Block 3765, lot 413
401 Harrison St
- City’s use
- Commercial Retail
- Built
- 2014
- Stories
- 1
- Building
- 1,706 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2026 | In progress issued Apr 2026 | 401 Harrison St | Acco Engineered Systems Inc. Dba Acco En | permrevision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment.Details
permrevision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment. | |
| Mar 4, 2026 | Completed final sign-off Apr 2026 | 401 Harrison St | Berland Design | replace damaged fascia panel at (e) awningDetails
replace damaged fascia panel at (e) awning | $100,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 401 Harrison St | Acco Engineered Systems Inc. Dba Acco En | remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment.Details
remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment. | $64,000 |
| Sep 4, 2025 | Completed final sign-off Oct 2025 | 401 Harrison St | Faragon Restoration Ltd | 2nd floor, 4th floor basement level, common stairwell : drywall repair, insulation, base trim, painting/wall paper. common hallways and stairwell.Details
2nd floor, 4th floor basement level, common stairwell : drywall repair, insulation, base trim, painting/wall paper. common hallways and stairwell. | $44,821 |
| Mar 22, 2024 | Completed final sign-off Apr 2026 | 401 Harrison St | Andrew Chekene Enterprises/ Dba Ac Enter | scope of work miscellaneous repair of the building. window tune-up, cosmetic (non structrual) retaining wall repair, plumbing repair, cirucit setter replacement, red-white valves. post litigation repair. louver repair.Details
scope of work miscellaneous repair of the building. window tune-up, cosmetic (non structrual) retaining wall repair, plumbing repair, cirucit setter replacement, red-white valves. post litigation repair. louver repair. | $1,200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Acco Engineered Systems Inc. Dba Acco En (2), Andrew Chekene Enterprises/ Dba Ac Enter, Berland Design, Faragon Restoration Ltd
- Engineers
- Daniel Shearer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.