 580 California St | Golden Gate Fire Protection Inc | fire sprinklers; as built to 2023-0927-7490; relocate 32 pendents on the 22nd flDetails
fire sprinklers; as built to 2023-0927-7490; relocate 32 pendents on the 22nd fl | $1,000 |
| Nov 1, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | mechanical, electrical, plumbing system for 22nd fl t.i. ref to 202309207029Details
mechanical, electrical, plumbing system for 22nd fl t.i. ref to 202309207029 | $500,000 |
| Oct 24, 2023 | Completed final sign-off Apr 2024 | 580 California St | Tri-Signal Integration Inc. | 22/f: add notification devices to the existing fire alarm system due to tenant improvement. the balance to remain as is. ref. pa 202309076117Details
22/f: add notification devices to the existing fire alarm system due to tenant improvement. the balance to remain as is. ref. pa 202309076117 | $28,789 |
| Oct 18, 2023 | Completed final sign-off Jun 2024 | 580 California St | Tri-Signal Integration Inc. | installation of an rc-2a remote controller, relay and monitor modules on ground fl electrical room done to tenant improvement. ref # 202207289468.Details
installation of an rc-2a remote controller, relay and monitor modules on ground fl electrical room done to tenant improvement. ref # 202207289468. | $19,897 |
| Sep 27, 2023 | Completed final sign-off Apr 2024 | 580 California St | Golden Gate Fire Protection Inc | 22/f: fire sprinkler; relocate 67 concealed pendents and 4 uprights. ref pa# 202309076117.Details
22/f: fire sprinkler; relocate 67 concealed pendents and 4 uprights. ref pa# 202309076117. | $44,020 |
| Sep 20, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | modification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom.Details
modification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom. | $2,457,066 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 580 California St | Novo Construction Inc | administrative permit to remove mechanical as a deferred submittal to pa# 202305177943.Details
administrative permit to remove mechanical as a deferred submittal to pa# 202305177943. | |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | structural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570Details
structural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570 | $5,000 |
| Sep 11, 2023 | Completed final sign-off Jan 2025 | 580 California St | Novo Construction Inc | 23rd fl - mech & elect work for ti ref pa 2023-0725-2883Details
23rd fl - mech & elect work for ti ref pa 2023-0725-2883 | $15,000 |
| Sep 7, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | 22/f: interior demo of existing office partitions. no exterior work to be done.Details
22/f: interior demo of existing office partitions. no exterior work to be done. | $100,000 |
| Sep 5, 2023 | Completed final sign-off Jul 2024 | 580 California St | Tri-Signal Integration Inc. | installation of a new remote call station on 23rd fl; elevator lobby to be connected to existing communication systemDetails
installation of a new remote call station on 23rd fl; elevator lobby to be connected to existing communication system | $9,879 |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 580 California St | Intelligent Technologies & Services Inc | provide & install apre-action detection & control system within 19th fl idf room 1912. this work includes a conventional panel, area smoke detection and audible. ref pa202306089570.Details
provide & install apre-action detection & control system within 19th fl idf room 1912. this work includes a conventional panel, area smoke detection and audible. ref pa202306089570. | $21,840 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 580 California St | Pioneer Fire Inc. | 13/f - ste 1335: relocate 23 pendents, add 2 pendents and remove 2 pendentsDetails
13/f - ste 1335: relocate 23 pendents, add 2 pendents and remove 2 pendents | $5,400 |
| Aug 3, 2023 | Completed final sign-off Oct 2023 | 580 California St | Tri-Signal Integration Inc. | delete existing devices and appliances and install new on the 19th fl due to tenant iprovements.Details
delete existing devices and appliances and install new on the 19th fl due to tenant iprovements. | $18,789 |
| Aug 3, 2023 | Completed final sign-off Oct 2023 | 580 California St | Golden Gate Fire Protection Inc | fire sprinkler t.i.; relocate 4 uprights, relocate 57 pendents, and relocate 18 conceled pendents on 19th fl. ref t.i. pa# 202306089570.Details
fire sprinkler t.i.; relocate 4 uprights, relocate 57 pendents, and relocate 18 conceled pendents on 19th fl. ref t.i. pa# 202306089570. | $48,980 |
| Aug 3, 2023 | Completed final sign-off Aug 2023 | 580 California St | San Francisco Commercial Builders Inc | revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system.Details
revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system. | |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 580 California St | Tri-Signal Integration Inc. | fire alarm: delete existing devices and appliances and install new in suite 1335 due to tenant improvementDetails
fire alarm: delete existing devices and appliances and install new in suite 1335 due to tenant improvement | $17,987 |
| Jul 25, 2023 | Completed final sign-off Jul 2024 | 580 California St | suite 2300: constr of new office, power, ceiling, & small slope @ (e) conference room/reception w/new floor core & finishes. mep, l/s & sprinkler system under separate permit. addition of card reader/push button in accordance w/1010.2.12.1Details
suite 2300: constr of new office, power, ceiling, & small slope @ (e) conference room/reception w/new floor core & finishes. mep, l/s & sprinkler system under separate permit. addition of card reader/push button in accordance w/1010.2.12.1 | $219,682 | |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | 19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570Details
19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570 | $25,000 |
| Jun 8, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | 19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a.Details
19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a. | $450,000 |
| May 17, 2023 | Completed final sign-off Jan 2024 | 580 California St | Novo Construction Inc | 19/f: full fixture, finish and ada upgrades to common area restrooms. mep, f/l/s and sprinklers under separate permit.Details
19/f: full fixture, finish and ada upgrades to common area restrooms. mep, f/l/s and sprinklers under separate permit. | $100,000 |
| May 8, 2023 | Completed final sign-off Aug 2023 | 580 California St | Novo Construction Inc | administrative permit to remove deferred mechanical requirement from permit app 202205134260. elec, plumb, life safety and sprinklers still under separate permits.Details
administrative permit to remove deferred mechanical requirement from permit app 202205134260. elec, plumb, life safety and sprinklers still under separate permits. | |
| May 5, 2023 | Completed final sign-off Apr 2024 | 580 California St | Novo Construction Inc | 13/f: electrical title 24 compliances for t.i. restrooms. ref pa 202205134260.Details
13/f: electrical title 24 compliances for t.i. restrooms. ref pa 202205134260. | $10,000 |
| Apr 25, 2023 | Expired or cancelled cancelled Jan 2026 | 580 California St | request for technical infeasibility at restrooms with riser main conflict at accessible stall. accessibility is being provided to the maximum extent possible - floors 5,9, 10, 17, 18, 19, 20 & 23Details
request for technical infeasibility at restrooms with riser main conflict at accessible stall. accessibility is being provided to the maximum extent possible - floors 5,9, 10, 17, 18, 19, 20 & 23 | ||
| Apr 6, 2023 | Completed final sign-off Apr 2024 | 580 California St | Novo Construction Inc | 13/f ste# 1335: demo of non-structural walls,doors,finishes,ceilings,lighting,mechanical,electrical outlets and switches. refer to mep drawings, scope of work does not affect fixture quantities, occupant load or path of travel. no exterior bldg, site, landscape use or parking changes proposed.Details
13/f ste# 1335: demo of non-structural walls,doors,finishes,ceilings,lighting,mechanical,electrical outlets and switches. refer to mep drawings, scope of work does not affect fixture quantities, occupant load or path of travel. no exterior bldg, site, landscape use or parking changes proposed. | $100,000 |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 580 California St | Emcor Services/Mesa Energy Systems Inc | revision to pa# 202301260769, to include anchorage calcs & details to pad.Details
revision to pa# 202301260769, to include anchorage calcs & details to pad. | |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 580 California St | San Francisco Commercial Builders Inc | upgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal.Details
upgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal. | $80,000 |
| Jan 26, 2023 | Completed final sign-off Sep 2023 | 580 California St | Emcor Services/Mesa Energy Systems Inc | install (n) house keeping concrete pad and install new heat exchangeDetails
install (n) house keeping concrete pad and install new heat exchange | $458,151 |
| Jan 13, 2023 | Completed final sign-off Apr 2023 | 580 California St | Novo Construction Inc | 13th fl, ste 1350 - electrical work for ti ref pa 2022-0929-3426Details
13th fl, ste 1350 - electrical work for ti ref pa 2022-0929-3426 | $12,000 |
| Nov 7, 2022 | Completed final sign-off Dec 2022 | 580 California St | Golden Gate Fire Protection Inc | fire spinklers; relocate 42 upright sprinklers on the 13th floor.Details
fire spinklers; relocate 42 upright sprinklers on the 13th floor. | $22,050 |
| Oct 3, 2022 | Completed final sign-off Feb 2023 | 580 California St | Novo Construction Inc | 13th fl: floor consists of limited demo of non -structural partitions and associated power data, ceiling items and finishes througout space is currently unoccupied per ab-017 occupancy (e) paths travel restrooms to be undr sep permit mep is defferedDetails
13th fl: floor consists of limited demo of non -structural partitions and associated power data, ceiling items and finishes througout space is currently unoccupied per ab-017 occupancy (e) paths travel restrooms to be undr sep permit mep is deffered | $18,000 |
| Sep 29, 2022 | Completed final sign-off Feb 2023 | 580 California St | Novo Construction Inc | suite 1350 mgmt off - scope of work consists of limited demo of non-structural partitions & associated power data, downlights & finishes throughout. limited construction of (n) conference room which includes (n) partitions, finishes, power & lighting. mep & life safety deferred.Details
suite 1350 mgmt off - scope of work consists of limited demo of non-structural partitions & associated power data, downlights & finishes throughout. limited construction of (n) conference room which includes (n) partitions, finishes, power & lighting. mep & life safety deferred. | $100,000 |
| Aug 29, 2022 | Completed final sign-off Jan 2023 | 580 California St | Tri-Signal Integration Inc. | 17/f: fire alarm mod due to t.i. : remove (e) appiances/devices and add notification appliance. ref t.i. pa202206287215.Details
17/f: fire alarm mod due to t.i. : remove (e) appiances/devices and add notification appliance. ref t.i. pa202206287215. | $13,789 |
| Aug 11, 2022 | Completed final sign-off Sep 2022 | 580 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only relocate 33 pendents, add pendents and plug off 2 heads for wcas 17th flDetails
fire sprinkler only relocate 33 pendents, add pendents and plug off 2 heads for wcas 17th fl | $17,500 |
| Aug 9, 2022 | Completed final sign-off Mar 2023 | 580 California St | Peacock Construction | mechanical and electrical engineered drawings for base permit 202206287215Details
mechanical and electrical engineered drawings for base permit 202206287215 | $90,000 |
| Jul 28, 2022 | Completed final sign-off Jun 2023 | 580 California St | Tri-Signal Integration Inc. | replace all devices in stairwell communication system in existing locationsDetails
replace all devices in stairwell communication system in existing locations | $76,789 |
| Jul 28, 2022 | Completed final sign-off Aug 2022 | 580 California St | Tri-Signal Integration Inc. | revision to 202112073831 for t.i. 8th & 10th fl: install (2) proper supplies, (12) smoke detectors, (7) pull stations, (9) strobes, relocate (4) strobes, add (20) speakers. pull stations were existingDetails
revision to 202112073831 for t.i. 8th & 10th fl: install (2) proper supplies, (12) smoke detectors, (7) pull stations, (9) strobes, relocate (4) strobes, add (20) speakers. pull stations were existing | $20,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 580 California St | Peacock Construction | 17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)Details
17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721) | $902,002 |
| May 13, 2022 | Completed final sign-off Aug 2023 | 580 California St | Novo Construction Inc | fixture and finishes upgradeof common area restrooms, no structural work mep under sep permitDetails
fixture and finishes upgradeof common area restrooms, no structural work mep under sep permit | $200,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 580 California St | San Francisco Commercial Builders Inc | 23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.Details
23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit. | $190,000 |
| Mar 21, 2022 | Never finaled issued Mar 2022, no final | 580 California St | Gigabyte Graphics Inc. Dba Fastsigns | 9th & 10th fl: install six 1/8" thick non-glare acrylic evacuation signs. 15.5" x 23.5" to interior.Details
9th & 10th fl: install six 1/8" thick non-glare acrylic evacuation signs. 15.5" x 23.5" to interior. | $1,000 |
| Dec 7, 2021 | Never finaled issued Feb 2022, no final | 580 California St | Tri-Signal Integration Inc. | replace limited number of field devices due to age; as is; not an upgrade; intent is not to bring to current codeDetails
replace limited number of field devices due to age; as is; not an upgrade; intent is not to bring to current code | $100,000 |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 580 California St | Tri-Signal Integration Inc. | t.i for 9th and 10th flrs to install 2 power supplies, 12 smoke detectors, 7 pull stations, 9 strobes, relocate 4 strobes and add 20 speakers. pull stations existingDetails
t.i for 9th and 10th flrs to install 2 power supplies, 12 smoke detectors, 7 pull stations, 9 strobes, relocate 4 strobes and add 20 speakers. pull stations existing | $20,000 |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 580 California St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 33 pendent sprinklers & relocate 18 upright on the 9th fl. relocate 33 pendent sprinklers & 67 uprights on the 10th fl. t.i. ref #202101283514 (9th fl) & #202101273474 (10ht fl)Details
fire sprinklers, relocate 33 pendent sprinklers & relocate 18 upright on the 9th fl. relocate 33 pendent sprinklers & 67 uprights on the 10th fl. t.i. ref #202101283514 (9th fl) & #202101273474 (10ht fl) | $30,200 |
| Sep 22, 2021 | Completed final sign-off Oct 2021 | 580 California St | Tri-Signal Integration Inc. | relocate 1 strobe & remove 1 strobeDetails
relocate 1 strobe & remove 1 strobe | $9,500 |
| Jun 9, 2021 | Completed final sign-off Nov 2021 | 580 California St | Peacock Construction | ste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting.Details
ste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting. | $96,690 |
| Jan 28, 2021 | Completed final sign-off Nov 2022 | 580 California St | Novo Construction Inc | 9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a.Details
9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a. | $1,725,959 |
| Jan 27, 2021 | Completed final sign-off Feb 2023 | 580 California St | 10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a.Details
10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a. | $2,002,819 | |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 580 California St | Tri-Signal Integration Inc. | ref pa# 201912200226; frie alram system dodifications add (1) speaker/strobe to (e) systemDetails
ref pa# 201912200226; frie alram system dodifications add (1) speaker/strobe to (e) system | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 580 California St | street space | ||
| Feb 11, 2020 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | t24 mechanical for work under 201912200226Details
t24 mechanical for work under 201912200226 | |
| Jan 17, 2020 | Completed final sign-off Apr 2020 | 580 California St | Golden Gate Fire Protection Inc | ref pa# 201912200226; fire sprinklers relocate 9 pendent sprinklers on the 11th fl. n/a maherDetails
ref pa# 201912200226; fire sprinklers relocate 9 pendent sprinklers on the 11th fl. n/a maher | $4,500 |
| Jan 10, 2020 | Never finaled issued Jan 2020, no final | 580 California St | street space | ||
| Dec 30, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | 5th floor: t-24 electrical for work under app#201905312116Details
5th floor: t-24 electrical for work under app#201905312116 | |
| Dec 30, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | 19th floor: t-24 electrical for work under app#201910073676Details
19th floor: t-24 electrical for work under app#201910073676 | |
| Dec 30, 2019 | Never finaled issued Dec 2019, no final | 580 California St | Peacock Construction | 10th floor: t-24 electrical for work under app#201909161723Details
10th floor: t-24 electrical for work under app#201909161723 | |
| Dec 30, 2019 | Completed final sign-off Mar 2020 | 580 California St | Peacock Construction | 9th floor: t-24 electrical for work under app#201909261721Details
9th floor: t-24 electrical for work under app#201909261721 | |
| Dec 20, 2019 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | 11th flr - tenant improvement: demo and new non-structural partitions, electrical, light fixtures, and finishes. life safety and sprinklers under separate permit.Details
11th flr - tenant improvement: demo and new non-structural partitions, electrical, light fixtures, and finishes. life safety and sprinklers under separate permit. | $148,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 580 California St | street space | ||
| Dec 10, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | t-24 mechanical for work under 201910033676Details
t-24 mechanical for work under 201910033676 | $2,500 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 580 California St | street space only | ||
| Dec 10, 2019 | Completed final sign-off Mar 2020 | 580 California St | Peacock Construction | fl 9th & 10th - t24 mechanical for work under 201909161721 and 201909161723Details
fl 9th & 10th - t24 mechanical for work under 201909161721 and 201909161723 | $1,500 |
| Nov 27, 2019 | Completed final sign-off Apr 2020 | 580 California St | Golden Gate Fire Protection Inc | fire sprinkler only relocate 02 pendents for suite 1925 19th flr maher not reqDetails
fire sprinkler only relocate 02 pendents for suite 1925 19th flr maher not req | $1,200 |
| Nov 22, 2019 | Completed final sign-off Feb 2020 | 580 California St | Tri-Signal Integration Inc. | 5th fl: ref pa# 201909111277; no devices addedDetails
5th fl: ref pa# 201909111277; no devices added | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 580 California St | Tri-Signal Integration Inc. | 19th fl: ref pa# 201910073676; fa ti includes relocate (2) strobes, connected to (e) nac circuitDetails
19th fl: ref pa# 201910073676; fa ti includes relocate (2) strobes, connected to (e) nac circuit | $1,000 |
| Nov 18, 2019 | Completed final sign-off Feb 2020 | 580 California St | Golden Gate Fire Protection Inc | 9th & 10th flr fire sprinklers. relocate (10 pendent sprinklers on the 9th & 10th fl. restrooms ref pa# 201909161721 (9th fl) & 201909161723 (10th fl)Details
9th & 10th flr fire sprinklers. relocate (10 pendent sprinklers on the 9th & 10th fl. restrooms ref pa# 201909161721 (9th fl) & 201909161723 (10th fl) | $5,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 580 California St | street space only | ||
| Oct 15, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | t-24 mechanical for work under pa# 201905312116Details
t-24 mechanical for work under pa# 201905312116 | |
| Oct 7, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | suite 1925: interior tenant improvement: removal of non-structural partitions, new finishes, lighting & open office. mep, fire life safety & sprinkler under separate permit. maher naDetails
suite 1925: interior tenant improvement: removal of non-structural partitions, new finishes, lighting & open office. mep, fire life safety & sprinkler under separate permit. maher na | $168,000 |
| Oct 3, 2019 | Never finaled issued Oct 2019, no final | 580 California St | street space | ||
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 580 California St | Golden Gate Fire Protection Inc | fire sprinkler - relocate 92 upright sprinklers on the 9th fl (demo).Details
fire sprinkler - relocate 92 upright sprinklers on the 9th fl (demo). | $46,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2020 | 580 California St | Peacock Construction | project consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.Details
project consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit. | $200,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2020 | 580 California St | Peacock Construction | project consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.Details
project consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit. | $200,000 |
| Sep 11, 2019 | Completed final sign-off Feb 2020 | 580 California St | Tri-Signal Integration Inc. | fire alarm ti includes add 1 smoke det, 2 relay modules, 13 speakr strobes, 4 strobe, 1 sync module 1 control relay to e fire alarm system. ref pa 201907095384Details
fire alarm ti includes add 1 smoke det, 2 relay modules, 13 speakr strobes, 4 strobe, 1 sync module 1 control relay to e fire alarm system. ref pa 201907095384 | $12,000 |
| Sep 10, 2019 | Completed final sign-off Oct 2019 | 580 California St | Golden Gate Fire Protection Inc | fire sprinklers relocate 50 uprights, 18 pendents & 32 concealed pendents on the 5th flr, ref ti 201905312116Details
fire sprinklers relocate 50 uprights, 18 pendents & 32 concealed pendents on the 5th flr, ref ti 201905312116 | $50,000 |
| Jul 26, 2019 | Completed final sign-off Sep 2019 | 580 California St | Richlen Construction | 17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permitDetails
17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permit | $104,936 |
| Jul 18, 2019 | Completed final sign-off Nov 2019 | 580 California St | Peacock Construction | demolition of extg non structural partitions, doors, glazing, finishes. ceiling system, light fixture, devices, cabinets, tele/data, and elecrical fire life safety and sprinklers to remain.Details
demolition of extg non structural partitions, doors, glazing, finishes. ceiling system, light fixture, devices, cabinets, tele/data, and elecrical fire life safety and sprinklers to remain. | $137,000 |
| Jul 9, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | tenant improvement to vacant suite. demo and new non structural partitions, elec light fixtures and finishes. mep included; fire life safety as referenceDetails
tenant improvement to vacant suite. demo and new non structural partitions, elec light fixtures and finishes. mep included; fire life safety as reference | $1,320,000 |
| Jul 9, 2019 | Expired or cancelled cancelled Jan 2026 | 580 California St | tenant improvement to vacant suite. demo and new non structural partitions, elec, light fixtures and finishes. fire life safety, mep includedDetails
tenant improvement to vacant suite. demo and new non structural partitions, elec, light fixtures and finishes. fire life safety, mep included | $1,320,000 | |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 580 California St | Emcor Services/Mesa Energy Systems Inc | replace outside air fan with new cell fan wallDetails
replace outside air fan with new cell fan wall | $105,000 |
| May 31, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | 5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permitDetails
5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permit | $200,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | barrier removal, adding automatic door operator actuator at starbucks entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05Details
barrier removal, adding automatic door operator actuator at starbucks entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05 | $30,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | barrier removal, adding automatic door operator actuator at secondary entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05Details
barrier removal, adding automatic door operator actuator at secondary entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05 | $30,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | barrier removal, adding automatic door operator actuator at ladle & leaf entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05Details
barrier removal, adding automatic door operator actuator at ladle & leaf entry per accessible business entrance program ordinance 51-16. all work to comply with da-04 & da-05 | $30,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2020 | 580 California St | Peacock Construction | barrier removal, adding automatic door operator actuator at main entry per accessible business entry program ordinance 51-16. all work to comply with da-04 & da-05Details
barrier removal, adding automatic door operator actuator at main entry per accessible business entry program ordinance 51-16. all work to comply with da-04 & da-05 | $30,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 580 California St | 20th flr. fire sprinklers, relocate 2 pendent sprinkler, ref t.i pa 201810102735Details
20th flr. fire sprinklers, relocate 2 pendent sprinkler, ref t.i pa 201810102735 | $1,000 | |
| Nov 5, 2018 | Completed final sign-off Mar 2019 | 580 California St | Mcclure Electric Inc | suite 2050: title 24 only, lighting. ref 201810102735Details
suite 2050: title 24 only, lighting. ref 201810102735 | |
| Oct 23, 2018 | Completed final sign-off Feb 2019 | 580 California St | Tri-Signal Integration Inc. | relocate 1 strobe, remove 1 strobe. ref#201807023555.Details
relocate 1 strobe, remove 1 strobe. ref#201807023555. | $1,500 |
| Oct 19, 2018 | Never finaled issued Oct 2018, no final | 580 California St | Tri-Signal Integration Inc. | as-builts, ref 201810021940 | |
| Oct 10, 2018 | Completed final sign-off Feb 2019 | 580 California St | Marchetti Group | suite 2050 -add recption counter suspended ceiling grid system at (e) breakroom/kitchenetter open office space mill work mep deferredDetails
suite 2050 -add recption counter suspended ceiling grid system at (e) breakroom/kitchenetter open office space mill work mep deferred | $90,000 |
| Oct 2, 2018 | Completed final sign-off Oct 2018 | 580 California St | Tri-Signal Integration Inc. | fa ti includes: add 1 relay module, relocate 3 strobes, 1 speaker ref#201806273154 n/a for maher.Details
fa ti includes: add 1 relay module, relocate 3 strobes, 1 speaker ref#201806273154 n/a for maher. | $1,500 |
| Sep 14, 2018 | Completed final sign-off Oct 2018 | 580 California St | Skender Construction Llc | 18th fl - evacuation maps. ref pa 2018-0627-3154Details
18th fl - evacuation maps. ref pa 2018-0627-3154 | $1,000 |
| Sep 13, 2018 | Completed final sign-off Dec 2018 | 580 California St | Richlen Construction | 4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662Details
4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662 | $12,000 |
| Sep 11, 2018 | Completed final sign-off Nov 2018 | 580 California St | Waterproofing Associates | reroofing.Details
reroofing. | $588,459 |
| Jul 31, 2018 | Completed final sign-off Oct 2018 | 580 California St | Tri-Signal Integration Inc. | 20th floor - add 1 speaker, relocate 5 strobes maher naDetails
20th floor - add 1 speaker, relocate 5 strobes maher na | $2,000 |
| Jul 25, 2018 | Completed final sign-off Sep 2018 | 580 California St | 18th flr. fire sprinklers. 17 relocated pendents, 1 added. ref ba# 201806273154Details
18th flr. fire sprinklers. 17 relocated pendents, 1 added. ref ba# 201806273154 | $3,900 | |
| Jul 24, 2018 | Completed final sign-off Aug 2018 | 580 California St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 10 pendents for north point advisors for 20th floor. app #2018-07-02-3555. maher n/aDetails
fire sprinkler only. relocate 10 pendents for north point advisors for 20th floor. app #2018-07-02-3555. maher n/a | $5,500 |
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 580 California St | Richlen Construction | 4th fl - ti on a full floor build out, demo existing walls & mnior construction of new walls, finishes, millwork and power/data work. design-build mep, sprinkler system & life safetey modification is under separate permitDetails
4th fl - ti on a full floor build out, demo existing walls & mnior construction of new walls, finishes, millwork and power/data work. design-build mep, sprinkler system & life safetey modification is under separate permit | $123,000 |
| Jul 2, 2018 | Completed final sign-off Dec 2018 | 580 California St | Peacock Construction | 20/f: limited modification and expansion of existing ti, to include selective partition demo, and modifications to ceiling grid, & tile, light fixture relocations. new office doors & frame, salvage & reuse exisitng materials of millwork and new finishesDetails
20/f: limited modification and expansion of existing ti, to include selective partition demo, and modifications to ceiling grid, & tile, light fixture relocations. new office doors & frame, salvage & reuse exisitng materials of millwork and new finishes | $420,000 |
| Jun 27, 2018 | Completed final sign-off Oct 2018 | 580 California St | Skender Construction Llc | 18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community roomDetails
18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community room | $500,000 |
| Jun 21, 2018 | Completed final sign-off Sep 2018 | 580 California St | Tri-Signal Integration Inc. | fa ti includes: add (1) speaker/strobe (1) strobe and relocate (1) existing strobe. n/a maherDetails
fa ti includes: add (1) speaker/strobe (1) strobe and relocate (1) existing strobe. n/a maher | $2,000 |
| Jun 7, 2018 | Completed final sign-off Jul 2018 | 580 California St | Pribuss Engineering Inc | fire sprinkler t.i. on 23rd fl. relocated sprinkers (6), added sprinklers (2), total (8) ($514.00). n/a maherDetails
fire sprinkler t.i. on 23rd fl. relocated sprinkers (6), added sprinklers (2), total (8) ($514.00). n/a maher | $4,112 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 580 California St | Peacock Construction | 20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher naDetails
20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher na | $14,000 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 580 California St | Peacock Construction | 19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher naDetails
19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher na | $13,000 |
| Mar 27, 2018 | Completed final sign-off Sep 2018 | 580 California St | Fisher Development Inc | interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher naDetails
interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher na | $250,000 |
| Mar 22, 2018 | Completed final sign-off Jan 2019 | 580 California St | interior work to restrooms on the 18th fl. scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler under sep permitDetails
interior work to restrooms on the 18th fl. scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler under sep permit | $175,000 | |
| Feb 15, 2018 | Completed final sign-off Jan 2019 | 580 California St | Peacock Construction | interior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher naDetails
interior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher na | $175,000 |
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 580 California St | C B F Inc | title 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a.Details
title 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a. | $20,000 |
| Nov 6, 2017 | Never finaled issued Nov 2017, no final | 580 California St | A S F Electric Inc | 11th floor suite 1100 - new lights, controls title 24.. ref pa #201706270446. n/a maher ordinanceDetails
11th floor suite 1100 - new lights, controls title 24.. ref pa #201706270446. n/a maher ordinance | $10,000 |
| Sep 7, 2017 | Completed final sign-off Nov 2017 | 580 California St | Tri-Signal Integration Inc. | 11th fl: suite 1100 conference room. add 1 speaker/strobe to existing fire alarm system ref pa 2017-0627-0446. maher naDetails
11th fl: suite 1100 conference room. add 1 speaker/strobe to existing fire alarm system ref pa 2017-0627-0446. maher na | $1,500 |
| Aug 31, 2017 | Completed final sign-off Dec 2017 | 580 California St | fire sprinkler t.i. relocate 52, add 2 pendents, replace 50 pendents with upright sprinklers & add 8 uprights. t.i. pa#201706129080. n/a ordinance #155-13Details
fire sprinkler t.i. relocate 52, add 2 pendents, replace 50 pendents with upright sprinklers & add 8 uprights. t.i. pa#201706129080. n/a ordinance #155-13 | $57,568 | |
| Aug 25, 2017 | Completed final sign-off Oct 2017 | 580 California St | Tri-Signal Integration Inc. | 4/f - fire alarm ti includes: add ten(10) speaker/strobes and one (1) strobe to existing fire alarm system, relocate seven (7) speakers and fire strrobes. ref ti appl.# 2017-0627-0446.Details
4/f - fire alarm ti includes: add ten(10) speaker/strobes and one (1) strobe to existing fire alarm system, relocate seven (7) speakers and fire strrobes. ref ti appl.# 2017-0627-0446. | $7,000 |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 580 California St | Richlen Construction | rev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall.Details
rev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall. | |
| Aug 3, 2017 | Completed final sign-off Oct 2017 | 580 California St | Richlen Construction | #1700- construction of new office and demise on (e) office, relocate (2) light fixtures, install new ada compliant water fountain. paint throughout. space is currently unoccupied. life safety, sprinkler and mep under seperate permits. n/a ordinance #155-13Details
#1700- construction of new office and demise on (e) office, relocate (2) light fixtures, install new ada compliant water fountain. paint throughout. space is currently unoccupied. life safety, sprinkler and mep under seperate permits. n/a ordinance #155-13 | $36,800 |
| Jun 27, 2017 | Completed final sign-off Dec 2017 | 580 California St | San Francisco Commercial Builders Inc | 11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit.Details
11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit. | $48,000 |
| Jun 23, 2017 | Completed final sign-off Jul 2017 | 580 California St | Tri-Signal Integration Inc. | as built for previously approved fa permit 201705025372, to include 4 new duct detectors for >2000 cfm fans per pa 201701318262 (ameps).Details
as built for previously approved fa permit 201705025372, to include 4 new duct detectors for >2000 cfm fans per pa 201701318262 (ameps). | |
| Jun 12, 2017 | Never finaled issued Jul 2017, no final | 580 California St | Richlen Construction | 4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not reqDetails
4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not req | $800,000 |
| May 2, 2017 | Completed final sign-off Jul 2017 | 580 California St | Tri-Signal Integration Inc. | 1st floor - fire alarm ti includes 7 new strobes to circuit "b2", add 1 new speaker to circuit "c", relocate 1 speaker on circuit "c", remove 2 strobes from circuite b4 & remove circuit "b4". maher naDetails
1st floor - fire alarm ti includes 7 new strobes to circuit "b2", add 1 new speaker to circuit "c", relocate 1 speaker on circuit "c", remove 2 strobes from circuite b4 & remove circuit "b4". maher na | $5,000 |
| Apr 26, 2017 | Completed final sign-off Jun 2017 | 580 California St | Ayoob & Peery Plumbing Co Inc | 1/f #150- add (3), relocate (23) & remove (2) fire sprinklers per t.i. ref. t.i. pa#201701318262. n/a ordinance #155-13Details
1/f #150- add (3), relocate (23) & remove (2) fire sprinklers per t.i. ref. t.i. pa#201701318262. n/a ordinance #155-13 | $13,650 |
| Apr 25, 2017 | Completed final sign-off Jul 2017 | 580 California St | Superior Electrical Advertising Inc | install (1) illuminated interior window sign "starbucks".Details
install (1) illuminated interior window sign "starbucks". | $2,000 |
| Apr 25, 2017 | Completed final sign-off Jul 2017 | 580 California St | Superior Electrical Advertising Inc | install (2) illuminated wall signs onto existing cabinets "starbucks".Details
install (2) illuminated wall signs onto existing cabinets "starbucks". | $6,000 |
| Mar 24, 2017 | Never finaled issued Mar 2017, no final | 580 California St | Anderson, Rowe & Buckley, Inc. | as built per fire inspector: add 9 heads ref pa 2017-0126-8005Details
as built per fire inspector: add 9 heads ref pa 2017-0126-8005 | |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 580 California St | T C B Builders Inc | suite # 150: commercial tenant improvement to an extg vacant unit includes mechanical, electrical and plumbing. signage and spriklers under seperate pemit. n/a for maher.Details
suite # 150: commercial tenant improvement to an extg vacant unit includes mechanical, electrical and plumbing. signage and spriklers under seperate pemit. n/a for maher. | $215,938 |
| Jan 26, 2017 | Completed final sign-off May 2017 | 580 California St | Anderson, Rowe & Buckley, Inc. | fire sprinler system ti 93 relocated & 16 added sprinklers and 12 plugged sprinklers. ref pa 2016-1214-4935. maher naDetails
fire sprinler system ti 93 relocated & 16 added sprinklers and 12 plugged sprinklers. ref pa 2016-1214-4935. maher na | $54,000 |
| Jan 18, 2017 | Completed final sign-off May 2017 | 580 California St | Tri-Signal Integration Inc. | 7th floor: fire alarm t.i. includes add 7 speakers and 19 strobes to extg fire alarm system, relocate 9 extg speakers and 2 strobes. remove 1 smoke detectors, and 8 strobes. ref app#201612144935. n/a for maher.Details
7th floor: fire alarm t.i. includes add 7 speakers and 19 strobes to extg fire alarm system, relocate 9 extg speakers and 2 strobes. remove 1 smoke detectors, and 8 strobes. ref app#201612144935. n/a for maher. | $13,950 |
| Jan 18, 2017 | Never finaled issued Jan 2017, no final | 580 California St | Tri-Signal Integration Inc. | 1st floor: fire alarm t.i. includes add 1 relay modules to extg fire alarm. n/a for maher. ref app#201608104653Details
1st floor: fire alarm t.i. includes add 1 relay modules to extg fire alarm. n/a for maher. ref app#201608104653 | $1,500 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 580 California St | Richlen Construction | suite 150: revision to app#201606139764. install base bldg mep equipment for future tenant. add new transformer circuit breaker, nw conduit ring/string, add fan, 2 panel boards with meters, new exhaust fan, 2 new heat pump,& new cold water meter. n/a for maher.Details
suite 150: revision to app#201606139764. install base bldg mep equipment for future tenant. add new transformer circuit breaker, nw conduit ring/string, add fan, 2 panel boards with meters, new exhaust fan, 2 new heat pump,& new cold water meter. n/a for maher. | $250,000 |
| Dec 14, 2016 | Completed final sign-off Jul 2017 | 580 California St | Richlen Construction | 7th flr: ti - including demo of walls and (e) ceiling system, new walls, electrical and ceiling finishes & life safety maher naDetails
7th flr: ti - including demo of walls and (e) ceiling system, new walls, electrical and ceiling finishes & life safety maher na | $1,300,000 |
| Dec 12, 2016 | Completed final sign-off Jul 2018 | 580 California St | Rossi Builders Inc. | revision to 201608104653. new destination dispatch/keypad consoles in elevator lobby. elec sep permitDetails
revision to 201608104653. new destination dispatch/keypad consoles in elevator lobby. elec sep permit | $5,200 |
| Dec 1, 2016 | Completed final sign-off Jul 2018 | 580 California St | Rossi Builders Inc. | lobby: minor renovation to extg bldg lobby. work consists of new reception desk, new screen walls, finishes, and relamping lights. electrical and fire on separate permit. no mechanical and plbmg. n/a for maherDetails
lobby: minor renovation to extg bldg lobby. work consists of new reception desk, new screen walls, finishes, and relamping lights. electrical and fire on separate permit. no mechanical and plbmg. n/a for maher | $1,290,000 |
| Nov 30, 2016 | Completed final sign-off Dec 2016 | 580 California St | Pribuss Engineering Inc | fire sprinkler as built for 2016-0830-6332. n/a for maherDetails
fire sprinkler as built for 2016-0830-6332. n/a for maher | |
| Nov 17, 2016 | Completed final sign-off Dec 2016 | 580 California St | Pribuss Engineering Inc | 1st floor fire sprinkler - ste. 175 - t.i . under pa #201606139764 - relocates 14, adds 4 totoal = 18. n/a maher ordinanceDetails
1st floor fire sprinkler - ste. 175 - t.i . under pa #201606139764 - relocates 14, adds 4 totoal = 18. n/a maher ordinance | $9,263 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 580 California St | Tri-Signal Integration Inc. | 2nd floor - add 7 speakers and 6 strobes; replace 10 speakers, 1 strobe, relocate 6 strobes; remove 1 smoke detector, 1 door holder, 3 speakers, 2 strobes. ref pa 2016-0613-9762 maher naDetails
2nd floor - add 7 speakers and 6 strobes; replace 10 speakers, 1 strobe, relocate 6 strobes; remove 1 smoke detector, 1 door holder, 3 speakers, 2 strobes. ref pa 2016-0613-9762 maher na | $7,800 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 580 California St | Tri-Signal Integration Inc. | add 2 new weatherproof strobes; relocate 1 speaker and 2 strobes; remove 1 speaker and 3 strobes. ref pa 2016-08104674. maher naDetails
add 2 new weatherproof strobes; relocate 1 speaker and 2 strobes; remove 1 speaker and 3 strobes. ref pa 2016-08104674. maher na | $2,000 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 580 California St | Tri-Signal Integration Inc. | add 3 speakers and 4 strobes; remove 1 pull station, 1 speaker. ref pa 2016-0810-4653. maher naDetails
add 3 speakers and 4 strobes; remove 1 pull station, 1 speaker. ref pa 2016-0810-4653. maher na | $4,300 |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 580 California St | Tri-Signal Integration Inc. | suite 1300 fire alarm ti add one speaker and one strobe. relocate 3 speakers and 7 strobes. ref pa 2016-0720-2862Details
suite 1300 fire alarm ti add one speaker and one strobe. relocate 3 speakers and 7 strobes. ref pa 2016-0720-2862 | $6,500 |
| Aug 30, 2016 | Completed final sign-off Dec 2016 | 580 California St | Pribuss Engineering Inc | 2nd floor: fire sprinkler t.i. under gc #2016-0613-9762. relocate 86, add 02, plug 02. nfpa-13. n/a for maher.Details
2nd floor: fire sprinkler t.i. under gc #2016-0613-9762. relocate 86, add 02, plug 02. nfpa-13. n/a for maher. | $45,524 |
| Aug 18, 2016 | Completed final sign-off Aug 2016 | 580 California St | Pribuss Engineering Inc | suite 1300 fire sprinkler ti under 201607202862 relocate 4. n/a for maher.Details
suite 1300 fire sprinkler ti under 201607202862 relocate 4. n/a for maher. | $2,070 |
| Aug 10, 2016 | Completed final sign-off Dec 2016 | 580 California St | Pribuss Engineering Inc | 1st flr: ste 150: fire sprinkler t.i. ref. 201606139764, relocates 19 total 9,829.Details
1st flr: ste 150: fire sprinkler t.i. ref. 201606139764, relocates 19 total 9,829. | $9,829 |
| Aug 10, 2016 | Completed final sign-off Apr 2017 | 580 California St | Richlen Construction | #175- demolition of interior partitions, doors, frames, hardware & finishes. space is currently unoccupied. construction of new conference room, bike storage, pantry & office. new finishes throughout. sprinkler/life safety under separate permit. maher naDetails
#175- demolition of interior partitions, doors, frames, hardware & finishes. space is currently unoccupied. construction of new conference room, bike storage, pantry & office. new finishes throughout. sprinkler/life safety under separate permit. maher na | $350,000 |
| Jul 20, 2016 | Completed final sign-off Nov 2016 | 580 California St | Richlen Construction | 13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordinaDetails
13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordina | $232,000 |
| Jun 13, 2016 | Completed final sign-off Apr 2017 | 580 California St | Richlen Construction | arch/mep for ste 150 demo interior partitions, doors, frames, hardware, power/data, and finishes; currently unoccupied. construction of demising partition at vestibule and new finishes throughout. demo & construction of restrooms and showers. fire sprinkler and alarms under separate permit. maher naDetails
arch/mep for ste 150 demo interior partitions, doors, frames, hardware, power/data, and finishes; currently unoccupied. construction of demising partition at vestibule and new finishes throughout. demo & construction of restrooms and showers. fire sprinkler and alarms under separate permit. maher na | $140,640 |
| Jun 13, 2016 | Completed final sign-off Apr 2017 | 580 California St | Richlen Construction | arch/mep full floor ste 200 demolition of select interior partitions and millwork. construction of new conferences and phone rooms. new millwork, power/data and finishes throughout. space is currently unoccupied. fire sprinklers and alarms under separate permitDetails
arch/mep full floor ste 200 demolition of select interior partitions and millwork. construction of new conferences and phone rooms. new millwork, power/data and finishes throughout. space is currently unoccupied. fire sprinklers and alarms under separate permit | $803,040 |
| May 20, 2016 | Never finaled issued May 2016, no final | 580 California St | fire sprinkler permit, demo (e) sprinkler head in elevator shaft and elevator machine room on 13/f & roof level. 19 deleted sprinkler heads. n/a ordinance #155-13Details
fire sprinkler permit, demo (e) sprinkler head in elevator shaft and elevator machine room on 13/f & roof level. 19 deleted sprinkler heads. n/a ordinance #155-13 | $5,243 | |
| Sep 22, 2015 | Never finaled issued Sep 2015, no final | 580 California St | street space | ||
| Aug 25, 2015 | Expired or cancelled cancelled Jan 2026 | 580 California St | fire sprinkler elevator modernization, remove heads at top of elevator shafts & in elevator machine room on 15th & 23rd floor. reference ab2.01 addendum "d".Details
fire sprinkler elevator modernization, remove heads at top of elevator shafts & in elevator machine room on 15th & 23rd floor. reference ab2.01 addendum "d". | $2,500 | |
| Aug 20, 2015 | Never finaled issued Aug 2015, no final | 580 California St | street space | ||
| Aug 20, 2015 | Never finaled issued Aug 2015, no final | 580 California St | Pioneer Fire Inc. | 21/f: relocate or add fire sprinklers to accommodate new buildout, gf per 2015-0708-0886. compliance with maher ordinance no 155-13 not required.Details
21/f: relocate or add fire sprinklers to accommodate new buildout, gf per 2015-0708-0886. compliance with maher ordinance no 155-13 not required. | $3,900 |
| Aug 6, 2015 | Completed final sign-off Nov 2017 | 580 California St | Tri-Signal Integration Inc. | fire alarm t.i., add 1 speaker and 1 strobe to existing fire system. maher not reqDetails
fire alarm t.i., add 1 speaker and 1 strobe to existing fire system. maher not req | $1,200 |
| Jul 8, 2015 | Completed final sign-off Nov 2015 | 580 California St | Richlen Construction | 21st floor: new work consists of new ceiling ht partitions, doors, frames, and hardware. new millwork, new power/data, finishes throughout space is currently unoccupied. sprinkler/life safety under seperate permit. n/a for the maher.Details
21st floor: new work consists of new ceiling ht partitions, doors, frames, and hardware. new millwork, new power/data, finishes throughout space is currently unoccupied. sprinkler/life safety under seperate permit. n/a for the maher. | $500,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 580 California St | street space | ||
| May 22, 2015 | Never finaled issued May 2015, no final | 580 California St | Tri-Signal Integration Inc. | 14th & penthouse: fire alarm upgrade due to elevator upgrade: add 2 relay modules for flashing in elevators and removing heat detector is elevator machine rooms. maher naDetails
14th & penthouse: fire alarm upgrade due to elevator upgrade: add 2 relay modules for flashing in elevators and removing heat detector is elevator machine rooms. maher na | $1,400 |
| Apr 13, 2015 | Completed final sign-off Aug 2015 | 580 California St | Richlen Construction | renovation of beakrooms, new cabinets and appiances. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not reqDetails
renovation of beakrooms, new cabinets and appiances. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req | $50,000 |
| Apr 13, 2015 | Completed final sign-off Aug 2015 | 580 California St | Richlen Construction | renovation of beakrooms, new cabinets and appiances. renovation of reception area. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not reqDetails
renovation of beakrooms, new cabinets and appiances. renovation of reception area. restroom ada upgrades, drinking fountain added. new flooring and paint finishes. mep under separate permit. maher not req | $80,000 |
| Oct 1, 2014 | Completed final sign-off Oct 2014 | 580 California St | Golden Gate Fire Protection Inc | 13rd floor - relocate 7 pendent sprinkler. ref #2014.0815.3925. compliance with ord 155-13 naDetails
13rd floor - relocate 7 pendent sprinkler. ref #2014.0815.3925. compliance with ord 155-13 na | $3,605 |
| Sep 11, 2014 | Completed final sign-off Oct 2014 | 580 California St | Tri-Signal Integration Inc. | add 1 new strobe to existing nac circuit maher not reqDetails
add 1 new strobe to existing nac circuit maher not req | $1,200 |
| Aug 15, 2014 | Completed final sign-off Jan 2015 | 580 California St | Peacock Construction | 13th floor ste 1330 - demolition & construction of interior non-load bearing partitions, doors, millwork & finishes. minor modifications to lighting /switching as required by this scope. any mech, elec, life safety/fire protection modifications under separate permit.Details
13th floor ste 1330 - demolition & construction of interior non-load bearing partitions, doors, millwork & finishes. minor modifications to lighting /switching as required by this scope. any mech, elec, life safety/fire protection modifications under separate permit. | $57,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 580 California St | San Francisco Commercial Builders Inc | #1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a.Details
#1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a. | $58,000 |
| May 30, 2014 | Completed final sign-off Jun 2014 | 580 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler t.i.: add 3 heads, relocate 111 heads, total heads 114. t.i. pa# 201404183582. n/a ordinance #155-13.Details
fire sprinkler t.i.: add 3 heads, relocate 111 heads, total heads 114. t.i. pa# 201404183582. n/a ordinance #155-13. | $58,872 |
| May 9, 2014 | Completed final sign-off Jul 2014 | 580 California St | Tri-Signal Integration Inc. | (e) fire alarm ti, add: 1 speaker; 22 speaker strobes, 2 strobes, 1 smoke detector, 1 realy module, 1 control realy, 1 sync module to existing fire alarm system. ref pa# 201404183582. na for maher ordiance.Details
(e) fire alarm ti, add: 1 speaker; 22 speaker strobes, 2 strobes, 1 smoke detector, 1 realy module, 1 control realy, 1 sync module to existing fire alarm system. ref pa# 201404183582. na for maher ordiance. | $10,500 |
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 580 California St | Dpr Construction | 5th floor: t.i. for office bldg. modification of non-structural partitions doors, cabinets and finishes. life safety , sprinkler work under deffered submittal. n/a for the maher ordinance #155-13 incl mepDetails
5th floor: t.i. for office bldg. modification of non-structural partitions doors, cabinets and finishes. life safety , sprinkler work under deffered submittal. n/a for the maher ordinance #155-13 incl mep | $1,294,546 |
| Apr 16, 2014 | Expired or cancelled cancelled Sep 2023 | 580 California St | Tri-Signal Integration Inc. | 14th floor: as built for app#201402259224 | |
| Mar 31, 2014 | Completed final sign-off Jun 2014 | 580 California St | Skyline Construction | revision to 201312103769. new scope of work is revision to occupancy loads and existing to document as built conditions - and remove requirement for place of assembly permit - no "a" occupancy in this tenant space. maher ordiance not required.Details
revision to 201312103769. new scope of work is revision to occupancy loads and existing to document as built conditions - and remove requirement for place of assembly permit - no "a" occupancy in this tenant space. maher ordiance not required. | |
| Mar 26, 2014 | Completed final sign-off Jun 2014 | 580 California St | Skyline Construction | rev. to pa#201312103769 scope of work at elevator lobby: relocation of exit sign, relocate of emergency door release pull, expand fire pull station opening 4" in all directions, bring fire pull station/fire mains jack to fill compliance.Details
rev. to pa#201312103769 scope of work at elevator lobby: relocation of exit sign, relocate of emergency door release pull, expand fire pull station opening 4" in all directions, bring fire pull station/fire mains jack to fill compliance. | |
| Mar 12, 2014 | Expired or cancelled cancelled Jan 2026 | 580 California St | revise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13.Details
revise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13. | ||
| Feb 25, 2014 | Completed final sign-off Jun 2014 | 580 California St | Skyline Construction | revision to pa #2013/1210/3769 to provide structural calcs. and details for folding partitions.Details
revision to pa #2013/1210/3769 to provide structural calcs. and details for folding partitions. | $8,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 580 California St | Tri-Signal Integration Inc. | floor 14th suite 1420, add 2 speakers and 3 strobe lights to existing fire alarm system. complaince with ordinance #155-13 not required.Details
floor 14th suite 1420, add 2 speakers and 3 strobe lights to existing fire alarm system. complaince with ordinance #155-13 not required. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tri-Signal Integration Inc. (42), Peacock Construction (27), Skyline Construction (25), Golden Gate Fire Protection Inc (15), Richlen Construction (15), Novo Construction Inc (11), Anderson, Rowe & Buckley, Inc. (6), Pribuss Engineering Inc (6), San Francisco Commercial Builders Inc (5), Ayoob & Peery Plumbing Co Inc (3), Emcor Services/Mesa Energy Systems Inc (3), Pioneer Fire Inc. (2), Rossi Builders Inc. (2), Skender Construction Llc (2), Superior Electrical Advertising Inc (2), A S F Electric Inc, C B F Inc, Capitol Electric Const, Dpr Construction, Fisher Development Inc, Gigabyte Graphics Inc. Dba Fastsigns, Intelligent Technologies & Services Inc, Marchetti Group, Mcclure Electric Inc, Rainbow Waterproofing & Restor, T C B Builders Inc, Urban Graphics Inc, Waterproofing Associates
- Architects
- Martha Breed (8), Scott E Clement (8), Leighton Lee (5), Sashikala Murthy (4), Christopher Preovolos (2), Claudette Bleijenberg (2), Joseph A. Remling (2), Revel Archi (2), Stanley H Lew (2), Suwanty Mulia (2), Adriana Daringa, Ajp Associates, Alma Rossy Jauregui, Carl Christiansen, Jin Park, John Kamus, Joyce Polhamus, Katherine Dwyer, Michael J Myers, Shawn Anderson, William Diefenbach
- Engineers
- Amit Wadhwa (3), Stephen Shafeer (3), Alexander Joseph Pacheco (2), Joshua Mcmahan (2), Levi Abarte (2), Rudolfo P Bustos Iii (2), Christopher Jordan Malabed, Craig Laws, Daniel Shearer, Edward Rivera, Edward Rivera, Guil Orihuela, Habtom Nugusse Tewelde, Jing Wei Huang, Lars Peter Mortensen, Laura Hendrickson, Mike Howe, Prabhjeet Grewal, Sashikala Murthy, Wiss, Janney, Elster Ass., Xuong Quach, Zin Min Aye
- Authorized agents
- Joyce Mizuhara (2)
- Designers
- Tri-Signal Integration Inc. (4), Moline Jason, Peter Mchugh, William Anthony Baker
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.