Block 3719, lot 018
300 Howard St
- City’s use
- Commercial Office
- Built
- 2001
- Stories
- 25
- Lot
- 32,501 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
163 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress issued Nov 2026 | 300 Howard St | Novo Construction Inc | 9th fl: mdf room ti. mechanical and electrical included, no plumbingDetails
9th fl: mdf room ti. mechanical and electrical included, no plumbing | $50,000 |
| Oct 16, 2026 | In progress filed Oct 2026, not yet issued | 300 Howard St | basement level 1,2,3 & 1,2,3/f: service elevator - structural improvements to accommodate elevator shaft modifications. mechanical & electrical tie in to accommodate new service elevator.Details
basement level 1,2,3 & 1,2,3/f: service elevator - structural improvements to accommodate elevator shaft modifications. mechanical & electrical tie in to accommodate new service elevator. | $593,938 | |
| Oct 9, 2026 | In progress filed Oct 2026, not yet issued | 300 Howard St | 14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538Details
14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538 | $531,770 | |
| Oct 8, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | basement level 1: mpoe permit, mchanical & electrical only, no arch under this permitDetails
basement level 1: mpoe permit, mchanical & electrical only, no arch under this permit | $56,897 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 16th floor: dining and servery t.i. includes interior wall, ceiling, millwork and finishes.Details
16th floor: dining and servery t.i. includes interior wall, ceiling, millwork and finishes. | $6,048,657 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.Details
14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes. | $9,172,090 | |
| Sep 17, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | 3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.Details
3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes. | $15,451,442 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | Novo Construction Inc | 2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms.Details
2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms. | $8,061,217 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 1/floor lobby: t.i.including interior walls, ceilings,millwork and finishes.Details
1/floor lobby: t.i.including interior walls, ceilings,millwork and finishes. | $2,029,883 | |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 15th floor: t.i. including new interior walls, ceilings, millwork & finishesDetails
15th floor: t.i. including new interior walls, ceilings, millwork & finishes | $8,361,087 | |
| Sep 1, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | 5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishesDetails
5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes | $15,451,442 |
| Aug 25, 2026 | In progress issued Nov 2026 | 300 Howard St | 2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbingDetails
2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing | $6,048,657 | |
| Aug 24, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 14th/f: structural upgrade to accommodate future t.i.Details
14th/f: structural upgrade to accommodate future t.i. | $165,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 15th f/l: structural upgrades to accomodate future tenant buildout.Details
15th f/l: structural upgrades to accomodate future tenant buildout. | $165,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes.Details
7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes. | $15,451,442 |
| Jul 15, 2026 | Completed final sign-off Aug 2026 | 300 Howard St | Gci, Inc | barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.Details
barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3. | $10,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 300 Howard St | Novo Construction Inc | 9/f: structural upgrades to accommodate future tenant buildout.Details
9/f: structural upgrades to accommodate future tenant buildout. | $135,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 16th fl: structural upgrades to accommodate future tenant buildoutDetails
16th fl: structural upgrades to accommodate future tenant buildout | $165,000 |
| Jun 23, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 2 : structural upgrades to accommodate future tenant buildoutDetails
2 : structural upgrades to accommodate future tenant buildout | $200,000 |
| Apr 30, 2026 | Completed final sign-off Jul 2026 | 199 Fremont St | Gci, Inc | level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7).Details
level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7). | $10,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 199 Fremont St | Novo Construction Inc | floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.Details
floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017. | $1,500,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 199 Fremont St | Novo Construction Inc | 4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017.Details
4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017. | $1,000,000 |
| Feb 24, 2026 | Completed final sign-off May 2026 | 199 Fremont St | b1 & b2 levels: upgrade fire sprinklers sytem for new ev charging stations. reolcate 36 and add 5 uprights sprinklers. t.i. 202506269604.Details
b1 & b2 levels: upgrade fire sprinklers sytem for new ev charging stations. reolcate 36 and add 5 uprights sprinklers. t.i. 202506269604. | $30,000 | |
| Jan 6, 2026 | Completed final sign-off Jul 2026 | 199 Fremont St | Gci, Inc | to obtain final inspection for work approved under pa # 202311291553. all work is complete.Details
to obtain final inspection for work approved under pa # 202311291553. all work is complete. | |
| Dec 4, 2025 | Expired or cancelled withdrawn Feb 2026 | 300 Howard St | 2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.Details
2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms. | $2,959,620 | |
| Jul 2, 2024 | In progress issued Jul 2024 | 300 Howard St | remove 300 howard street address from apn 3719/009 and add 300 howard st to apn 3719/018 per nevile's approval.Details
remove 300 howard street address from apn 3719/009 and add 300 howard st to apn 3719/018 per nevile's approval. | ||
| Nov 29, 2023 | Expired or cancelled expired Jul 2026 | 199 Fremont St | Gci, Inc | installation of (4) electric vehicle charging stations in (e) parking garage. no change of use or occupancy.Details
installation of (4) electric vehicle charging stations in (e) parking garage. no change of use or occupancy. | $99,968 |
| May 23, 2023 | Never finaled issued May 2023, no final | 199 Fremont St | Siemens Industry, Inc. | fire only work for the shell space remodel on floor 19. 8 speaker strobes added. ref 202212279182Details
fire only work for the shell space remodel on floor 19. 8 speaker strobes added. ref 202212279182 | $7,688 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 199 Fremont St | Siemens Industry, Inc. | 10/f: add 10 speaker/strobes for the shell space remodel, ref pa# 202212279182.Details
10/f: add 10 speaker/strobes for the shell space remodel, ref pa# 202212279182. | $9,610 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 199 Fremont St | Siemens Industry, Inc. | 24 & 25/f: add 17 speaker/strobes for the shell space remodel, ref pa# 202212279184.Details
24 & 25/f: add 17 speaker/strobes for the shell space remodel, ref pa# 202212279184. | $16,337 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 199 Fremont St | Siemens Industry, Inc. | 7/f: add 12 speaker/strobes for the shell space remodel, ref pa# 202212279180.Details
7/f: add 12 speaker/strobes for the shell space remodel, ref pa# 202212279180. | $11,532 |
| Feb 9, 2023 | Completed final sign-off Feb 2023 | 199 Fremont St | Siemens Industry, Inc. | 2nd fl - fire only work to add 15 speaker/strobes for the shell space remodel; ref pa 2022-0405-1550Details
2nd fl - fire only work to add 15 speaker/strobes for the shell space remodel; ref pa 2022-0405-1550 | $14,415 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 199 Fremont St | Siemens Industry, Inc. | 23rd fl - fire only work to add 11 speaker/strobes for the shell space remodel. ref pa 2022-0901-1696Details
23rd fl - fire only work to add 11 speaker/strobes for the shell space remodel. ref pa 2022-0901-1696 | $10,571 |
| Dec 28, 2022 | Completed final sign-off Apr 2023 | 199 Fremont St | Golden Gate Fire Protection Inc | 10th fl - relocate 139 upright sprinklers; 19th relocate 82 upright sprinklersDetails
10th fl - relocate 139 upright sprinklers; 19th relocate 82 upright sprinklers | $49,000 |
| Dec 28, 2022 | Completed final sign-off Apr 2023 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinlker only 24th fl & 25th fl relocate 84 pendent sprinklersDetails
fire sprinlker only 24th fl & 25th fl relocate 84 pendent sprinklers | $35,917 |
| Dec 28, 2022 | Completed final sign-off Apr 2023 | 199 Fremont St | Golden Gate Fire Protection Inc | 6th fl - relocate 139 upright sprinklers; 7th fl - relocate 139 upright sprinklersDetails
6th fl - relocate 139 upright sprinklers; 7th fl - relocate 139 upright sprinklers | $49,000 |
| Dec 27, 2022 | Completed final sign-off Dec 2023 | 199 Fremont St | Gci, Inc | 10th & 19th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. ref 202212289229Details
10th & 19th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. ref 202212289229 | $134,000 |
| Dec 27, 2022 | Completed final sign-off Dec 2023 | 199 Fremont St | Gci, Inc | 6th & 7th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork.Details
6th & 7th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. | $165,000 |
| Dec 27, 2022 | Completed final sign-off Apr 2024 | 199 Fremont St | Gci, Inc | 24th & 25th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. demolition per san francisco's ab-017. ref 2022 1228 9222Details
24th & 25th/ flrs: demo only, non-load bearing partitions, doors, frames, flooring, ceilings, lighting, finishes & millwork. demolition per san francisco's ab-017. ref 2022 1228 9222 | $133,000 |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 199 Fremont St | B N Builders Inc | 9/f (& 8/f): deferred mep for approved pa#202202037255 | $800,000 |
| Oct 19, 2022 | Completed final sign-off Nov 2022 | 199 Fremont St | Siemens Industry, Inc. | 1st floor: fire only work to obtain an as built permit for the life safety panels upgrade job; fire ref pa#202011108649Details
1st floor: fire only work to obtain an as built permit for the life safety panels upgrade job; fire ref pa#202011108649 | |
| Oct 11, 2022 | Completed final sign-off Nov 2022 | 199 Fremont St | Pioneer Fire Inc. | relocate (2) pendents on 23/f. ref ti permit 202209011696Details
relocate (2) pendents on 23/f. ref ti permit 202209011696 | $475 |
| Sep 1, 2022 | Completed final sign-off Dec 2023 | 199 Fremont St | Gci, Inc | 23/f: interior demo (e) nonstructural partitions, ceilings, millwork, doors/frames, flooring & finishes. install new lighting, remodeling of restroom, new fixture & finishes.Details
23/f: interior demo (e) nonstructural partitions, ceilings, millwork, doors/frames, flooring & finishes. install new lighting, remodeling of restroom, new fixture & finishes. | $483,387 |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 199 Fremont St | Sun Graphics | fabricate and install (28) emergency evacuation maps on floors 8,9,11,12,15,16,17 and 18. subsurface digital print 16"x22"x1/8" thick non-fade acrylic, mounted to wall with vhb room tape and silicone as needed.Details
fabricate and install (28) emergency evacuation maps on floors 8,9,11,12,15,16,17 and 18. subsurface digital print 16"x22"x1/8" thick non-fade acrylic, mounted to wall with vhb room tape and silicone as needed. | $5,065 |
| May 11, 2022 | Never finaled issued May 2022, no final | 199 Fremont St | Skyline Construction | 8th & 9th fl: addition of new light fixtures in 3 existing phone rooms and new door pull hardware to existing door.Details
8th & 9th fl: addition of new light fixtures in 3 existing phone rooms and new door pull hardware to existing door. | $75,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Gci, Inc | 2/f: interior demo of (e) unoccupied 2/f includes demo of non-structural partitions, ceilings, lighting, finishes, doors, frames and ab-017 millwork. fire sprinkler 202204051588Details
2/f: interior demo of (e) unoccupied 2/f includes demo of non-structural partitions, ceilings, lighting, finishes, doors, frames and ab-017 millwork. fire sprinkler 202204051588 | $10,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Pioneer Fire Inc. | 23/f: fire sprinkler demo: remove (e) pendents, all hangers & sway bracing are existing. remove all 1in arm-overs from rmeovel pendent heads in opening ceiling. return to warm shell. ref demo pa202204051551. maher n/a.Details
23/f: fire sprinkler demo: remove (e) pendents, all hangers & sway bracing are existing. remove all 1in arm-overs from rmeovel pendent heads in opening ceiling. return to warm shell. ref demo pa202204051551. maher n/a. | $19,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Pioneer Fire Inc. | 2/f: fire sprinkler demo: remove (e) pendent.remove all 1in arm-overs from removed pendent heads in open ceiling. ref demo pa202204051550. maher n/a.Details
2/f: fire sprinkler demo: remove (e) pendent.remove all 1in arm-overs from removed pendent heads in open ceiling. ref demo pa202204051550. maher n/a. | |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Gci, Inc | 23/f: selective demo of (e) non-structural partitions, ceilings, millwork, doors/frames, flooring and other ifnishes, hvac, ab-017 electrical, lighting, plumbing and equipment.Details
23/f: selective demo of (e) non-structural partitions, ceilings, millwork, doors/frames, flooring and other ifnishes, hvac, ab-017 electrical, lighting, plumbing and equipment. | $20,000 |
| Mar 10, 2022 | Never finaled issued Mar 2022, no final | 199 Fremont St | Siemens Industry, Inc. | lobby: fire only work for the main lobby upgrade on the g/f; additions are 1 duct detector, 1 module, 4 speaker/strobes, 8 strobes, as well as the relocation of 4 smoke detectors and 1 duct detector. ref permit 202106142325.Details
lobby: fire only work for the main lobby upgrade on the g/f; additions are 1 duct detector, 1 module, 4 speaker/strobes, 8 strobes, as well as the relocation of 4 smoke detectors and 1 duct detector. ref permit 202106142325. | $10,920 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 199 Fremont St | ti to lobby space. delete 18 (e) sprinklers; relocate 51 pendant sprinklers. add one pendant sprinkler. permit 202106142325Details
ti to lobby space. delete 18 (e) sprinklers; relocate 51 pendant sprinklers. add one pendant sprinkler. permit 202106142325 | $5,000 | |
| Feb 3, 2022 | Never finaled issued Dec 2022, no final | 199 Fremont St | Skyline Construction, B N Builders Inc | 9th fl: t.i. to partially remain on lvl 9. modifications within this area are limited to non-load bearing partitions to meet code requirements, selective demolition for egress path, and partition modifications to meet demolition of extg offece (b use) t.i. in the area where the nw cafe is proposedDetails
9th fl: t.i. to partially remain on lvl 9. modifications within this area are limited to non-load bearing partitions to meet code requirements, selective demolition for egress path, and partition modifications to meet demolition of extg offece (b use) t.i. in the area where the nw cafe is proposed | $2,000,000 |
| Jan 27, 2022 | Never finaled filed Jan 2022, never issued | 199 Fremont St | Skyline Construction | (e)rooftop @ lvl 9: selective demo of the (e) roofing, (e) roof walk pads, and portions of the (e) curtain wall system. const of new housekeeping pads for new mech equipment, new roofing and installation of new spandrel curtain wall penal within (e)system. mech equipment installed in separate permitDetails
(e)rooftop @ lvl 9: selective demo of the (e) roofing, (e) roof walk pads, and portions of the (e) curtain wall system. const of new housekeeping pads for new mech equipment, new roofing and installation of new spandrel curtain wall penal within (e)system. mech equipment installed in separate permit | $1,000,000 |
| Sep 14, 2021 | Completed final sign-off Nov 2021 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 26 pendent sprinklers and 30 uprights on 14th fl ti 202106092033Details
fire sprinklers, relocate 26 pendent sprinklers and 30 uprights on 14th fl ti 202106092033 | $19,425 |
| Sep 9, 2021 | Completed final sign-off Nov 2021 | 199 Fremont St | Siemens Industry, Inc. | fire only work for the "catering" remodel of 14/f; additions of 1 smoke deterctor, 1 module, 1 duct detector, 2 speaker/ strobes, 3 strobes, as well as the relocation of 4 speaker/ strobes, ref pa # 2021 0609 2033Details
fire only work for the "catering" remodel of 14/f; additions of 1 smoke deterctor, 1 module, 1 duct detector, 2 speaker/ strobes, 3 strobes, as well as the relocation of 4 speaker/ strobes, ref pa # 2021 0609 2033 | $5,500 |
| Aug 30, 2021 | Expired or cancelled cancelled Jan 2026 | 199 Fremont St | Skyline Construction | flrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def.Details
flrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def. | $155,000 |
| Aug 12, 2021 | Never finaled issued Jan 2022, no final | 199 Fremont St | Skyline Construction | flr 8,9,11,12,14-18: revision to pa 202102255357 to add bike storage at basement level 1, replace toilets on 8,9,11,12,15. remove previously approved relocation of toilet on 8,9,11,12, and 14-18.Details
flr 8,9,11,12,14-18: revision to pa 202102255357 to add bike storage at basement level 1, replace toilets on 8,9,11,12,15. remove previously approved relocation of toilet on 8,9,11,12, and 14-18. | $20,000 |
| Jun 23, 2021 | Never finaled issued Jul 2021, no final | 199 Fremont St | Skyline Construction | revision to pa 202102255357 to request technical infeasability ato mens and womens accessible restroom stall.Details
revision to pa 202102255357 to request technical infeasability ato mens and womens accessible restroom stall. | |
| Jun 14, 2021 | Completed final sign-off May 2023 | 199 Fremont St | Skyline Construction | lobby: interior t.i., ground fl lobby nonstrctural demo, new nonstructural partitions, millwork, doors, frames, & hardware, new lighting, ceiling, power/data, plumbing fixtures/finishes.Details
lobby: interior t.i., ground fl lobby nonstrctural demo, new nonstructural partitions, millwork, doors, frames, & hardware, new lighting, ceiling, power/data, plumbing fixtures/finishes. | $916,815 |
| Jun 9, 2021 | Completed final sign-off Dec 2021 | 199 Fremont St | Skyline Construction | demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electrDetails
demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr | $3,000,000 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 199 Fremont St | Skyline Construction | remove and replace (3) ac units on roof including thermostats and assocated duck work.Details
remove and replace (3) ac units on roof including thermostats and assocated duck work. | $175,000 |
| Jun 2, 2021 | Never finaled issued Jul 2021, no final | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinklers; as-built to permit 2021-0421-9079. every floor has changes, wrong backgrounds on original permits. relocate 16 pendent sprinklers throughout the floors instead of 17. relocate 12 uprights instead of 24. t.i. #2021-0225-5357Details
fire sprinklers; as-built to permit 2021-0421-9079. every floor has changes, wrong backgrounds on original permits. relocate 16 pendent sprinklers throughout the floors instead of 17. relocate 12 uprights instead of 24. t.i. #2021-0225-5357 | $1,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 199 Fremont St | Golden Gate Fire Protection Inc | it ref @2021-0225-5357. relocate 3 pendents on the 18th floor. relocate 4 pendents and 3 uprights on the 8th fllor. relocate 4 pendents on the 9th floor. relocate 2 uprights on the 11th floor. relocate 2 pendents and 3 uprights on the 12th floor. relocate 7 uprights on the 14th floor. relocate 2 penDetails
it ref @2021-0225-5357. relocate 3 pendents on the 18th floor. relocate 4 pendents and 3 uprights on the 8th fllor. relocate 4 pendents on the 9th floor. relocate 2 uprights on the 11th floor. relocate 2 pendents and 3 uprights on the 12th floor. relocate 7 uprights on the 14th floor. relocate 2 pen | $20,500 |
| Apr 19, 2021 | Completed final sign-off Jun 2021 | 199 Fremont St | ti upgrade of existing fire sprinkler system 1 relocated upright sprinkler rbp # 2021-0225-5357Details
ti upgrade of existing fire sprinkler system 1 relocated upright sprinkler rbp # 2021-0225-5357 | $300 | |
| Apr 13, 2021 | Never finaled issued Jun 2021, no final | 199 Fremont St | Siemens Industry, Inc. | fire only work for the "fitbit" security door and idf room conversions on various floors. additions are 8 smoke detectors, 8 modules, 8 speaker/strobes, 9 strobes, and 4 door holders. ref permit app # 2021 0225 5357Details
fire only work for the "fitbit" security door and idf room conversions on various floors. additions are 8 smoke detectors, 8 modules, 8 speaker/strobes, 9 strobes, and 4 door holders. ref permit app # 2021 0225 5357 | $19,800 |
| Mar 11, 2021 | Never finaled issued Sep 2021, no final | 199 Fremont St | Skyline Construction | 6th fl: tenant improvement to 1 interior room. to add full height non-load bearing partition and card readered security door. adding 1 exhaust fan to interior room.Details
6th fl: tenant improvement to 1 interior room. to add full height non-load bearing partition and card readered security door. adding 1 exhaust fan to interior room. | $20,000 |
| Feb 25, 2021 | Never finaled issued May 2021, no final | 199 Fremont St | Skyline Construction | addition of new security doors and convert existing rooms into idf to mdf rooms. minor interior demolition of non-structural elements.Details
addition of new security doors and convert existing rooms into idf to mdf rooms. minor interior demolition of non-structural elements. | $1,000,000 |
| Nov 10, 2020 | Never finaled issued Nov 2020, no final | 199 Fremont St | Siemens Industry, Inc. | fire only work to upgrade the life safety system; the main control panel, 11 node panels, 2 fan interface panels, 1 annunciator, and 1 fire fighter's panel wil be replaced, as well as the addition of a new cellular dialer. all existing field devices will remain. to be reviewed by swiDetails
fire only work to upgrade the life safety system; the main control panel, 11 node panels, 2 fan interface panels, 1 annunciator, and 1 fire fighter's panel wil be replaced, as well as the addition of a new cellular dialer. all existing field devices will remain. to be reviewed by swi | $55,000 |
| Aug 5, 2019 | Expired or cancelled cancelled Jan 2026 | 199 Fremont St | provide and install new nitrogen infused coffee dispenserDetails
provide and install new nitrogen infused coffee dispenser | $8,500 | |
| May 1, 2019 | Never finaled issued May 2019, no final | 199 Fremont St | Ad Art Inc. | commencement of work not started under previosly approved permit appication pa# 2017-0606-8505.Details
commencement of work not started under previosly approved permit appication pa# 2017-0606-8505. | $5,000 |
| Mar 4, 2019 | Never finaled issued Mar 2019, no final | 199 Fremont St | Tim Rhones Installation Department | install 1 electric single faced wall sign "stubhub"Details
install 1 electric single faced wall sign "stubhub" | $2,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 199 Fremont St | Ad Art Inc. | erect one illuminated electric single faced wall logo display sign. n/a ordinance #155-13Details
erect one illuminated electric single faced wall logo display sign. n/a ordinance #155-13 | $5,000 |
| May 24, 2017 | Never finaled issued Aug 2017, no final | 199 Fremont St | Level 10 Construction Lp | the landscape design integrates the new building footprint at 181 fremont with 199 fremont's (e) poets garden. the design renovations re-use and re-configure all of the (e) granite stone blocks, continues to use the same palette of stone paving materials and re-interprets the poetry wall byengravingDetails
the landscape design integrates the new building footprint at 181 fremont with 199 fremont's (e) poets garden. the design renovations re-use and re-configure all of the (e) granite stone blocks, continues to use the same palette of stone paving materials and re-interprets the poetry wall byengraving | $200,000 |
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 199 Fremont St | Siemens Industry, Inc. | 24th flr fire alarm for the conference room, add 1 speaker/strobe maher naDetails
24th flr fire alarm for the conference room, add 1 speaker/strobe maher na | $510 |
| Mar 17, 2017 | Completed final sign-off Aug 2017 | 199 Fremont St | 14th floor evacuation plans.Details
14th floor evacuation plans. | $2,250 | |
| Mar 2, 2017 | Completed final sign-off Mar 2018 | 199 Fremont St | Skyline Construction | mechanical & electrical for tenant improvement on the 14th floor. ref pa 2016-1214-4897. maher naDetails
mechanical & electrical for tenant improvement on the 14th floor. ref pa 2016-1214-4897. maher na | $275,000 |
| Feb 28, 2017 | Completed final sign-off Apr 2017 | 199 Fremont St | Siemens Industry, Inc. | 14th flr: fire alarm, add 9 smoke detectors, 4 duct detectors, 1 strobe power supply, 45 speaker/strobe, 1 strobe and 8 door holders. ref 201612144897 maher naDetails
14th flr: fire alarm, add 9 smoke detectors, 4 duct detectors, 1 strobe power supply, 45 speaker/strobe, 1 strobe and 8 door holders. ref 201612144897 maher na | $35,430 |
| Feb 15, 2017 | Completed final sign-off Mar 2017 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinklers relocate 58 upright sprinklers on the 14th fl. relocate 108 pendent sprinklers. maher not reqDetails
fire sprinklers relocate 58 upright sprinklers on the 14th fl. relocate 108 pendent sprinklers. maher not req | $87,150 |
| Feb 10, 2017 | Completed final sign-off May 2017 | 199 Fremont St | Charles Pankow Builders Ltd | office ti revision to lighting rcp plan. ref pa 2016-1206-4202. n/a maherDetails
office ti revision to lighting rcp plan. ref pa 2016-1206-4202. n/a maher | |
| Feb 10, 2017 | Completed final sign-off May 2017 | 199 Fremont St | Charles Pankow Builders Ltd | 4th & 5th floor - deferred submittal - structural connections of metal screen decorative. ref pa 2016-1121-3185. n/a maher ordinanceDetails
4th & 5th floor - deferred submittal - structural connections of metal screen decorative. ref pa 2016-1121-3185. n/a maher ordinance | |
| Feb 10, 2017 | Completed final sign-off Mar 2017 | 199 Fremont St | Charles Pankow Builders Ltd | level 4 & 5 - revision to g004 ddrawing - key note revision original approve app 201611213185 maher naDetails
level 4 & 5 - revision to g004 ddrawing - key note revision original approve app 201611213185 maher na | |
| Feb 1, 2017 | Completed final sign-off Feb 2017 | 199 Fremont St | Siemens Industry, Inc. | 12th flr: fire alarm - revisions are to indicate existing device at 3 locations per the sffd testing inspector ref 201610190650 maher naDetails
12th flr: fire alarm - revisions are to indicate existing device at 3 locations per the sffd testing inspector ref 201610190650 maher na | |
| Jan 23, 2017 | Completed final sign-off Jan 2017 | 199 Fremont St | Siemens Industry, Inc. | 12th flr: fire alarm add 7 smoke detectors, 1 strobe power supply, 36 speaker/strobes and 7 strobes maher na ref 201610190650Details
12th flr: fire alarm add 7 smoke detectors, 1 strobe power supply, 36 speaker/strobes and 7 strobes maher na ref 201610190650 | $28,240 |
| Jan 12, 2017 | Completed final sign-off Mar 2017 | 199 Fremont St | 4 evacuation signs 12th flDetails
4 evacuation signs 12th fl | $1,800 | |
| Dec 23, 2016 | Completed final sign-off Mar 2017 | 199 Fremont St | Siemens Industry, Inc. | 4th & 5th flr: fire alarm add 6 smoke detectors, 41 speaker/strobes and 1 strobe. ref 201611213185 maher naDetails
4th & 5th flr: fire alarm add 6 smoke detectors, 41 speaker/strobes and 1 strobe. ref 201611213185 maher na | $25,080 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 199 Fremont St | Charles Pankow Builders Ltd | spec details for wood cladding on 4th fl interior wall. ref 201611213185. n/a for maher.Details
spec details for wood cladding on 4th fl interior wall. ref 201611213185. n/a for maher. | |
| Dec 14, 2016 | Never finaled issued Jan 2017, no final | 199 Fremont St | Skyline Construction | 14/f: full floor t.i. to include non-bearing partitions, ceiling and finishes. mep under sep permit.Details
14/f: full floor t.i. to include non-bearing partitions, ceiling and finishes. mep under sep permit. | $700,000 |
| Dec 6, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Charles Pankow Builders Ltd | new electrical for work associated with 201611213185 maher not reqDetails
new electrical for work associated with 201611213185 maher not req | |
| Nov 30, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | level 12 - mechanical and electrical work of ti ref 201610190650Details
level 12 - mechanical and electrical work of ti ref 201610190650 | $200,000 |
| Nov 29, 2016 | Never finaled issued Nov 2016, no final | 199 Fremont St | H & M Fire Protection, Inc. | fire sprinkler ti of entire 4th floor & 1 room on 5th floor. ref arch pa 2016-1121-3185Details
fire sprinkler ti of entire 4th floor & 1 room on 5th floor. ref arch pa 2016-1121-3185 | $35,000 |
| Nov 29, 2016 | Completed final sign-off Dec 2016 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 8 upright sprinklers on the 12th floor floor. relocate 119 pendent sprinklers. ref pa 2016-1019-0650. maher naDetails
fire sprinklers; relocate 8 upright sprinklers on the 12th floor floor. relocate 119 pendent sprinklers. ref pa 2016-1019-0650. maher na | $19,050 |
| Nov 21, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Charles Pankow Builders Ltd | demo of suspended ceiling and associated lights on level 4 construction of non-load bearing partitions, gyp board & suspended ceiling and (n) finishes, mech. maher naDetails
demo of suspended ceiling and associated lights on level 4 construction of non-load bearing partitions, gyp board & suspended ceiling and (n) finishes, mech. maher na | $2,364,000 |
| Nov 3, 2016 | Completed final sign-off Jan 2017 | 199 Fremont St | Charles Pankow Builders Ltd | soft demolition for single tenant at 4th floor and select demolition for break room at 5th floor per ab-017. t.i. and mep/fs work to follow on seperate permit. n/a for maher.Details
soft demolition for single tenant at 4th floor and select demolition for break room at 5th floor per ab-017. t.i. and mep/fs work to follow on seperate permit. n/a for maher. | $87,974 |
| Oct 19, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 12/f: ti to consist of non-load bearing partitions, ceilings. mep and fire life safety under separate permitDetails
12/f: ti to consist of non-load bearing partitions, ceilings. mep and fire life safety under separate permit | $75,000 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 199 Fremont St | evacuation plan signs 11th fl. 4 maps.Details
evacuation plan signs 11th fl. 4 maps. | $1,800 | |
| Sep 13, 2016 | Completed final sign-off Oct 2016 | 199 Fremont St | Siemens Industry, Inc. | 11th floor: fire alarm add 10 smoke det, 13 modules, 1 strobe power supply, 38 speaker/strobes, 5 duct detectors and 3 strobes. ref 2016-0527-8619 maher naDetails
11th floor: fire alarm add 10 smoke det, 13 modules, 1 strobe power supply, 38 speaker/strobes, 5 duct detectors and 3 strobes. ref 2016-0527-8619 maher na | $32,950 |
| Aug 31, 2016 | Never finaled issued Oct 2016, no final | 199 Fremont St | Skyline Construction | mechanical and electrical for tenant improvement on the 11th fl ref 201605278619Details
mechanical and electrical for tenant improvement on the 11th fl ref 201605278619 | $275,000 |
| Aug 25, 2016 | Completed final sign-off Aug 2016 | 199 Fremont St | Siemens Industry, Inc. | 16th flr: as built fire alarm fitbit - changes are addition of 1 speaker/strobe and the revisions to detector addresses ref pa 201604074173 maher naDetails
16th flr: as built fire alarm fitbit - changes are addition of 1 speaker/strobe and the revisions to detector addresses ref pa 201604074173 maher na | $510 |
| Aug 11, 2016 | Completed final sign-off Sep 2016 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 26 upright and relocate pendent 144 ct total 170 sprinkler heads; maher ord 155-13 not required.Details
fire sprinkler only. relocate 26 upright and relocate pendent 144 ct total 170 sprinkler heads; maher ord 155-13 not required. | $85,000 |
| Jul 21, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 18th floor - revision to 2016-0407-4176 to show idf room as a non rated room maher naDetails
18th floor - revision to 2016-0407-4176 to show idf room as a non rated room maher na | |
| Jul 21, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 15th floor - revision to pa 2016-0119-7333 to show idf room as a non-rated room. maher naDetails
15th floor - revision to pa 2016-0119-7333 to show idf room as a non-rated room. maher na | |
| Jul 20, 2016 | Completed final sign-off Mar 2017 | 199 Fremont St | 16th & 18th flors: evac maps maher naDetails
16th & 18th flors: evac maps maher na | $2,700 | |
| Jul 6, 2016 | Never finaled issued Jul 2016, no final | 199 Fremont St | street space | ||
| Jun 9, 2016 | Completed final sign-off Aug 2016 | 199 Fremont St | Charles Pankow Builders Ltd | 6/f- revision to pa# 201603152062 electrical changes- mechanical changes. n/a ordinance #155-13Details
6/f- revision to pa# 201603152062 electrical changes- mechanical changes. n/a ordinance #155-13 | $12,000 |
| Jun 1, 2016 | Completed final sign-off Jun 2016 | 199 Fremont St | Siemens Industry, Inc. | revisions on the "fitbit" remodels for floors 15 and 17. the changes are the deletion of 4 duct detectors, the addition of 4 modules, and the relocation of 1 duct detector. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17) maher naDetails
revisions on the "fitbit" remodels for floors 15 and 17. the changes are the deletion of 4 duct detectors, the addition of 4 modules, and the relocation of 1 duct detector. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17) maher na | |
| May 27, 2016 | Never finaled issued Jul 2016, no final | 199 Fremont St | Skyline Construction | full floor office tenant improvement to include non bearing partitons, ceilings and finishes.Details
full floor office tenant improvement to include non bearing partitons, ceilings and finishes. | $700,000 |
| May 25, 2016 | Completed final sign-off Sep 2016 | 199 Fremont St | Siemens Industry, Inc. | 18th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 3 strobes.Details
18th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 3 strobes. | $27,500 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 199 Fremont St | Siemens Industry, Inc. | 16th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 2 strobes.Details
16th floor: fire alarm, add 5 smoke detectors, 1 strobe power supply, 41 speaker/strobes, 2 strobes. | $27,000 |
| May 20, 2016 | Completed final sign-off Mar 2017 | 199 Fremont St | 15th & 17th floors: evacuation plan x3 each floor. maher naDetails
15th & 17th floors: evacuation plan x3 each floor. maher na | $2,850 | |
| May 19, 2016 | Never finaled issued May 2016, no final | 199 Fremont St | Siemens Industry, Inc. | 6th floor fire alarm for the "e-bay": add 5 smoke detectors, 1 strobe power supply, 47 speaker/strobes and 2 strobe maher na ref pa 2016 0315 2062. n/a maher ordinanceDetails
6th floor fire alarm for the "e-bay": add 5 smoke detectors, 1 strobe power supply, 47 speaker/strobes and 2 strobe maher na ref pa 2016 0315 2062. n/a maher ordinance | $30,040 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 199 Fremont St | Golden Gate Fire Protection Inc | fire srpinklers; relocate 22 upright sprinklers on the 16floor. relocate 143 pendent sprinklers. relocate 23 upright sprinklers on the 18th. relocate 144 pendents, and 4 concealed. ti 16th floor - 2016-0407-4173 & 18th floor - 2016-0407-4176. maher na. total for both floors: 336 relo-ed heads.Details
fire srpinklers; relocate 22 upright sprinklers on the 16floor. relocate 143 pendent sprinklers. relocate 23 upright sprinklers on the 18th. relocate 144 pendents, and 4 concealed. ti 16th floor - 2016-0407-4173 & 18th floor - 2016-0407-4176. maher na. total for both floors: 336 relo-ed heads. | $145,425 |
| May 5, 2016 | Never finaled issued May 2016, no final | 199 Fremont St | T C B Builders Inc | grd fl: interior update restroom to current ada code. modify (e) ceiling soffit. remove (e) lighting, replace with new, remove (e) walls, doors, floor penetrations, equip, furniture, casework, flooring, walk off mat & finishes. provide new install new handsink. maher na. life safety deferred.Details
grd fl: interior update restroom to current ada code. modify (e) ceiling soffit. remove (e) lighting, replace with new, remove (e) walls, doors, floor penetrations, equip, furniture, casework, flooring, walk off mat & finishes. provide new install new handsink. maher na. life safety deferred. | $106,105 |
| May 4, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 18th floor: mech/elec work for ti.ref pa 2016 04074 4176 maher naDetails
18th floor: mech/elec work for ti.ref pa 2016 04074 4176 maher na | $300,000 |
| May 2, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | mechanical & electrical for t.i. on the 16/f. t.i. pa# 201604074173. n/a ordinance #155-13Details
mechanical & electrical for t.i. on the 16/f. t.i. pa# 201604074173. n/a ordinance #155-13 | $300,000 |
| Apr 21, 2016 | Completed final sign-off May 2016 | 199 Fremont St | Pribuss Engineering Inc | 1st floor: suite 100: fire sprinklers ti ref pa 2016 0217 9796: relocate 5, add 1Details
1st floor: suite 100: fire sprinklers ti ref pa 2016 0217 9796: relocate 5, add 1 | $3,088 |
| Apr 15, 2016 | Completed final sign-off Jun 2016 | 199 Fremont St | H & M Fire Protection, Inc. | tenant remodel for fire sprinklers on 6/f. t.i., 214 sprinklers pa#201603152062. n/a ordinance #155-13.Details
tenant remodel for fire sprinklers on 6/f. t.i., 214 sprinklers pa#201603152062. n/a ordinance #155-13. | $26,000 |
| Apr 7, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 16th floor tenant improvement, non load bearing partitions, finishes. mep, fire life safety under separate permit. n/a maher ordinanceDetails
16th floor tenant improvement, non load bearing partitions, finishes. mep, fire life safety under separate permit. n/a maher ordinance | $700,000 |
| Apr 7, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 18th floor full floor tenant improvement consisting of non load bearing partitoins. mep, fire life safety under separate permit. n/a maher ordinanceDetails
18th floor full floor tenant improvement consisting of non load bearing partitoins. mep, fire life safety under separate permit. n/a maher ordinance | $700,000 |
| Mar 25, 2016 | Completed final sign-off Apr 2017 | 199 Fremont St | Skyline Construction | demo of (e) non structural partitions, door frames, interior glazing, millwork ab017. maher naDetails
demo of (e) non structural partitions, door frames, interior glazing, millwork ab017. maher na | $15,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 199 Fremont St | Siemens Industry, Inc. | fire alarm work for the "building management: conference room on floor 1; the addition is 1 speaker/strobe. maher naDetails
fire alarm work for the "building management: conference room on floor 1; the addition is 1 speaker/strobe. maher na | $500 |
| Mar 21, 2016 | Completed final sign-off May 2017 | 199 Fremont St | 17th floor: mechanical and electrical work for t.i. ref app#201601197335. n/a for maherDetails
17th floor: mechanical and electrical work for t.i. ref app#201601197335. n/a for maher | $325,000 | |
| Mar 21, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 15th floor: mechanical and electrical work for t.i. ref arch app#201601197333. n/a for maherDetails
15th floor: mechanical and electrical work for t.i. ref arch app#201601197333. n/a for maher | $325,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2018 | 199 Fremont St | Hathaway Dinwiddie Co. | mep ti for 1st floor suite 100. reference 2016 0217 9796 - maher naDetails
mep ti for 1st floor suite 100. reference 2016 0217 9796 - maher na | $40,000 |
| Mar 15, 2016 | Completed final sign-off Jul 2016 | 199 Fremont St | Charles Pankow Builders Ltd | interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13Details
interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13 | $2,160,000 |
| Mar 9, 2016 | Completed final sign-off Jun 2016 | 199 Fremont St | Siemens Industry, Inc. | fire alarm work for the "fitbit" ti remodels on floors 15 and 17; additions are 10 smoke detectors, 14 duct detectors, 2 modules, 2 strobe power supplies, 82 speaker/strobes, and 2 strobes. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17). maher naDetails
fire alarm work for the "fitbit" ti remodels on floors 15 and 17; additions are 10 smoke detectors, 14 duct detectors, 2 modules, 2 strobe power supplies, 82 speaker/strobes, and 2 strobes. ref pa 2016-0119-7333 (floor 15) and 2016-0119-7335 (floor 17). maher na | $61,400 |
| Mar 3, 2016 | Completed final sign-off Apr 2016 | 199 Fremont St | Golden Gate Fire Protection Inc | 15th & 17th floor fire sprinklers - relcoate 26 upright sprinklers on 15th floor. relocate 114 pendent sprinklers, relocate 24 upright sprinklers, relocate 113 pendent on 17th floor. t.i. ref #2016010197335 (15th floor) & #201601197333 ( 17th floor). n/a maher ordinanceDetails
15th & 17th floor fire sprinklers - relcoate 26 upright sprinklers on 15th floor. relocate 114 pendent sprinklers, relocate 24 upright sprinklers, relocate 113 pendent on 17th floor. t.i. ref #2016010197335 (15th floor) & #201601197333 ( 17th floor). n/a maher ordinance | $142,655 |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 199 Fremont St | Charles Pankow Builders Ltd | soft demo on 6th fl. ti and mepfs work to follow on sep permit per ab-017 demo of light fixtures and lowered ceiling is under separate appl. n/a ordinance #155-13Details
soft demo on 6th fl. ti and mepfs work to follow on sep permit per ab-017 demo of light fixtures and lowered ceiling is under separate appl. n/a ordinance #155-13 | $100,000 |
| Feb 26, 2016 | Completed final sign-off Nov 2016 | 199 Fremont St | Peacock Construction | 10th floor; partital floor ti for single tenant. maher naDetails
10th floor; partital floor ti for single tenant. maher na | $21,600 |
| Feb 17, 2016 | Completed final sign-off Jun 2018 | 199 Fremont St | Hathaway Dinwiddie Co. | 1st floor: minor demo of select partitions construction - 1 conference room and 1 office with associated new power, new lighting and finishes throughout, ceiling frid and tile to remain. mep/fire/life saftey under sep permitDetails
1st floor: minor demo of select partitions construction - 1 conference room and 1 office with associated new power, new lighting and finishes throughout, ceiling frid and tile to remain. mep/fire/life saftey under sep permit | $160,000 |
| Jan 28, 2016 | Completed final sign-off Apr 2017 | 199 Fremont St | Skyline Construction | 16th and 18th flrs: interior non-structural demolition of partitions, doors, frames & interior glazing partitions finishes, millwork ab-047; maher n/aDetails
16th and 18th flrs: interior non-structural demolition of partitions, doors, frames & interior glazing partitions finishes, millwork ab-047; maher n/a | $43,000 |
| Jan 19, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 17th floor:full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.Details
17th floor:full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred. | $700,000 |
| Jan 19, 2016 | Completed final sign-off May 2017 | 199 Fremont St | Skyline Construction | 15th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.Details
15th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred. | $700,000 |
| Dec 15, 2015 | Never finaled issued Dec 2015, no final | 199 Fremont St | Siemens Industry, Inc. | #1423- remove the preaction cabinet from the closet & connect the wet supply to new office. n/a ordinance #155-13Details
#1423- remove the preaction cabinet from the closet & connect the wet supply to new office. n/a ordinance #155-13 | $3,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2017 | 199 Fremont St | 8th and 9th floor evacuation plans. n/a for maherDetails
8th and 9th floor evacuation plans. n/a for maher | $3,800 | |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 199 Fremont St | Siemens Industry, Inc. | fire alarm work for the floor 8 and 9 "fitbit" ti remodels; additions are 2 duct detectors, 17 speakers, 10 strobes, as well as the relocation of 1 speaker and 8 strobes. ref pa 2015-0921-7506 (9th floor) and 2015-0921-7505 (floor 8) n/a for maher.Details
fire alarm work for the floor 8 and 9 "fitbit" ti remodels; additions are 2 duct detectors, 17 speakers, 10 strobes, as well as the relocation of 1 speaker and 8 strobes. ref pa 2015-0921-7506 (9th floor) and 2015-0921-7505 (floor 8) n/a for maher. | $11,500 |
| Nov 12, 2015 | Expired or cancelled cancelled Jul 2016 | 199 Fremont St | Northwest Signs | install one single faced led illuminated electric wall sign. n/a ordinance #155-13Details
install one single faced led illuminated electric wall sign. n/a ordinance #155-13 | $8,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2015 | 199 Fremont St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 38 uprigh sprinklers on the 8th floor. relocate 30 pendent sprinklers. relocate 38 uprigh sprinklers on the 9th floor. relocate 60 pendents. ti 2015-0921-7505 (8th floor), 2015-0921-7506 (9th floor)Details
fire sprinkler; relocate 38 uprigh sprinklers on the 8th floor. relocate 30 pendent sprinklers. relocate 38 uprigh sprinklers on the 9th floor. relocate 60 pendents. ti 2015-0921-7505 (8th floor), 2015-0921-7506 (9th floor) | $84,460 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 199 Fremont St | Hathaway Dinwiddie Co. | title 24 for 201503090297- adding exit signage and emergency lighting. ste 100Details
title 24 for 201503090297- adding exit signage and emergency lighting. ste 100 | $48,000 |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 199 Fremont St | Skyline Construction | 9th floor: mep for ti - ref pa 2015 0921 7506. n/a maher ord. # 155-13Details
9th floor: mep for ti - ref pa 2015 0921 7506. n/a maher ord. # 155-13 | $30,000 |
| Oct 7, 2015 | Completed final sign-off Apr 2017 | 199 Fremont St | Skyline Construction | 8th floor: mep for ti - ref pa 2015 0921 7505. maher naDetails
8th floor: mep for ti - ref pa 2015 0921 7505. maher na | $30,000 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 199 Fremont St | Skyline Construction | 9th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher naDetails
9th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher na | $700,000 |
| Sep 21, 2015 | Completed final sign-off Apr 2017 | 199 Fremont St | Skyline Construction | 8th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher naDetails
8th flr: full for ti - non bearing partitions, ceiling and finishes. mep, life safety under sep permit. maher na | $700,000 |
| Aug 21, 2015 | Completed final sign-off Oct 2015 | 199 Fremont St | Ayoob & Peery Plumbing Co Inc | 19/f: remove (e) pre-action pipe and heads from new supply/copy room, plug main at server room total fire sprinklers add (4) supply with wet pipe connect ref pa 2015-0415-3644. to 2'2 main at corridorDetails
19/f: remove (e) pre-action pipe and heads from new supply/copy room, plug main at server room total fire sprinklers add (4) supply with wet pipe connect ref pa 2015-0415-3644. to 2'2 main at corridor | $1,028 |
| Jul 14, 2015 | Completed final sign-off Jan 2017 | 199 Fremont St | Novo Construction Inc | 19th floor - mechanical & electrical work for tenant improvement. ref pa #2015.0415.3644. n/a maher ordinanceDetails
19th floor - mechanical & electrical work for tenant improvement. ref pa #2015.0415.3644. n/a maher ordinance | $3,500 |
| Jun 4, 2015 | Expired or cancelled cancelled Oct 2016 | 199 Fremont St | Siemens Industry, Inc. | fire alarm work for the floor 19 copy roomo ti remodel, addition of 1 speaker/strobe and relocation of smoke detector. ref pa #2015.0415.3644.Details
fire alarm work for the floor 19 copy roomo ti remodel, addition of 1 speaker/strobe and relocation of smoke detector. ref pa #2015.0415.3644. | $800 |
| Apr 21, 2015 | Completed final sign-off May 2015 | 199 Fremont St | Pribuss Engineering Inc | basement 1 and basement 2: fire sprinkler t.i. under g. c. permit #201503090297. total relocated 18 heades. n/a for the maher.Details
basement 1 and basement 2: fire sprinkler t.i. under g. c. permit #201503090297. total relocated 18 heades. n/a for the maher. | $9,264 |
| Apr 15, 2015 | Completed final sign-off Jan 2017 | 199 Fremont St | Novo Construction Inc | modification include new partition at server room to reduce the size of existing server room. total estimated improvement area = 592 sq.ft., mech., elec., sprinkler & fire alarm under seperate permit. n/a ordinance #155-13 room is one hour rated with existing rated door.Details
modification include new partition at server room to reduce the size of existing server room. total estimated improvement area = 592 sq.ft., mech., elec., sprinkler & fire alarm under seperate permit. n/a ordinance #155-13 room is one hour rated with existing rated door. | $28,284 |
| Apr 2, 2015 | Completed final sign-off Jun 2015 | 199 Fremont St | Siemens Industry, Inc. | fire alarm work to add 1 speaker/strobe in the vestibule ara at the fitness center on basement level 2Details
fire alarm work to add 1 speaker/strobe in the vestibule ara at the fitness center on basement level 2 | $500 |
| Mar 9, 2015 | Completed final sign-off Dec 2015 | 199 Fremont St | Hathaway Dinwiddie Co. | barrier removal, plumbing and finish upgrades, replace existing ceiling grid and tile. all work on 1st and 2nd basement flrs. mep,ls and sprinkler system modifcation under sep permitDetails
barrier removal, plumbing and finish upgrades, replace existing ceiling grid and tile. all work on 1st and 2nd basement flrs. mep,ls and sprinkler system modifcation under sep permit | $48,000 |
| Feb 13, 2015 | Never finaled issued Feb 2015, no final | 199 Fremont St | Ad Art Inc. | remove existing sign "stub hub" per planning n.o.v. permit no. 2014 0725 2142. n/a ordinance #155-13Details
remove existing sign "stub hub" per planning n.o.v. permit no. 2014 0725 2142. n/a ordinance #155-13 | $2,000 |
| Jul 25, 2014 | Never finaled issued Aug 2014, no final | 199 Fremont St | Ad Art Inc. | 1 illuminate electric single faced wall sign. n/a ordinance #155-13.Details
1 illuminate electric single faced wall sign. n/a ordinance #155-13. | $10,000 |
| Sep 11, 2013 | Completed final sign-off May 2018 | 199 Fremont St | temporary support for excavation for 181 fremont st adjacant property. site permit for 181 fremont st pa#2013-05-01-5894s. under maher ordiance and is excavate more than 50 cubic yard of soil.Details
temporary support for excavation for 181 fremont st adjacant property. site permit for 181 fremont st pa#2013-05-01-5894s. under maher ordiance and is excavate more than 50 cubic yard of soil. | $700,000 | |
| May 29, 2013 | Completed final sign-off Oct 2013 | 199 Fremont St | Ayoob & Peery Plumbing Co Inc | 10th floor:add, relocate and remove fire sprinkler heads per t.i. add 12 and relocate 77, remove 13. ref app#201304053834Details
10th floor:add, relocate and remove fire sprinkler heads per t.i. add 12 and relocate 77, remove 13. ref app#201304053834 | $45,700 |
| May 23, 2013 | Completed final sign-off Oct 2013 | 199 Fremont St | Siemens Industry, Inc. | 10th floor - addition of 1 smoke detector, 2 modules, 1 strobe power supply, 6 speakers, 30 speaker/strobes & 6 strobes for the "ebay". all devices connect onto fire alarm system. ref pa #2013.04.05.3834Details
10th floor - addition of 1 smoke detector, 2 modules, 1 strobe power supply, 6 speakers, 30 speaker/strobes & 6 strobes for the "ebay". all devices connect onto fire alarm system. ref pa #2013.04.05.3834 | $22,500 |
| Apr 5, 2013 | Completed final sign-off Oct 2013 | 199 Fremont St | Swinerton Builders | 10th floor: t.i. construction will include soft demolition, offices and conference rooms meps will be design buildDetails
10th floor: t.i. construction will include soft demolition, offices and conference rooms meps will be design build | $980,000 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 199 Fremont St | Novo Construction Inc | 23rd floor-tenant improvement of existing office space on 23rd fl. 1997 sq ft. new partitions and bathroom hardware upgrades. no structural. fa/sprinkler under seperate permit.Details
23rd floor-tenant improvement of existing office space on 23rd fl. 1997 sq ft. new partitions and bathroom hardware upgrades. no structural. fa/sprinkler under seperate permit. | $56,900 |
| Oct 17, 2012 | Completed final sign-off Nov 2012 | 199 Fremont St | Siemens Industry, Inc. | fire alarm ti- addition of 8 speakers, 1 speaker/strobe, and 2 strobes for the "folger levin" remodel on foor 20. all new devices connect onto the life safety system. t.i. pa#201210010975Details
fire alarm ti- addition of 8 speakers, 1 speaker/strobe, and 2 strobes for the "folger levin" remodel on foor 20. all new devices connect onto the life safety system. t.i. pa#201210010975 | $5,200 |
| Oct 1, 2012 | Completed final sign-off Jan 2013 | 199 Fremont St | Dpr Construction | minor t.i. on 20th floor. work includes (n) partitions, millwork fixtures finishes mechanical. no lighting changes. vestible of stair was reduced in area. fire protection under separate permit.Details
minor t.i. on 20th floor. work includes (n) partitions, millwork fixtures finishes mechanical. no lighting changes. vestible of stair was reduced in area. fire protection under separate permit. | $250,000 |
| Sep 27, 2012 | Completed final sign-off Oct 2012 | 199 Fremont St | Anderson, Rowe & Buckley, Inc. | 20th floor-(e) fire alarm sprinkler system tenant improvements-4 relocated sprinklers & 1 added sprinklers. no ti on fileDetails
20th floor-(e) fire alarm sprinkler system tenant improvements-4 relocated sprinklers & 1 added sprinklers. no ti on file | $2,500 |
| Apr 13, 2012 | Completed final sign-off May 2012 | 199 Fremont St | Siemens Industry, Inc. | floor 2 - addition of 1 monitor module, 34 speakers, 28 strobes for the "ebay stub hub" remodel, all devices connect onto the life safety system.Details
floor 2 - addition of 1 monitor module, 34 speakers, 28 strobes for the "ebay stub hub" remodel, all devices connect onto the life safety system. | $25,000 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 199 Fremont St | Ayoob & Peery Plumbing Co Inc | 2nd floor: add relocate and remove fire sprinkler heads per tenant improvement. 3 add, 33 relocate, 9 remove.Details
2nd floor: add relocate and remove fire sprinkler heads per tenant improvement. 3 add, 33 relocate, 9 remove. | $18,504 |
| Feb 15, 2012 | Completed final sign-off Mar 2012 | 199 Fremont St | Siemens Industry, Inc. | addition of one relay module for release of new door holders in the basement. the door holders are provided by others.Details
addition of one relay module for release of new door holders in the basement. the door holders are provided by others. | $800 |
| Jan 31, 2012 | Completed final sign-off Nov 2012 | 199 Fremont St | Novo Construction Inc | 2nd floor:tenant improvement on 2nd fl. new non bearing partitions and doors for new conference rooms, new millwork in breakroom. mep sep permitDetails
2nd floor:tenant improvement on 2nd fl. new non bearing partitions and doors for new conference rooms, new millwork in breakroom. mep sep permit | $850,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (32), Skyline Construction (32), Novo Construction Inc (17), Golden Gate Fire Protection Inc (12), Charles Pankow Builders Ltd (10), Gci, Inc (10), Ad Art Inc. (4), Hathaway Dinwiddie Co. (4), Ayoob & Peery Plumbing Co Inc (3), Pioneer Fire Inc. (3), B N Builders Inc (2), H & M Fire Protection, Inc. (2), Pribuss Engineering Inc (2), Anderson, Rowe & Buckley, Inc., Dpr Construction, Level 10 Construction Lp, Northwest Signs, Peacock Construction, Sun Graphics, Swinerton Builders, T C B Builders Inc, Tim Rhones Installation Department
- Architects
- Marc Penninger (15), Kevin Schaeffer (6), Adam Murphy (5), Matt Cottrill (5), Scott E Clement (5), Ha-Pui Iris Chan (4), Martha L. Breed (4), Marc Pfenninger (3), Anne Torney (2), Christine Laing (2), Elizabeth Allen, Goldberg David William, Jeffrey D. Heller, Jonathan Tsao, Joseph Mastro Valerio
- Engineers
- Amit Wadhwa (6), Levi G. Abarte (6), Paul Littler (4), Jevin Almazan (2), Caroline Fenlon-Harding, E.S. Lindquist, Edward Rivera, Elisabeth Allen, Imad Kashiif, Jason Lau, Jeff Brink, Jillian P. Moritz, Joshua Mcmahan, Joshua Mcmmahan, Kevin Carter, Laurie K. Johnston, Lindsay M Marion, Marc Penninger, Mary Katherine Vasquez, Sargon Ishaya, M.S., Theodore Garcia, Todd M. See, Vahe Kouyoumdjian, Zack Kardon
- Authorized agents
- Paul Littler (2), Sarah Dailey
- Designers
- Siemens Industry, Inc., Sun Graphics, Terrence Olson