Alix Kotkee
- License
- 6703
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- E-Structure
- Based in
- Oakland
- On San Francisco permits
- Apr 2026 to May 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Herrero Builders Incorporated
- Architects
- Megan Koehler (2)
- Engineers
- Electrical Engineer Allen, Elisabeth Maria, Mechanical Engineer Shearer, Daniel Patrick, Wesley Lau, Yi-Shu Kung
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2026 | In progress filed May 2026, not yet issued | 185 Berry St | like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repaiDetails
like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repai | $1,500,000 | |
| Apr 30, 2026 | In progress issued Jul 2026 | 1100 Van Ness Av | Herrero Builders Incorporated | 14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd settingDetails
14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd setting | $2,900,000 |