Jason Lau
- Listed as
- engineer
- Firm
- Interface Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Jul 2026
19 permits since 2000 (engineer on 19 permits): 14 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Sep 2026 | 650 Davis St | Field Construction Inc. | meps for project: 2026.0130.4901 - ste 250Details
meps for project: 2026.0130.4901 - ste 250 | $397,000 |
| Dec 4, 2025 | Expired or cancelled withdrawn Feb 2026 | 300 Howard St | 2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.Details
2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms. | $2,959,620 | |
| Mar 5, 2025 | In progress issued Apr 2025 | 900 Innes Av | addition of egress lighting per request of sffd at final inspection ref pa 2021-0324-7213Details
addition of egress lighting per request of sffd at final inspection ref pa 2021-0324-7213 | $3,000 | |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 440 Davis Ct | C B F Inc | building #4: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista east, building #4. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building #4: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista east, building #4. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 155 Jackson St | C B F Inc | building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 550 Battery St | C B F Inc | bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required.Details
bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 405 Davis Ct | C B F Inc | building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Aug 20, 2020 | Never finaled filed Aug 2020, never issued | 599 Skyline Bl | Terra Nova Industries | new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical.Details
new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical. | $100,000 |
| Apr 4, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 5th fl - mep for tenant improvement ref pa 2019-0319-5584Details
5th fl - mep for tenant improvement ref pa 2019-0319-5584 | $500,000 |
| Apr 4, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 7th fl - mep for tenant improvement ref pa 2019-0319-5583Details
7th fl - mep for tenant improvement ref pa 2019-0319-5583 | $500,000 |
| Mar 13, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 6th floor: mechanical, electrical and plumbing for 201903114897Details
6th floor: mechanical, electrical and plumbing for 201903114897 | $567,000 |
| Dec 20, 2018 | Completed final sign-off Dec 2020 | 2230 Jerrold Av | Plant Construction Co, Lp | erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.Details
erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a. | $10,471,820 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklistDetails
rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklist | |
| Sep 20, 2018 | Completed final sign-off Feb 2021 | 1830 17th St | Oliver & Company Inc. | remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include.Details
remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include. | $1,000,000 |
| May 18, 2018 | Completed final sign-off Oct 2019 | 1175 Howard St | J & J South West Construction Inc | interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a.Details
interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a. | $86,000 |
| Nov 8, 2017 | Completed final sign-off Nov 2018 | 355 Mcallister St | Roebbelen Contracting Inc, Plant Construction Co, Lp | propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom.Details
propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom. | $850,000 |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 1 Daniel Burnham Ct | Commercial Interior Builders Inc | 2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13Details
2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13 | $54,000 |
| Feb 3, 2012 | Expired or cancelled cancelled Jan 2026 | 178 Townsend St | James E Roberts-Obayashi Corporation | mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540.Details
mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540. | |
| Jul 28, 2008 | Completed final sign-off Mar 2009 | 400 California St | Swinerton Builders | 10th fl ti: selective ceiling demolition, new partitions and doors for private open offices, new ceiling, electrical, lighting, and finishes of single tenant floor. mep scope of work to be performed and modified per new layout. life safety to be design build under seperate permit.Details
10th fl ti: selective ceiling demolition, new partitions and doors for private open offices, new ceiling, electrical, lighting, and finishes of single tenant floor. mep scope of work to be performed and modified per new layout. life safety to be design build under seperate permit. | $200,000 |