Permit GraphSan Francisco building permits since 2000

Block 3719, lot 018

300 Howard St

159 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 30, 2026In progress300 Howard St16th floor: dining and servery t.i. includes interior wall, ceiling, millwork and finishes.$6,048,657
Sep 23, 2026In progress300 Howard St14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.$9,172,090
Sep 17, 2026In progress300 Howard St3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.$15,451,442
Sep 15, 2026In progress300 Howard StNovo Construction Inc2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms.$8,061,217
Sep 10, 2026In progress300 Howard St1/floor lobby: t.i.including interior walls, ceilings,millwork and finishes.$2,029,883
Sep 1, 2026In progress300 Howard St15th floor: t.i. including new interior walls, ceilings, millwork & finishes$8,361,087
Sep 1, 2026In progress300 Howard St5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes$15,451,442
Aug 25, 2026In progress300 Howard St2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing$6,048,657
Aug 24, 2026In progress300 Howard StNovo Construction Inc14th/f: structural upgrade to accommodate future t.i.$165,000
Aug 20, 2026In progress300 Howard StNovo Construction Inc15th f/l: structural upgrades to accomodate future tenant buildout.$165,000
Aug 17, 2026In progress300 Howard StNovo Construction Inc7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes.$15,451,442
Jul 15, 2026Completed300 Howard StGci, Incbarrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.$10,000
Jul 7, 2026In progress300 Howard StNovo Construction Inc9/f: structural upgrades to accommodate future tenant buildout.$135,000
Jul 6, 2026In progress300 Howard StNovo Construction Inc16th fl: structural upgrades to accommodate future tenant buildout$165,000
Jun 23, 2026In progress300 Howard StNovo Construction Inc2 : structural upgrades to accommodate future tenant buildout$200,000
Apr 30, 2026Completed199 Fremont StGci, Inclevel 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7).$10,000
Mar 30, 2026In progress199 Fremont StNovo Construction Incfloor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.$1,500,000
Mar 16, 2026In progress199 Fremont StNovo Construction Inc4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017.$1,000,000
Feb 24, 2026Completed199 Fremont StR L H Fire Protection Incb1 & b2 levels: upgrade fire sprinklers sytem for new ev charging stations. reolcate 36 and add 5 uprights sprinklers. t.i. 202506269604.$30,000
Jan 6, 2026Completed199 Fremont StGci, Incto obtain final inspection for work approved under pa # 202311291553. all work is complete.
Dec 4, 2025Expired or cancelled300 Howard St2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.$2,959,620
Jul 2, 2024In progress300 Howard Stremove 300 howard street address from apn 3719/009 and add 300 howard st to apn 3719/018 per nevile's approval.
Nov 29, 2023Expired or cancelled199 Fremont StGci, Incinstallation of (4) electric vehicle charging stations in (e) parking garage. no change of use or occupancy.$99,968
May 23, 2023Never finaled199 Fremont StSiemens Industry, Inc.fire only work for the shell space remodel on floor 19. 8 speaker strobes added. ref 202212279182$7,688
Mar 3, 2023Never finaled199 Fremont StSiemens Industry, Inc.10/f: add 10 speaker/strobes for the shell space remodel, ref pa# 202212279182.$9,610
Mar 3, 2023Never finaled199 Fremont StSiemens Industry, Inc.7/f: add 12 speaker/strobes for the shell space remodel, ref pa# 202212279180.$11,532
Mar 3, 2023Never finaled199 Fremont StSiemens Industry, Inc.24 & 25/f: add 17 speaker/strobes for the shell space remodel, ref pa# 202212279184.$16,337
Feb 9, 2023Completed199 Fremont StSiemens Industry, Inc.2nd fl - fire only work to add 15 speaker/strobes for the shell space remodel; ref pa 2022-0405-1550$14,415
Feb 9, 2023Never finaled199 Fremont StSiemens Industry, Inc.23rd fl - fire only work to add 11 speaker/strobes for the shell space remodel. ref pa 2022-0901-1696$10,571
Dec 28, 2022Completed199 Fremont StGolden Gate Fire Protection Inc6th fl - relocate 139 upright sprinklers; 7th fl - relocate 139 upright sprinklers$49,000
Dec 28, 2022Completed199 Fremont StGolden Gate Fire Protection Inc10th fl - relocate 139 upright sprinklers; 19th relocate 82 upright sprinklers$49,000
Dec 28, 2022Completed199 Fremont StGolden Gate Fire Protection Incfire sprinlker only 24th fl & 25th fl relocate 84 pendent sprinklers$35,917
Dec 27, 2022Completed199 Fremont StGci, Inc24th & 25th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. demolition per san francisco's ab-017. ref 2022 1228 9222$133,000
Dec 27, 2022Completed199 Fremont StGci, Inc6th & 7th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork.$165,000
Dec 27, 2022Completed199 Fremont StGci, Inc10th & 19th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. ref 202212289229$134,000
Dec 21, 2022In progress199 Fremont StB N Builders Inc9/f (& 8/f): deferred mep for approved pa#202202037255$800,000
Oct 19, 2022Completed199 Fremont StSiemens Industry, Inc.1st floor: fire only work to obtain an as built permit for the life safety panels upgrade job; fire ref pa#202011108649
Oct 11, 2022Completed199 Fremont StPioneer Fire Inc.relocate (2) pendents on 23/f. ref ti permit 202209011696$475
Sep 1, 2022Completed199 Fremont StGci, Inc23/f: interior demo (e) nonstructural partitions, ceilings, millwork, doors/frames, flooring & finishes. install new lighting, remodeling of restroom, new fixture & finishes.$483,387
Jun 23, 2022Never finaled199 Fremont StSun Graphicsfabricate and install (28) emergency evacuation maps on floors 8,9,11,12,15,16,17 and 18. subsurface digital print 16"x22"x1/8" thick non-fade acrylic, mounted to wall with vhb room tape and silicone as needed.$5,065
May 11, 2022Never finaled199 Fremont StSkyline Construction8th & 9th fl: addition of new light fixtures in 3 existing phone rooms and new door pull hardware to existing door.$75,000
Apr 5, 2022Completed199 Fremont StPioneer Fire Inc.2/f: fire sprinkler demo: remove (e) pendent.remove all 1in arm-overs from removed pendent heads in open ceiling. ref demo pa202204051550. maher n/a.
Apr 5, 2022Completed199 Fremont StGci, Inc23/f: selective demo of (e) non-structural partitions, ceilings, millwork, doors/frames, flooring and other ifnishes, hvac, ab-017 electrical, lighting, plumbing and equipment.$20,000
Apr 5, 2022Completed199 Fremont StGci, Inc2/f: interior demo of (e) unoccupied 2/f includes demo of non-structural partitions, ceilings, lighting, finishes, doors, frames and ab-017 millwork. fire sprinkler 202204051588$10,000
Apr 5, 2022Completed199 Fremont StPioneer Fire Inc.23/f: fire sprinkler demo: remove (e) pendents, all hangers & sway bracing are existing. remove all 1in arm-overs from rmeovel pendent heads in opening ceiling. return to warm shell. ref demo pa202204051551. maher n/a.$19,000
Mar 10, 2022Never finaled199 Fremont StSiemens Industry, Inc.lobby: fire only work for the main lobby upgrade on the g/f; additions are 1 duct detector, 1 module, 4 speaker/strobes, 8 strobes, as well as the relocation of 4 smoke detectors and 1 duct detector. ref permit 202106142325.$10,920
Feb 25, 2022Completed199 Fremont StR L H Fire Protection Incti to lobby space. delete 18 (e) sprinklers; relocate 51 pendant sprinklers. add one pendant sprinkler. permit 202106142325$5,000
Feb 3, 2022Never finaled199 Fremont StSkyline Construction, B N Builders Inc9th fl: t.i. to partially remain on lvl 9. modifications within this area are limited to non-load bearing partitions to meet code requirements, selective demolition for egress path, and partition modifications to meet demolition of extg offece (b use) t.i. in the area where the nw cafe is proposed$2,000,000
Jan 27, 2022In progress199 Fremont StSkyline Construction(e)rooftop @ lvl 9: selective demo of the (e) roofing, (e) roof walk pads, and portions of the (e) curtain wall system. const of new housekeeping pads for new mech equipment, new roofing and installation of new spandrel curtain wall penal within (e)system. mech equipment installed in separate permit$1,000,000
Sep 14, 2021Completed199 Fremont StGolden Gate Fire Protection Incfire sprinklers, relocate 26 pendent sprinklers and 30 uprights on 14th fl ti 202106092033$19,425
Sep 9, 2021Completed199 Fremont StSiemens Industry, Inc.fire only work for the "catering" remodel of 14/f; additions of 1 smoke deterctor, 1 module, 1 duct detector, 2 speaker/ strobes, 3 strobes, as well as the relocation of 4 speaker/ strobes, ref pa # 2021 0609 2033$5,500
Aug 30, 2021Expired or cancelled199 Fremont StSkyline Constructionflrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def.$155,000
Aug 12, 2021Never finaled199 Fremont StSkyline Constructionflr 8,9,11,12,14-18: revision to pa 202102255357 to add bike storage at basement level 1, replace toilets on 8,9,11,12,15. remove previously approved relocation of toilet on 8,9,11,12, and 14-18.$20,000
Jun 23, 2021Never finaled199 Fremont StSkyline Constructionrevision to pa 202102255357 to request technical infeasability ato mens and womens accessible restroom stall.
Jun 14, 2021Completed199 Fremont StSkyline Constructionlobby: interior t.i., ground fl lobby nonstrctural demo, new nonstructural partitions, millwork, doors, frames, & hardware, new lighting, ceiling, power/data, plumbing fixtures/finishes.$916,815
Jun 9, 2021Completed199 Fremont StSkyline Constructiondemo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr$3,000,000
Jun 4, 2021Completed199 Fremont StSkyline Constructionremove and replace (3) ac units on roof including thermostats and assocated duck work.$175,000
Jun 2, 2021Never finaled199 Fremont StGolden Gate Fire Protection Incfire sprinklers; as-built to permit 2021-0421-9079. every floor has changes, wrong backgrounds on original permits. relocate 16 pendent sprinklers throughout the floors instead of 17. relocate 12 uprights instead of 24. t.i. #2021-0225-5357$1,000
Apr 21, 2021Completed199 Fremont StGolden Gate Fire Protection Incit ref @2021-0225-5357. relocate 3 pendents on the 18th floor. relocate 4 pendents and 3 uprights on the 8th fllor. relocate 4 pendents on the 9th floor. relocate 2 uprights on the 11th floor. relocate 2 pendents and 3 uprights on the 12th floor. relocate 7 uprights on the 14th floor. relocate 2 pen$20,500
Apr 19, 2021Completed199 Fremont StR L H Fire Protection Incti upgrade of existing fire sprinkler system 1 relocated upright sprinkler rbp # 2021-0225-5357$300
Apr 13, 2021Never finaled199 Fremont StSiemens Industry, Inc.fire only work for the "fitbit" security door and idf room conversions on various floors. additions are 8 smoke detectors, 8 modules, 8 speaker/strobes, 9 strobes, and 4 door holders. ref permit app # 2021 0225 5357$19,800
Mar 11, 2021Never finaled199 Fremont StSkyline Construction6th fl: tenant improvement to 1 interior room. to add full height non-load bearing partition and card readered security door. adding 1 exhaust fan to interior room.$20,000
Feb 25, 2021Never finaled199 Fremont StSkyline Constructionaddition of new security doors and convert existing rooms into idf to mdf rooms. minor interior demolition of non-structural elements.$1,000,000
Nov 10, 2020Never finaled199 Fremont StSiemens Industry, Inc.fire only work to upgrade the life safety system; the main control panel, 11 node panels, 2 fan interface panels, 1 annunciator, and 1 fire fighter's panel wil be replaced, as well as the addition of a new cellular dialer. all existing field devices will remain. to be reviewed by swi$55,000
Aug 5, 2019Expired or cancelled199 Fremont Stprovide and install new nitrogen infused coffee dispenser$8,500
May 1, 2019Never finaled199 Fremont StAd Art Inc.commencement of work not started under previosly approved permit appication pa# 2017-0606-8505.$5,000
Mar 4, 2019Never finaled199 Fremont StTim Rhones Installation Departmentinstall 1 electric single faced wall sign "stubhub"$2,000
Jun 6, 2017Never finaled199 Fremont StAd Art Inc.erect one illuminated electric single faced wall logo display sign. n/a ordinance #155-13$5,000
May 24, 2017Never finaled199 Fremont StLevel 10 Construction Lpthe landscape design integrates the new building footprint at 181 fremont with 199 fremont's (e) poets garden. the design renovations re-use and re-configure all of the (e) granite stone blocks, continues to use the same palette of stone paving materials and re-interprets the poetry wall byengraving$200,000
Mar 27, 2017Never finaled199 Fremont StSiemens Industry, Inc.24th flr fire alarm for the conference room, add 1 speaker/strobe maher na$510
Mar 17, 2017Completed199 Fremont St14th floor evacuation plans.$2,250
Mar 2, 2017Completed199 Fremont StSkyline Constructionmechanical & electrical for tenant improvement on the 14th floor. ref pa 2016-1214-4897. maher na$275,000
Feb 28, 2017Completed199 Fremont StSiemens Industry, Inc.14th flr: fire alarm, add 9 smoke detectors, 4 duct detectors, 1 strobe power supply, 45 speaker/strobe, 1 strobe and 8 door holders. ref 201612144897 maher na$35,430
Feb 15, 2017Completed199 Fremont StGolden Gate Fire Protection Incfire sprinklers relocate 58 upright sprinklers on the 14th fl. relocate 108 pendent sprinklers. maher not req$87,150
Feb 10, 2017Completed199 Fremont StCharles Pankow Builders Ltdoffice ti revision to lighting rcp plan. ref pa 2016-1206-4202. n/a maher
Feb 10, 2017Completed199 Fremont StCharles Pankow Builders Ltd4th & 5th floor - deferred submittal - structural connections of metal screen decorative. ref pa 2016-1121-3185. n/a maher ordinance
Feb 10, 2017Completed199 Fremont StCharles Pankow Builders Ltdlevel 4 & 5 - revision to g004 ddrawing - key note revision original approve app 201611213185 maher na
Feb 1, 2017Completed199 Fremont StSiemens Industry, Inc.12th flr: fire alarm - revisions are to indicate existing device at 3 locations per the sffd testing inspector ref 201610190650 maher na
Jan 23, 2017Completed199 Fremont StSiemens Industry, Inc.12th flr: fire alarm add 7 smoke detectors, 1 strobe power supply, 36 speaker/strobes and 7 strobes maher na ref 201610190650$28,240
Jan 12, 2017Completed199 Fremont St4 evacuation signs 12th fl$1,800
Dec 23, 2016Completed199 Fremont StSiemens Industry, Inc.4th & 5th flr: fire alarm add 6 smoke detectors, 41 speaker/strobes and 1 strobe. ref 201611213185 maher na$25,080
Dec 22, 2016Completed199 Fremont StCharles Pankow Builders Ltdspec details for wood cladding on 4th fl interior wall. ref 201611213185. n/a for maher.
Dec 14, 2016Never finaled199 Fremont StSkyline Construction14/f: full floor t.i. to include non-bearing partitions, ceiling and finishes. mep under sep permit.$700,000
Dec 6, 2016Completed199 Fremont StCharles Pankow Builders Ltdnew electrical for work associated with 201611213185 maher not req
Nov 30, 2016Completed199 Fremont StSkyline Constructionlevel 12 - mechanical and electrical work of ti ref 201610190650$200,000
Nov 29, 2016Completed199 Fremont StGolden Gate Fire Protection Incfire sprinklers; relocate 8 upright sprinklers on the 12th floor floor. relocate 119 pendent sprinklers. ref pa 2016-1019-0650. maher na$19,050
Nov 29, 2016Never finaled199 Fremont StH & M Fire Protection, Inc.fire sprinkler ti of entire 4th floor & 1 room on 5th floor. ref arch pa 2016-1121-3185$35,000
Nov 21, 2016Completed199 Fremont StCharles Pankow Builders Ltddemo of suspended ceiling and associated lights on level 4 construction of non-load bearing partitions, gyp board & suspended ceiling and (n) finishes, mech. maher na$2,364,000
Nov 3, 2016Completed199 Fremont StCharles Pankow Builders Ltdsoft demolition for single tenant at 4th floor and select demolition for break room at 5th floor per ab-017. t.i. and mep/fs work to follow on seperate permit. n/a for maher.$87,974
Oct 19, 2016Completed199 Fremont StSkyline Construction12/f: ti to consist of non-load bearing partitions, ceilings. mep and fire life safety under separate permit$75,000
Sep 23, 2016Completed199 Fremont Stevacuation plan signs 11th fl. 4 maps.$1,800
Sep 13, 2016Completed199 Fremont StSiemens Industry, Inc.11th floor: fire alarm add 10 smoke det, 13 modules, 1 strobe power supply, 38 speaker/strobes, 5 duct detectors and 3 strobes. ref 2016-0527-8619 maher na$32,950
Aug 31, 2016Never finaled199 Fremont StSkyline Constructionmechanical and electrical for tenant improvement on the 11th fl ref 201605278619$275,000
Aug 25, 2016Completed199 Fremont StSiemens Industry, Inc.16th flr: as built fire alarm fitbit - changes are addition of 1 speaker/strobe and the revisions to detector addresses ref pa 201604074173 maher na$510
Aug 11, 2016Completed199 Fremont StGolden Gate Fire Protection Incfire sprinkler only. relocate 26 upright and relocate pendent 144 ct total 170 sprinkler heads; maher ord 155-13 not required.$85,000
Jul 21, 2016Completed199 Fremont StSkyline Construction18th floor - revision to 2016-0407-4176 to show idf room as a non rated room maher na
Jul 21, 2016Completed199 Fremont StSkyline Construction15th floor - revision to pa 2016-0119-7333 to show idf room as a non-rated room. maher na
Jul 20, 2016Completed199 Fremont St16th & 18th flors: evac maps maher na$2,700
Jul 6, 2016Never finaled199 Fremont Ststreet space
Jun 9, 2016Completed199 Fremont StCharles Pankow Builders Ltd6/f- revision to pa# 201603152062 electrical changes- mechanical changes. n/a ordinance #155-13$12,000
Jun 1, 2016Completed199 Fremont StSiemens Industry, Inc.revisions on the "fitbit" remodels for floors 15 and 17. the changes are the deletion of 4 duct detectors, the addition of 4 modules, and the relocation of 1 duct detector. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17) maher na
May 27, 2016Never finaled199 Fremont StSkyline Constructionfull floor office tenant improvement to include non bearing partitons, ceilings and finishes.$700,000
May 25, 2016Completed199 Fremont StSiemens Industry, Inc.16th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 2 strobes.$27,000
May 25, 2016Completed199 Fremont StSiemens Industry, Inc.18th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 3 strobes.$27,500
May 20, 2016Completed199 Fremont St15th & 17th floors: evacuation plan x3 each floor. maher na$2,850
May 19, 2016Never finaled199 Fremont StSiemens Industry, Inc.6th floor fire alarm for the "e-bay": add 5 smoke detectors, 1 strobe power supply, 47 speaker/strobes and 2 strobe maher na ref pa 2016 0315 2062. n/a maher ordinance$30,040
May 5, 2016Never finaled199 Fremont StT C B Builders Incgrd fl: interior update restroom to current ada code. modify (e) ceiling soffit. remove (e) lighting, replace with new, remove (e) walls, doors, floor penetrations, equip, furniture, casework, flooring, walk off mat & finishes. provide new install new handsink. maher na. life safety deferred.$106,105
May 5, 2016Completed199 Fremont StGolden Gate Fire Protection Incfire srpinklers; relocate 22 upright sprinklers on the 16floor. relocate 143 pendent sprinklers. relocate 23 upright sprinklers on the 18th. relocate 144 pendents, and 4 concealed. ti 16th floor - 2016-0407-4173 & 18th floor - 2016-0407-4176. maher na. total for both floors: 336 relo-ed heads.$145,425
May 4, 2016Completed199 Fremont StSkyline Construction18th floor: mech/elec work for ti.ref pa 2016 04074 4176 maher na$300,000
May 2, 2016Completed199 Fremont StSkyline Constructionmechanical & electrical for t.i. on the 16/f. t.i. pa# 201604074173. n/a ordinance #155-13$300,000
Apr 21, 2016Completed199 Fremont StPribuss Engineering Inc1st floor: suite 100: fire sprinklers ti ref pa 2016 0217 9796: relocate 5, add 1$3,088
Apr 15, 2016Completed199 Fremont StH & M Fire Protection, Inc.tenant remodel for fire sprinklers on 6/f. t.i., 214 sprinklers pa#201603152062. n/a ordinance #155-13.$26,000
Apr 7, 2016Completed199 Fremont StSkyline Construction18th floor full floor tenant improvement consisting of non load bearing partitoins. mep, fire life safety under separate permit. n/a maher ordinance$700,000
Apr 7, 2016Completed199 Fremont StSkyline Construction16th floor tenant improvement, non load bearing partitions, finishes. mep, fire life safety under separate permit. n/a maher ordinance$700,000
Mar 25, 2016Completed199 Fremont StSkyline Constructiondemo of (e) non structural partitions, door frames, interior glazing, millwork ab017. maher na$15,000
Mar 23, 2016Completed199 Fremont StSiemens Industry, Inc.fire alarm work for the "building management: conference room on floor 1; the addition is 1 speaker/strobe. maher na$500
Mar 21, 2016Completed199 Fremont St17th floor: mechanical and electrical work for t.i. ref app#201601197335. n/a for maher$325,000
Mar 21, 2016Completed199 Fremont StSkyline Construction15th floor: mechanical and electrical work for t.i. ref arch app#201601197333. n/a for maher$325,000
Mar 18, 2016Completed199 Fremont StHathaway Dinwiddie Co.mep ti for 1st floor suite 100. reference 2016 0217 9796 - maher na$40,000
Mar 15, 2016Completed199 Fremont StCharles Pankow Builders Ltdinterior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13$2,160,000
Mar 9, 2016Completed199 Fremont StSiemens Industry, Inc.fire alarm work for the "fitbit" ti remodels on floors 15 and 17; additions are 10 smoke detectors, 14 duct detectors, 2 modules, 2 strobe power supplies, 82 speaker/strobes, and 2 strobes. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17). maher na$61,400
Mar 3, 2016Completed199 Fremont StGolden Gate Fire Protection Inc15th & 17th floor fire sprinklers - relcoate 26 upright sprinklers on 15th floor. relocate 114 pendent sprinklers, relocate 24 upright sprinklers, relocate 113 pendent on 17th floor. t.i. ref #2016010197335 (15th floor) & #201601197333 ( 17th floor). n/a maher ordinance$142,655
Mar 1, 2016Completed199 Fremont StCharles Pankow Builders Ltdsoft demo on 6th fl. ti and mepfs work to follow on sep permit per ab-017 demo of light fixtures and lowered ceiling is under separate appl. n/a ordinance #155-13$100,000
Feb 26, 2016Completed199 Fremont StPeacock Construction10th floor; partital floor ti for single tenant. maher na$21,600
Feb 17, 2016Completed199 Fremont StHathaway Dinwiddie Co.1st floor: minor demo of select partitions construction - 1 conference room and 1 office with associated new power, new lighting and finishes throughout, ceiling frid and tile to remain. mep/fire/life saftey under sep permit$160,000
Jan 28, 2016Completed199 Fremont StSkyline Construction16th and 18th flrs: interior non-structural demolition of partitions, doors, frames & interior glazing partitions finishes, millwork ab-047; maher n/a$43,000
Jan 19, 2016Completed199 Fremont StSkyline Construction17th floor:full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.$700,000
Jan 19, 2016Completed199 Fremont StSkyline Construction15th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.$700,000
Dec 15, 2015Never finaled199 Fremont StSiemens Industry, Inc.#1423- remove the preaction cabinet from the closet & connect the wet supply to new office. n/a ordinance #155-13$3,000
Dec 11, 2015Completed199 Fremont St8th and 9th floor evacuation plans. n/a for maher$3,800
Nov 20, 2015Completed199 Fremont StSiemens Industry, Inc.fire alarm work for the floor 8 and 9 "fitbit" ti remodels; additions are 2 duct detectors, 17 speakers, 10 strobes, as well as the relocation of 1 speaker and 8 strobes. ref pa 2015-0921-7506 (9th floor) and 2015-0921-7505 (floor 8) n/a for maher.$11,500
Nov 12, 2015Expired or cancelled199 Fremont StNorthwest Signsinstall one single faced led illuminated electric wall sign. n/a ordinance #155-13$8,000
Nov 12, 2015Completed199 Fremont StGolden Gate Fire Protection Incfire sprinkler; relocate 38 uprigh sprinklers on the 8th floor. relocate 30 pendent sprinklers. relocate 38 uprigh sprinklers on the 9th floor. relocate 60 pendents. ti 2015-0921-7505 (8th floor), 2015-0921-7506 (9th floor)$84,460
Oct 21, 2015Never finaled199 Fremont StHathaway Dinwiddie Co.title 24 for 201503090297- adding exit signage and emergency lighting. ste 100$48,000
Oct 7, 2015Never finaled199 Fremont StSkyline Construction9th floor: mep for ti - ref pa 2015 0921 7506. n/a maher ord. # 155-13$30,000
Oct 7, 2015Completed199 Fremont StSkyline Construction8th floor: mep for ti - ref pa 2015 0921 7505. maher na$30,000
Sep 21, 2015Never finaled199 Fremont StSkyline Construction9th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher na$700,000
Sep 21, 2015Completed199 Fremont StSkyline Construction8th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher na$700,000
Aug 21, 2015Completed199 Fremont StAyoob & Peery Plumbing Co Inc19/f: remove (e) pre-action pipe and heads from new supply/copy room, plug main at server room total fire sprinklers add (4) supply with wet pipe connect ref pa 2015-0415-3644. to 2'2 main at corridor$1,028
Jul 14, 2015Completed199 Fremont StNovo Construction Inc19th floor - mechanical & electrical work for tenant improvement. ref pa #2015.0415.3644. n/a maher ordinance$3,500
Jun 4, 2015Expired or cancelled199 Fremont StSiemens Industry, Inc.fire alarm work for the floor 19 copy roomo ti remodel, addition of 1 speaker/strobe and relocation of smoke detector. ref pa #2015.0415.3644.$800
Apr 21, 2015Completed199 Fremont StPribuss Engineering Incbasement 1 and basement 2: fire sprinkler t.i. under g. c. permit #201503090297. total relocated 18 heades. n/a for the maher.$9,264
Apr 15, 2015Completed199 Fremont StNovo Construction Incmodification include new partition at server room to reduce the size of existing server room. total estimated improvement area = 592 sq.ft., mech., elec., sprinkler & fire alarm under seperate permit. n/a ordinance #155-13 room is one hour rated with existing rated door.$28,284
Apr 2, 2015Completed199 Fremont StSiemens Industry, Inc.fire alarm work to add 1 speaker/strobe in the vestibule ara at the fitness center on basement level 2$500
Mar 9, 2015Completed199 Fremont StHathaway Dinwiddie Co.barrier removal, plumbing and finish upgrades, replace existing ceiling grid and tile. all work on 1st and 2nd basement flrs. mep,ls and sprinkler system modifcation under sep permit$48,000
Feb 13, 2015Never finaled199 Fremont StAd Art Inc.remove existing sign "stub hub" per planning n.o.v. permit no. 2014 0725 2142. n/a ordinance #155-13$2,000
Jul 25, 2014Never finaled199 Fremont StAd Art Inc.1 illuminate electric single faced wall sign. n/a ordinance #155-13.$10,000
Sep 11, 2013Completed199 Fremont Sttemporary support for excavation for 181 fremont st adjacant property. site permit for 181 fremont st pa#2013-05-01-5894s. under maher ordiance and is excavate more than 50 cubic yard of soil.$700,000
May 29, 2013Completed199 Fremont StAyoob & Peery Plumbing Co Inc10th floor:add, relocate and remove fire sprinkler heads per t.i. add 12 and relocate 77, remove 13. ref app#201304053834$45,700
May 23, 2013Completed199 Fremont StSiemens Industry, Inc.10th floor - addition of 1 smoke detector, 2 modules, 1 strobe power supply, 6 speakers, 30 speaker/strobes & 6 strobes for the "ebay". all devices connect onto fire alarm system. ref pa #2013.04.05.3834$22,500
Apr 5, 2013Completed199 Fremont StSwinerton Builders10th floor: t.i. construction will include soft demolition, offices and conference rooms meps will be design build$980,000
Dec 14, 2012Completed199 Fremont StNovo Construction Inc23rd floor-tenant improvement of existing office space on 23rd fl. 1997 sq ft. new partitions and bathroom hardware upgrades. no structural. fa/sprinkler under seperate permit.$56,900
Oct 17, 2012Completed199 Fremont StSiemens Industry, Inc.fire alarm ti- addition of 8 speakers, 1 speaker/strobe, and 2 strobes for the "folger levin" remodel on foor 20. all new devices connect onto the life safety system. t.i. pa#201210010975$5,200
Oct 1, 2012Completed199 Fremont StDpr Constructionminor t.i. on 20th floor. work includes (n) partitions, millwork fixtures finishes mechanical. no lighting changes. vestible of stair was reduced in area. fire protection under separate permit.$250,000
Sep 27, 2012Completed199 Fremont StAnderson, Rowe & Buckley, Inc.20th floor-(e) fire alarm sprinkler system tenant improvements-4 relocated sprinklers & 1 added sprinklers. no ti on file$2,500
Apr 13, 2012Completed199 Fremont StSiemens Industry, Inc.floor 2 - addition of 1 monitor module, 34 speakers, 28 strobes for the "ebay stub hub" remodel, all devices connect onto the life safety system.$25,000
Mar 16, 2012Completed199 Fremont StAyoob & Peery Plumbing Co Inc2nd floor: add relocate and remove fire sprinkler heads per tenant improvement. 3 add, 33 relocate, 9 remove.$18,504
Feb 15, 2012Completed199 Fremont StSiemens Industry, Inc.addition of one relay module for release of new door holders in the basement. the door holders are provided by others.$800
Jan 31, 2012Completed199 Fremont StNovo Construction Inc2nd floor:tenant improvement on 2nd fl. new non bearing partitions and doors for new conference rooms, new millwork in breakroom. mep sep permit$850,000