Permit GraphShortlistSan Francisco building permits since 2000

Marc Pfenninger

License
C278800
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C278800 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Studios
Based in
San Francisco
On San Francisco permits
Oct 2006 to Oct 2026

41 permits since 2000 (architect on 40 permits, engineer on 1 permit): 30 completed, 6 in progress, 3 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dpr Construction Inc (11), Dpr Construction (10), Bcci Construction Company (4), Novo Construction Inc (4), Sc Builders, Inc (2), Skyline Construction (2), Peacock Construction, Source Planning And Construction Inc, The Whiting-Turner Contracting Company, Truebeck Construction
Engineers
Paul Littler (3), Joshua Mcmahan (2), Amit Wadhwa, Glenn Friedman, Josh Mcmahan, Justin Martinkovic, Levi Abarte, Mark Koenigs, Sebastian Asvaraksh, Shawn Vessels, Steven Curry, Valeria Balderramos, Wayne Gaw

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 21, 2026In progress
filed Oct 2026, not yet issued
345 Spear StSource Planning And Construction Inc1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg
Details
Permit
202610219700

1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg

Open the permit page

$292,338
Oct 9, 2026In progress
filed Oct 2026, not yet issued
300 Howard St14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538
Details
Permit
202610099281

14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538

Open the permit page

$531,770
Sep 17, 2026In progress
issued Oct 2026
300 Howard StNovo Construction Inc3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.
Details
Permit
202609178288
Permit issued
Oct 19, 2026

3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.

Open the permit page

$15,451,442
Sep 1, 2026In progress
issued Oct 2026
300 Howard StNovo Construction Inc5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes
Details
Permit
202609017533
Permit issued
Oct 8, 2026

5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes

Open the permit page

$15,451,442
Dec 16, 2025In progress
filed Dec 2025, not yet issued
1089 03rd Stproj-25-625; mou port. ti on 5th, 6th, 7th & 8th floor in (e) 8 story office building. imporvements to include arch, mep, structural, full prep kitchen & satellite food service stations work to accomodate new tenant build out. includes change of occupancy from b to a-2 on lvl 5 & b to a-3 on lvl.7
Details
Permit
202511079166

proj-25-625; mou port. ti on 5th, 6th, 7th & 8th floor in (e) 8 story office building. imporvements to include arch, mep, structural, full prep kitchen & satellite food service stations work to accomodate new tenant build out. includes change of occupancy from b to a-2 on lvl 5 & b to a-3 on lvl.7

Open the permit page

$32,500,000
Oct 15, 2025Completed
final sign-off Feb 2026
505 Howard StNovo Construction Incdocumenting the 2 way commander system location in the elevator lobby on the 3rd floor .
Details
Permit
202510157465
Permit issued
Oct 28, 2025
Final sign-off
Feb 26, 2026

documenting the 2 way commander system location in the elevator lobby on the 3rd floor .

Open the permit page

$125,000
Oct 15, 2025Completed
final sign-off Sep 2026
505 Howard StNovo Construction Incinstallation of phone booths throughout the 2nd, 3rd, and 4th floor.
Details
Permit
202510157462
Permit issued
Nov 4, 2025
Final sign-off
Sep 23, 2026

installation of phone booths throughout the 2nd, 3rd, and 4th floor.

Open the permit page

$660,000
Sep 12, 2024Completed
final sign-off Mar 2025
1 Harrison StTruebeck Constructiondemo of interior partitions, ceilings, finishes on all floors. structural and architectural upgrades under sep permit
Details
Permit
202409120580
Permit issued
Sep 18, 2024
Final sign-off
Mar 6, 2025

demo of interior partitions, ceilings, finishes on all floors. structural and architectural upgrades under sep permit

Open the permit page

$609,000
Aug 29, 2024In progress
issued Sep 2024
444 De Haro StSkyline Constructionrevision to pa#: 202405071536 with revised attachment details for booths on the 2nd flr as they can not be braced to the concrete floor because of radiant coils
Details
Permit
202408299768
Permit issued
Sep 11, 2024

revision to pa#: 202405071536 with revised attachment details for booths on the 2nd flr as they can not be braced to the concrete floor because of radiant coils

Open the permit page

Jan 31, 2018Completed
final sign-off Nov 2018
345 Spear StBcci Construction Company1st floor - add 1 fire rated door in passageway
Details
Permit
201801310078
Permit issued
Mar 20, 2018
Final sign-off
Nov 5, 2018

1st floor - add 1 fire rated door in passageway

Open the permit page

$5,000
Dec 19, 2016Completed
final sign-off May 2017
188 The EmbarcaderoDpr Construction#420 - interior alterations including walls, coilings, flooring and casework. mechanical, electrical and plumbing work to support new interior space, demo and safe off per the demo drawings. ref. sprinkler permit app#2016-1202-4076. n/a ordinance #155-13
Details
Permit
201612195265
Permit issued
Dec 22, 2016
Final sign-off
May 3, 2017

#420 - interior alterations including walls, coilings, flooring and casework. mechanical, electrical and plumbing work to support new interior space, demo and safe off per the demo drawings. ref. sprinkler permit app#2016-1202-4076. n/a ordinance #155-13

Open the permit page

$1,200,000
Oct 19, 2016Completed
final sign-off Jan 2018
2 Embarcadero CenterPeacock Construction21st floor:demo selected non-structural partitions, ceilings, doors, new non-structural partitions, millwork, ada shower, ceiling, doors, frames and finishes. mep, fire life safty sprinkler under seperate permit. n/a for maher
Details
Permit
201610190673
Permit issued
Nov 1, 2016
Final sign-off
Jan 9, 2018

21st floor:demo selected non-structural partitions, ceilings, doors, new non-structural partitions, millwork, ada shower, ceiling, doors, frames and finishes. mep, fire life safty sprinkler under seperate permit. n/a for maher

Open the permit page

$715,000
Aug 9, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher na
Details
Permit
201608094569
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher na

Open the permit page

Aug 9, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher na
Details
Permit
201608094567
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher na
Details
Permit
201608054319
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher na
Details
Permit
201608054315
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher na
Details
Permit
201608054318
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher na
Details
Permit
201608054312
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher na
Details
Permit
201608054320
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher na

Open the permit page

Aug 5, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Increvision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher na
Details
Permit
201608054317
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher na

Open the permit page

Aug 3, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Inc8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13
Details
Permit
201608034069
Permit issued
Aug 17, 2016
Final sign-off
Sep 2, 2016

8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13

Open the permit page

Aug 3, 2016Never finaled
issued Aug 2016, no final
188 The EmbarcaderoDpr Construction Inc6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13
Details
Permit
201608034068
Permit issued
Aug 17, 2016

6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13

Open the permit page

Aug 3, 2016Completed
final sign-off Sep 2016
188 The EmbarcaderoDpr Construction Inc4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13
Details
Permit
201608034066
Permit issued
Aug 17, 2016
Final sign-off
Sep 6, 2016

4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13

Open the permit page

Mar 21, 2016Completed
final sign-off Jun 2017
345 Spear StBcci Construction Companyminor demolition of 9 existing offices to create more open office space and restroom upgrades
Details
Permit
201603212643
Permit issued
Mar 21, 2016
Final sign-off
Jun 2, 2017

minor demolition of 9 existing offices to create more open office space and restroom upgrades

Open the permit page

$205,700
Sep 11, 2015Never finaled
issued Sep 2015, no final
188 The EmbarcaderoDpr Construction2nd floor: ti - addition of conference rooms and open office seating. mep & electrical included. maher na
Details
Permit
201509116686
Permit issued
Sep 29, 2015

2nd floor: ti - addition of conference rooms and open office seating. mep & electrical included. maher na

Open the permit page

$2,500,000
Sep 3, 2015Completed
final sign-off Jan 2016
22 04th StSc Builders, Incminor demo, t.i. construction, upgrade/replace extg card reader, new ada pantry millwork on 4th and 5th floor. n/a for maher.
Details
Permit
201509036112
Permit issued
Sep 30, 2015
Final sign-off
Jan 26, 2016

minor demo, t.i. construction, upgrade/replace extg card reader, new ada pantry millwork on 4th and 5th floor. n/a for maher.

Open the permit page

$40,000
Jul 28, 2015Completed
final sign-off Feb 2016
188 The EmbarcaderoDpr Constructionrevision to pa#201506048095 re-arranging some conference room walls. n/a ordinance #155-13.
Details
Permit
201507282729
Permit issued
Aug 18, 2015
Final sign-off
Feb 9, 2016

revision to pa#201506048095 re-arranging some conference room walls. n/a ordinance #155-13.

Open the permit page

Jun 29, 2015Expired or cancelled
cancelled Jan 2026
188 The EmbarcaderoDpr Construction5th floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. ref pa# #201504204092. n/a for maher.
Details
Permit
201506290261

5th floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. ref pa# #201504204092. n/a for maher.

Open the permit page

Jun 29, 2015Expired or cancelled
cancelled Jan 2026
188 The EmbarcaderoDpr Construction3rd floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. revision to pa #201504204091. n/a for maher.
Details
Permit
201506290259

3rd floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. revision to pa #201504204091. n/a for maher.

Open the permit page

May 11, 2015Completed
final sign-off Nov 2016
22 04th StSc Builders, Incfloors 8,9,11 & 13: replace extg and add new card reader devices at stairwells elevator doors and misc, and closets those floors. also replace new lobby doors at floor 8,9 & 13. minor partition demo on floor 8. n/a for maher.
Details
Permit
201505115911
Permit issued
Oct 26, 2015
Final sign-off
Nov 17, 2016

floors 8,9,11 & 13: replace extg and add new card reader devices at stairwells elevator doors and misc, and closets those floors. also replace new lobby doors at floor 8,9 & 13. minor partition demo on floor 8. n/a for maher.

Open the permit page

$20,000
Apr 22, 2015Completed
final sign-off Aug 2015
22 04th StDpr Construction6th floor: t.i. to upgrade office space. work includes refurbishing open office, private offices, breakfast, and training room. n/a for the maher.
Details
Permit
201504224272
Permit issued
Jun 2, 2015
Final sign-off
Aug 3, 2015

6th floor: t.i. to upgrade office space. work includes refurbishing open office, private offices, breakfast, and training room. n/a for the maher.

Open the permit page

$200,000
Mar 16, 2015Completed
final sign-off Jan 2016
505 Howard StSkyline Construction8th floor: electrical work for t.i. ref app#201502047414. n/a for the maher.
Details
Permit
201503160958
Permit issued
Mar 17, 2015
Final sign-off
Jan 29, 2016

8th floor: electrical work for t.i. ref app#201502047414. n/a for the maher.

Open the permit page

$30,000
Feb 11, 2015Completed
final sign-off Oct 2015
22 04th StDpr Constructiont.i. to upgrade office space on 3/f. work includes breakroom, restroom expansion, refurbishing, open and private offices, scope of work also includes training room. no increase in square footage, no change in use. n/a ordinance #155-13
Details
Permit
201502118061
Permit issued
Feb 24, 2015
Final sign-off
Oct 5, 2015

t.i. to upgrade office space on 3/f. work includes breakroom, restroom expansion, refurbishing, open and private offices, scope of work also includes training room. no increase in square footage, no change in use. n/a ordinance #155-13

Open the permit page

$822,000
Feb 11, 2015Never finaled
issued Feb 2015, no final
22 04th StDpr Constructionsoft demolition of 3/f & 10/f, ab-17 compliant. n/a ordinance #155-13
Details
Permit
201502118058
Permit issued
Feb 24, 2015

soft demolition of 3/f & 10/f, ab-17 compliant. n/a ordinance #155-13

Open the permit page

$80,000
Feb 11, 2015Completed
final sign-off Jul 2015
22 04th StDpr Constructiont.i. to upgrade office space on 10/f. work includes breakroom, restroom expansion, refurbishing, open and private offices. no increase in square footage, no change in use. n/a ordinance #155-13
Details
Permit
201502118063
Permit issued
Feb 24, 2015
Final sign-off
Jul 1, 2015

t.i. to upgrade office space on 10/f. work includes breakroom, restroom expansion, refurbishing, open and private offices. no increase in square footage, no change in use. n/a ordinance #155-13

Open the permit page

$822,000
Feb 3, 2015Completed
final sign-off Oct 2016
188 The EmbarcaderoDpr Constructionnew interior build out of idf room on 3rd fl. minor mech and elec work. 1 floor drain. somoe work on 2nd fl to support 3rd fl room. no changes to e fire alarm or smoke systems
Details
Permit
201502037319
Permit issued
Feb 10, 2015
Final sign-off
Oct 13, 2016

new interior build out of idf room on 3rd fl. minor mech and elec work. 1 floor drain. somoe work on 2nd fl to support 3rd fl room. no changes to e fire alarm or smoke systems

Open the permit page

$110,000
Aug 18, 2014Completed
final sign-off Jun 2016
345 Spear StBcci Construction Companyt.i. on 3/f including new offices, conference rooms & restrooms. mechanical, electrical, fire alarm system & fire sprinkler system under seperate permit. n/a ordinance #155-13.
Details
Permit
201408184059
Permit issued
Aug 22, 2014
Final sign-off
Jun 6, 2016

t.i. on 3/f including new offices, conference rooms & restrooms. mechanical, electrical, fire alarm system & fire sprinkler system under seperate permit. n/a ordinance #155-13.

Open the permit page

$3,805,000
Aug 14, 2014Completed
final sign-off Sep 2014
345 Spear StBcci Construction Company1st floor tenant improvement including new non-load bearing partitions & finiahes. associated life safety under spearate permit. n/a maher ordinance
Details
Permit
201408143836
Permit issued
Aug 14, 2014
Final sign-off
Sep 17, 2014

1st floor tenant improvement including new non-load bearing partitions & finiahes. associated life safety under spearate permit. n/a maher ordinance

Open the permit page

$145,000
Aug 8, 2013Completed
final sign-off Feb 2016
1600 Owens StThe Whiting-Turner Contracting Companyaltered site permit. change of occupancy from what was approved, change from l occupancy to b office occupancy. admin bulletin no# ab-032 for refrence. original site permit approved under pa# 2007/11/09/7802s. reduce stories from 10 stories to 9 stories.
Details
Permit
201308083838
Permit issued
Dec 2, 2013
Final sign-off
Feb 4, 2016

altered site permit. change of occupancy from what was approved, change from l occupancy to b office occupancy. admin bulletin no# ab-032 for refrence. original site permit approved under pa# 2007/11/09/7802s. reduce stories from 10 stories to 9 stories.

Open the permit page

$1,000,000
Oct 10, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-2 on 5th floor, new m.e.p.
Details
Permit
200610104514
Permit issued
Oct 17, 2006
Final sign-off
Oct 10, 2007

oti-2 on 5th floor, new m.e.p.

Open the permit page

$13,500
Oct 10, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-1 of partial 5th floor (1670 sq.ft.), new partitions for divided office space. first time tenant built out office space.
Details
Permit
200610104512
Permit issued
Oct 20, 2006
Final sign-off
Oct 10, 2007

oti-1 of partial 5th floor (1670 sq.ft.), new partitions for divided office space. first time tenant built out office space.

Open the permit page

$25,000