Daniel Shearer
- Listed as
- authorized agent-others, engineer
- Firm
- Acco Engineered Systems
- Based in
- San Francisco
- On San Francisco permits
- Dec 2025 to Sep 2026
8 permits since 2000 (engineer on 7 permits, authorized agent-others on 1 permit): 1 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 580 California St | electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811Details
electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811 | $120,000 | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 185 Berry St | like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repaiDetails
like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repai | $1,500,000 | |
| May 13, 2026 | In progress filed May 2026, not yet issued | 1501 Sunnydale Av | Truebeck Construction | (230 hahn st) - mep complied work related to bpa: 202212017477Details
(230 hahn st) - mep complied work related to bpa: 202212017477 | |
| Mar 2, 2026 | In progress issued Mar 2026 | 401 Harrison St | Acco Engineered Systems Inc. Dba Acco En | remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment.Details
remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment. | $64,000 |
| Jan 28, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | ste 300 - deferred mep to 202511240285Details
ste 300 - deferred mep to 202511240285 | $700,000 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | 2nd fl, ste 250 deferred mep for pa 202509084793Details
2nd fl, ste 250 deferred mep for pa 202509084793 | $731,160 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | level 1 and level 2: suites 100 and 200. deferred mep for 202509084794Details
level 1 and level 2: suites 100 and 200. deferred mep for 202509084794 | $2,146,752 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop.Details
revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop. |