Wesley S. Lau
- Listed as
- engineer
- Firm
- Interface Engineering
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Apr 2026
15 permits since 2000 (engineer on 15 permits): 11 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | In progress issued Jul 2026 | 1100 Van Ness Av | Herrero Builders Incorporated | 14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd settingDetails
14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd setting | $2,900,000 |
| Jun 24, 2025 | Completed final sign-off Nov 2025 | 2000 Post St | Achill Beg Construction Inc | retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access.Details
retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access. | $300,000 |
| Nov 12, 2024 | Expired or cancelled withdrawn Dec 2024 | 3433 03rd St | Nibbi Bros Assoc Inc. | excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices.Details
excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices. | $583,600 |
| Nov 12, 2024 | In progress issued Mar 2025 | 3433 03rd St | Nibbi Bros Assoc Inc. | to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2)Details
to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2) | $15,551,608 |
| Sep 13, 2023 | Completed final sign-off Jun 2025 | 388 Beale St | Achill Beg Construction Inc | 4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tvDetails
4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv | $325,000 |
| Jul 10, 2023 | Completed final sign-off Nov 2023 | 829 Kearny St | Pinnacle Constructing | 1/f: mep work t.i. 202208241201.Details
1/f: mep work t.i. 202208241201. | $150,000 |
| Oct 31, 2022 | Completed final sign-off Oct 2023 | 450 Powell St | Centric Construction Inc | revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.Details
revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen. | $10,000 |
| Mar 1, 2022 | Completed final sign-off Nov 2023 | 450 Powell St | Centric Construction Inc | revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.Details
revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel. | |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 450 Powell St | Centric Construction Inc | rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.Details
rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms. | |
| Aug 18, 2021 | Completed final sign-off Oct 2023 | 450 Powell St | Centric Construction Inc | lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...Details
lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area... | $2,000,000 |
| Mar 22, 2021 | Completed final sign-off Mar 2022 | 3200 California St | Cahill Contractors Llc. | remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall.Details
remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall. | $10,000 |
| Mar 11, 2020 | Expired or cancelled withdrawn Mar 2021 | 755 Sansome St | 3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by theDetails
3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by the | $590,000 | |
| Jan 24, 2020 | Completed final sign-off Jul 2021 | 200 Larkin St | C B 2 Builders Incorporated | construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systemsDetails
construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems | $1,000,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |
| Dec 20, 2018 | Completed final sign-off Dec 2020 | 2230 Jerrold Av | Plant Construction Co, Lp | erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.Details
erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a. | $10,471,820 |